CN207641641U - Water circulation system for building waste processing - Google Patents

Water circulation system for building waste processing Download PDF

Info

Publication number
CN207641641U
CN207641641U CN201721624098.3U CN201721624098U CN207641641U CN 207641641 U CN207641641 U CN 207641641U CN 201721624098 U CN201721624098 U CN 201721624098U CN 207641641 U CN207641641 U CN 207641641U
Authority
CN
China
Prior art keywords
pond
mud
water
sand
refuse receptacle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721624098.3U
Other languages
Chinese (zh)
Inventor
江晓丹
林秋平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Jiangshi Enze Industrial Co ltd
Original Assignee
Shenzhen City Jiasheng Environmental Protection Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen City Jiasheng Environmental Protection Industry Co Ltd filed Critical Shenzhen City Jiasheng Environmental Protection Industry Co Ltd
Priority to CN201721624098.3U priority Critical patent/CN207641641U/en
Application granted granted Critical
Publication of CN207641641U publication Critical patent/CN207641641U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Abstract

The utility model provides a kind of water circulation system for building waste processing, include for washing the first husky pond, second pond and sand washer, third pond and the 6th pond for storing mud, the first cyclone separator for detaching sandstone and mud, the first refuse receptacle for detaching mud, first Pulp pump and Duo Tai filter presses, water circulation system further includes clear water reserviors, clear water reserviors are respectively connected to the first pond equipped with pipeline, second pond, third pond, 6th pond, first refuse receptacle and multiple filter presses, the water of multiple filter press separation is flowed into through pipeline in clear water reserviors, clear water reserviors are respectively to the first pond, second pond, sand washer, third pond, 6th pond and the first refuse receptacle supply water.By above-mentioned setting, recycling for water is realized, save water resource, energy conservation and environmental protection.

Description

Water circulation system for building waste processing
Technical field
The utility model belongs to technical field of waste treatment more particularly to a kind of water cyclic system for building waste processing System.
Background technology
Building waste refers to that construction, unit in charge of construction or individual build all kinds of buildings, structures, pipe network etc., spread If or removing, generated dregs, spoir, rejected material, mud and other wastes in reparative processes.With industrialization, urbanization The acceleration of process, construction industry is also fast-developing simultaneously, and the building waste generated together is increasing, the number of Chinese architecture rubbish Amount has accounted for 1/3 of municipal refuse total amount or more.It is calculated with 500-600 tons/ten thousand square metres of standard, arrives the year two thousand twenty, China is also By about 30,000,000,000 square metres of newly-increased construction area, newly generated building waste will be a shocking number.However, big absolutely Part building waste just transports countryside or rural area, air storage or landfill to without any processing by unit in charge of construction, consumes a large amount of The pork barrels such as land acquisition expense, refuse collection expense, meanwhile, it clears and is flown upward with dust, sand-lime with dropping in stacking process Problem causes serious environmental pollution again.
The processing mode of building waste presently mainly carries out limited recycling using the technologies such as sorting, broken, and Include complicated component in the building waste of recycling, cannot act as the major ingredient of new construction, auxiliary material can only be used as to utilize, to building rubbish The digestion amount of rubbish is small, and water waste is serious in processing procedure, seriously polluted, the not energy-efficient environmental protection of generation.
Therefore, above-mentioned technical problem in the urgent need to address.
Utility model content
The purpose of this utility model is to provide a kind of water circulation system for building waste processing, in processing building waste During, it realizes recycling for water, saves water resource, energy conservation and environmental protection.
To realize that the purpose of this utility model, the utility model provide the following technical solution:
The utility model provides a kind of water circulation system for building waste processing, includes for washing the first husky water Pond, the second pond and sand washer, third pond and the 6th pond for storing mud, first for detaching sandstone and mud Cyclone separator, the first refuse receptacle, the first Pulp pump and Duo Tai filter presses for detaching mud, the water circulation system further include Clear water reserviors, the clear water reserviors are respectively connected to first pond, second pond, the third pond, institute equipped with pipeline The 6th pond, first refuse receptacle and the multiple filter press are stated, the water of the multiple filter press separation flows into institute through pipeline It states in clear water reserviors, the clear water reserviors are respectively to first pond, second pond, the third pond, the 6th water Pond and first refuse receptacle supply water, and the mud that first pond is washed after sand enters the third pond, first eddy flow Mud in the third pond is separated into the sandstone for entering the 6th pond and enters first refuse receptacle by separator Mud.
Wherein, the first water channel, first cyclone separator are connected between the third pond and first pond The first dredging tube is connected between first refuse receptacle, the mud that first cyclone separator is isolated is through described first Dredging tube is delivered to first refuse receptacle and is precipitated, and the mud of the first refuse receptacle bottom precipitation is through first slurry Pump is delivered to the filter press, and the filter press obtains mud after squeezing mud, and detaches water outlet.
Wherein, further include the 4th pond and the 5th pond for storing mud, detach the second eddy flow of sandstone and mud Separator, third cyclone separator and the 4th cyclone separator, for detaching the second refuse receptacle of mud, third refuse receptacle, second Pulp pump and third Pulp pump are also associated with the second water channel, the 5th water between the 4th pond and second pond Third water channel is also associated between pond and the sand washer, the mud that the 4th pond is isolated is delivered to through third dredging tube Second refuse receptacle, the mud that the 5th pond is isolated is delivered to the third refuse receptacle through the 4th dredging tube, described The mud that 6th pond is isolated is delivered to the third refuse receptacle through the second dredging tube, the second refuse receptacle bottom precipitation Mud is delivered to the filter press through second Pulp pump, and the mud of the third refuse receptacle bottom precipitation is through the third slag Stock pump is delivered to the filter press.
Wherein, the clear water reserviors set the first water route, the second water route and third water route, and first water route is from the clear water reserviors After extraction, it is delivered to first pond, second pond and the sand washer respectively;Second water route is from the clear water After pond is drawn, it is delivered to the third pond, the 4th pond, the 5th pond and the 6th pond respectively;It is described Third water route is respectively delivered to first refuse receptacle, second refuse receptacle and the third after clear water reserviors extraction Refuse receptacle.
Wherein, the mud that the partially aqueous after sand is washed in first pond flows into the third water through first water channel Pond also has partially aqueous sandstone to enter second pond in first pond;The part after sand is washed in second pond Aqueous slurry enters the 4th pond through second water channel, also has in second pond described in the entrance of partially aqueous sandstone Sand washer;The mud washed after sand in the sand washer enters the 5th pond through the third water channel.
Wherein, further include rough sand dewaterer, also have partially aqueous sandstone to enter the rough sand dewaterer in the sand washer, The rough sand dewaterer is additionally provided with pipeline and dewatered water is delivered to the 5th pond.
Wherein, further include fine sand dewaterer and the 4th conveyer belt, first cyclone separator, the third cyclonic separation The aqueous sandstone that device and the 4th cyclone separator are isolated are delivered to the 6th pond through the 4th conveyer belt, described Fine sand dewaterer is additionally provided with pipeline and dewatered water is delivered to the 6th pond.
Wherein, first refuse receptacle includes the first staving, including the first peripheral wall and is fixedly connected on first peripheral wall The bottom wall of one end;Second peripheral wall, one end of second peripheral wall are fixedly attached to the bottom wall and form the second staving, and described second Staving is located in first staving;Sleeve is sheathed on outside second staving, shape between the sleeve and first peripheral wall At receiving space, the first gap is formed between the sleeve and second peripheral wall;Second staving fills with mud mixture Afterwards, the mud mixture is overflowed from second staving, and the receiving space is flowed into behind first gap.
Wherein, it is equipped with tiltedly material in the receiving space and is intubated layer, the oblique material intubation layer is used for the receiving space point It is divided into clear water zone and mud area.
Wherein, the bottom wall is equipped with first discharge port, and the first discharge port is connected to the receiving space and the external world, is used for The mud in the mud area is discharged.
The beneficial effects of the utility model:
Building waste processing system provided by the utility model is by being arranged the first pond, the second pond, third pond, the Six ponds, sand washer, the first cyclone separator, the first refuse receptacle, the first Pulp pump, more filter presses and clear water reserviors, are building In garbage processing procedure, the first pond of clear water reserviors pair, the second pond, third pond, the 6th pond, sand washer and the first refuse receptacle It supplies water, the water of filter press separation enters clear water reserviors, realizes recycling for water, saves water resource, energy conservation and environmental protection.
Description of the drawings
It, below will be to implementing in order to illustrate more clearly of the utility model embodiment or technical solution in the prior art Mode or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, the accompanying drawings in the following description Only some embodiments of the utility model are not making the creative labor for those of ordinary skill in the art Under the premise of, other drawings may also be obtained based on these drawings.
Fig. 1 is a kind of structural schematic diagram of the building waste processing system of embodiment of the utility model;
Fig. 2 is the water circulation system structural schematic diagram in Fig. 1;
Fig. 3 is the structural schematic diagram of the first cyclone separator in Fig. 1;
Fig. 4 a are a kind of structural schematic diagrams of the charger in embodiment;
Fig. 4 b are the left view structural representations of the charger in Fig. 4 a;
Fig. 5 a are the structural schematic diagram for the waste material seperator that the utility model embodiment provides;
Fig. 5 b are the structural schematic diagram at another visual angle for the waste material seperator that the utility model embodiment provides;
Fig. 5 c are the structural schematic diagram of the first cylinder for the waste material seperator that the utility model embodiment provides;
Fig. 5 d are the structural schematic diagram of the sieve part for the waste material seperator that the utility model embodiment provides;
Fig. 6 a are the structural schematic diagram for the husky machine of fishing that the utility model embodiment provides;
Fig. 6 b are the structural schematic diagram of the tipping bucket for the husky machine of fishing that the utility model embodiment provides;
Fig. 7 a are the structural schematic diagram for the sand sieving machine that the utility model embodiment provides;
Fig. 7 b are the structural schematic diagram of the first cylinder of the sand sieving machine that the utility model embodiment provides;
Fig. 7 c are the structural schematic diagram of the second cylinder of the sand sieving machine that the utility model embodiment provides;
Fig. 8 a are a kind of dimensional structure diagrams of the sand washer of embodiment of the utility model;
Fig. 8 b are the runner cross-sectional structure schematic diagrames of the sand washer in Fig. 8 a;
Fig. 8 c are the sieve-plate structure schematic diagrames of the sand washer in Fig. 8 a;
Fig. 8 d are the slab construction schematic diagrames of the sand washer in Fig. 8 a;
Fig. 8 e are the use state diagrams of the sand washer of Fig. 8 a;
Fig. 9 a are a kind of dimensional structure diagrams of the vibrating-dewatering screen of embodiment of the utility model;
Fig. 9 b are the right side structural representations of the vibrating-dewatering screen in Fig. 9 a;
Fig. 9 c are the partial enlargement structural representations of the compass screen surface of the vibrating-dewatering screen in Fig. 9 a;
Figure 10 a are the structural schematic diagram for the mud separator that the utility model embodiment provides;
Figure 10 b are the schematic cross-section for the mud separator that the utility model embodiment provides;
Figure 10 c are the vertical view for the mud separator that the utility model embodiment provides.
