CN203741864U - Special die for iron tower foundation protection cap - Google Patents

Special die for iron tower foundation protection cap Download PDF

Info

Publication number
CN203741864U
CN203741864U CN201420104239.9U CN201420104239U CN203741864U CN 203741864 U CN203741864 U CN 203741864U CN 201420104239 U CN201420104239 U CN 201420104239U CN 203741864 U CN203741864 U CN 203741864U
Authority
CN
China
Prior art keywords
protection cap
die
iron tower
tower foundation
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420104239.9U
Other languages
Chinese (zh)
Inventor
徐长义
姜吉平
张竟伟
李寿清
刘延林
刘欣伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jixi Power Supply Co of State Grid Heilongjiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jixi Power Supply Co of State Grid Heilongjiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jixi Power Supply Co of State Grid Heilongjiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420104239.9U priority Critical patent/CN203741864U/en
Application granted granted Critical
Publication of CN203741864U publication Critical patent/CN203741864U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model provides a special die for an iron tower foundation protection cap, belongs to the field of electric power transmission line construction and particularly relates to a die for the iron tower foundation protection cap. The special die mainly solves the problem that an existing iron tower foundation protection cap die is complex to assemble and the surface of the poured protection cap is rough. The protection cap die is composed of a left die and a right die which are of the same structure, a C-shaped base plate in the left die is provided with a plurality of fixed holes, a side wallboard and a main wallboard form a C shape to be vertically connected with the upper surface of the base plate, a side wall of the open end of the side wallboard is provided with a connecting plate, the connecting plate is provided with bolt holes, an edge plate is arranged on the upper edge of the wallboards, and the left die and the right die are connected through a bolt. The die for the iron tower foundation protection cap is fewer in modules and is convenient to assemble and dismantle, the outline dimension of the protection cap is accurate after die removal, concrete strength and surface smoothness of the foundation protection cap are improved, and construction efficiency is improved.

Description

铁塔基础保护帽专用模具Special mold for iron tower foundation protection cap

技术领域technical field

本实用新型属于电力输电线路建设领域,具体涉及一种铁塔基础保护帽的模具。The utility model belongs to the field of electric power transmission line construction, in particular to a mold for an iron tower foundation protection cap.

背景技术Background technique

铁塔基础保护帽是覆盖在铁塔地脚螺栓上的水泥注块,对铁塔地脚螺栓起保护作用。基础保护帽模板为一个方形框架,作为基础保护帽的浇注模。The tower foundation protection cap is a cement block covering the tower anchor bolts, which protects the tower anchor bolts. The basic protective cap template is a square frame, which is used as the pouring mold for the basic protective cap.

目前,随着电力建设快速发展,加之原有铁塔基础保护帽的破损,需要及时进行维修,因此现有涉及铁塔基础保护帽的施工越来越多,国网公司要求66千伏及以上的工程建设必须达标创优,施工工艺必须百分之百达标,但在工程建设涉及铁塔基础保护帽施工的技术措施略有滞后,现有铁塔基础保护帽模具为多块模板拼装,组装繁琐,工作效率低,浇筑出的铁塔基保护帽不规范。At present, with the rapid development of electric power construction and the damage of the original tower foundation protection cap, timely repairs are required. Therefore, there are more and more constructions involving the tower foundation protection cap. The State Grid Corporation requires 66 kV and above projects The construction must meet the standard and create excellence, and the construction technology must be 100% up to the standard. However, the technical measures related to the construction of the iron tower foundation protection cap are slightly lagging behind. The existing iron tower foundation protection cap mold is assembled from multiple templates, which is cumbersome to assemble. The protective cap of the iron tower base is not standardized.

实用新型内容Utility model content

本实用新型目的是为了解决现有铁塔基础保护帽模具组装繁琐,浇筑出的保护帽表面粗糙的问题,而提供铁塔基础保护帽专用模具。The purpose of the utility model is to provide a special mold for the protection cap of the iron tower foundation in order to solve the problems of cumbersome assembly of the existing iron tower foundation protection cap mold and rough surface of the poured protection cap.

