CN107916785A - Detachable turnover type distribution box hole to be provided constructing device and its construction method - Google Patents

Detachable turnover type distribution box hole to be provided constructing device and its construction method Download PDF

Info

Publication number
CN107916785A
CN107916785A CN201711185709.3A CN201711185709A CN107916785A CN 107916785 A CN107916785 A CN 107916785A CN 201711185709 A CN201711185709 A CN 201711185709A CN 107916785 A CN107916785 A CN 107916785A
Authority
CN
China
Prior art keywords
steel form
detachable
steel
side steel
framed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711185709.3A
Other languages
Chinese (zh)
Inventor
史青林
孟晓东
郭家宁
高卓飞
邓鹏举
徐志强
张路
冯源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Engineering Co Ltd of China Railway Construction Group Co Ltd
Original Assignee
Beijing Engineering Co Ltd of China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Engineering Co Ltd of China Railway Construction Group Co Ltd filed Critical Beijing Engineering Co Ltd of China Railway Construction Group Co Ltd
Priority to CN201711185709.3A priority Critical patent/CN107916785A/en
Publication of CN107916785A publication Critical patent/CN107916785A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • E04G15/063Re-usable forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The present invention proposes a kind of detachable turnover type distribution box hole to be provided constructing device and its construction method, long side steel form and the short side steel form of a pair of parallel setting and four groups of detachable corner members including a pair of parallel setting, it is fixed between each long side steel form and short side steel form by one group of detachable corner member, detachable corner member includes outside corner member and interior kerb-shoe member, outside corner member includes outboard angle, interior kerb-shoe member includes interior angle steel, and the latch assembly for being used for clamping long side steel form and short side steel form is equipped between outboard angle and interior angle steel.The steel of the present invention is detachable framed, and disposable input, may be reused;Construction quality is good, framed firm, is unlikely to deform, and it is splendid to survive face impression quality;Easy for construction, dismounting is easy to assembly, both dismountable after wall form dismounting, does not consume supernumerary's work substantially;It is environmentally protective, based on steel material, timber is not consumed, has perfectly catered to the target that company reduces lumber consumption.