Specific implementation mode
Below in conjunction with the attached drawing in the utility model embodiment, to the technical solution in the utility model embodiment It being clearly and completely described, it is clear that described embodiment is only a part of embodiment of the utility model, without It is whole embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not making creation Property labour under the premise of the every other embodiment that is obtained, shall fall within the protection scope of the present invention.
It please refers to Fig.1 and Fig. 2, a kind of better embodiment of the utility model provides a kind of building waste processing system, Including rough sand system 100, fine sand system 200, mud system 300 and water circulation system 400, the rough sand system 100 with it is described thin Husky system 200 connects, and the fine sand system 200 is connect with the mud system 300, and the water circulation system 40 is respectively to described thick Husky system 100, the fine sand system 200 and the mud system 300 supply water, and the rough sand system 100 is fed, in obtained rough sand mistake The mud generated in journey enters the fine sand system 200, the fine sand system 200 during fine sand is made the mud that generates into Enter the mud treatment system 300, the mud treatment system 300 is made the water generated during mud cake and enters the water circulation system 400。
In present embodiment, by the way that rough sand system 100, fine sand system 200, mud system 300 and water circulation system is arranged 400, and each system is organically combined, the isolated rough sand of energy, fine sand and mud, and can realize recycling for water, have It has imitated and has recycled building waste, and water resource, energy conservation and environmental protection can be saved.
In present embodiment, the size range of rough sand and fine sand can be adjusted by the market demand, it is however generally that, it is obtained The size range of rough sand be 0.5mm~8mm, the size range of fine sand is 0.075mm~0.5mm.Rough sand can be used for making mixed Solidifying soil, fine sand can be used for plastering and jointing, mud can be used for brickmaking.
Further, the rough sand system 100 includes the charger 101 being sequentially arranged, the fishing of waste material seperator 102, first Husky machine 106, the husky machine 109 of the fishing of crusher 107, second, sand sieving machine 110, sand washer 112 and rough sand dewaterer 113, wherein described The outlet of waste material seperator 101 is equipped with the first pond 105, and the outlet of the crusher 107 is equipped with the second pond 108, first fishing Husky machine 106 send the sandstone fishing that the scrap separator 102 detaches to the crusher 107, institute from first pond 105 The second fishing sand machine 109 is stated to drag for the sandstone that the crusher 107 is crushed into the sand sieving machine 110 from second pond 108, The rough sand dewaterer 113 is connected with first conveyer belt (not shown), and the first conveyer belt is set on holder 115, And the first conveyer belt is movably arranged on the holder 115.
Wherein, the 6th conveyer belt 114 can also be set between holder 115 and rough sand dewaterer 113, pass through the 6th conveyer belt 114 are delivered to 113 dewatered rough sand of rough sand dewaterer in the first conveyer belt on holder 115, defeated for adjustment first The installation position for sending band is more convenient for installing equipment according to geographical terrain.Be additionally provided on holder 115 can opposite brackets 115 sliding set The secondary support 116 set, first conveyer belt are also partly arranged on secondary support 116, change rough sand by the sliding of secondary support 116 Discharge position so that rough sand can carry out discharging in rough sand discharge zone 117.Holder 115 can be supported on by pillar 118 apart from ground compared with High position can directly use truck then rough sand below holder 116 in rough sand discharge zone 117 in this way, and can save will be thick Sand refills the step being downloaded on truck, improves efficiency.
Further, 106 one end of the husky machine of first fishing is set in first pond 105, the husky machine of the first fishing The 106 opposite other ends raise setting, and make the husky machine 106 of the first fishing from the scrap separator 102 to the crusher 107 directions are in the structure gradually risen, and 109 one end of the husky machine of second fishing is set in second pond 108, and described second The opposite other end of the husky machine 109 of fishing raises setting, and keeps the husky machine 109 of the second fishing husky from the crusher 107 to the sieve 110 direction of machine is in the structure gradually risen, and the second conveyer belt is also associated between the sand sieving machine 110 and the crusher 203 111, second conveyer belt 111 conveys the sand sieving machine 110 and sieves the sandstone of the bulky grain generated after sand to the crusher 107 Carry out second-time breakage.
Sand is dragged for from the first pond 105 by setting the first fishing sand machine 106, with to being separated in scrap separator 102 Sandstone carry out preliminary washing, part mud and fine sand can be washed out, the sandstone pulled out are broken through crusher 107, large-sized sand Stone is crushed into the sandstone of small size, by the screening of the sieve in crusher 107, obtains size and is less than 107 sieve of crusher Sandstone of size, and be sent into the second pond 108 and washed, further wash out part mud and fine sand, the husky machine of the second fishing 109 from The sandstone pulled out in second pond 108 are screened through sand sieving machine 110, obtain the sandstone that size is less than 110 screen mesh size of sand sieving machine, Middle size is delivered to crusher 107 by the second conveyer belt 111 more than the sandstone of 110 screen mesh size of sand sieving machine and is broken again It is broken, until size is less than 110 screen mesh size of sand sieving machine.Sand sieving machine 110 conveys sandstone and enters sand washer 112, sand washer 112 Inside be connected with water, by runner rotation drive sand washer 112 in sandstone be sufficiently mixed with water, and by sandstone itself and with The friction of sand washer 112 so that mud and fine sand suspend in water, and rough sand then takes rough sand dewaterer 113 to by runner, wash sand Machine 112 may include multiple and be used in series, to accelerate to wash husky efficiency.
Further, the waste material seperator 102 is connected with third conveyer belt 103, and the waste material seperator 102 detaches sand The waste material that stone generates is transported by the third conveyer belt 103.In general, waste material include the big reinforcing bar of size, plank etc. cannot Pass through the building waste of the sieve in waste material seperator 102.The waste material that third conveyer belt 103 conveys deposits in waste material storage area 104, these waste materials can be recycled certainly with other modes, to make full use of resource.
Further, please also refer to Fig. 1 and Fig. 3, the fine sand system 200 includes third pond 203, the 4th pond 207, the 5th pond 210, the 6th pond 212, the 4th conveyer belt 205, fine sand dewaterer 214, the rotation of the 5th conveyer belt 215, first Stream separator 204 and the second cyclone separator 213, first is connected between the third pond 203 and first pond 105 Water channel 201 is connected with the second water channel 206, the 5th pond 210 between the 4th pond 207 and second pond 108 It is connected with third water channel 209 between the sand washer 112, the third pond 203 is equipped with the first slush pump 2041, and described the One slush pump 2041 is by the slurry transportation in the third pond 203 to first cyclone separator 204, first eddy flow The fine sand that separator 204 is isolated is delivered to the 6th pond 212, the 6th pond 212 through the 4th conveyer belt 205 Equipped with the second slush pump (non-label in figure), second slush pump is by the slurry transportation in the 6th pond 212 to described Second cyclone separator 213, the fine sand that second cyclone separator 213 is isolated is after the fine sand dewaterer 214 dehydration The 5th conveyer belt 215 by connecting the fine sand dewaterer 214 is transported.
Wherein, the form of pipeline, the first pond can also be used in the first water channel 201, the second water channel 206 and third water channel 209 105 upper sides open up opening (not shown) and are connect with the first water channel 201 so that the mud in the first pond 105 suspends Object flows into the first water channel 201 by the opening, and 108 upper side of the second pond opens up opening (not shown) and the second water channel 206 connections so that the mud suspended matter in the second pond 108 flows into the second water channel 206 by the opening, and sand washer 112 is washed Sand basin upper portion side wall offers opening (not shown) and is connect with third water channel 209 so that the mud in sand washer 112 suspends Object flows into third water channel 209 by the opening.By the first water channel 201,206 upper side of the second water channel open up opening and In the form of sand washer 112 washed sand basin upper portion side wall and open up opening, avoid sinking to the sandstone outflow of bottom of pond, ensure that rough sand and Fine sand is individually separated.
Wherein, sand washer 112 can be arranged multiple, and multiple sand washers 112 are sequentially connected, and multiple sand washers 112 wash sand Sink can be set between outlet on pond or pipeline communicates with one another, and open up opening and third water channel on sink or water pipe 209 connection, third water channel 209 could be provided as it is multiple, with accelerate conveying mud speed.
Referring to FIG. 3, being a kind of structural schematic diagram of preferred embodiment of the first cyclone separator 204, it is possible to understand that , the structure of other cyclone separators in this system can also refer to the first cyclone separator.Cyclone separator is also known as waterpower rotation Device is flowed, is the equipment for detaching solid particle from suspended matter using centrifugal sedimentation principle.Equipment body is by cylinder and circular cone two Part is constituted, and circular cone is than cylinder closer in the following, cylindrical portions are shorter and cylindrical portions side wall has suspended matter import, cylindrical portion Point top has liquid outlet, and the liquid portion of separation comes out from the liquid outlet of barrel top, and tapered segment is longer and from circle To the gradual necking of conical outlet portion, the solid particle of separation comes out cylinder from the opening of necking place.Cyclonic separation in this system Device is 2 and is arranged side by side, and top 2047 and 2048 is by 2049 unicom of pipeline, defeated equipped with opening and first on pipeline 2049 Mud pipe 301 connects.The mud suspension that first slush pump 2041 is extracted from third pond 203 divides through entering pipe 2042 for the first via 2043 and second tunnel 2044 tangentially respectively enter 2 cylinders, mud suspension makees downwards spiral shape fortune in cyclone separator Dynamic, solid particle is thrown toward wall by inertial centrifugal force effect, and the outlet 2045 and 2046 at cone bottom is down to lower eddy flow.Clear liquid or Liquid containing subparticle then becomes the internal layer eddy flow risen, is discharged from the pipeline of top center, referred to as overflow.Cyclonic separation In device, solid particle can cause the serious abrasion of separator along quickly moving for wall surface, be expanded service life, using wear-resisting material Material manufacture makees liner using wear-resistant material.
Wherein, the fine sand detached in the second cyclone separator 213 enters fine sand dewaterer 214, de- through washing husky dewaterer 214 Fine sand after water is delivered to fine sand storage area 216 by the 5th conveyer belt 215, and fine sand storage area 216 is set far from rough sand storage area 117 It sets, rough sand and fine sand is made to store respectively.
Further, the fine sand system 200 further includes third cyclone separator 208 and the 4th cyclone separator 211, institute It states the 4th pond 207 and is equipped with third slush pump (non-label in figure), the third slush pump is by the mud in the 4th pond 207 Slurry is delivered to the third cyclone separator 208, and the 5th pond 210 is equipped with the 4th slush pump (non-label in figure), described 4th slush pump divides the slurry transportation in the 5th pond 210 to the 4th cyclone separator 211, the third eddy flow The fine sand isolated from device 208 and the 4th cyclone separator 211 is delivered to the 6th water through the 4th conveyer belt 205 Pond 212.
Wherein, the first cyclone separator 204, third cyclone separator 208 and the 4th cyclone separator 211 be in the present system Arrangement is in a straight line, and the 4th conveyer belt 205 is arranged in the first cyclone separator 204, third cyclone separator 208 and the 4th eddy flow The outlet port of separator 211, the 4th conveyer belt 205 assume that on holder.