本实用新型铁塔基础保护帽专用模具由结构相同的左模具和右模具组成,其中左模具包括底板、2块侧壁板、主壁板、2块连接板和沿板,在“C”形状的底板的板面上开有多个固定孔,2块侧壁板与主壁板围成C形垂直连接到底板的上表面上,长条形的连接板与侧壁板的夹角呈90°设置在侧壁板开放端的侧壁上,在连接板上开有多个螺栓孔,沿板设置在2块侧壁板与主壁板的上边沿上,左模具和右模具通过连接板上的螺栓孔对齐,并使用螺栓连接左模具和右模具。The special mold for the protection cap of the iron tower foundation of the utility model is composed of a left mold and a right mold with the same structure, wherein the left mold includes a bottom plate, 2 side wall plates, a main wall plate, 2 connecting plates and an edge plate, in the "C" shape There are multiple fixing holes on the surface of the base plate, and the two side wall plates and the main wall plate form a C shape and are vertically connected to the upper surface of the base plate, and the angle between the long connecting plate and the side wall plate is 90° It is set on the side wall of the open end of the side wall plate, and there are a plurality of bolt holes on the connecting plate. Align the bolt holes and connect the left and right molds with bolts.

该铁塔基础保护帽专用模具是按照铁塔基础保护帽标准规格裁成模具板面,将钢板通过折弯、焊接、打孔制成左模具和右模具,模具用角钢定型并加强强度。左模具和右模具通过螺栓组合成一个可分合的钢质铁塔基础保护帽模具。在应用过程中只需将两件模具套在塔脚基础上,通过螺栓连接、定型铁塔基础保护帽的模具即可完成模具的组装,使用此铁塔基础保护帽专用模具浇筑出的保护帽表面光洁,提高了施工效率。The special mold for the iron tower foundation protection cap is cut into the mold plate surface according to the standard specifications of the iron tower foundation protection cap, and the steel plate is bent, welded and punched to make the left mold and the right mold, and the mold is shaped and strengthened with angle steel. The left mold and the right mold are combined into a detachable steel tower foundation protective cap mold by bolts. In the application process, it is only necessary to put two molds on the foundation of the tower foot, and the mold assembly can be completed by connecting the bolts and shaping the mold of the iron tower foundation protection cap. The surface of the protection cap casted by this special mold for the iron tower foundation protection cap is smooth and clean , Improve the construction efficiency.

附图说明Description of drawings

图1是铁塔基础保护帽专用模具中左模具的结构示意图;Fig. 1 is the structural representation of the left mold in the special mold for iron tower foundation protection cap;

图2是铁塔基础保护帽专用模具中左模具的俯视图;Fig. 2 is the top view of the left mold in the special mold for iron tower foundation protection cap;

图3是左模具和右模具组装成铁塔基础保护帽专用模具的示意图。Fig. 3 is a schematic diagram of a special mold for the iron tower foundation protective cap assembled from the left mold and the right mold.

具体实施方式Detailed ways

具体实施方式一:本实施方式铁塔基础保护帽专用模具由结构相同的左模具和右模具组成,其中左模具包括底板1、2块侧壁板2、主壁板3、2块连接板4和沿板5,在“C”形状的底板1的板面上开有多个固定孔1-1,2块侧壁板2与主壁板3围成C形垂直连接到底板1的上表面上,长条形的连接板4与侧壁板2的夹角呈90°设置在侧壁板2开放端的侧壁上,在连接板4上开有多个螺栓孔4-1,沿板5设置在2块侧壁板2与主壁板3的上边沿上,左模具和右模具通过连接板4上的螺栓孔4-1对齐,并使用螺栓连接左模具和右模具。Specific embodiment one: the special mold for the iron tower foundation protective cap in this embodiment is made up of left mold and right mold with the same structure, wherein the left mold includes bottom plate 1, 2 side wall plates 2, main wall plate 3, 2 connecting plates 4 and Along the plate 5, a plurality of fixing holes 1-1 are opened on the surface of the “C” shaped bottom plate 1, and two side wall plates 2 and the main wall plate 3 are surrounded by a C shape and vertically connected to the upper surface of the bottom plate 1 , the angle between the strip-shaped connecting plate 4 and the side wall plate 2 is 90° and is arranged on the side wall of the open end of the side wall plate 2, and a plurality of bolt holes 4-1 are opened on the connecting plate 4, and are arranged along the plate 5 On the upper edge of the two side wall panels 2 and the main wall panel 3, the left mold and the right mold are aligned through the bolt holes 4-1 on the connecting plate 4, and bolts are used to connect the left mold and the right mold.

使用本实施方式铁塔基础保护帽专用模具代替了现有的木工支模(木模板),变为力工支模,可使铁塔基础保护帽施工规范化、标准化,提高砼强度,增加保护帽成品表面光洁度,缩短组模时间,减少施工人员工作量,提高施工工艺效率。Using the special mold for the iron tower foundation protection cap in this embodiment replaces the existing carpentry formwork (wood formwork) and becomes a mechanical support formwork, which can standardize and standardize the construction of the iron tower foundation protection cap, improve the concrete strength, and increase the surface of the finished protection cap. Smoothness, shorten the time of forming the mold, reduce the workload of construction personnel, and improve the efficiency of construction technology.