Description

Detachable turnover type distribution box hole to be provided constructing device and its construction method
Technical field
The present invention relates to technical field of building construction, more particularly, to a kind of detachable turnover type distribution box hole to be provided construction Device and its construction method.
Background technology
Hole to be provided tradition, which is finished, in currently available technology, during electric distribution box structure construction is usually used wood glue plate and adds wood The form of side carries out structure and reserves.Electric distribution box installs dismounting in three layers of index bed in the electrical installation project of this mode Occurs a series of problems after wall form:Concrete is inoculated with hole to be provided deformation, wooden case, wooden model repairs matter after removing difficult, installation Measure grade not in place and be directed to sex chromosome mosaicism.Propose regarding to the issue above a kind of detachable turnover type distribution box hole to be provided constructing device and Its construction method.
The content of the invention
The present invention proposes that a kind of detachable turnover type distribution box hole to be provided constructing device and its construction method, steel are detachable Formula is framed, and disposable input, may be reused;Construction quality is good, framed firm, is unlikely to deform, and survives face impression quality pole It is good;Easy for construction, dismounting is easy to assembly, both dismountable after wall form dismounting, does not consume supernumerary's work substantially;Green ring Protect, based on steel material, do not consume timber, perfectly catered to the target that company reduces lumber consumption.
What a kind of technical solution of the present invention was realized in:Detachable turnover type distribution box hole to be provided constructing device, bag The long side steel form and the short side steel form of a pair of parallel setting and four groups of detachable corner members of a pair of parallel setting are included, it is each It is fixed between the long side steel form and short side steel form by detachable corner member described in one group, the detachable angle Component includes outside corner member and interior kerb-shoe member, and the outside corner member includes outboard angle, and the interior kerb-shoe member includes interior Angle steel, is equipped with the latch assembly for being used for clamping the long side steel form and short side steel form between the outboard angle and interior angle steel.
As a kind of perferred technical scheme, the latch assembly includes hingedly being installed on the two steel plates company of the outboard angle The threaded rod at place is connect, further includes the fixed plate being fixedly installed between two steel plates of the interior angle steel, the two of the interior angle steel One is equipped with steel plate junction and fixed plate and is used for through hole, the threaded rod is fixed through the through hole and by nut.
As a kind of perferred technical scheme, it is equipped with angle between the fixed plate and two steel plates of interior angle steel.
As a kind of perferred technical scheme, two adjacent the long side steel form, short side steel form, interior angle steel and outboard angle Between gap be filled with filler.
As a kind of perferred technical scheme, the filler is concrete.
As a kind of perferred technical scheme, the long side steel form is welded with short side steel form by square steel.
What the another technical solution of the present invention was realized in:A kind of detachable turnover type distribution box hole to be provided construction work Method, includes the following steps:
S1, while shear force wall reinforcing steel bar is bound, carry out positioning, being solid for a pair of of long side steel form and a pair of short edges steel form Fixed, piping work;
S2, according to the absolute altitude of Design Requirement Drawing cut reinforcing bar;
In working face by long side steel form and short side steel form and four groups of detachable corner members after the completion of S3, reinforcing bar cutting Assembled;First outside corner member and interior kerb-shoe member are stood up in plane during assembling, after then threaded rod is unscrewed, by one Long side steel form and a pair of short edges steel form are respectively put between corresponding kerb-shoe member and interior kerb-shoe member, are completed Fastening thread bar afterwards, fastens using to horn cupping, tape measure diagonal length is used when fastening 2/3, to ensure to have assembled Framed after is upright, so as to complete whole framed assembling;
S4, framed be completed are put it in the wall steel bar of well cutting, and reinforced steel support is used in framed lower part Rise framed, prevent framed sinking, withstood on framed both sides using twice backform reinforcing bar framed, prevent it from moving left and right;
S5, it is framed carry out pipe arrangement after installation is complete successively, framed with wall form faying face part after the completion of pipe arrangement A circle sponge strip is sticked, prevents seam from not having sternly cement mortar to enter in framed;
S6, the cast (interval time after cast) for carrying out concrete;
S7, treat concrete setting be molded, shear wall formwork remove 4-5 it is small when after, using wrench, first by two of top Detachable corner member bolt is unscrewed, and after taking out corresponding interior kerb-shoe member, the short side steel form on top is further taken out, under then unscrewing The detachable corner member in two, portion, after taking out corresponding interior kerb-shoe member, further takes out the long side steel form of both sides, finally further takes out outer Kerb-shoe member and the short side steel form of bottom, after the taking-up of all components, releasing agent is painted after member planar is cleaned out.