Further, first water channel 201 is equipped with sizing equipment 202, for picking up in first water channel 201 Sundries.Wherein, sundries includes mainly plastics, plant stem-leaf etc., and the processing of other modes is carried out after the recycling of these sundries, to avoid Pollute environment.Sizing equipment 202 includes grid, and further, grid can be end to end loop configuration, and be set to On holder, it is also also provided with hook protrusion on grid, driving device is set on holder and is connect with grid, grid is made And hook protrusion does looped motions up and down on the first water channel 201, and the sundries in the first water channel 201 is triggered by hook protrusion. Grid has gap to allow size to pass through less than the water and mud in the gap, to complete the separation of sundries.
Further, the mud system 300 includes the first refuse receptacle 302, the first Pulp pump 304 and Duo Tai filter presses 309, The first dredging tube 301, first eddy flow are connected between first cyclone separator 204 and first refuse receptacle 302 The mud that separator 204 is isolated is delivered to first refuse receptacle 302 through first dredging tube 301 and is precipitated, described The mud of first refuse receptacle, 302 bottom precipitation is delivered to the filter press 309, the filter press through first Pulp pump 304 309 pairs of mud obtain mud cake after squeezing, and the water in mud is separated.
Wherein, the first Pulp pump 304 is connect by pipeline 303 with the first refuse receptacle 302, and pipeline 303 is set to the first ring The inside that 302 lateral wall bottom parallel connection of bucket passes to the first refuse receptacle 302 is protected, outlet and the pipeline 305 of the first Pulp pump 304 connect It connects, pipeline 305 is connected to filter press 309.Wherein, for the operating mode of reasonable control system, the output of the first Pulp pump 304 is set Flow is adjustable, and the motor (figure that PLC controller and Frequency Converter Control are connect with the first Pulp pump 304 may be used in adjustment mode In be not shown) power so that wheel speed inside the first Pulp pump 304 changes so that the quantitative change of the mud of impeller propelled Change and realizes.
Further, the mud system 300 further includes the second refuse receptacle 307, third refuse receptacle 312, the second Pulp pump 309, third Pulp pump 314 is connected with the second defeated mud between the third cyclone separator 208 and second refuse receptacle 307 Pipe 306, the mud that the third cyclone separator 208 is isolated are delivered to second environmental protection through second dredging tube 306 Bucket 307 is precipitated, and the mud of 307 bottom precipitation of the second refuse receptacle is delivered to the pressure through second Pulp pump 309 Filter 319 is connected with third dredging tube 311 between the 4th cyclone separator 211 and the third refuse receptacle 312, described The mud that 4th cyclone separator 211 is isolated is delivered to the third refuse receptacle 312 through the third dredging tube 311 and is sunk It forms sediment, the 4th dredging tube 316, second rotation is connected between second cyclone separator 213 and the third refuse receptacle 312 The mud that stream separator 213 is isolated is delivered to the third refuse receptacle 312 through the 4th dredging tube 316 and is precipitated, institute The mud for stating 312 bottom precipitation of third refuse receptacle is delivered to the filter press 319, the press filtration through the third Pulp pump 314 Machine 319 obtains mud cake after squeezing mud, and the water in mud is separated.
Wherein, the second Pulp pump 309 is connect by pipeline 308 with the second refuse receptacle 307, and pipeline 308 is set to the second ring The inside that 307 lateral wall bottom parallel connection of bucket passes to the second refuse receptacle 307 is protected, outlet and the pipeline 310 of the second Pulp pump 309 connect It connects, pipeline 310 is connected to filter press 309.Wherein, for the operating mode of reasonable control system, the output of the second Pulp pump 309 is set Flow is adjustable, and the motor (figure that PLC controller and Frequency Converter Control are connect with the second Pulp pump 309 may be used in adjustment mode In be not shown) power so that wheel speed inside the second Pulp pump 309 changes so that the quantitative change of the mud of impeller propelled Change and realizes.Third Pulp pump 314 is connect by pipeline 313 with third refuse receptacle 312, and pipeline 313 is set to third refuse receptacle 312 lateral wall bottom parallel connections pass to the inside of third refuse receptacle 312, and the outlet of third Pulp pump 314 is connect with pipeline 315, pipe Road 315 is connected to filter press 309.Wherein, for the operating mode of reasonable control system, the output flow of the first Pulp pump 302 is set Adjustable, motor that PLC controller and Frequency Converter Control are connect with third Pulp pump 314 may be used (in figure not in adjustment mode Show) power so that wheel speed inside third Pulp pump 314 changes so that the amount of the mud of impeller propelled change and It realizes.
Wherein, filter press 319 may be disposed in workshop 318, and workshop is double-layer structure, and filter press 319 is set to the second layer, First layer is arranged mud cake storage area 320, and in 319 course of work of filter press, the mud cake pressed drops to mud cake from filter press 319 Storage area 320, the water being extruded then separately set pipeline to clear water reserviors 401.Workshop is additionally provided with the necessary auxiliary such as stair 317 and sets Standby or device.
Further, it please refers to Fig.1 and Fig. 2, the water circulation system 400 includes clear water reserviors 401, the clear water reserviors 401 It is respectively connected to first pond 105, second pond 108, the third pond 203, the 4th water equipped with pipeline Pond 207, the 5th pond 210, the 6th pond 212, first refuse receptacle 302, second refuse receptacle 307, institute Third refuse receptacle 312 and the multiple filter press 319 are stated, the water that the multiple filter press 319 detaches flows into institute through the pipeline It states in clear water reserviors 401, the clear water reserviors 401 are respectively to first pond 105, second pond 108, the third pond 203, the 4th pond 207, the 5th pond 210, the 6th pond 212, first refuse receptacle 302 and described Two refuse receptacles 307 supply water.
Wherein, clear water reserviors 401 could be provided as multiple, can also communicate with one another between multiple clear water reserviors 401.
Wherein, the flow direction of water is, clear water reserviors 401 draw the first, second, and third 3 water routes, and the first water route is from clear water reserviors After 401 draw, it is respectively delivered to the first pond 105, the second pond 108 and sand washer 112;Draw from clear water reserviors 401 in the second water route After going out, it is respectively delivered to third pond 203, the 4th pond 207, the 5th pond 210 and the 6th pond 212;Third water route is from clear After pond is drawn, it is respectively delivered to the first refuse receptacle 302, the second refuse receptacle 307 and third refuse receptacle 312;In first pond 105 The mud for washing the partially aqueous after sand flows into third pond 203 through the first water channel 201, also has partially aqueous in the first pond 105 Sandstone enter the second pond 108;The partially aqueous mud after sand is washed in second pond 108 enters the 4th water through the second water channel 206 Pond 207 also has partially aqueous sandstone to enter sand washer 112 in second pond 108;The mud warp washed after sand in sand washer 112 Third water channel 209 enters the 5th pond 210, also has partially aqueous sandstone to enter rough sand dewaterer 112 in sand washer 112;Rough sand Dewaterer 112 is additionally provided with pipeline and dewatered water is delivered to the 5th pond 210;Mud in third pond 203 is through the first rotation Stream separator 204 is separated into is delivered to the aqueous fine sand in the 6th pond 212 and through the first dredging tube 301 through the 4th conveyer belt 205 It is delivered to the mud of the first refuse receptacle 302;The mud in the 4th pond 207 is separated into defeated through the 4th through third cyclone separator 208 It send band 205 to be delivered to the aqueous fine sand in the 6th pond 212 and is delivered to the mud of the second refuse receptacle 307 through the second dredging tube 306; Mud in 5th pond 210 is separated into through the 4th cyclone separator 211 is delivered to the 6th pond 212 through the 4th conveyer belt 205 Aqueous fine sand and the mud of third refuse receptacle 312 is delivered to through third dredging tube 311;Mud in 6th pond 203 is through Two cyclone separators 213 are separated into the aqueous fine sand of fine sand dewaterer 214 and are delivered to third ring through the 4th dredging tube 316 Protect the mud of bucket 312;Fine sand dewaterer 214 is additionally provided with pipeline and dewatered water is delivered to the 6th pond 212;First refuse receptacle The aqueous slurry precipitated in 302 is delivered to filter press 319 through the first Pulp pump 304;The cement precipitated in second refuse receptacle 307 Slurry is delivered to filter press 319 through the second Pulp pump 309;The aqueous slurry precipitated in third refuse receptacle 313 is through third Pulp pump 314 It is delivered to filter press 319;More filter presses 319 squeeze the water separated after mud and flow into clear water reserviors 401 through pipeline, since then, Recycling for water is completed, the waste of water resource can be reduced.
In the following, providing the preferred embodiment of capital equipment in this system.
1, charger 101
A to Fig. 4 b is please referred to Fig.4, charger 101 includes the container 1011 that steel plate is enclosed, wherein the container 1011 Top and bottom opening, which is connected with a conveyer belt 1012, also, the development length of the conveyer belt 1012 More than the length of the container 1011, and stretch out the 1011 length direction a distance of container, the extension width of the conveyer belt 1012 More than the width of the container 1011, and stretch out the 1011 width direction a distance of container.1011 bottom surface of container and conveyer belt 1012 are in close contact, and one is opened up on one end side plate of the length direction of 1011 bottom of container near conveyer belt 1012 Seam 1013.
Specifically, the container 1011, which is open top, is more than bottom opening, it is in inverted trapezoidal on the cross section of length direction, Certainly, can also be in inverted trapezoidal on the cross section of width direction so that in the container 1011 into material gravity can be relied on to converge Gather bottom open area, top big opening also allows for feeding, and the seam 1013 which opens up may be sized to Adjustable, to adapt to various sizes of fuel requirements.
Its workflow is:Building waste is put into the container from the opening at 1011 top of container using the machinery such as forklift In 1011, start conveyer belt 1012, building waste takes the appearance out of from the seam 1013 that the container 1011 opens up by conveyer belt 1012 Device 1011, and enter next equipment.
The charger 101 is applicable to the building wastes such as stone, sand, soil, also may include with reinforcing bar, plastic garbage Deng, charging stabilization, good reliability.
2, waste material seperator 102
Also referring to Fig. 5 a to Fig. 5 d, the utility model embodiment provides a kind of waste material seperator 102, for that will collect Building residue need to carry out primary dcreening operation, will build the reinforcing bar in residue, bulk sandstone larger impurity and sandstone in equal volume Separation, the operations such as the sandstone filtered out can just crush, postsearch screening.In the present embodiment, waste material seperator includes pedestal 1021 and revolving part 1022.Specifically, pedestal 1021 is fixed on ground 10.In the present embodiment, pedestal 1021 detaches for waste material The main supporting structure of machine, the stability of pedestal 1021 determine the overall structure stability of waste material seperator.A kind of embodiment party In formula, it can drive piles on ground 10, the fixation that pedestal 1021 is stablized.Further, pedestal 1021 is hollow holder, While stablizing fixed waste material seperator 102, own wt and material cost are reduced.In a kind of embodiment, pedestal 1021 For metallic support, and it is coated with paint or electroplating film layer on the surface of pedestal 1021, to avoid rainwater, sunlight etc. to pedestal 1021 corrosion improves the service life of pedestal 1021 and waste material seperator.
