CN207647221U - The building of outdoor installation elevator - Google Patents

The building of outdoor installation elevator Download PDF

Info

Publication number
CN207647221U
CN207647221U CN201721108460.1U CN201721108460U CN207647221U CN 207647221 U CN207647221 U CN 207647221U CN 201721108460 U CN201721108460 U CN 201721108460U CN 207647221 U CN207647221 U CN 207647221U
Authority
CN
China
Prior art keywords
additional
area
elevator
building
resident family
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721108460.1U
Other languages
Chinese (zh)
Inventor
高起鹏
刘威
王硕
陈红亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiji Xunda Elevator Co., Ltd
Original Assignee
XJ Elevator Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XJ Elevator Co Ltd filed Critical XJ Elevator Co Ltd
Priority to CN201721108460.1U priority Critical patent/CN207647221U/en
Application granted granted Critical
Publication of CN207647221U publication Critical patent/CN207647221U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to a kind of buildings of outdoor installation elevator, there is in the Main Corridor road that each floor of the second layer of building body and top is successively distributed bridge joint between additional elevator and passageway area, the side in Main Corridor road is equipped with the additional gallery that area of resident family is extended to from passageway area, additional side of the gallery far from Main Corridor road is equipped with the further user door being located in area of resident family, and further user door, additional gallery and Main Corridor road are sequentially communicated and form the outer elevator hallway of building turned between area of resident family and additional elevator.In the way of in the additional gallery of Main Corridor road side increase, it on the one hand can utilize Main Corridor road lateral space, another aspect resident family that can easily be got in from facade, no longer need to detour out of building body;Third, can also add gallery by this increases the ambulant space of resident family.

Description

The building of outdoor installation elevator
Technical field
The utility model is related to a kind of buildings of outdoor installation elevator.
Background technology
Currently, existing installation elevator provides a convenient for high-level user, but it is merely by direct gallery and building Simple connection, and its complementary space does not make full use of, and this segment space can not due to the presence of elevator shaft and connection gallery It utilizes.
Utility model content
The utility model is intended to provide a kind of building of the outdoor installation elevator for the aisle space making full use of additional elevator.
In order to solve the above technical problems, the technical solution of the building of outdoor installation elevator is as follows in the utility model:
The building of outdoor installation elevator, includes at least two layers of building body, and the side alien invasion of every layer of building body all has Area of resident family outside resident family space and the passageway area between neighbouring households region are equipped with outside the passageway area of building body vertical The additional elevator for going straight up to drop, there is bridge joint between additional elevator and passageway area is successively distributed in each floor of the second layer of building body and top Main Corridor road, the side in Main Corridor road is equipped with the additional gallery for extending to area of resident family from passageway area, adds gallery far from Main Corridor road Side is equipped with the further user door being located in area of resident family, and further user door, additional gallery and Main Corridor road are sequentially communicated and are formed and turned on The outer elevator hallway of building between area of resident family and additional elevator.
The both sides in passageway area are symmetrically arranged with the area of resident family, and additional gallery is symmetricly set on the both sides in Main Corridor road.
Step ladder equipped with building body in the area of passageway, the terraced entrance of step of passageway area first layer and the first layer of additional elevator are opposite Interval.
Additional elevator is that splicing is piled up successively from bottom to top for pit, bottom section, intermediate interval and top layer section, pit, Bottom section, intermediate interval and top layer section are modular structure made of being prefabricated in the factory.
On the alien invasion of building body, outside only supports and is connected on support post for the inside static connection of additional gallery, branch Support column, which erects, to be fixed in ground base.
The utility model has the beneficial effects that:
In the way of in the additional gallery of Main Corridor road side increase, Main Corridor road lateral space, another party on the one hand can be utilized Face resident family can easily get in from facade, no longer need to detour out of building body;Third, also corridor can be added by this Road increases the ambulant space of resident family.
Description of the drawings
Fig. 1 is the structure of capital construction schematic diagram of the building;
Fig. 2 is structural schematic diagram of the building after installing elevator additional in Fig. 1;
Fig. 3 is the front view of Fig. 1;
Fig. 4 is the left view of Fig. 3;
Fig. 5 is the vertical view of Fig. 3.
Specific implementation mode
The utility model is described in detail below with reference to attached drawing and in conjunction with the embodiments.It should be noted that not rushing In the case of prominent, the feature in the embodiments of the present invention and embodiment can be combined with each other.
The embodiment of the building of outdoor installation elevator in the utility model:As shown in Figures 1 to 5, which includes multilayer Building body 1, the side alien invasion of every layer of building body 1 all has the area of resident family outside resident family space and is located at neighbouring households area Passageway area between domain, is equipped with the additional elevator 3 of vertical lift outside the passageway area of building body 1, additional elevator 3 and passageway area it Between bridge joint have in the Main Corridor road that each layer of the second layer of building body 1 and top is successively distributed, the side in Main Corridor road is equipped with from passageway area The additional gallery 2 in area of resident family is extended to, 2 side far from Main Corridor road of gallery is added and is equipped with the further user door being located in area of resident family, Further user door, additional gallery 2 and Main Corridor road are sequentially communicated and form the building dispatch from foreign news agency turned between area of resident family and additional elevator 3 Terraced corridor.
The both sides in passageway area are symmetrically arranged with the area of resident family, and additional gallery 2 is symmetricly set on the both sides in Main Corridor road.Passageway Step ladder equipped with building body 1 in area, the first layer relative spacing of the step terraced entrance and additional elevator 3 of passageway area first layer.It is additional Elevator 3 is that splicing is piled up successively from bottom to top for pit, bottom section, intermediate interval and top layer section, pit, bottom section, centre Interval and top layer section are modular structure made of being prefabricated in the factory.The inside static connection of additional gallery 2 is in the outer vertical of building body 1 On face, outside only supports and is connected on support post, and support post, which erects, to be fixed in ground base, and ground base is cast-in-place filling Note pours concrete body in ground foundation pit 4.
The building belongs to elevator and balcony integrated programme.Realize the purpose for installing elevator additional;Elevator is entered by Main Corridor road Additional gallery 2(It is equivalent to additional gallery 2), then got in by additional gallery 2;The branch of elevator, Main Corridor road, additional gallery 2 It supports column to share, improves stock utilization;It is compact-sized, make full use of space;Level position of elevator is flat with flooring, can be straight It taps into man of resident family, registers one's residence again without upper and lower half storey.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model, rather than its limitations; Although the utility model is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: It still can be with technical scheme described in the above embodiments is modified, or is carried out to which part technical characteristic etc. With replacement;And these modifications or replacements, various embodiments of the utility model technology that it does not separate the essence of the corresponding technical solution The spirit and scope of scheme.

