CN205557567U - Prestressing force divides to divide with serial compartment uses formula underground pipe gallery - Google Patents

Prestressing force divides to divide with serial compartment uses formula underground pipe gallery Download PDF

Info

Publication number
CN205557567U
CN205557567U CN201620182787.2U CN201620182787U CN205557567U CN 205557567 U CN205557567 U CN 205557567U CN 201620182787 U CN201620182787 U CN 201620182787U CN 205557567 U CN205557567 U CN 205557567U
Authority
CN
China
Prior art keywords
prestressing force
piping lane
storehouse
pipe
lane body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620182787.2U
Other languages
Chinese (zh)
Inventor
张楸长
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620182787.2U priority Critical patent/CN205557567U/en
Application granted granted Critical
Publication of CN205557567U publication Critical patent/CN205557567U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The utility model discloses a prestressing force divides to divide with serial compartment uses formula underground pipe gallery, including the body of stress tube corridor in advance and outer skeleton and inner skeleton, be provided with horizontal bobbin and vertical bobbin between the two -layer skeleton, wherein horizontal bobbin setting be provided with steel strand wires in the horizontal bobbin in the roof of the stress tube corridor body in advance and bottom plate, the anchor is in the both sides of the stress tube corridor body in advance after stretch -draw produces prestressing force, the internal hole in stress tube corridor is provided with two piece at least compartment backup pads in advance, with the at least three piping lane storehouse of piping lane hole separated one -tenth. The utility model discloses utilizing new construction and new technology, new technology to reduce engineering cost, having increased the utility function, having solved underground pipe gallery, worth and especially big technological problem its usefulness not to the utmost plays positive promoting effect to underground pipe gallery's promotion conference.