In the present embodiment, revolving part 1022 includes the first cylinder 22 and sieve part 24, and sieve part 24 is fixed on first In cylinder 22.Specific to Fig. 5 c, the first cylinder 22 is the structure that side wall surrounds formation in one week around the central shaft of the first cylinder 22, and And the both ends of the first cylinder 22 are open.The first cylinder 22 is made as cylindrical shape in favor of the rolling of itself.In the present embodiment, the The side wall of one cylinder 22 is made of metal material, to provide enough intensity, situations such as avoiding deforming in rolling process.Into One step, the surface of side wall is coated with paint or electroplating film layer, the corrosion to avoid rainwater, sunlight etc. to the first cylinder 22, Improve the service life of the first cylinder 22 and waste material seperator.In the present embodiment, the first cylinder 22 include the outside wall surface that is oppositely arranged with Internal face, outside wall surface are exposed to the external world, and internal face is to the inside of the first cylinder 22, in a kind of embodiment, outside wall surface and inner wall Face is coated with paint or electroplating film layer.Refering to Fig. 5 a and Fig. 5 b, the outside wall surface and the sliding of pedestal 1021 of the first cylinder 22 connect It connects, pedestal 1021 drives revolving part 1022 around central shaft rotation.Specifically, outside wall surface is contacted with pedestal 1021, pedestal 1021 according to The power drive the first cylinder 22 provided by driving motor rotates.
Specific to Fig. 5 d, sieve part 24 is that multiple reinforcement weldings are formed, specifically, sieve part 24 is arranged by different directions Reinforcing bar be intertwined to form sieve, the screen mesh size of sieve part 24 needs the volume size of the sandstone screened to set according to screening Meter, can be passed through, the intransitable effect of impurity with reaching sandstone.In the present embodiment, sieve part 24 is solid by modes such as welding It is scheduled in the first cylinder 22, specifically, sieve part 24 is fixed on the internal face of the first cylinder 22.Further, sieve part 24 It is equipped with gap between the internal face of the first cylinder 22, in other words, between sieve part 24 and the side wall of the first cylinder 22 is formed and is received Hold space, the space is for accommodating the sandstone for having passed through sieve part 24.Specifically, waste material enters rotation from one end of revolving part 1022 Turn in part 1022, sandstone enter gap sieve part 24 and the first cylinder 22 after sieve part 24, and from revolving part 1022 other end discharge.
Waste material enters revolving part 1022 from one end of revolving part 1022, specifically, waste material enters in sieve part 24, revolving part During 1022 rotations, waste material rolls in revolving part 1022, and the sandstone of small volume pass through sieve part 24 to enter sieve part Gap between 24 and the internal face of the first cylinder 22, and be finally discharged and collect from the other end of the first cylinder 22, it is reinforcing bar, big The impurity such as volume sandstone can not pass through sieve part 24, then be discharged and collect from one end of sieve part 24, to realize sandstone with it is miscellaneous The separation of matter, the rolling of revolving part 1022 make waste material be come into full contact with sieve part 24, avoid the sandstone being piled up on impurity that from can not wearing Sieving netware 24 and be wasted, sandstone screening effect is good, and screen efficiency it is higher.
Refering to Fig. 5 a, in the present embodiment, revolving part 1022 is placed with inclined in ground 10.Specifically, the first circle Cylinder 22 and sieve part 24 favour ground 10, and waste material enters revolving part 1022 from higher-height one end of revolving part 1022, give up Material is separated into after impurity and sandstone and revolving part 1022 is discharged from a lower height of one end of revolving part 1022.Waste material enters from one end And while rolling in revolving part 1022, waste material is moved by the gravity of itself to the other end, it is to be understood that waste material exists Actually it is also the process of a rolling during being moved to the other end, to keep waste material and the contact of sieve part 24 uniform, Have an opportunity across sieve part 24 the sandstone being stacked on impurity.The mode that impurity is discharged relies on the weight of impurity itself Power, it is simple in structure, easy to implement without increasing additional driving device.In a kind of embodiment, the central shaft of the first cylinder 22 Angle with ground 10 is 3 °~5 °, while meeting the requirement that waste material moves from one end to the other side, is also unlikely to the gradient too Cause the movement speed of waste material too big greatly, and full screening can not be carried out.
Refering to Fig. 5 d, in the present embodiment, sieve part 24 is cylindrical shape, and the central shaft of sieve part 24 and the first cylinder 22 It overlaps.Specifically, sieve part 24 can be the cylindrical shape of both ends open, it can be understood as sieve part 24 is wall surface around center One week cylindrical structure formed of axis, and sieve is the hole being arranged on wall surface, and hole is connected to the Intranet of sieve part 24, multiple Kong Jun It is even to be arranged on wall surface, to which wall surface is at sieve.Cylindric sieve part 24 is identical as the shape of the first cylinder 22, and sieve The center overlapping of axles of part 24 and the first cylinder 22, to keep the distance between sieve part 24 and the side wall of the first cylinder 22 uniformly permanent It is fixed, improve screening effect.
Refering to Fig. 5 a, in the present embodiment, revolving part 1022 includes the feed end 11 being oppositely arranged and discharge end 12, feed end 11 are more than discharge end 12 at a distance from ground 10 at a distance from ground 10, and in discharge end 12, sieve part 24 is equipped with and protrudes from first The nose section 13 of cylinder 22, the impurity in waste material are discharged from the port of nose section 13.Specifically, the axial length ruler of sieve part 24 Degree is more than the length dimension of the first cylinder 22, and in feed end 11, the first cylinder 22 is flushed with sieve part 24, and waste material is facilitated to enter sieve In netware 24, in discharge end 12, sieve part 24 protrudes from the first cylinder 22, i.e. nose section 13 protrudes from outside the first cylinder 22, wears The sandstone for netware 24 of being sieved are discharged from the first cylinder 22 positioned at the port of discharge end 12, and it is miscellaneous not pass through reinforcing bar of sieve part 24 etc. Matter is discharged from the port of nose section 13, and sandstone and impurity are separately discharged, and can be with separate collection, to make sandstone and impurity point From.
In a kind of embodiment, waste material seperator further includes barrier sheet 1023, and barrier sheet 1023 is set to discharge end 12, is dashed forward Go out section 13 to be contained between a pair of of barrier sheet 1023, the impurity or sandstone that barrier sheet 1023 is used to that discharge end 12 to be prevented to be discharged splash It penetrates.Specifically, barrier sheet 1023 can be the metallic plate being welded on pedestal 1021, a pair of of barrier sheet 1023 is arranged in funnel-form In discharge end 12, since revolving part 1022 remains rotation status, the sandstone and impurity that are discharged from discharge end 12 keep certain Rotation speed and sputter outward, barrier sheet 1023 stops the impurity and sandstone sputtered outward, makes impurity and sandstone can Into in the equipment in the container of collection or into the next step, the utilization rate of sandstone is improved, reduces waste.
Fig. 5 a and Fig. 5 b are please referred to, pedestal 1021 is equipped with driving gear 42, and driving gear 42 is connected to driving motor, the The outside wall surface of one cylinder 22 is equipped with rack 44, and rack 44 is surrounded in the outside wall surface of the first cylinder 22, drives gear 42 and rack 44 cooperations are to drive the first cylinder 22 to rotate.Specifically, driving motor is fixed on pedestal 1021, driving motor drives sliding tooth 42 rotation of wheel, to drive the first cylinder 22 and revolving part 1022 to rotate integrally.In a kind of embodiment, the number of gear 42 is driven Amount at least two, driving gear 42 are symmetrically disposed on the radial opposite both sides of the first cylinder 22.Specifically, working as sliding tooth When the quantity of wheel 42 is two, two driving gears 42 coordinate with a rack 44 jointly, to which two driving gears 42 are common Revolving part 1022 is driven to rotate by a rack 44.Further, driving gear 42 is symmetrically disposed on the diameter of the first cylinder 22 To opposite both sides, from monosymmetric support revolving part 1022, to make the installation of revolving part 1022 firm.
In the present embodiment, driven wheel 52 is additionally provided on pedestal 1021, driven wheel 52 is contacted with the outside wall surface of the first cylinder 22, Driven wheel 52 is for reducing the frictional force between pedestal 1021 and the first cylinder 22.Specifically, driven wheel 52 does not drive itself Power, driven wheel 52 are contacted with the outside wall surface of the first cylinder 22, and the first cylinder 22 and revolving part 1022 are supported in base by driven wheel 52 On seat 1021, revolving part 1022 is during rotation, the frictional force drives driven wheel between the first cylinder 22 and driven wheel 52 52 rotations, in other words, the frictional force between the first cylinder 22 and pedestal 1021 is changed into force of rolling friction by driven wheel 52, is reduced Energy loss, driving revolving part 1022 rotate more efficient.In a kind of embodiment, the quantity of driven wheel 52 is at least two A, driven wheel 52 is symmetrically disposed on the radial opposite both sides of the first cylinder 22, and driven wheel 52 is from revolving part supported on both sides 1022, keep the installation of revolving part 1022 firm.In a kind of embodiment, a circle guide rail is also surrounded in the outside wall surface of the first cylinder 22 54, the guide rail 54 and driven wheel 52 coordinate, to fix movement locus of the driven wheel 52 in the first cylinder 22, to keep the One cylinder 22 and revolving part 1022 are around center axis rotation.
Waste material enters revolving part 1022 from one end of revolving part 1022, specifically, waste material enters in sieve part 24, revolving part During 1022 rotations, waste material rolls in revolving part 1022, and the sandstone of small volume pass through sieve part 24 to enter sieve part Gap between 24 and the internal face of the first cylinder 22, and be finally discharged and collect from the other end of the first cylinder 22, it is reinforcing bar, big The impurity such as volume sandstone can not pass through sieve part 24, then be discharged and collect from one end of sieve part 24, to realize sandstone with it is miscellaneous The separation of matter, the rolling of revolving part 1022 make waste material be come into full contact with sieve part 24, avoid the sandstone being piled up on impurity that from can not wearing Sieving netware 24 and be wasted, sandstone screening effect is good, and screen efficiency it is higher.
3, husky machine (referring to the first fishing sand machine 106, the second fishing sand machine 109 can refer to) is dragged for
Fig. 6 a are please referred to, the fishing sand machine 106 that the utility model embodiment provides passes through powder for cleaning construction waste residue The smaller sandstone of particle that broken, stirring, screening etc. are formed after processes, the fine impurities in sandstone are detached from sandstone, with To clean sandstone.Specifically, the husky machine 106 of fishing includes first support 1061, driving wheel 1062, driven wheel 1063, chain ring 1065 And tipping bucket 1068.First support 1061 is the main support of fishing sand machine 106, and first support 1061 is fixed on ground 10, first Frame 1061 is main supporting structure, therefore is made using the larger material of metal equal strength.It is also set in first support 1061 There are the devices such as driving motor, gear set.In a kind of embodiment, ground is fixed in the bottom end of first support 1061 by screw etc. On 10, so that the stabilization of first support 1061 is fixed on ground 10.In the present embodiment, sink into ground 10 in sedimentation basin 105, the One holder 1061 is fixed on 105 side of sedimentation basin, and sedimentation basin 105 is the receiving pond for placing sandstone raw material, is also filled in sedimentation basin 105 The water of constant flow, and sandstone are soaked in water.
It should be appreciated that the sedimentation basin 105 in the present embodiment corresponds in the utility model in building waste processing system First pond 105, certainly, sedimentation basin 105 or the second pond 108.