具体实施方式二:本实施方式与具体实施方式一不同的是侧壁板2和主壁板3为5毫米厚的钢板。Embodiment 2: This embodiment differs from Embodiment 1 in that the side wall plate 2 and the main wall plate 3 are steel plates with a thickness of 5 mm.

具体实施方式三:本实施方式与具体实施方式一或二不同的是在侧壁板2与主壁板3连接处的外壁上焊接有角钢。Embodiment 3: This embodiment differs from Embodiment 1 or Embodiment 2 in that an angle steel is welded on the outer wall of the joint between the side wall plate 2 and the main wall plate 3 .

本实施方式角钢的设置用以加强模具的强度。The arrangement of the angle steel in this embodiment is used to strengthen the strength of the mould.

具体实施方式四:本实施方式与具体实施方式一至三之一不同的是紧贴主壁板3的外壁垂直于底板还设置有加强板6。Embodiment 4: This embodiment differs from Embodiments 1 to 3 in that the outer wall close to the main wall plate 3 is perpendicular to the bottom plate and is also provided with a reinforcing plate 6 .

本实施方式加强板的设置用以加强模具的强度。In this embodiment, the reinforcing plate is provided to strengthen the strength of the mould.

实施例一:本实施例铁塔基础保护帽专用模具由结构相同的左模具和右模具组成,其中左模具包括底板1、2块侧壁板2、主壁板3、2块连接板4和沿板5,在“C”形状的底板1的板面上开有多个固定孔1-1,2块侧壁板2与主壁板3围成C形垂直连接到底板1的上表面上,长条形的连接板4与侧壁板2的夹角呈90°设置在侧壁板2开放端的侧壁上,在连接板4上开有多个螺栓孔4-1,沿板5设置在2块侧壁板2与主壁板3的上边沿上,左模具和右模具通过连接板4上的螺栓孔4-1对齐,并使用螺栓连接左模具和右模具。Embodiment 1: The special mold for the iron tower foundation protective cap in this embodiment is composed of a left mold and a right mold with the same structure, wherein the left mold includes a bottom plate 1, two side wall plates 2, a main wall plate 3, two connecting plates 4 and edge plates. The plate 5 is provided with a plurality of fixing holes 1-1 on the surface of the base plate 1 in the shape of a “C”, and two side wall plates 2 and the main wall plate 3 form a C shape and are vertically connected to the upper surface of the base plate 1, The angle between the strip-shaped connecting plate 4 and the side wall plate 2 is 90° and is arranged on the side wall of the open end of the side wall plate 2, and a plurality of bolt holes 4-1 are opened on the connecting plate 4, and are arranged on the side wall along the plate 5. On the upper edge of 2 side wall panels 2 and the main wall panel 3, the left mold and the right mold are aligned through the bolt holes 4-1 on the connecting plate 4, and bolts are used to connect the left mold and the right mold.

本实施例主壁板3的长度为590mm,侧壁板2的长度为295mm,左、右模具的总高度为320mm。The length of the main wall panel 3 of the present embodiment is 590mm, the length of the side wall panel 2 is 295mm, and the total height of the left and right molds is 320mm.

本实施例铁塔基础保护帽专用模具的使用过程是将左模具和右模具扣合,套在铁塔基础上,螺栓穿过左模具和右模具连接板上的螺栓孔,紧固连接左模具和右模具,然后向模具腔中灌注混凝土,待混凝土固化成型后,拧松螺栓,拆下左模具和右模具即可。The use process of the special mold for the protection cap of the iron tower foundation in this embodiment is to fasten the left mold and the right mold, put them on the iron tower foundation, pass the bolts through the bolt holes on the connecting plate of the left mold and the right mold, and fasten the left mold and the right mold. Then pour concrete into the mold cavity. After the concrete is solidified and formed, loosen the bolts and remove the left and right molds.

本实用新型铁塔基础保护帽专用模具组件少,组装拆卸方便,拆模后的保护帽外形尺寸精准,提高了基础保护帽砼强度和表面光洁度,在铁塔基础保护帽施工中提高了施工效率。The utility model has fewer special mold components for the iron tower foundation protection cap, and is convenient to assemble and disassemble.