Description

Prestressing force divides and adds series compartment demultiplexing formula underground pipe gallery
Technical field
This utility model relates to a kind of prestressing force and divides and add series compartment demultiplexing formula underground pipe gallery.
Background technology
The urban construction upsurge of China is formed under specific economic setting, wide street, high building are found everywhere, domain, city is increasing, nonstandard residential quarter is to outer visible, communal facility irrational distribution, garden-like cities that can be the most up to standard are fewer and feweri, and urban waterlogging, the problems such as have inconvenient traffic highlight day by day.Produce and the infrastructure such as life, in terms of maintenance and increase-volume, all suffer from the biggest difficulty, especially " shunting of removing contamination " also be difficult to implementation.In order to solve practical problems, the Novel underground piping lane of construction of modern, it has also become uniquely select.
The underground pipe gallery that indivedual cities were built in recent years is all traditional handicraft, the technology used, and have has put into operation, and have becomes uncompleted project.Find to there is " bad phenomenon " such as " investment are big, and function is poor, standard is low " through on-site inspection, carry out " structure innovation " for this and reduce engineering cost, carry out " function innovation " and improve earnings ratio, it has also become the new problem of people's research.
Under the influence of new economic situation, traditional municipal works also should be carried out " transition and upgrade ", also should promote " popular foundation, millions of people innovation ", should become the main body of " Industry Innovation " for this Urban Underground piping lane." structure innovation " and function innovation is carried out according to country's a series of " principles and policies " " and " system innovation ", it is that to be necessary especially is also the most in good time.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of prestressing force and divides and add series compartment demultiplexing formula underground pipe gallery, in the cover plate and base plate of prestressing force piping lane body, it is provided with prestressing force divides feeder apparatus, belong to " structure innovation ", can increase the compressive resistance of upper cover plate and the anti-subgrade reaction of lower shoe, solving square structure body can not " technical barrier " of Prestressing.Water-swellable adhesive tape is set in the construction joint of prestressing force piping lane body, solves " technical barrier " of construction joint infiltration thoroughly.Discharge casing is set in the base plate bottom of prestressing force piping lane body, solves " technical barrier " how discharged after piping lane hole endogenous cause of ill repairs generation hydrops.Utilizing new construction and new technology, new technique to reduce construction costs, add utilitarian function, " technical barrier, positive facilitation is played in the promotion conference to underground pipe gallery to solve underground pipe gallery " worth and not to the utmost its with " especially big.
Specifically, the technical solution adopted in the utility model is as follows:
nullA kind of prestressing force divides and adds series compartment demultiplexing formula underground pipe gallery,The outer layer skeleton including prestressing force piping lane body and set within it and nexine skeleton,Horizontal bobbin and longitudinal bobbin it is provided with in the inner side of outer layer skeleton,Laterally bobbin is separately positioned in top board and the base plate of prestressing force piping lane body,The steel strand wires being anchored at prestressing force piping lane body both sides through stretch-draw generation prestressing force anchorage it are provided with in horizontal bobbin,The steel strand wires being anchored at prestressing force piping lane body two ends through stretch-draw generation prestressing force anchorage it are provided with in longitudinal bobbin,In prestressing force piping lane body, hole is provided with at least two pieces of compartment gripper shoes,Storehouse in piping lane is formed between middle two pieces of adjacent compartment gripper shoes,The discharge casing communicated therewith is set in the bottom of prestressing force piping lane body,The end of prestressing force piping lane body is provided with connecting box,The middle part of described prestressing force piping lane body is provided with construction joint,Water-swellable adhesive tape it is provided with in construction joint.
Described outer layer skeleton is indulged muscle by outer layer horizontal bar and outer layer and is constituted, nexine skeleton is indulged muscle by nexine horizontal bar and nexine and is constituted, indulge muscle at outer layer horizontal bar and outer layer to carry out the both sides of infall and be provided with U-shaped positioning bar, laterally bobbin is arranged in the U-shaped mouth of U-shaped positioning bar, and the steel strand wires in horizontal bobbin produce prestressing force anchorage through stretch-draw and anchor in prestressing force piping lane body both sides.
In prestressing force piping lane body, hole is provided with two pieces of compartment gripper shoes, and piping lane hole is separated into storehouse and storehouse, the right in storehouse, the left side, piping lane by the most successively, and three's inner bottom part is respectively arranged with rhone, and the bottom of prestressing force piping lane body is provided with bed course.
In described piping lane, the row's of being provided with rain pipe in storehouse, running water pipe, regeneration water pipe, logical heat pipe and cable tube, be provided with Gas Pipe in described storehouse, the left side, be provided with power pipe, ventilation duct and sewage pipe in storehouse, the right.