In the present embodiment, driving wheel 1062 is rotationally connected with the top of first support 1061, and driven wheel 1063 is located at precipitation It in pond 105, and is rotatablely connected to the bottom of pond 1051 of sedimentation basin 105, chain ring 1065 is sheathed on driving wheel 1062 and driven wheel 1063 On, chain ring 1065 stretches between driving wheel 1062 and driven wheel 1063.Specifically, the rotation axis of driving wheel 1062 passes through gear To driving motor, driving motor drives driving wheel 1062 to rotate for group rotation connection, and in a kind of embodiment, driving wheel 1062 is circle Cylindrical scroll wheel is conducive to improve the drive chain of driving wheel 1062 to increase the contact area of chain ring 1065 and driving wheel 1062 The energy transfer efficiency of 1065 rotation of circle.Driven wheel 1063 is located at the bottom of pond 1051 of sedimentation basin 105, driven wheel 1063 and driving wheel 1062 stretch chain ring 1065, to drive chain ring 1065 to move by the cooperation of driving wheel 1062 and driven wheel 1063.It is a kind of In embodiment, driven wheel 1063 is cylindrical scroll wheel to be had to increase the contact area of chain ring 1065 and driven wheel 1063 Conducive to raising driven wheel 1063 to the support effect of chain ring 1065.As shown in Figure 6 a, driving wheel 1062 drives 1065 inverse time of chain ring Needle direction rotates.In a kind of embodiment, by the stretching masterpiece of 1065 gravity of chain ring and driving wheel 1062 and driven wheel 1063 With 1065 part of chain ring is straightened.In a kind of embodiment, chain ring 1065 includes multiple chain links, and each chain link joins end to end shape At closed chain ring 1065, specifically, being connected in articulated manner between each chain link, to make have one between each chain link Fixed scope of activities.
In the present embodiment, tipping bucket 1068 is fixed on the outside of chain ring 1065, for stirring and scooping up the sand in sedimentation basin 105 Stone.Specifically, tipping bucket 1068 is fixed on the outside of chain ring 1065 by modes such as welding.It is worth noting that, chain ring 1065 Outside is the side that chain ring 1065 deviates from driving wheel 1062 and driven wheel 1063, and the inside of chain ring 1065 is the contact master of chain ring 1065 The side of driving wheel 1062 and driven wheel 1063.In a kind of embodiment, each tipping bucket 1068 is welded on a chain link, tipping bucket 1068 is synchronous with the motion state of connection.In the present embodiment, tipping bucket 1068 under the driving of chain ring 1065 enter sedimentation basin 105 or It leaves sedimentation basin 105, when tipping bucket 1068 enters sedimentation basin 105, stirs the water and sandstone in sedimentation basin 105, between sandstone mutually Grinding, makes the impurity for being covered in sandstone surface be detached with sandstone, and destroys the steam layer being coated on the grains of sand, is conducive to follow-up Dehydration.During tipping bucket 1068 is by 105 bottommost of sedimentation basin and the upward drift surface motions, tipping bucket 1068 scoops up Sandstone, in fact, tipping bucket 1068 has also scooped up the impurity and water detached with sandstone.Tipping bucket 1068 is driven to rise simultaneously in chain ring 1065 After removing the water surface, the impurity of water and small volume is leaked out from 1068 bottom of tipping bucket, to obtain clean sandstone.The cleaning of sandstone Process is simple, and cleaning performance is good, and cleaning process is continuously uninterrupted, and cleaning efficiency is high.
In the present embodiment, driving wheel 1062 and the line of driven wheel 1063 favour ground 10.Specifically, driving wheel 1062 It it is 45 ° to 60 ° with the line of driven wheel 1063 and the angle on ground 10, to make tipping bucket 1068 along favouring 1045 ° of ground extremely 60 ° of direction movement.Compared to the direction rising perpendicular to ground 10, oblique rising makes tipping bucket 1068 the rising during It is formed and is increased, to provide more times for making water and impurity be leaked out from tipping bucket 1068.
Please refer to Fig. 6 b, in the present embodiment, tipping bucket 1068 includes receiving portion 16 and protruding portion 15, and protruding portion 15 is convexly equipped in appearance Receive the edge in portion 16, for scooping up the sandstone in sedimentation basin 105, receiving portion 16 is equipped with filter hole 17, for leaking out in sandstone Water and impurity.Specifically, filter hole 17 is set to the bottom end of receiving portion 16, in order to which water and impurity leak out.A kind of embodiment In, the granular size design for the impurity that the size of filter hole 17 leaks out as needed.
In the present embodiment, the top of first support 1061 is additionally provided with discharging guide groove 14, and discharging guide groove 14 favours ground 10, The guide groove 14 that discharges is used to export in the sandstone of the transport of tipping bucket 1068 to the top of first support 1061.Specifically, discharging guide groove 14 Favour ground 10, sandstone risen into eminence when tipping bucket 1068 transports sandstone, discharging guide groove 14 by sandstone from high to lower It transports, to be transported to next treatment process, transports sandstone using its own gravity of sandstone, the conevying efficiency of sandstone is high, nothing Power plant need to be additionally provided.
Driving wheel 1062 drives chain ring 1065 that tipping bucket 1068 is driven to move, and tipping bucket 1068 stirs the sandstone in sedimentation basin 105, So that sandstone are mutually ground, the impurity for being covered in sandstone surface is made to be detached with sandstone, tipping bucket 1068 is by the sand in sedimentation basin 105 The mixture of stone, partial impurities and water scoops up, and tipping bucket 1068 is from sedimentation basin 105 to the moving process at 1061 top of first support In, impurity and water are leaked out from the filter hole 17 of 1068 bottom of tipping bucket, to obtain clean sandstone, the cleaning process letter of sandstone Single, cleaning performance is good, and cleaning process is continuously uninterrupted, and cleaning efficiency is high.
In the present embodiment, it further includes second support 1066 to drag for husky machine 106, and second support 1066 includes first be oppositely arranged End 1064 and second end 1067, first end 1064 are fixed on the top of first support 1061, and driving wheel 1062 is rotationally connected with the One end 1064, second end 1067 are fixed on the bottom of pond 1051 of sedimentation basin 105, and driven wheel 1063 is rotationally connected with second end 1067. Specifically, second support 1066, first support 1061 and ground 10 form triangle, to be conducive to the stabilization of structure.Into one Step, support construction of the second support 1066 as carrying driving wheel 1062 and driven wheel 1063, the rotary shaft of driving wheel 1062 It is fixed on first end 1064, the rotary shaft of driven wheel 1063 is fixed on second end 1067, and second support 1066 maintains driving wheel The distance between 1062 and driven wheel 1063, so that it is determined that the height that tipping bucket 1068 rises.In a kind of embodiment, second The bottom of pond 1051 of 1067 contacting sedimentation tank 105 of second end of frame 1066, and it is fixed on bottom of pond 1051 by modes such as screws.This reality It applies in example, second support 1066 can be that two symmetrical rod-shaped scaffolds are arranged in parallel to be formed, and simplify the knot of second support 1066 Structure advantageously reduces the husky 106 whole weight of machine of fishing, and saves cost.
Please refer to Fig. 6 a, in the present embodiment, second support 1066 is equipped with auxiliary wheel 1069, and auxiliary wheel 1069 is held in chain The inside of circle 1065, is used to support chain ring 1065.Specifically, auxiliary wheel 1069 is the idler wheel of non-active rotation, auxiliary wheel 1069 Surface contact chain ring 1065 inside, chain ring 1065 rotation drive auxiliary wheel 1069 rotation, in other words, auxiliary wheel 1069 Make to be rolling friction between chain ring 1065 and second support 1066, auxiliary wheel 1069 plays support chain ring 1065 and tipping bucket 1068 While effect, frictional resistance when chain ring 1065 rotates is reduced.
In a kind of embodiment, auxiliary wheel 1069 is set between driving wheel 1062 and driven wheel 1063, auxiliary wheel 1069 Quantity be multiple, and the spacing between auxiliary wheel 1069 is identical.Specifically, multiple auxiliary wheels 1069 support chain ring jointly 1065, the longer chain ring of length 1065 is overally supported, the spacing between multiple auxiliary wheels 1069 is identical, so that chain ring 1065 is each Partial stress is identical, and chain ring 1065 is whole to be flattened, and the rotation of chain ring 1065 and the rising of tipping bucket 1068 are conducive to.
Driving wheel 1062 drives chain ring 1065 that tipping bucket 1068 is driven to move, and tipping bucket 1068 stirs the sandstone in sedimentation basin 105, So that sandstone are mutually ground, the impurity for being covered in sandstone surface is made to be detached with sandstone, tipping bucket 1068 is by the sand in sedimentation basin 105 The mixture of stone, partial impurities and water scoops up, and tipping bucket 1068 is from sedimentation basin 105 to the moving process at 1061 top of first support In, impurity and water are leaked out from the filter hole 17 of 1068 bottom of tipping bucket, to obtain clean sandstone, the cleaning process letter of sandstone Single, cleaning performance is good, and cleaning process is continuously uninterrupted, and cleaning efficiency is high.
The utility model embodiment also provides a kind of sandstone cleaning method, which utilizes the utility model embodiment The fishing sand machine 106 and sedimentation basin 105 of offer, specifically, the husky machine 106 of fishing includes first support 1061, driving wheel 1062, driven wheel 1063, chain ring 1065 and tipping bucket 1068, first support 1061 are fixed on ground 10, and driving wheel 1062 is rotationally connected with first The top of frame 1061, driven wheel 1063 are located in sedimentation basin 105, and are rotatablely connected to the bottom of pond 1051 of sedimentation basin 105, chain ring 1065 are sheathed on driving wheel 1062 on driven wheel 1063, and chain ring 1065 stretches between driving wheel 1062 and driven wheel 1063, Tipping bucket 1068 is fixed on the outside of chain ring 1065, and driving wheel 1062 drives chain ring 1065 that tipping bucket 1068 is driven to move, tipping bucket 1068 The sandstone in sedimentation basin 105 are stirred, so that sandstone are mutually ground.
In a kind of embodiment, when cleaning sandstone, persistently plus water, sedimentation basin 105 are equipped with overfall into sedimentation basin 105, The partial impurities that grinding sandstone decomposite float on the water surface, and are discharged from overfall with water.In the present embodiment, to sedimentation basin In 105 plus after water, flow plays certain stirring action in sedimentation basin 105, and at the same time, tipping bucket 1068 stirs the sand in water The impurity of stone, sandstone surface is detached with sandstone, and the smaller impurity of partial density floats on the water surface, the water in sedimentation basin 105 When face height reaches the position of overfall, impurity is discharged from overfall together with dampening, to eliminate partial impurities.
In a kind of embodiment, driving wheel 1062 and the line of driven wheel 1063 favour ground 10, and tipping bucket 1068 is equipped with Filter hole 17, tipping bucket 1068 pass through 17 fugitive water of filter hole and impurity during rising.