Above-mentioned technical proposal is employed, beneficial effects of the present invention are:The framed of the present invention passes through detachable assembling Part is assembled and dismantled, convenient turnover.Pass through the long side steel form of a pair of parallel setting and the short side steel of a pair of parallel setting It is framed that template and four groups of detachable corner members are assembled into distribution box, this is framed to be easily assembled and dismantle, will be upper in wall construction State component and assemble and be installed on wall steel bar, steel component becomes the mode than woodwork, and good, intensity is high, is removing wall mould It will not be deformed after plate, shaping impression quality is good, simple and easy to operate when turnover removes framed.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is attached drawing needed in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, without having to pay creative labor, may be used also To obtain other attached drawings according to these attached drawings.
Fig. 1 is the structure diagram of the present invention;
Fig. 2 is the structure diagram of the detachable corner member of the present invention;
Fig. 3 is the structure diagram of present invention outside corner member;
Wherein:1st, long side steel form;2nd, short side steel form;3rd, detachable corner member;4th, outboard angle;5th, interior angle steel;6th, spiral shell Rasp bar;7th, fixed plate;8th, through hole;9th, nut.
Embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other without creative efforts Embodiment, belongs to the scope of protection of the invention.
Embodiment one
As shown in Figs. 1-3, detachable turnover type distribution box hole to be provided constructing device, includes the long side steel of a pair of parallel setting Template 1 and the short side steel form 2 of a pair of parallel setting and four groups of detachable corner members 3, each long side steel form 1 with it is short It is fixed between side steel form 2 by detachable corner member 3 described in one group, the detachable corner member 3 includes outer corners Component and interior kerb-shoe member, the outside corner member include outboard angle 4, and the interior kerb-shoe member includes interior angle steel 5, the exterior angle The latch assembly for being used for clamping the long side steel form 1 and short side steel form 2 is equipped between steel 4 and interior angle steel 5.
Wherein, latch assembly includes the threaded rod 6 for being hingedly installed on two steel plate junctions of the outboard angle 4, further includes The fixed plate 7 being fixedly installed between two steel plates of the interior angle steel 5, two steel plate junctions of the interior angle steel 5 and fixation One is equipped with plate 7 and is used for through hole 8, the threaded rod 6 is fixed through the through hole 8 and by nut 9.
Two through holes 8 are passed through by threaded rod 6, fixed long side steel form 1 and short side are reached by 6 clamp nut of threaded rod The purpose of steel form 2.
In the present embodiment, angle is equipped between fixed plate 7 and two steel plates of interior angle steel 5.The two adjacent long side punching blocks Gap between plate 1, short side steel form 2, interior angle steel 5 and outboard angle 4 is filled with filler.Filler is concrete.Long side steel Template 1 is welded with short side steel form 2 by square steel.
Embodiment two
A kind of detachable turnover type distribution box hole to be provided construction, includes the following steps:
S1, while shear force wall reinforcing steel bar is bound, carry out a pair of of long side steel form 1 and a pair of short edges steel form 2 positioning, Fixed, piping work;
S2, according to the absolute altitude of Design Requirement Drawing cut reinforcing bar;
In working face by long side steel form 1 and short side steel form 2 and four groups of detachable angle structures after the completion of S3, reinforcing bar cutting Part 3 is assembled;First outside corner member and interior kerb-shoe member are stood up in plane during assembling, after then threaded rod 6 is unscrewed, A pair of of long side steel form 1 and a pair of short edges steel form 2 are respectively put between corresponding kerb-shoe member and interior kerb-shoe member, group Fastening thread bar 6, fastens using to horn cupping after the completion of dress, tape measure diagonal length is used when fastening 2/3, to ensure Framed after being completed is upright, so as to complete whole framed assembling;
S4, framed be completed are put it in the wall steel bar of well cutting, and reinforced steel support is used in framed lower part Rise framed, prevent framed sinking, withstood on framed both sides using twice backform reinforcing bar framed, prevent it from moving left and right;
S5, it is framed carry out pipe arrangement after installation is complete successively, framed with wall form faying face part after the completion of pipe arrangement A circle sponge strip is sticked, prevents seam from not having sternly cement mortar to enter in framed;
S6, the cast (interval time after cast) for carrying out concrete;
S7, treat concrete setting be molded, shear wall formwork remove 4-5 it is small when after, using wrench, first by two of top Detachable 3 bolt of corner member is unscrewed, and after taking out corresponding interior kerb-shoe member, further takes out the short side steel form 2 on top, then unscrews The detachable corner member 3 in lower part two, after taking out corresponding interior kerb-shoe member, further takes out the long side steel form 1 of both sides, finally takes again Kerb-shoe member and the short side steel form 2 of bottom out, after the taking-up of all components, paint the demoulding after member planar is cleaned out Agent.
In the present embodiment, as shown in table 1, lived with Beijing Engineering Co., Ltd first item minister An Yi gardens engineering 2#, 3# Exemplified by residence building:Shear wall distribution box 200, makes one layer of punching block according to cross construction section and meets construction requirement by 8 every layer.
Table 1
Beijing Engineering Co., Ltd first item minister An Yi gardens engineering 2#, 3# index bed amounts to distribution box hole to be provided 200 It is a, it using typified form in installation and Demolition Construction, can reduce labor intensity, improve work efficiency.After form removable, coagulation Native perception is preferable, and spillage, pitted skin, hole, the quality problems such as mould phenomenon that rise significantly reduce.Up-to-standard rate greatly improves, and reaches More than 98%.The framed number of turnover of shaping is more, can be with recycling.Reduce follow-up renewal expense so that construction cost drops It is low.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent replacement, improvement and so on, should all be included in the protection scope of the present invention god.