Described discharge casing is connected with storehouse, storehouse, the left side and storehouse, the right in piping lane respectively by osculum, be respectively arranged with drain pipe and special drain pipe in the both sides of discharge casing, regulation and control boiled water room and drain sump that described drain pipe is external with being arranged on prestressing force piping lane are connected.
Sidepiece at described connecting box is provided with designated lane, and connecting box is connected with function room, maintenance centre, Surveillance center, ventilating house, special room, underground parking, electricity business supermarket and the service centre of being connected respectively by passage.
Top arranged on left and right sides at prestressing force piping lane body is respectively provided with rain import, lower row's rain pipe and lower row's raintank, lower row's raintank is connected with row's rain pipe by discharge casing, and row's rain pipe is connected with water flowing room, water storehouse and purification sump by discharge casing.
Good effect of the present utility model is as follows:
This utility model uses Shi Hanzhang in the cover plate and lower shoe of prestressing force piping lane body, solve underground pipe gallery and increase compressive resistance and " technical barrier " of subgrade reaction, use high performance concrete and high tensile reinforcement, the intensity of piping lane body can be strengthened, the construction standard of piping lane can be improved, can effectively reduce the quantities of underground pipe gallery sectional area, the target of engineering totle drilling cost can be reduced.
This utility model arranges compartment gripper shoe in the hole of prestressing force piping lane body, can be according to engineering installation requirement, two or three above bins are set, in the upper cover plate of prestressing force piping lane body and lower shoe and side plate and gripper shoe, longitudinal bobbin is set, and the piping lane section of the prefabricated tube coupling of long 2-3 rice or the long 5-10 rice of cast in situs can be linked the piping lane body of growth 30-80 rice by steel strand wires applying longitudinal stress, the resist displacement of piping lane can be increased, counter-bending, the performance of anti-settling, earthquake-resistant ability can be strengthened, can fundamentally solve earthquake-prone region, coal mine gob, " technical barrier " of underground pipe gallery built by the complex foundations such as hydropenia hopper zone.
This utility model arranges discharge casing in the base plate bottom of piping lane body, the hydrops produced because of assembling and maintenance in piping lane body can be exhausted in time, discharge timely by being arranged on the drain pipe of the band gradient of piping lane body both sides, can reach, from arranging self-cleaning, self-cleaning high standard requirement, the overall arrangement of underground pipe gallery can be brought up to a new height.
Accompanying drawing explanation
Accompanying drawing 1 is this utility model agent structure schematic diagram;
Accompanying drawing 2 is this utility model section structure schematic diagram;
Accompanying drawing 3 is this utility model planar structure schematic diagram;
Accompanying drawing 4 is this utility model side elevation structural representation;
Accompanying drawing 5 is this utility model function room structural representation;
Accompanying drawing 6 is this utility model ventilating house structural representation;
Accompanying drawing 7 is this utility model water flowing room structural representation;
Accompanying drawing 8 is this utility model special connection room structural representation.
nullIn the accompanying drawings: 1 prestressing force piping lane body、2 outer layer skeletons、3 nexine skeletons、4 outer layer horizontal bars、5 outer layers indulge muscle、6 U-shaped positioning bars、7 horizontal bobbins、8 longitudinal bobbins、9 nexine horizontal bars、10 nexines indulge muscle、11 steel strand wires、12 compartment gripper shoes、13 storehouse, the left sides、Storehouse on the right of in the of 14、Storehouse in 15 piping lanes、16 rhones、17 bed courses、18 anchorages、19 osculums、20 discharge casings、21 drain pipies、22 bracing frames、23 Gas Pipe、24 power pipes、25 ventilation ducts、26 row's rain pipes、27 running water pipes、28 regeneration water pipes、29 sewage pipes、30 thermal pipes、31 refuse conveying pipes、32 communication pipes、33 cable tubes、34 light controlling devices、35 water-swellable adhesive tape、36 dilatation seams、37 connecting boxs、38 passages、39 function rooms、40 repair and maintenance centers、41 rainwater imports、42 times row's rain pipes、43 times row's raintank、44 special drain pipies、45 water flowing rooms、46 water storehouses、47 purify sump、48 regulation and control boiled water rooms、49 drain sumps、50 Surveillance center、51 ventilating houses、52 special connection rooms、53 underground parkings、54 ecommerce supermarkets、55 service centres、56 rubber fastening bands、57 construction joints、58 greenery patches planes、59 road surface, cities、60 air-intake devices、61 air exhausting devices、62 water supply installations、63 self-con-tained units.
Detailed description of the invention
As shown in Figure 1, this utility model includes that cross section is rectangular prestressing force piping lane body 1 and the outer layer skeleton 2 set within it and nexine skeleton 3, described outer layer skeleton 2 is indulged muscle 5 by outer layer horizontal bar 4 and outer layer and is constituted, nexine skeleton 3 is indulged muscle 10 by nexine horizontal bar 9 and nexine and is constituted, horizontal bobbin 7 and longitudinal bobbin 8 it is provided with in the inner side of outer layer skeleton 2, it is provided with steel strand wires 11 in horizontal bobbin 7 and longitudinal bobbin 8, indulge, at outer layer horizontal bar 4 and outer layer, the both sides that muscle 5 carries out infall and be provided with U-shaped positioning bar 6, laterally bobbin 7 is arranged in the U-shaped mouth of U-shaped positioning bar 6, laterally the steel strand wires 11 in bobbin 7 produce prestressing force anchorage 18 in the anchoring of prestressing force piping lane body 1 both sides through stretch-draw.
