CN207643374U - Building mould is matched in adjustable industrial makeup - Google Patents

Building mould is matched in adjustable industrial makeup Download PDF

Info

Publication number
CN207643374U
CN207643374U CN201721470952.5U CN201721470952U CN207643374U CN 207643374 U CN207643374 U CN 207643374U CN 201721470952 U CN201721470952 U CN 201721470952U CN 207643374 U CN207643374 U CN 207643374U
Authority
CN
China
Prior art keywords
mould
article
special fixture
makeup
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721470952.5U
Other languages
Chinese (zh)
Inventor
李铁辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721470952.5U priority Critical patent/CN207643374U/en
Application granted granted Critical
Publication of CN207643374U publication Critical patent/CN207643374U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a kind of makeup of adjustable industrial and matches building mould, including four mould sides and four special fixtures, first mould while end face with Article 2 mould while vertical butt joint, with special fixture fixation;Article 2 mould while end face and Article 3 mould while vertical butt joint, with special fixture fixation;Article 3 mould while end face and Article 4 mould while vertical butt joint, with special fixture fixation;Article 4 mould while end face with first mould while dock, with special fixture fixation.The beneficial effects of the utility model are:Mold is arbitrarily adjustable in length and width direction size, to meet the requirement of construction;Mold is fixed using special fixture, can make installation, convenient disassembly, can be reused.

Description

Building mould is matched in adjustable industrial makeup
Technical field
The utility model belongs to industry assembling formula building field, and in particular to a kind of makeup of adjustable industrial is with building mould Tool.
Background technology
Current country strengthens green, environmental protection, energy saving building.Novel fabricated building is a desirable route, and assembled is built Build is to be assembled into industrial equipment after producing required parts as manufacturing industry;The industrialization assembled architecture There are parts, its component prefabricated component is first produced various dry walls, floor, beam, column etc. with mold equally in factory and mixed Solidifying soil prefabricated components transport to construction site and are assembled into building, but building building has different shape and of different sizes, thus wants There are different molds and is manufactured it is necessary to a large amount of molds of demand to complete prefabricated component, it cannot a general prefabricated component one but there is mold Mold greatly increases construction cost and waste, annoyings assembly building trade always.
Utility model content
The utility model purpose of design is just to provide a kind of makeup of adjustable industrial and matches building mould, solves industrial makeup The problems such as with formula building mould length and width adjustability, versatility, versatility, convenient and practical property.
The utility model Analyzing on Building A Planning Scheme is:
Building mould, including four mould sides and four special fixtures, the one end on first mould side are matched in adjustable industrial makeup Face and Article 2 mould side vertical butt joint, with special fixture fixation;Article 2 mould while end face with Article 3 mould while it is vertical Docking, with special fixture fixation;Article 3 mould while end face and Article 4 mould while vertical butt joint, fixed with special fixture Securely;Article 4 mould while end face with first mould while dock, with special fixture fixation.
Wherein, the special fixture includes U-shaped folder, positioning convex platform, fishbolt, is set on the inside of one end of the U-shaped folder There are positioning convex platform, the other end of U-shaped folder to be equipped with for the bolt hole across fishbolt.
Wherein, the length all same on four mould sides, the width all same on four mould sides, the height on four mould sides are equal It is identical.
Wherein, several described adjustable industrials makeup overlaps to fall up and down with building mould is integrated, and is combined into compound Adjustable mould.
Compared with prior art, the beneficial effects of the utility model are:Mold is arbitrarily adjustable in length and width direction size, To meet the requirement of construction;Mold is fixed using special fixture, can make installation, convenient disassembly, can be reused.
Description of the drawings
Fig. 1 is vertical view of the adjustable industrial makeup with building mould.
Fig. 2 is vertical view of the adjustable industrial makeup with building composite die.
Fig. 3 is the enlarged drawing of circled in Fig. 2.
Fig. 4 is special fixture schematic diagram.
In figure:1, first mould side;2, Article 2 mould is in 3, Article 3 mould;4, Article 4 mould side;5, special fixture;6、 U-shaped folder;7, positioning convex platform;8, fishbolt.
Specific implementation mode
The utility model is described further in the following with reference to the drawings and specific embodiments.
Embodiment 1
As shown in Figure 1 and Figure 4, adjustable industrial makeup is provided with building schematic diagram, first by first mould side 1, second Mould 3, Article 4 mould side 4 in 2, Article 3 mould is mutually perpendicular to dock, and adjusts required length dimension, solid with special fixture 5 It is set to one, then the casting concrete into mold, after concrete is solid, removes special fixture 5, remove mould side, is just made required Precast concrete finished product, it is easy to operate.
Special fixture 5 includes U-shaped folder 6, positioning convex platform 7, fishbolt 8, and positioning convex platform is equipped on the inside of one end of U-shaped folder 6 7, the other end of U-shaped folder 6 is equipped with for the bolt hole across fishbolt 8.
Embodiment 2
As shown in figs 2-4, adjustable industrial makeup is provided and matches building composite die schematic diagram, it first will as shown in Figure 1 Combine two sets of required size or building mould matched in more set adjustable industrial makeups, overlapping, which is fallen, up and down is integrated, mix up needed for Positions and dimensions fix, then will be prefabricated in required reinforcing bar etc. arrange, then casting concrete, splits out after concrete setting Special fixture 5 first tears upper mold open, then tears lower mold open, and required MULTILAYER COMPOSITE prefabricated component is just made.