Claims (4)

1. iron tower foundation protective cap particular manufacturing craft, it is characterized in that this iron tower foundation protective cap particular manufacturing craft is made up of the identical left mould of structure and right mould, wherein left mould comprises base plate (1), 2 sidewall panelings (2), main wallboard (3), 2 junction plates (4) and along plate (5), on the plate face of the base plate (1) of " C " shape, have multiple fixing holes (1-1), 2 sidewall panelings (2) surround on the vertical upper surface that is connected to base plate (1) of C shape with main wallboard (3), the junction plate (4) of strip and the angle of sidewall paneling (2) are on 90 ° of sidewalls that are arranged on sidewall paneling (2) open end, on junction plate (4), have multiple bolts hole (4-1), be arranged on along plate (5) on the upper edge of 2 sidewall panelings (2) and main wallboard (3), left mould and right mould are by bolt hole (4-1) alignment on junction plate (4), and use bolt to connect left mould and right mould.
2. iron tower foundation protective cap particular manufacturing craft according to claim 1, it is characterized in that sidewall paneling (2) and main wallboard (3) are the steel plate of 5 millimeters thick.
3. iron tower foundation protective cap particular manufacturing craft according to claim 1, is characterized in that being welded with angle steel on the outer wall of sidewall paneling (2) and main wallboard (3) junction.
4. iron tower foundation protective cap particular manufacturing craft according to claim 1, is characterized in that the outer wall vertical of being close to main wallboard (3) is also provided with stiffener (6) in base plate (1).
CN201420104239.9U 2014-03-07 2014-03-07 Special die for iron tower foundation protection cap Expired - Fee Related CN203741864U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420104239.9U CN203741864U (en) 2014-03-07 2014-03-07 Special die for iron tower foundation protection cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420104239.9U CN203741864U (en) 2014-03-07 2014-03-07 Special die for iron tower foundation protection cap

Publications (1)

Publication Number Publication Date
CN203741864U true CN203741864U (en) 2014-07-30

Family

ID=51341685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420104239.9U Expired - Fee Related CN203741864U (en) 2014-03-07 2014-03-07 Special die for iron tower foundation protection cap

Country Status (1)

Country Link
CN (1) CN203741864U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088163A (en) * 2016-06-17 2016-11-09 国网黑龙江省电力有限公司鸡西供电公司 Iron tower foundation protective cap special modular mold
CN118148431A (en) * 2024-05-09 2024-06-07 山西省安装集团股份有限公司 Device and method for constructing foundation of electric collecting line iron tower

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088163A (en) * 2016-06-17 2016-11-09 国网黑龙江省电力有限公司鸡西供电公司 Iron tower foundation protective cap special modular mold
CN118148431A (en) * 2024-05-09 2024-06-07 山西省安装集团股份有限公司 Device and method for constructing foundation of electric collecting line iron tower
CN118148431B (en) * 2024-05-09 2024-07-12 山西省安装集团股份有限公司 Device and method for constructing foundation of electric collecting line iron tower

Similar Documents

Publication Publication Date Title
CN103243730B (en) The mould on casting concrete basis
CN110722666A (en) Splicing type prefabricated composite floor slab forming die and splicing method thereof
CN108687939A (en) The universal mold of house prefabricated components overlapping sheet metal forming
CN204386154U (en) Wall internal corner concrete casting shaping equipment
CN203741864U (en) Special die for iron tower foundation protection cap
CN204199687U (en) A kind of bath is fallen plate-girder side shaping tool formula between defending and is hung die device
CN204354275U (en) A kind of cable duct list ditch mould
CN204221939U (en) A kind of precast concrete cable channel cover plate mold system
CN208343121U (en) Prefabricated assembled steel structure concrete wallboard mould
CN204626956U (en) A kind of combination set shaped steel formwork
CN209903505U (en) A concrete experimental model pouring mold
CN204418654U (en) For the aluminum alloy pattern plate between body of wall
CN205704621U (en) For pouring into a mould the battery mould of the big wallboard with protruding crossbeam
CN106088163A (en) Iron tower foundation protective cap special modular mold
CN204221941U (en) A kind of combined type sycon cable duct mould
CN211709601U (en) A prefabricated laminated plate mold with adjustable size
CN205063361U (en) Forming die of reinforced concrete protective layer setting element
CN207700692U (en) A kind of floor cave entrance reservation structure
CN206667744U (en) A kind of basement roof post-cast strip side template support system
CN205291221U (en) Prefabricated mould of concrete guardrail
CN205976467U (en) Modular aluminum alloy building templates
CN203782712U (en) Equipment for pouring and forming foundation protection cap
CN105239770A (en) Integrally-cast steel frame-plastic building formwork system
CN205421712U (en) Reinforced concrete embeds channel steel structure
CN207058839U (en) A kind of mould of prefabricated terminal box basic component

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140730