As shown in Figure 2, laterally bobbin 7 is separately positioned in top board and the base plate of prestressing force piping lane body 1, the top board of prestressing force piping lane body 1 can be that plane can also be for arch, in horizontal bobbin 7, it is provided with the steel strand wires 11 being anchored at prestressing force piping lane body 1 both sides through stretch-draw generation prestressing force anchorage 18, in longitudinal bobbin 8, is provided with the steel strand wires 11 being anchored at prestressing force piping lane body 1 two ends through stretch-draw generation prestressing force anchorage 18.
Prestressing force piping lane body 1 endoporus is provided with two pieces of compartment gripper shoes 12, piping lane hole is separated into storehouse 15 and storehouse, the right 14 in storehouse, the left side 13, piping lane by the most successively, three's inner bottom part is respectively arranged with rhone 16, the discharge casing 20 connected with rhone 16 is set in the bottom of prestressing force piping lane body 1, discharge casing 20 arranges one every a segment distance according to specific needs in the bottom of prestressing force piping lane body 1, does not has prestressing force piping lane body 1 bottom of discharge casing 20 to be provided with bed course 17.
The row's of being provided with rain pipe 26 in storehouse 15, running water pipe 27, regeneration water pipe 28, logical heat pipe 32 and cable tube 33 in described piping lane, in described storehouse, the left side 13, it is provided with Gas Pipe 23, in storehouse, the right 14, is provided with power pipe 24, ventilation duct 25 and sewage pipe 29.
nullAs shown in Figure 3,The end of the piping lane section of some prestressing force piping lane bodies 1 formation is provided with connecting box 37,The junction of connecting box 37 and prestressing force piping lane body 1 is provided with dilatation seam 36,Connected by passage 38 in the both sides of connecting box 37 and have function room 39、Ventilating house 51 and Surveillance center 50,Two upper lateral parts at prestressing force piping lane body 1 are provided with rainwater import 41、Lower row's rain pipe 42 and lower row's raintank 43,Sidepiece at prestressing force piping lane body 1 is provided with water flowing room 45、Water storehouse 46、Purify sump 47、Service centre 55 and special drain pipe 44,Special drain pipe 44 is connected with storehouse, the left side 13,Sidepiece at prestressing force piping lane body 1 is additionally provided with regulation and control boiled water room 48、Drain sump 49、Special connection room 52、Underground parking 53 and ecommerce supermarket 54,Described drain sump 49 is connected with sewage pipe 29 by pressue device.
As shown in Figure 4, this utility model is provided with dilatation seam 36 between connecting box 37 and prestressing force piping lane body 1, it is provided with rubber fastening band 56 in described dilatation seam 36, described lower row's raintank 43 is in vertical, it is connected with discharge casing 20 by drain pipe, entering in prefabricated drain pipe 21 by discharge casing 28 again, described drain pipe 21 arranges height gradient mode.The middle part of described prestressing force piping lane body 1 is provided with construction joint 57, in construction joint 57, is provided with water-swellable adhesive tape 35.
As shown in Figure 5, function room 39 described in the utility model is arranged on the upper and lower of greenery patches plane 58, described rainwater import 41 is arranged on the avris portion on road surface, city 59, described row's rain pipe 42 is connected with prefabricated drain pipe 21 by discharge casing 20, function room 39 is connected with connecting box 37 by passage 38, and the osculum 19 between connecting box 37 and discharge casing 20 is provided around water-swellable adhesive tape 35.
As shown in Figure 6, ventilating house 51 described in the utility model is provided with air-intake device 60 and air exhausting device 61, is connected with ventilation duct 25 by passage 38, and the avris at passage is provided with lower discharge casing 43, is connected with lower row's rain pipe 42.
As shown in Figure 7, water flowing room 45 described in the utility model is arranged on the bottom of greenery patches plane 58, water supply installation 62 it is provided with in water flowing room 45, rainwater in drain pipe 21 is discharged to water flowing room 45 and water storehouse 46 by discharge casing 20, it is discharged to after precipitation purify sump 47, is returned in prestressing force piping lane body 1 by regeneration water pipe 28 again by purifying sump 47.
As shown in Figure 8, special connection room 52 described in the utility model is provided with self-con-tained unit 63, is arranged on the running water pipe 27 in prestressing force piping lane body 1, regeneration water pipe 28, thermal pipe 30, ventilation duct 25, cable tube 33, Gas Pipe 23, power pipe 24 and refuse conveying pipe 31 and is docked by the dedicated pipeline of special connection room 52 and community.
This utility model arranges regulation and control boiled water room at the sidepiece of prestressing force piping lane body, also the rain mud hydrops produced in row's rain pipe can be discharged to drain sump, " technical barrier " of initial rainwater pollution can be solved, utilize high-pressure hydraulic pump that the sedimentary clay of drain sump, sand are delivered to sewage pipe, the flow velocity of sewage pipe can also be increased, can guarantee that sewage pipe reach from arranging, flow automatically, the high standard requirement of self-cleaning.
This utility model arranges the auxiliary facilities such as function room, water flowing room, ventilating house at the sidepiece of prestressing force piping lane body, it is provided to increase the utilitarian function of underground pipe gallery, underground pipe gallery can be promoted to become combined system engineering, " internal rate of return (IRR) " of underground pipe gallery can be improved, carry out PPP pattern for country to create conditions, save the investment of more foundation engineering for place, can promote underground pipe gallery more preferably, Geng Sheng, more planned implementation.