Claims (7)

1. detachable turnover type distribution box hole to be provided constructing device, it is characterised in that the long side punching block including a pair of parallel setting Plate and the short side steel form of a pair of parallel setting and four groups of detachable corner members, each long side steel form and short side punching block It is fixed between plate by detachable corner member described in one group, the detachable corner member includes outside corner member and inner edge Corner member, the outside corner member include outboard angle, and the interior kerb-shoe member includes interior angle steel, the outboard angle and interior angle steel it Between be equipped with the latch assembly for being used for clamping the long side steel form and short side steel form.
2. detachable turnover type distribution box hole to be provided constructing device as claimed in claim 1, it is characterised in that the locking group Part includes the threaded rod for being hingedly installed on two steel plate junctions of the outboard angle, further includes and is fixedly installed in the interior angle steel Fixed plate between two steel plates, is equipped with one on two steel plate junctions of the interior angle steel and fixed plate and is used for through hole, described Threaded rod is fixed through the through hole and by nut.
3. detachable turnover type distribution box hole to be provided constructing device as claimed in claim 1, it is characterised in that the fixed plate Angle is equipped between two steel plates of interior angle steel.
4. detachable turnover type distribution box hole to be provided constructing device as claimed in claim 1, it is characterised in that two is adjacent described Gap between long side steel form, short side steel form, interior angle steel and outboard angle is filled with filler.
5. detachable turnover type distribution box hole to be provided constructing device as claimed in claim 1, it is characterised in that the filler For concrete.
6. detachable turnover type distribution box hole to be provided constructing device as claimed in claim 1, it is characterised in that the long side steel Template is welded with short side steel form by square steel.
A kind of 7. detachable turnover type distribution box hole to be provided construction as described in claim 1-7, it is characterised in that including Following steps:
S1, while shear force wall reinforcing steel bar is bound, carry out the positioning, fix of a pair of of long side steel form and a pair of short edges steel form, Piping work;
S2, according to the absolute altitude of Design Requirement Drawing cut reinforcing bar;
Long side steel form and short side steel form and four groups of detachable corner members are carried out in working face after the completion of S3, reinforcing bar cutting Assembling;First outside corner member and interior kerb-shoe member are stood up in plane during assembling, it is after then threaded rod is unscrewed, a pair is long Side steel form and a pair of short edges steel form are respectively put between corresponding kerb-shoe member and interior kerb-shoe member, tight after being completed Gu threaded rod, fastens using to horn cupping, tape measure diagonal length is used when fastening 2/3, after ensuring to be completed It is framed be upright, so as to complete whole framed assembling;
S4, framed be completed are put it in the wall steel bar of well cutting, and mould is held up using reinforced steel in framed lower part Frame, prevents framed sinking, is withstood on framed both sides using twice backform reinforcing bar framed, prevents it from moving left and right;
S5, it is framed carry out pipe arrangement successively after installation is complete, sticked after the completion of pipe arrangement in the framed faying face part with wall form One circle sponge strip, prevents seam from not having sternly cement mortar to enter in framed;
S6, the cast for carrying out concrete;
S7, treat concrete setting be molded, shear wall formwork remove 4-5 it is small when after, it is first removable by two of top using wrench Unload corner member bolt to unscrew, after taking out corresponding interior kerb-shoe member, further take out the short side steel form on top, then unscrew lower part two A detachable corner member, after taking out corresponding interior kerb-shoe member, further takes out the long side steel form of both sides, finally further takes out outer corners Component and the short side steel form of bottom, after the taking-up of all components, releasing agent is painted after member planar is cleaned out.
CN201711185709.3A 2017-11-23 2017-11-23 Detachable turnover type distribution box hole to be provided constructing device and its construction method Pending CN107916785A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711185709.3A CN107916785A (en) 2017-11-23 2017-11-23 Detachable turnover type distribution box hole to be provided constructing device and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711185709.3A CN107916785A (en) 2017-11-23 2017-11-23 Detachable turnover type distribution box hole to be provided constructing device and its construction method

Publications (1)

Publication Number Publication Date
CN107916785A true CN107916785A (en) 2018-04-17

Family

ID=61897625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711185709.3A Pending CN107916785A (en) 2017-11-23 2017-11-23 Detachable turnover type distribution box hole to be provided constructing device and its construction method

Country Status (1)

Country Link
CN (1) CN107916785A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110630021A (en) * 2019-09-12 2019-12-31 江苏永联精筑建设集团有限公司 One-step forming construction process for embedded distribution box
CN110905187A (en) * 2019-12-09 2020-03-24 国网新疆电力有限公司建设分公司 Template structure for transformer substation main body construction