Claims (4)

1. building mould is matched in adjustable industrial makeup, it is characterised in that:Including four mould sides and four special fixtures(5), first Mould side(1)End face and Article 2 mould side(2)Vertical butt joint uses special fixture(5)Fixation;Article 2 mould side(2) End face and Article 3 mould side(3)Vertical butt joint uses special fixture(5)Fixation;Article 3 mould side(3)End face with Article 4 mould side(4)Vertical butt joint uses special fixture(5)Fixation;Article 4 mould side(4)End face and first mould side (1)Docking, uses special fixture(5)Fixation.
2. building mould is matched in adjustable industrial makeup according to claim 1, it is characterised in that:The special fixture (5)Including U-shaped folder(6), positioning convex platform(7), fishbolt(8), the U-shaped folder(6)One end on the inside of be equipped with positioning convex platform (7), U-shaped folder(6)The other end be equipped with for across fishbolt(8)Bolt hole.
3. building mould is matched in adjustable industrial makeup according to claim 1, it is characterised in that:Four mould sides Length all same.
4. building mould is matched in adjustable industrial makeup according to claim 1, it is characterised in that:The adjustable industrial Makeup is overlapped to fall and is integrated up and down with building mould, is combined into compound adjustable mould.
CN201721470952.5U 2017-11-07 2017-11-07 Building mould is matched in adjustable industrial makeup Expired - Fee Related CN207643374U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721470952.5U CN207643374U (en) 2017-11-07 2017-11-07 Building mould is matched in adjustable industrial makeup

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721470952.5U CN207643374U (en) 2017-11-07 2017-11-07 Building mould is matched in adjustable industrial makeup

Publications (1)

Publication Number Publication Date
CN207643374U true CN207643374U (en) 2018-07-24

Family

ID=62884455

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721470952.5U Expired - Fee Related CN207643374U (en) 2017-11-07 2017-11-07 Building mould is matched in adjustable industrial makeup

Country Status (1)

Country Link
CN (1) CN207643374U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110103322A (en) * 2019-06-06 2019-08-09 电联工程技术股份有限公司 A kind of Prefabricated stacking floor composable mold of adjustable dimension
CN110421699A (en) * 2019-07-25 2019-11-08 德睿盛兴(大连)装配式建筑科技有限公司 A kind of assembled side form of prefabricated component
CN112720771A (en) * 2019-05-16 2021-04-30 丽水市莲都区千盛轴承制造厂 Building materials processing equipment based on straw recycle
CN114953120A (en) * 2022-05-27 2022-08-30 中国十七冶集团有限公司 Test block mold convenient for demolding and assembling type wall crack grouting material and working method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112720771A (en) * 2019-05-16 2021-04-30 丽水市莲都区千盛轴承制造厂 Building materials processing equipment based on straw recycle
CN110103322A (en) * 2019-06-06 2019-08-09 电联工程技术股份有限公司 A kind of Prefabricated stacking floor composable mold of adjustable dimension
CN110421699A (en) * 2019-07-25 2019-11-08 德睿盛兴(大连)装配式建筑科技有限公司 A kind of assembled side form of prefabricated component
CN114953120A (en) * 2022-05-27 2022-08-30 中国十七冶集团有限公司 Test block mold convenient for demolding and assembling type wall crack grouting material and working method

Similar Documents

Publication Publication Date Title
CN207643374U (en) Building mould is matched in adjustable industrial makeup
CN109518556B (en) Prefabricated road plate connected by elbow bolts, manufacturing method thereof and connecting process
KR20130121281A (en) Apparatus for a in-line mold of precast concrete culverts and method for producing precast concrete culverts
CN205370110U (en) Construction enclosure
CN101131009A (en) Cast-in-place shaping construction method and shaping equipment
CN206953254U (en) Shaped steel combination floor makes mould
CN103758284B (en) Integrated house Multifunctional column
CN103741878B (en) Novel integrated house Multifunctional column
CN203296304U (en) Combined insulation board
CN210888078U (en) Embedded box for hyperboloid structural veneer and hyperboloid veneer construction structure
CN210233414U (en) Door opening mold for prefabricated wallboard
CN206902892U (en) A kind of inlet for stom water mould
CN207228395U (en) A kind of precast wall structure
CN107916785A (en) Detachable turnover type distribution box hole to be provided constructing device and its construction method
CN203741864U (en) Special die for iron tower foundation protection cap
CN103741929A (en) Integrated-house floor structure
CN203669202U (en) Beam structure for integrated house
CN209755578U (en) Prefabricated component magnetic force assembled production mould
CN203452268U (en) Box-type combined concrete column
CN202910972U (en) Prefabricated die for wall crown corner building block
CN207003720U (en) A kind of assembled integral concrete shear force wall attachment structure
CN113021581A (en) Prefabricated component pouring mold for prefabricated building
CN110630088A (en) Assembled antique artistic enclosing wall and construction method thereof
CN203238767U (en) Novel house with walls combined in spot
CN205422160U (en) Stand and penetrating formula enclosure of penetrating formula enclosure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180724