Claims (7)

  1. null1. a prestressing force divides and adds series compartment demultiplexing formula underground pipe gallery,It is characterized in that: include prestressing force piping lane body (1) and the outer layer skeleton (2) set within it and nexine skeleton (3),Horizontal bobbin (7) and longitudinal bobbin (8) it is provided with in the inner side of outer layer skeleton (2),Laterally bobbin (7) is separately positioned in top board and the base plate of prestressing force piping lane body (1),The steel strand wires (11) being anchored at prestressing force piping lane body (1) both sides through stretch-draw generation prestressing force anchorage (18) it are provided with in horizontal bobbin (7),The steel strand wires (11) being anchored at prestressing force piping lane body (1) two ends through stretch-draw generation prestressing force anchorage (18) it are provided with in longitudinal bobbin (8),Prestressing force piping lane body (1) endoporus is provided with at least two pieces of compartment gripper shoes (12),Storehouse (15) in piping lane is formed between middle two pieces of adjacent compartment gripper shoes (12),The discharge casing (20) communicated therewith is set in the bottom of prestressing force piping lane body (1),The end of prestressing force piping lane body (1) is provided with connecting box (37),The middle part of described prestressing force piping lane body (1) is provided with construction joint (57),Water-swellable adhesive tape (35) it is provided with in construction joint (57).
  2. A kind of prestressing force the most according to claim 1 divides and adds series compartment demultiplexing formula underground pipe gallery, it is characterized in that: described outer layer skeleton (2) is indulged muscle (5) by outer layer horizontal bar (4) and outer layer and constituted, nexine skeleton (3) is indulged muscle (10) by nexine horizontal bar (9) and nexine and is constituted, indulge muscle (5) at outer layer horizontal bar (4) and outer layer to carry out the both sides of infall and be provided with U-shaped positioning bar (6), laterally bobbin (7) is arranged in the U-shaped mouth of U-shaped positioning bar (6), laterally the steel strand wires (11) in bobbin (7) produce prestressing force anchorage (18) in the anchoring of prestressing force piping lane body (1) both sides through stretch-draw.
  3. A kind of prestressing force the most according to claim 1 and 2 divides and adds series compartment demultiplexing formula underground pipe gallery, it is characterized in that: prestressing force piping lane body (1) endoporus is provided with two pieces of compartment gripper shoes (12), piping lane hole is separated into storehouse (15) and storehouse, the right (14) in storehouse, the left side (13), piping lane by the most successively, three's inner bottom part is respectively arranged with rhone (16), and the bottom of prestressing force piping lane body (1) is provided with bed course (17).
  4. A kind of prestressing force the most according to claim 3 divides and adds series compartment demultiplexing formula underground pipe gallery, it is characterized in that: the row's of being provided with rain pipe (26) in storehouse (15), running water pipe (27), regeneration water pipe (28), logical heat pipe (32) and cable tube (33) in described piping lane, in described storehouse, the left side (13), it is provided with Gas Pipe (23), in storehouse, the right (14), is provided with power pipe (24), ventilation duct (25) and sewage pipe (29).
  5. A kind of prestressing force the most according to claim 3 divides and adds series compartment demultiplexing formula underground pipe gallery, it is characterized in that: described discharge casing (20) is connected with storehouse in piping lane (15), storehouse, the left side (13) and storehouse, the right (14) respectively by osculum (19), be respectively arranged with drain pipe (21) and special drain pipe (44) in the both sides of discharge casing (20), described drain pipe (21) be arranged on the outer regulation and control boiled water room (48) of prestressing force piping lane body (1) and drain sump (49) is connected.
  6. A kind of prestressing force the most according to claim 3 divides and adds series compartment demultiplexing formula underground pipe gallery, it is characterized in that: the sidepiece at described connecting box (37) is provided with designated lane (38), connecting box (37) is connected with function room (39), maintenance centre (40), Surveillance center (50), ventilating house (51), special room (52), underground parking (53), electricity business supermarket (54) and the service centre (55) of being connected respectively by passage (38).
  7. A kind of prestressing force the most according to claim 3 divides and adds series compartment demultiplexing formula underground pipe gallery, it is characterized in that: the top arranged on left and right sides at prestressing force piping lane body (1) is respectively provided with rain import (41), lower row's rain pipe (42) and lower row's raintank (43), lower row's raintank (43) is connected with row's rain pipe (26) by discharge casing (20), and row's rain pipe (26) is connected with water flowing room (45), water storehouse (46) and purification sump (47) by discharge casing (20).
CN201620182787.2U 2016-03-10 2016-03-10 Prestressing force divides to divide with serial compartment uses formula underground pipe gallery Expired - Fee Related CN205557567U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620182787.2U CN205557567U (en) 2016-03-10 2016-03-10 Prestressing force divides to divide with serial compartment uses formula underground pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620182787.2U CN205557567U (en) 2016-03-10 2016-03-10 Prestressing force divides to divide with serial compartment uses formula underground pipe gallery