Driving wheel 1062 drives chain ring 1065 that tipping bucket 1068 is driven to move, and tipping bucket 1068 stirs the sandstone in sedimentation basin 105, So that sandstone are mutually ground, the impurity for being covered in sandstone surface is made to be detached with sandstone, tipping bucket 1068 is by the sand in sedimentation basin 105 The mixture of stone, partial impurities and water scoops up, and tipping bucket 1068 is from sedimentation basin 105 to the moving process at 1061 top of first support In, impurity and water are leaked out from the filter hole 17 of 1068 bottom of tipping bucket, to obtain clean sandstone, the cleaning process letter of sandstone Single, cleaning performance is good, and cleaning process is continuously uninterrupted, and cleaning efficiency is high.
4, sand sieving machine 110
Also referring to Fig. 7 a, Fig. 7 b and Fig. 7 c, the utility model embodiment provides a kind of sand sieving machine 110, is used for from sand The impurity such as the grains of sand and stone are detached in stone mixture, the pure grains of sand filtered out are collected for utilizing again, and by stone The impurity such as son are discharged and collect.The sand sieving machine 110 that the utility model embodiment provides includes first motor 1101, the first cylinder 1102 and second cylinder 1103.Specifically, first motor 1101 is set on ground 10, certainly, first motor 1101 can be straight It connects and is fixed on ground 10, can also be fixed on ground 10 by being fixed on the upper holder on ground 10.A kind of embodiment In, first motor 1101 can be stepper motor, to provide driving force.
In conjunction with Fig. 7 b, the first cylinder 1102 is set on ground 10, specifically, the first cylinder 1102 is set up in by holder On ground 10, in a kind of embodiment, sand sieving machine 110 further includes first rotating shaft 1104, and the first cylinder 1102 is sheathed on first turn On axis 1104, and the first cylinder 1102 is fixedly connected with first rotating shaft 1104, can utilize holder rotatable connection first rotating shaft 1104 both ends, to which the first cylinder 1102 to be set up on ground 10.In the present embodiment, the first cylinder 1102 includes outside first Wall 21, it is to be understood that the first cylinder 1102 is that the first outer wall 21 was formed around the central shaft of the first cylinder 1102 around one week Structure, and the both ends of the first cylinder 1102 are open.In a kind of embodiment, the first outer wall 21 is equipped with through-hole 600, through-hole 600 the first cylinder of connection, 1102 inside and the external world, specifically, the quantity of through-hole 600 is multiple, the size of through-hole 600 is identical, and And uniformly spread all over the first outer wall 21.Further, the size of through-hole 600 is according to the size designs of the grains of sand, specifically, through-hole 600 size can pass through the short grained grains of sand, but volume can not be made to be more than the impurity such as the stone of the grains of sand and passed through, according to sandstone The type of mixture and the size of the target grains of sand, can design various sizes of through-hole 600.In the present embodiment, first motor 1101 are connected to the first cylinder 1102, and for driving the first cylinder 1102 around central shaft rotation, specifically, first motor 1101 First rotating shaft 1104 is connected, first motor 1101 is by driving the rotation of first rotating shaft 1104 to drive the first cylinder 1102 to revolve Turn.In a kind of embodiment, the center overlapping of axles of first rotating shaft 1104 and the first cylinder 1102, the rotation of first rotating shaft 1104 can To drive the first cylinder 1102 around center axis rotation.In the present embodiment, also set between first motor 1101 and first rotating shaft 1104 There are speed reducer, speed reducer that the torque that first motor 1101 exports is transferred to first rotating shaft 1104, first rotating shaft 1104 is made to obtain Suitable rotating speed.In the present embodiment, sandstone mixture enters the first cylinder 1102 from one end of the first cylinder 1102, specifically, First cylinder 1102 includes the charging port 1106 that is oppositely arranged and discharging port 1105, and sandstone mixture is from charging port 1106 Into in the first cylinder 1102, to the rolling in the first cylinder 1102.In the present embodiment, sandstone mixture is in the first cylinder In 1102 during rolling, the grains of sand are leaked out from the through-hole 600 of the first outer wall 21, can due to the first persistently rolling of cylinder 1102 To avoid the sandstone mixture entered in the first cylinder 1102 is stacked and causes the grains of sand being stacked on impurity can not be into Enter the through-hole 600 of the first outer wall 21, sandstone mixture comes into full contact with the first outer wall 21, improves the effect of screening, avoid wave Take.
In conjunction with Fig. 7 c, the second cylinder 1103 is sheathed on outside the first cylinder 1102, in the present embodiment, the second cylinder 1103 and One cylinder 1102 can be with relative motion, and in a kind of embodiment, the second cylinder 1103 is fixed relative to ground 10, and One cylinder 1102 then can be with central shaft rotation.Second cylinder 1103 includes the second outer wall 31, it is to be understood that the second cylinder 1103 be that the second outer wall 31 surrounds one week structure formed, and the two of the second cylinder 1103 around the central shaft of the second cylinder 1103 End is open.In a kind of embodiment, the second outer wall 31 is equipped with through-hole 600, through-hole 600 be connected to 1103 inside of the second cylinder with it is outer Boundary, specifically, the quantity of through-hole 600 is multiple, the size of through-hole 600 is identical, and uniformly spreads all over the second outer wall 31.Into one Step, the size of through-hole 600 is according to the size designs of the grains of sand, specifically, the size of through-hole 600 can lead to the short grained grains of sand It crosses, but the impurity such as stone that volume can not be made to be more than the grains of sand pass through, according to the type of sandstone mixture and the size of the target grains of sand, Various sizes of through-hole 600 can be designed.The grains of sand leaked out from the through-hole 600 of the first outer wall 21 enter the second cylinder 1103 In, specifically, the grains of sand enter between the first outer wall 21 and the second outer wall 31, to be carried out by the through-hole 600 on the second outer wall 31 Screening.The grains of sand leak out after the screening of the first outer wall 21 and the second outer wall 31 from the second outer wall 31 successively, can be outside second The pure grains of sand of container collection are placed outside wall 31, and impurity is then discharged from one end of the first cylinder 1102 or the second cylinder 1103. Specifically, impurity can be discharged by two paths, not by the impurity of the through-hole 600 of the first outer wall 21 from the first cylinder 1102 One end discharge, that is, discharge port 1105, do not pass through the through-hole of the second outer wall 31 by through-hole 600 of the first outer wall 21 600 impurity is discharged from one end of the second cylinder 1103, i.e. the second cylinder 1103 one end corresponding with discharging port 1105 is opened Mouthful.
During first cylinder 1102 rolls, the first outer wall 21 carries out first time screening, the i.e. grains of sand to sandstone mixture Through-hole 600 across the first outer wall 21 leaks out, and the impurity such as larger sandstone of particle are discharged from one end of the first cylinder 1102, enters Sandstone between first cylinder 1102 and the second cylinder 1103 carry out programmed screening, i.e. the grains of sand pass through the through-hole of the second outer wall 31 600 leak out, and the impurity such as larger sandstone of particle are discharged from one end of the second cylinder 1103, and the process screened twice effectively improves The purity of the grains of sand, screening effect is good, and the efficiency screened is higher.
In the present embodiment, the first cylinder 1102 is placed with inclined in ground 10.Specifically, first rotating shaft 1104 with The center overlapping of axles of first cylinder 1102, first rotating shaft 1104 favour the placement of ground 10.In a kind of embodiment, the first cylinder 1102 1106 one end of charging port is more than discharging 1105 one end of port at a distance from ground 10, is entered by charging port 1106 The sandstone mixture of first cylinder 1102 is during the rolling with the first cylinder 1102 is rolled, by the gravity of itself It is rolled to discharging port 1105, the grains of sand are leaked out from the through-hole 600 of the first outer wall 21, and the impurity such as stone then roll on the first outer wall 21 It is dynamic, and roll to discharging port 1105, to be placed on the container collection of discharging port 1105.The mode of discharge impurity relies on The gravity of impurity itself, it is simple in structure, easy to implement without increasing additional driving device.In a kind of embodiment, first The central shaft of body 1102 and the angle on ground 10 are 3 °~5 °.
In the present embodiment, the central axis of the central shaft of the first cylinder 1102 and the second cylinder 1103, specifically, first Outer wall 21 remains unchanged at a distance from the second outer wall 31, to be conducive to uniformly be screened to sandstone mixture.A kind of reality It applies in mode, the aperture of the through-hole 600 of the first outer wall 21 is more than the aperture of the through-hole 600 of the second outer wall 31.First outer wall 21 Through-hole 600 is used to screen the first time of sandstone mixture, and the through-hole 600 of the second outer wall 31 is used for the second of sandstone mixture Secondary screening, for the first time screening can carry out initial screening, the larger impurity of particle in sandstone mixture be screened out, in the obtained grains of sand Still partial impurities are mixed with, programmed screening can carry out fine screen choosing, and the smaller impurity of particle in sandstone mixture is screened out, is obtained To the pure grains of sand.Sizing screening can obtain better screening effect twice, if specifically, only carrying out primary screening, through-hole The 600 oversized grains of sand purity that screening can be caused to obtain are not high, and through-hole 600 is undersized to lead to bulky grain in screening process Impurity blocks through-hole 600, and the part grains of sand can not pass through through-hole 600, and screening efficiency is low, wastes raw material.It screens out for the first time Large granular impurity, programmed screening screen out little particle impurity, and screening efficiency is high, and screening effect is good.
In a kind of embodiment, sand sieving machine further includes the second motor, and the second motor is connected to the second cylinder 1103, the second electricity Machine is for driving the second cylinder 1103 around central shaft rotation.Second cylinder 1103 is with central shaft rotation, and sandstone mixture is second In cylinder 1103 during rolling, the grains of sand are leaked out from the through-hole 600 of the second outer wall 31, since the second cylinder 1103 persistently turns over Rolling, the sandstone mixture that can be avoided enter into the second cylinder 1103 be stacked and cause the grains of sand being stacked on impurity without Method enters the through-hole 600 of the second outer wall 31, and sandstone mixture comes into full contact with the second outer wall 31, improves the effect of screening, keep away Exempt to waste.
In a kind of embodiment, the direction of rotation of the first cylinder 1102 and the second cylinder 1103 is on the contrary, the mistake screened twice Journey is on the contrary, the effect of screening can be improved.In a kind of embodiment, shell is additionally provided with outside the second cylinder 1103, shell is for protecting The second cylinder 1103 is protected, and not easily collecting after preventing the second cylinder 1103 grains of sand being thrown out of in rotary course.
In the present embodiment, the first cylinder 1102 includes multiple first auxiliary cylinder bodies, and the first auxiliary cylinder body, which joins end to end, to be spliced to form First cylinder 1102.The length of first auxiliary cylinder body is shorter, and multiple first auxiliary cylinder body splicings can form large-sized first cylinder 1102, connecting method is simply easily realized, is conducive to the assembling and transport of sand sieving machine.
In the present embodiment, the second cylinder 1103 includes multiple second auxiliary cylinder bodies, and the second auxiliary cylinder body, which joins end to end, to be spliced to form Second cylinder 1103.The length of second auxiliary cylinder body is shorter, and multiple second auxiliary cylinder body splicings can form large-sized second cylinder 1103, connecting method is simply easily realized, is conducive to the assembling and transport of sand sieving machine.