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101368444A (en) * 2008-09-10 2009-02-18 江苏省华建建设股份有限公司 Novel profiled bar and wood combination type door, window shaping template and its installation method
CN201377179Y (en) * 2009-03-06 2010-01-06 铁法煤业集团建设工程有限责任公司 Concrete wall performed square-hole model frame external-corner clamp
CN201649645U (en) * 2010-01-29 2010-11-24 中国二十二冶集团有限公司 Supporting mould clamp of simple window and door
JP2011007024A (en) * 2009-06-24 2011-01-13 Kyoto Supeesaa:Kk Open-form holding bracket
CN202467189U (en) * 2012-02-21 2012-10-03 北京城乡建设集团有限责任公司 Fixed muzzle template
CN204510817U (en) * 2015-03-31 2015-07-29 江苏南通二建集团有限公司 Hole to be provided regularization adjustable steel frame template
CN205875719U (en) * 2016-06-24 2017-01-11 中建六局建设发展有限公司 Concrete wall reserves horizontal vertical shuttering connecting piece at entrance to a cave
CN207714751U (en) * 2017-11-23 2018-08-10 中铁建设集团北京工程有限公司 Detachable turnover type distribution box hole to be provided constructing device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101368444A (en) * 2008-09-10 2009-02-18 江苏省华建建设股份有限公司 Novel profiled bar and wood combination type door, window shaping template and its installation method
CN201377179Y (en) * 2009-03-06 2010-01-06 铁法煤业集团建设工程有限责任公司 Concrete wall performed square-hole model frame external-corner clamp
JP2011007024A (en) * 2009-06-24 2011-01-13 Kyoto Supeesaa:Kk Open-form holding bracket
CN201649645U (en) * 2010-01-29 2010-11-24 中国二十二冶集团有限公司 Supporting mould clamp of simple window and door
CN202467189U (en) * 2012-02-21 2012-10-03 北京城乡建设集团有限责任公司 Fixed muzzle template
CN204510817U (en) * 2015-03-31 2015-07-29 江苏南通二建集团有限公司 Hole to be provided regularization adjustable steel frame template
CN205875719U (en) * 2016-06-24 2017-01-11 中建六局建设发展有限公司 Concrete wall reserves horizontal vertical shuttering connecting piece at entrance to a cave
CN207714751U (en) * 2017-11-23 2018-08-10 中铁建设集团北京工程有限公司 Detachable turnover type distribution box hole to be provided constructing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110630021A (en) * 2019-09-12 2019-12-31 江苏永联精筑建设集团有限公司 One-step forming construction process for embedded distribution box
CN110905187A (en) * 2019-12-09 2020-03-24 国网新疆电力有限公司建设分公司 Template structure for transformer substation main body construction

Similar Documents

Publication Publication Date Title
CN202248876U (en) Shear wall door/window opening formwork composite device
CN102704672A (en) Installation construction method for large all-steel formwork at internal corner of shear wall
CN202706536U (en) Lateral support formwork applied to post-cast strip or construction joint
CN108824676B (en) Bottom joint structure of double-sided superimposed shear wall and installation construction method thereof
CN106677520A (en) Beam, floor and corner uptight column composite structure of building aluminium alloy templates
CN201106282Y (en) Post-irrigating band, construction joint plate side module
CN107916785A (en) Detachable turnover type distribution box hole to be provided constructing device and its construction method
CN207643374U (en) Building mould is matched in adjustable industrial makeup
CN205370110U (en) Constructon site fence
CN102605902A (en) Penetrating rib and clamping hook combined steel mesh template and application method
CN206418767U (en) A kind of concrete beam strengthening device
CN102733600A (en) Totally-enclosed stair template components
CN210289132U (en) Cross-shaped constructional column combined type aluminum alloy template assembly
CN202180515U (en) Window frame precasting mould for buildings
CN207714751U (en) Detachable turnover type distribution box hole to be provided constructing device
CN203097290U (en) Assembled type split bolt
CN106013773A (en) Assembled interior and exterior wall composite template mud leakage prevention device and construction method
CN206128624U (en) Complete wooden structural grouping instrument formula wall form system
CN201614748U (en) Composite-material brace keel
CN203514341U (en) Mold supporting structure for concrete foundation hole of large device
JP2002061206A (en) Built-up method of reinforced concrete tank by panel type part
CN207499422U (en) Toilet drop crab bolt, which is fixed to repeat, utilizes steel form constructing device
CN202937002U (en) Metal net supporting fabricated formwork
CN202990423U (en) Shearing force wall opening forming die
CN207847151U (en) The telescopic support device to cornice for installing exterior wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination