CN203741864U - Special die for iron tower foundation protection cap - Google Patents

Special die for iron tower foundation protection cap Download PDF

Info

Publication number
CN203741864U
CN203741864U CN201420104239.9U CN201420104239U CN203741864U CN 203741864 U CN203741864 U CN 203741864U CN 201420104239 U CN201420104239 U CN 201420104239U CN 203741864 U CN203741864 U CN 203741864U
Authority
CN
China
Prior art keywords
iron tower
die
tower foundation
protection cap
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420104239.9U
Other languages
Chinese (zh)
Inventor
徐长义
姜吉平
张竟伟
李寿清
刘延林
刘欣伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIXI POWER SUPPLY COMPANY STATE GRID HEILONGJIANG ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Original Assignee
JIXI POWER SUPPLY COMPANY STATE GRID HEILONGJIANG ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIXI POWER SUPPLY COMPANY STATE GRID HEILONGJIANG ELECTRIC POWER Co Ltd, State Grid Corp of China SGCC filed Critical JIXI POWER SUPPLY COMPANY STATE GRID HEILONGJIANG ELECTRIC POWER Co Ltd
Priority to CN201420104239.9U priority Critical patent/CN203741864U/en
Application granted granted Critical
Publication of CN203741864U publication Critical patent/CN203741864U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides a special die for an iron tower foundation protection cap, belongs to the field of electric power transmission line construction and particularly relates to a die for the iron tower foundation protection cap. The special die mainly solves the problem that an existing iron tower foundation protection cap die is complex to assemble and the surface of the poured protection cap is rough. The protection cap die is composed of a left die and a right die which are of the same structure, a C-shaped base plate in the left die is provided with a plurality of fixed holes, a side wallboard and a main wallboard form a C shape to be vertically connected with the upper surface of the base plate, a side wall of the open end of the side wallboard is provided with a connecting plate, the connecting plate is provided with bolt holes, an edge plate is arranged on the upper edge of the wallboards, and the left die and the right die are connected through a bolt. The die for the iron tower foundation protection cap is fewer in modules and is convenient to assemble and dismantle, the outline dimension of the protection cap is accurate after die removal, concrete strength and surface smoothness of the foundation protection cap are improved, and construction efficiency is improved.

Description

Iron tower foundation protective cap particular manufacturing craft
Technical field
The utility model belongs to electric power transmission line construction field, is specifically related to a kind of mould of iron tower foundation protective cap.
Background technology
Iron tower foundation protective cap is the cement castable covering on foundation of iron tower bolt, and foundation of iron tower bolt is shielded.Foundation to protect hat cone plate is a quadra, as the injection molding that waters of foundation to protect cap.
At present; along with power construction fast development; in addition the breakage of original iron tower foundation protective cap; need to keep in repair in time; therefore the existing construction that relates to iron tower foundation protective cap gets more and more; Guo Wang company requires 66 kilovolts and the above engineering construction must up to standard providing quality goods or brilliant; construction technology must be absolutely up to standard; but the technical measures that relate to the construction of iron tower foundation protective cap in engineering construction slightly lag behind; existing iron tower foundation protective cap mould is polylith template assembly; assemble loaded down with trivial details, inefficiency, the steel tower base protective cap of building out is lack of standardization.
Utility model content
The utility model object is loaded down with trivial details in order to solve existing iron tower foundation protective cap mould assembling, the shaggy problem of protective cap of building out, and iron tower foundation protective cap particular manufacturing craft is provided.
The utility model iron tower foundation protective cap particular manufacturing craft is made up of the identical left mould of structure and right mould, wherein left mould comprises base plate, 2 sidewall panelings, main wallboard, 2 junction plates and along plate, on the plate face of the base plate of " C " shape, have multiple fixing holes, 2 sidewall panelings surround on the vertical upper surface that is connected to base plate of C shape with main wallboard, the junction plate of strip and the angle of sidewall paneling are on 90 ° of sidewalls that are arranged on sidewall paneling open end, on junction plate, have multiple bolts hole, be arranged on along plate on the upper edge of 2 sidewall panelings and main wallboard, left mould and right mould are by the bolt hole alignment on junction plate, and use bolt to connect left mould and right mould.
This iron tower foundation protective cap particular manufacturing craft is to be cut into die sheet surface according to iron tower foundation protective cap standard specification, and steel plate is made to left mould and right mould by bending, welding, punching, and mould is shaped with angle steel and strengthened intensity.Left mould becomes a separable steel iron tower foundation protective cap mould with right mould by bolt combination.In application process, only two moulds need be enclosed within on column foot basis; the mould of iron tower foundation protective cap of being bolted, shaping can complete the assembling of mould; the protective cap any surface finish that uses this iron tower foundation protective cap particular manufacturing craft to build out, has improved efficiency of construction.
Brief description of the drawings
Fig. 1 is the structural representation of left mould in iron tower foundation protective cap particular manufacturing craft;
Fig. 2 is the top view of left mould in iron tower foundation protective cap particular manufacturing craft;
Fig. 3 is the schematic diagram that left mould and right set of molds are dressed up iron tower foundation protective cap particular manufacturing craft.
Detailed description of the invention
Detailed description of the invention one: present embodiment iron tower foundation protective cap particular manufacturing craft is made up of the identical left mould of structure and right mould, wherein left mould comprises base plate 1, 2 sidewall panelings 2, main wallboard 3, 2 junction plates 4 and along plate 5, on the plate face of the base plate 1 of " C " shape, have multiple fixing hole 1-1, 2 sidewall panelings 2 surround on the vertical upper surface that is connected to base plate 1 of C shape with main wallboard 3, the junction plate 4 of strip and the angle of sidewall paneling 2 are on 90 ° of sidewalls that are arranged on sidewall paneling 2 open ends, on junction plate 4, have multiple bolt hole 4-1, be arranged on along plate 5 on the upper edge of 2 sidewall panelings 2 and main wallboard 3, left mould and right mould are by the bolt hole 4-1 alignment on junction plate 4, and use bolt to connect left mould and right mould.
Use present embodiment iron tower foundation protective cap particular manufacturing craft to replace existing carpenter's formwork (wooden form); become power work formwork; can make iron tower foundation protective cap job specfication, standardization; improve concrete strength; increase protective cap finished surface fineness; the shortening group mould time, reduces constructor's workload, improves construction technology efficiency.
Detailed description of the invention two: what present embodiment was different from detailed description of the invention one is that sidewall paneling 2 and main wallboard 3 are the steel plate of 5 millimeters thick.
Detailed description of the invention three: what present embodiment was different from detailed description of the invention one or two is to be welded with angle steel on the outer wall of sidewall paneling 2 and main wallboard 3 junctions.
The setting of present embodiment angle steel is in order to strengthen the intensity of mould.
Detailed description of the invention four: what present embodiment was different from one of detailed description of the invention one to three is that the outer wall vertical of being close to main wallboard 3 is also provided with stiffener 6 in base plate.
The setting of present embodiment stiffener is in order to strengthen the intensity of mould.
Embodiment mono-: the present embodiment iron tower foundation protective cap particular manufacturing craft is made up of the identical left mould of structure and right mould, wherein left mould comprises base plate 1, 2 sidewall panelings 2, main wallboard 3, 2 junction plates 4 and along plate 5, on the plate face of the base plate 1 of " C " shape, have multiple fixing hole 1-1, 2 sidewall panelings 2 surround on the vertical upper surface that is connected to base plate 1 of C shape with main wallboard 3, the junction plate 4 of strip and the angle of sidewall paneling 2 are on 90 ° of sidewalls that are arranged on sidewall paneling 2 open ends, on junction plate 4, have multiple bolt hole 4-1, be arranged on along plate 5 on the upper edge of 2 sidewall panelings 2 and main wallboard 3, left mould and right mould are by the bolt hole 4-1 alignment on junction plate 4, and use bolt to connect left mould and right mould.
The length of the main wallboard 3 of the present embodiment is 590mm, and the length of sidewall paneling 2 is 295mm, and the overall height of left and right mould is 320mm.
The use procedure of the present embodiment iron tower foundation protective cap particular manufacturing craft is that left mould and right mould are fastened; be enclosed within on iron tower foundation; bolt is through the bolt hole on left mould and right mould junction plate; be fastenedly connected left mould and right mould; then to concrete perfusion in mold cavity; after concrete curing molding, looser a bolt, pull down left mould and right mould.
The utility model iron tower foundation protective cap Special die component is few, and assembly and disassembly is convenient, and the protective cap appearance and size after form removal is accurate, has improved foundation to protect cap concrete strength and finish, in the construction of iron tower foundation protective cap, has improved efficiency of construction.