In the sand sieving machine that the utility model embodiment provides, the first outer wall 21 and the second outer wall 31 are latticed wire It is knitted to form.Specifically, metalloid gauze, metal wire knitted can be readily attained the through-hole 600 of the size of needs, and The density of through-hole 600 is big.Compared to punching on the outer wall, the first outer wall 21 or the second outer wall 31 that metal wire knitted can be formed Quality it is small, be easy to assembled, and motor needs driving force to be offered smaller, the energy that sand sieving machine consumes during sieve is husky is smaller.
During first cylinder 1102 rolls, the first outer wall 21 carries out first time screening, the i.e. grains of sand to sandstone mixture Through-hole 600 across the first outer wall 21 leaks out, and the impurity such as larger sandstone of particle are discharged from one end of the first cylinder 1102, enters Sandstone between first cylinder 1102 and the second cylinder 1103 carry out programmed screening, i.e. the grains of sand pass through the through-hole of the second outer wall 31 600 leak out, and the impurity such as larger sandstone of particle are discharged from one end of the second cylinder 1103, and the process screened twice effectively improves The purity of the grains of sand, screening effect is good, and the efficiency screened is higher.
5, sand washer 112
Fig. 8 a to Fig. 8 e are please referred to, a kind of better embodiment of the utility model provides a kind of sand washer 112, including washes Sand basin 01, be fixed in the supporting rack 02 washed in sand basin 01, the runner 10-1 being rotatably connected on support frame as described above 02 and The motor 03 of the runner 10-1 rotations, the runner 10-1 is driven to include the shaft 04 being erected on support frame as described above 02, lead to Cross the circular screen mesh 06 and be fixed in 06 peripheral surface of the sieve and circumferentially put down that supporting rod 05 is connected in the shaft 04 Multiple partition boards 011 of row setting, are fixed with multiple sieve plates 012,012 one end of the sieve plate between the two neighboring partition board 011 It is connected to the sieve 06, the opposite other end is arranged far from the sieve 06 and inclines towards the runner 10-1 directions of motion Tiltedly, multiple described so that the angle a of the tangent line of the sieve plate 012 and 06 tie point of the sieve and the sieve plate 012 is acute angle Sieve plate 012 is arranged along 04 center array of the shaft, and first through hole (non-label in figure), the sieve are offered on the sieve 06 The second through-hole 0121 is offered on plate 012.
In present embodiment, by the way that multiple partition boards 011 and sieve plate 012 is arranged, and first through hole is opened up on sieve 06, The second through-hole 0121 is opened up on sieve plate 012, makes runner 10-1 in rotation, sieve 06 and sieve plate 012 can make the mud in sand Pass through, washes sand thoroughly, improve and wash husky efficiency, need not do over again.
Specifically, the first through hole can be different from the structure of second through-hole 0121, for example, first through hole is circle Shape, the second through-hole 0121 are elongate holes, it is preferred that first through hole is identical as the structure of the second through-hole 0121, such as both For through-hole or all it is elongate holes, the size of the first through hole is 1~10mm, wherein when first through hole is round hole, this Size refers to diameter of a circle, and first through hole be elongate holes when, this size be finger-hole can by maximum object ruler It is very little.It is further preferred that the size of the first through hole is 3~7mm, it is further preferred that the size of the first through hole is 4 ~6mm.
Specifically, supporting rack 02 is arranged on the opposite two sides on washing sand basin 01 so that runner 10-1 is connected to institute When stating on supporting rack 02, the part of runner 10-1, which is located at, to be washed in sand basin 01, is washed in sand basin 01 and is accommodated silt mixture, washes sand basin 01, which is passed through a part of mud after water in silt mixture, incorporates in water and forms muddy water, due to husky not soluble in water and general grain size compared with Greatly, cannot be by first through hole and the second through-hole 0121, and mud structural instability, in runner 10-1 rotation processes, part grain The larger mud of diameter is decomposed into the mud of small particle with the friction with husky and runner 10-1, from first through hole and the second through-hole 0121 In leak down to enter to wash in sand basin 01 and contact with water and soluble in water, complete to wash sand.
The second through-hole 0121 is opened up on setting sieve plate 012, compared to the scheme that sieve plate 012 does not open up hole, since grain size is larger Mud can be leaked down by first through hole, can also be drained on sieve 06 by the second through-hole 0121, then leaked by first through hole It is mixed to washing in sand basin 01 with water, makes mud decomposition rate faster, made to enter the grain size smaller for washing the mud in sand basin 01, be more soluble in Water makes to wash husky speed faster.
In present embodiment, the mud for being dissolved in water is located at the upper layer for washing the muddy water in sand basin 01, by taking out the muddy water on upper layer It walks, that is, realizes the separation of the mud in sand, can subsequently be separated mud using sedimentation process, obtain the higher mud of purity.
In order to take the muddy water washed in sand basin 01 away, water outlet 33, the water outlet 33 can be set on washing sand basin 01 It is washed near 01 upper edge of sand basin described in being set to, the muddy water washed herein in sand basin 01 diffuses out, and can pass through and pipeline or water channel company is arranged The water outlet 33 is connect, muddy water is transported.It should be understood that in order to accelerate speed, can be arranged on washing sand basin 01 it is multiple go out The mouth of a river 33.
In present embodiment, described wash in sand basin 01 is also associated with support platform 07, and the motor 03 is set to the support On platform 07.The support platform 07 includes a support inclined plate 08, support platform 07 is set on washing sand basin 01 so that motor 03 is arranged, It looks for space that motor 03 is set again from without ground on the scene, is conducive to optimize equipment occupation space, keeps production line more compact.
In present embodiment, feed end 1121, the feed end are being equipped in 04 axially direction of the shaft 1121 are obliquely installed so that silt enter under gravity described in wash sand basin 01.
Specifically, feed end 1121 can be a side for washing sand basin 01, individually can also again be set on washing sand basin 01 One inclined platy structure.
Further, discharge end 1122, discharge end can be equipped with by washing the other side in sand basin 01 with respect to feed end 1121 1122 can also be obliquely installed so that it is ship shape to wash sand basin 01.
In a kind of embodiment, with reference to figure 1 and Fig. 2, multiple tablets 013 are fixed between the two neighboring partition board 011, The tablet 013 is set between the two neighboring sieve plate 012, and 013 one end of the tablet is connected to the sieve 06, opposite The other end far from the sieve 06 be arranged, and towards the runner 10-1 directions of motion tilt so that the tablet 013 with it is described The tangent line of 06 tie point of sieve is acute angle with the angle b of the tablet 013, and multiple tablets 013 are along 04 center of the shaft Array arrangement.
Specifically, sieve plate 012 and tablet 013 are staggered between two neighboring partition board 011, in a kind of preferred implementation In mode, sieve plate 012 is identical as angle of inclination of the tablet 013 on sieve 06.In further preferred embodiment, sieve plate 012 is equal with the distance between two adjacent tablets 013, the distance between tablet 013 and two adjacent sieve plates 012 phase Deng.
Due to also including the smaller sand of grain size in silt mixture, the smaller sand of grain size can also pass through 012 He of sieve plate Sieve 06 leaks down, and the sand pushed forward when runner 10-1 being made to rotate is less, therefore tablet 013 is arranged, and hole is not opened up on tablet 013, The smaller sand of grain size is received after sieve plate 012 leaks down by tablet 013, then is pushed forward with the rotation of runner 10-1, improves husky Discharging speed.
Further, the partition board includes first partition 011, second partition 021, third partition board 031, the 4th partition board 041 With the 5th partition board 051, the first adjacent sieve plate 012 and first is equipped between the first partition 011 and the second partition 021 Adjacent the second sieve plate 022 and the second tablet are equipped between tablet 013, the second partition 021 and the third partition board 031 023, adjacent third sieve plate 032 and third tablet 033, institute are equipped between the third partition board 031 and the 4th partition board 041 It states and is equipped with adjacent the 4th sieve plate 042 and fourth panel 043 between the 4th partition board 041 and the 5th partition board 051, described first Sieve plate 012 and the third tablet 033 are concordant coplanar, and first tablet 013 flushes coplanar with the third sieve plate 032.
By above-mentioned setting, partition board increases, and effective usable floor area of runner 10-1 is made to increase, and passes through setting described first Sieve plate 012 and the third tablet 033 are concordant coplanar, and first tablet 013 flushes coplanar with the third sieve plate 032, makes The rate of promotion sand between each partition board is different, and discharge end 1122 can get and continuously go out husky rate relatively, be conducive to The layout of subsequent technique.
Further, second sieve plate 022 is concordant with the fourth panel 043 coplanar, second tablet 023 and institute State the 4th sieve plate 042 flush it is coplanar.It further uses husky rate and keeps continuous.
Further, second sieve plate 022 is set between first sieve plate 012 and first tablet 013 Medium position, during second tablet 023 is set between first tablet 013 and first sieve plate 012 at interval Portion position.So set, the advantage of multiple partition boards is maximumlly utilized, compared to a partition board or multiple partition boards but sieve therein The scheme that plate is all concordantly arranged, discharge continuous-stable, and in addition driving force required on runner 10-1 is relatively stable always, also saves The power consumption of power saving machine 03.
Wherein, the first partition 011 and the 5th partition board 051 are located at the outermost of the runner 10-1, and described the One partition board 011 is equipped with circumferentially distributed sawtooth 052 with 051 outer of the 5th partition board.The purpose that sawtooth 052 is arranged is to loosen Positioned at the silt mixture on keeping to the side in sand basin 01 is washed, avoid blocking runner 10-1.
Fig. 8 e are please referred to, is the schematic diagram in actual use of the sand washer 112 of present embodiment, is arranged in series 4 sand washers, wherein feed end 1121 enters silt mixture 01, forms muddy water after being passed through water, runner 10-1 turns clockwise It is dynamic, by the mud in silt mixture 01 with husky fully agitation and by driving rotation, mud to be decomposed with husky and runner 10-1 frictions, from Leak down in sieve and sieve plate in runner 10-1 to washing in sand basin, and be dissolved in water, is omitted to take away in figure and washes sand basin at the middle and upper levels The structure of muddy water, the sand after washing unload after discharge end 1122, complete to wash husky process.
Husky efficiency is washed due to the requirement of modern production line and wants high, while going out husky amount will greatly, therefore, in actual production, separate unit is washed Husky machine washes husky effect well although can reach, it is after washing husky in clay content can accomplish very low, but separate unit sand washer goes out Sand amount is few, and uses the more concatenated forms of sand washer, wherein the technology of each sand washer is required than using separate unit sand washer In the case of it is slightly lower, to achieve the purpose that measure sand greatly, by taking 4 sand washers of connecting as an example:The discharge end 1122 of first sand washer with The feed end 1123 of second sand washer is snug against, the discharge end 1124 of the second sand washer and the feed end 1125 of third sand washer It is snug against, the discharge end 1126 and the feed end 4011127 of the 4th sand washer of third sand washer are snug against, the 4th sand washer Discharge end 1128 be connected with discharging structure 1129, such as can be conveyer belt etc., the first runner 10-1, the second runner 10-2, Third runner 10-3 and the 4th runner 10-4 are rotated clockwise, to be stirred respectively to the silt mixture respectively washed in sand basin And push sand forward, and mud flows away from respectively washing in the muddy water in sand basin, washes sand by 4 sand washers, makes finally unloading The husky purity obtained at material mechanism 1129 is high, and clay content is low.