Publications (1)

Publication Number Publication Date
CN205557567U true CN205557567U (en) 2016-09-07

Family

ID=56817626

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620182787.2U Expired - Fee Related CN205557567U (en) 2016-03-10 2016-03-10 Prestressing force divides to divide with serial compartment uses formula underground pipe gallery

Country Status (1)

Country Link
CN (1) CN205557567U (en)

Similar Documents

Publication Publication Date Title
CN102995660B (en) Multifunctional arched combined prestress underground pipe gallery for cisty and preparation process thereof
CN202969415U (en) Multifunctional assembled comprehensive pipe gallery
CN1142363C (en) underground comprehesive pipe gallery and system for comprehensive developing and utilizing underground space
CN106381885B (en) A kind of Underground Steel pipe gallery with skeleton
CN205954798U (en) Large -traffic, height falls poor drainage drop well
CN207268009U (en) A kind of underground pipe gallery drainage system based on existing blowdown canal
CN203256772U (en) Multifunctional arched combination pre-stress urban underground pipe gallery
CN204151825U (en) Super-section prestressing force Urban Underground pipe gallery
CN204491659U (en) Jack arch shape prestressed structure pin-connected panel underground pipe gallery
Wang et al. Application and prospect of new steel corrugated plate technology in infrastructure fields
CN205557567U (en) Prestressing force divides to divide with serial compartment uses formula underground pipe gallery
CN203007978U (en) Multifunctional net-shaped combined prestressed underground pipe gallery
CN205557579U (en) Well controllable formula underground pipe gallery in storehouse is assembled to adding to prestressing force
CN205557574U (en) Underground pipe gallery with adjustable prestressing force divides to add assembles well storehouse
CN103032099A (en) Prefabricated partition wall structure of lateral smoke discharge passage of shield tunnel
CN205557570U (en) Prestressing force divides and adds series pipe storehouse formula underground pipe gallery side by side
CN202252422U (en) Multifunctional pre-stress underground draining integrated pipeline of city
CN202324155U (en) Adjustable corrugated prestress anti-pollution drainage culvert
CN205557561U (en) Formula underground pipe gallery is chooseed for use to adding serial many storehouses to prestressing force
CN205557571U (en) Prestressing force divides and adds series side storehouse drainage type underground pipe gallery
CN204491663U (en) Prestressed structure function formula underground pipe gallery combined system
CN205557563U (en) Prestressing force list adds series pipe storehouse and share formula underground pipe gallery
CN204080859U (en) High-strength resistance to compression centripetal-stress Urban Underground pipe gallery
CN205557569U (en) Prestressing force divides and adds special formula underground pipe gallery in serial limit storehouse
CN109469099A (en) Assembled underground pipe gallery

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907

Termination date: 20200310

CF01 Termination of patent right due to non-payment of annual fee