Claims (4)

1. iron tower foundation protective cap particular manufacturing craft, it is characterized in that this iron tower foundation protective cap particular manufacturing craft is made up of the identical left mould of structure and right mould, wherein left mould comprises base plate (1), 2 sidewall panelings (2), main wallboard (3), 2 junction plates (4) and along plate (5), on the plate face of the base plate (1) of " C " shape, have multiple fixing holes (1-1), 2 sidewall panelings (2) surround on the vertical upper surface that is connected to base plate (1) of C shape with main wallboard (3), the junction plate (4) of strip and the angle of sidewall paneling (2) are on 90 ° of sidewalls that are arranged on sidewall paneling (2) open end, on junction plate (4), have multiple bolts hole (4-1), be arranged on along plate (5) on the upper edge of 2 sidewall panelings (2) and main wallboard (3), left mould and right mould are by bolt hole (4-1) alignment on junction plate (4), and use bolt to connect left mould and right mould.
2. iron tower foundation protective cap particular manufacturing craft according to claim 1, it is characterized in that sidewall paneling (2) and main wallboard (3) are the steel plate of 5 millimeters thick.
3. iron tower foundation protective cap particular manufacturing craft according to claim 1, is characterized in that being welded with angle steel on the outer wall of sidewall paneling (2) and main wallboard (3) junction.
4. iron tower foundation protective cap particular manufacturing craft according to claim 1, is characterized in that the outer wall vertical of being close to main wallboard (3) is also provided with stiffener (6) in base plate (1).
CN201420104239.9U 2014-03-07 2014-03-07 Special die for iron tower foundation protection cap Expired - Fee Related CN203741864U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420104239.9U CN203741864U (en) 2014-03-07 2014-03-07 Special die for iron tower foundation protection cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420104239.9U CN203741864U (en) 2014-03-07 2014-03-07 Special die for iron tower foundation protection cap

Publications (1)

Publication Number Publication Date
CN203741864U true CN203741864U (en) 2014-07-30

Family

ID=51341685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420104239.9U Expired - Fee Related CN203741864U (en) 2014-03-07 2014-03-07 Special die for iron tower foundation protection cap

Country Status (1)

Country Link
CN (1) CN203741864U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088163A (en) * 2016-06-17 2016-11-09 国网黑龙江省电力有限公司鸡西供电公司 Iron tower foundation protective cap special modular mold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088163A (en) * 2016-06-17 2016-11-09 国网黑龙江省电力有限公司鸡西供电公司 Iron tower foundation protective cap special modular mold

Similar Documents

Publication Publication Date Title
CN110978229A (en) Method for prefabricating composite floor slab by splicing type mold
CN208343121U (en) Prefabricated assembled steel structure concrete wallboard mould
CN203741864U (en) Special die for iron tower foundation protection cap
CN103806650A (en) Steel column mould and construction method thereof
CN212312306U (en) Novel bench formwork for manufacturing prefabricated laminated slab
CN202937003U (en) Aluminium alloy easy-dismounting formwork for buildings
CN202639230U (en) No-box casting system for bimetallic casting
CN203994169U (en) A kind of combined wall board casting mold
CN106088163A (en) Iron tower foundation protective cap special modular mold
CN203733614U (en) Current transformer casting mold and casting molding device
WO2016127275A1 (en) Multi-purpose combined formwork
CN204249251U (en) Large-scale frame series products injection moulding palletizing die structure
CN201872231U (en) Adjustable composite steel mold
CN203765766U (en) Biological protection building block formwork of nuclear power station
CN205976467U (en) Modular aluminum alloy building templates
CN213352836U (en) Steel-wood mixing mold for concrete prefabricated part
CN211566280U (en) High-pressure brick die
CN104120805B (en) A kind of concrete is built a wall the construction method of body and structure
WO2016106758A1 (en) Multi-purpose combined formwork
CN202963367U (en) Wooden mold
CN202380719U (en) Adjustable large steel formwork
CN202053356U (en) Combined mold for producing corundum prefabricated brick
CN211137568U (en) Prefabricated coincide floor forming die of concatenation formula
CN203919338U (en) Polystyrene wallboard manufacture device
CN202380724U (en) Dual-purpose plastic corner mould for construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140730

Termination date: 20190307

CF01 Termination of patent right due to non-payment of annual fee