Claims (5)

1. installing the building of elevator outside Room additional, include at least two layers of building body, the side alien invasion of every layer of building body all has position In the area of resident family outside resident family space and the passageway area between neighbouring households region, which is characterized in that the passageway area of building body The outer additional elevator for being equipped with vertical lift, there is each in the second layer of building body and top bridge joint between additional elevator and passageway area The Main Corridor road that layer is successively distributed, the side in Main Corridor road are equipped with the additional gallery that area of resident family is extended to from passageway area, and it is remote to add gallery Side from Main Corridor road is equipped with the further user door being located in area of resident family, further user door, additional gallery and Main Corridor road be sequentially communicated and Form the outer elevator hallway of building turned between area of resident family and additional elevator.
2. the building of outdoor installation elevator according to claim 1, which is characterized in that the both sides in passageway area are symmetrically arranged with The area of resident family, additional gallery are symmetricly set on the both sides in Main Corridor road.
3. the building of outdoor installation elevator according to claim 2, which is characterized in that be equipped with the step of building body in the area of passageway Ladder, the first layer relative spacing of the step terraced entrance and additional elevator of passageway area first layer.
4. the building of outdoor installation elevator according to claim 1 or 2 or 3, which is characterized in that additional elevator be pit, Splicing is piled up successively from bottom to top for bottom section, intermediate interval and top layer section, pit, bottom section, intermediate interval and top layer section It is modular structure made of being prefabricated in the factory.
5. the building of outdoor installation elevator according to claim 1 or 2 or 3, which is characterized in that the inside of additional gallery is quiet It is connected on the alien invasion of building body, outside only supports and is connected on support post, and support post, which erects, is fixed on ground base On.
CN201721108460.1U 2017-08-31 2017-08-31 The building of outdoor installation elevator Active CN207647221U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721108460.1U CN207647221U (en) 2017-08-31 2017-08-31 The building of outdoor installation elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721108460.1U CN207647221U (en) 2017-08-31 2017-08-31 The building of outdoor installation elevator

Publications (1)

Publication Number Publication Date
CN207647221U true CN207647221U (en) 2018-07-24

Family

ID=62886731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721108460.1U Active CN207647221U (en) 2017-08-31 2017-08-31 The building of outdoor installation elevator

Country Status (1)

Country Link
CN (1) CN207647221U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355094A (en) * 2017-08-31 2017-11-17 西继迅达(许昌)电梯有限公司 The building of outdoor installation elevator

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107355094A (en) * 2017-08-31 2017-11-17 西继迅达(许昌)电梯有限公司 The building of outdoor installation elevator

Similar Documents

Publication Publication Date Title
CN207363302U (en) Multi-storey residential buildings install the building structure after elevator additional
WO2008009213A1 (en) Multi-floor buliding
CN100464047C (en) Dwelling house with courtyard
CN107355094A (en) The building of outdoor installation elevator
CN110685465A (en) Novel multilayer stack villa
CN207647221U (en) The building of outdoor installation elevator
JP6823328B1 (en) Building with aerial pool and how to build it
CN100424311C (en) One-stair-multiple-door resident with many gardens
JP7003564B2 (en) building
CN201809996U (en) Novel joint villa
CN215101356U (en) Corridor bridge structure suitable for old district installs elevator additional and uses
CN210316677U (en) Miniature villa unit and united villa
CN109235928A (en) A kind of Chinese style novel air villa
CN101967890A (en) New town house
WO2014204334A1 (en) Apartment building
CN216517108U (en) Folding and splicing house type
CN214659091U (en) Residential building with dynamic and static partitions
CN201635425U (en) Single-storey house type structure with swimming pool
JP2018145724A (en) Waterproof structure and waterproof construction method
CN104563542A (en) Double-family model residence with three-storey standard floors
JP6712871B2 (en) building
CN206769459U (en) Move back desk-top garden residence
JP2017145664A (en) building
CN106032726A (en) Multi-house type high-rise compound apartment
CN111809909A (en) Tower gallery public elevator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 461000 south section of Yanan Road, Xuchang economic and Technological Development Zone, Henan

Patentee after: Xiji Xunda Elevator Co., Ltd

Address before: 461000 south section of Yanan Road, Xuchang economic and Technological Development Zone, Henan

Patentee before: XJ SCHINDLER (XUCHANG) ELEVATOR Co.,Ltd.