6, rough sand dewaterer 113 (fine sand dewaterer 214 can refer to)
Fig. 9 a to Fig. 9 b are please referred to, a kind of better embodiment of the utility model provides a kind of vibrating-dewatering screen, including Screen box 610 and support element 640, the screen box 610 are supported by the support element 640, and the support element 640 has shock-absorbing function, The screen box 610 includes compass screen surface 611, the first side frame 612 and the second side frame 613, first side frame 612 and second side frame 613 is opposite set on 611 both sides of the compass screen surface, and first crossbeam is equipped between first side frame 612 and second side frame 613 621, affixed first motor 631 and the second motor 632 on the first crossbeam 621, the first motor 631 and second electricity The output shaft of machine 632 is connected separately with eccentric block (not shown), and the first motor 631 and 632 negative side of the second motor To synchronous rotary, the eccentric block forms two vibrators, point of the centrifugal force that described two vibrators generate along direction of vibration Power is superimposed, and reversed centrifugal force is offset, so that the screen box 610 linearly does periodic reverse motion, the compass screen surface 611 is opened If sieve pore 601, the size of the sieve pore 601 is less than the size of material.
In present embodiment, by the way that first motor 631 and the second motor 632 is arranged, and make first motor 631 and the second electricity 632 negative direction synchronous rotary of machine, makes screen box 610 linearly do periodic reverse motion, and the size for opening up sieve pore 601 is small In the size of material so that the smaller material of size will not leak down from sieve pore 601, to solve vibration dehydration efficiency it is low and and The serious problem of fine sand material loss.
In present embodiment, the operation principle for vibrating dehydration is to use double-motor self-synchronous technology, by the way that eccentric block is arranged Two vibrators are formed, two vibrators arranged side by side are set on screen box 610 and make synchronous backward operating, two groups of eccentric mass The centrifugal force of generation is superimposed along the component of direction of vibration, and reversed centrifugation is offset, to form the single exciting for not having direction of vibration It is dynamic, so that screen box 610 is done reciprocating linear motion.Wherein, it is additionally provided on first crossbeam 621 and is used to support first motor 631 and The platform 623 of two motors 632, platform 623 can be parallel with compass screen surface 611, it is possible to have inclined angle.
In present embodiment, first motor 631 and the second motor 632 further include having shell, output shaft and and output shaft The eccentric block of connection is coated by shell, and first motor 631 and the second motor 632 is made to form entirety.First motor 631 and The setting direction of two motors 632 is the plane extension side that is, with the first side frame 612 and the second side frame 613 along the direction of compass screen surface 611 To first motor 631 and the second motor 632 can be arranged in parallel.It should be noted that first motor 631 and the second motor 632 Direction refer to output shaft extending direction.
In present embodiment, screen box 610 includes feed end and discharge end, and first motor 631 and the second motor 632 are along charging Hold the direction to discharge end, i.e. first motor 631 and the shaft of the second motor 632 is parallel with the direction of feed end to discharge end, The centrifugal force for the eccentric block that first motor 631 is connected with the shaft of the second motor 632 is cancelled out each other, and is only had along feed end to going out The excited vibration for expecting the direction at end makes the vibration of screen box 610 have rule so that material is dehydrated in screen box 610 and is more uniformly distributed, and carries High dehydration efficiency.
In present embodiment, 601 array of the sieve pore arrangement on compass screen surface 611, the generally rectangular cross-section array of mode of arrangement, certainly It may be circular array.601 generally circular in cross section through-hole of sieve pore, the size of sieve pore 601 refers to the diameter of round sieve at this time, sieve Hole 601 can certainly be rectangular through-hole, and the size of sieve pore 601 refers to opposite the distance between the both sides of rectangle sieve pore at this time.
The size range of several preferred sieve pores 601 is given below, the size for meeting sieve pore 601 is less than the size of material, So that the smaller material of size will not leak down from sieve pore 601, solve the problems, such as that fine sand material loss is serious.
Further, the size of the sieve pore 601 is 0.005~0.035mm.
Further, the size of the sieve pore 601 is 0.010~0.030mm.
Further, the size of the sieve pore 601 is 0.010mm.
Further, the size of the sieve pore 601 is 0.030mm.
In a kind of embodiment, Fig. 9 b are please referred to, further include pedestal 642, the compass screen surface 611 favours the pedestal 642 Setting, and the angle e that the plane of reference of the compass screen surface 611 and the pedestal 642 is formed is 0~20 °.
In present embodiment, compass screen surface 611 feeds one end than discharging one end with higher height, i.e. compass screen surface 611 is from charging One end is tilted down to discharging one end, and movement of the material on compass screen surface 611 faster, can accelerate dehydration efficiency, certainly, compass screen surface 611 The angle e formed with the plane of reference of the pedestal 642 should not be too large, prevent material residence time on compass screen surface 611 too short and Have little time to be dehydrated.
Wherein, pedestal 642 can be truss structure, and pedestal 642 also has another pedestal 641 being oppositely arranged, another bottom Seat 641 is generally an integral structure with pedestal 642.The plane of reference of pedestal 642 can be horizontal plane.
In another embodiment, compass screen surface 611 discharge one end than charging one end with higher height, i.e., compass screen surface 611 from Discharging one end is tilted down to charging one end, and material is made to have the sufficiently long residence time on compass screen surface 611, aqueous to be suitable for Measure excessive material, such as mud etc..
Further, the compass screen surface 611 feeds one end and is also connected with the first tablet 619,619 opposite sides of the first tablet It is also associated with third side plate 614 and the 4th side plate 615, the third side plate 13 is connect with first side plate 612, and the described 4th Side plate 615 is connect with second side plate 613, and first tablet 619 is obliquely installed, and first tablet 619 with it is described The angle f that the plane of reference of pedestal 642 is formed is 20 °~45 °.
In present embodiment, by the way that the angle of the first tablet 619 is arranged, the first tablet 619 is set to have steeper than compass screen surface 611 Inclined ramp so that the first tablet 619 can accelerate material from the first tablet 619 to the movement speed of compass screen surface for feeding.
Further, the discharging of the compass screen surface 611 one end is also associated with the second tablet 618 for discharging, and described second is flat Plate 618 is obliquely installed, and the 5th side plate 616 and the 6th side plate 617 is also respectively set in 618 opposite sides of the second tablet, described 5th side plate 616 is connect with first side plate 612, and the 6th side plate 617 is connect with second side plate 613.
Wherein, the first side plate 612, the second side plate 613, third side plate 614, the 4th side plate 615, the 5th side plate 616 and Six side plates 617 make vibrating-dewatering screen have better stability for preventing material from being slid from side.
Further, it is also associated with second cross beam 622 between first side plate 612 and second side plate 613, be used for Reinforce the stability of screen box 610.
Wherein, second cross beam 622 can also be with 621 structure having the same of first crossbeam, second cross beam 622 One crossbeam, 621 structure is different, but second cross beam 622 should be arranged in parallel with first crossbeam 621, make the first side plate 612 of screen box 610 And second connect between side plate 613 compass screen surface 611, first crossbeam 621, form stable structure between second cross beam 622, reinforce The stabilization of screen box 610.
Further, the support element 640 is set on the pedestal 642, and the support element 640 is rubber spring.
Wherein, support element 640 has shock-absorbing function, and the damping effect of rubber spring is outstanding, and stable structure, uses the longevity Life length.
7, the first refuse receptacle 302 (the second refuse receptacle 307 can refer to third refuse receptacle 312)
Also referring to Figure 10 a, Figure 10 b and Figure 10 c, the refuse receptacle 302 that the utility model embodiment provides is used for mud Mud is separated from water in aqueous mixtures, and wherein mud is recycled for being again introduced into the circulatory system for firing brick, water, from And utilize mud mixture realization again, play the effect of environmental protection.In the present embodiment, refuse receptacle 302 includes the first staving 710, the second staving 720 and sleeve 730.
Specifically, the first staving 710, including the first peripheral wall 712 and bottom wall 714, the first peripheral wall 712 are fixedly connected on first 712 one end of peripheral wall, the first staving 710 are the barrel-like structure that one end has opening.In a kind of embodiment, the first staving 710 is Barrel shape, in other words, the first peripheral wall 712 rotate to form cylinder around center line, and bottom wall 714 is connected to one end of cylinder to shape There is the drum of opening at one end.In other embodiment, the staving of the first staving 710 or other shapes, for example (,) it is long Cube etc..In the present embodiment, in order to improve the amount of the working efficiency of refuse receptacle 302, raising while the mud mixture of separation, ring The volume for protecting bucket 302 is larger, and the first staving 710 is placed directly on ground, specifically, bottom wall 714 is positioned on ground.It is a kind of In embodiment, internal face and outside wall surface, the internal face of bottom wall 714 and outside wall surface of the first peripheral wall 712 are coated with paint, to prevent Only the mud mixture in the first staving 710 and external environment (such as rainwater, sunlight) are to the first peripheral wall 712 and bottom wall 714 Corrosion improves the service life of the first staving 710.
In the present embodiment, the second peripheral wall 722 is additionally provided in the first staving 710, one end of the second peripheral wall 722 is fixedly attached to Bottom wall 714, the second peripheral wall 722 is connect with bottom wall 714 forms the second staving 720, and the second staving 720 is located in the first staving 710. In the present embodiment, it can be understood as the inner space of the first staving 710 is divided into two independent parts by the second peripheral wall 722, Space between 722 to the first peripheral wall 712 of space inside wherein the second peripheral wall 722 and the second peripheral wall by the second peripheral wall 722 every It opens, it is understood that be that one end that bottom wall 714 is covered on the second peripheral wall 722 forms the second staving 720, and the second staving 720 is located at The inside of first staving 710.In a kind of embodiment, the second staving 720 is barrel shape, and in other words, the second peripheral wall 722 is in Heart line rotates to form cylinder, and bottom wall 714 is connected to one end of cylinder has the drum of opening to form one end.Other embodiment party In formula, the staving of the second staving 720 or other shapes, such as cuboid etc..
In the present embodiment, it is additionally provided with sleeve 730 in the first staving 710, is sheathed on outside the second staving 720, sleeve 730 and Receiving space 740 is formed between one peripheral wall 712, and the first gap 750 is formed between sleeve 730 and the second peripheral wall 722.A kind of implementation In mode, sleeve 730 is cylinder identical with the first peripheral wall 712 and 722 shape of the second peripheral wall, and sleeve 730 is sheathed on second week On wall 722, sleeve 730 can be fixedly connected by holder with the second peripheral wall 722, and sleeve 730 can also pass through holder and first Peripheral wall 712 is fixedly connected.In the present embodiment, the first gap 750 is formed between sleeve 730 and the second peripheral wall 722, when the second staving After 720 fill with mud mixture, mud mixture is overflowed from the second staving 720, and receiving space is flowed into behind the first gap 750 740, and the precipitation separation in receiving space 740.
Arrow shown in Figure 10 b is the flow direction of mud mixture.The mud mixture being delivered in the second staving 720 is first The first precipitation in the second staving 720 completes the separation of preliminary mud and water, and mud mixture is after the second staving 720 spilling Receiving space 740 is flowed by the first gap 750, mud is further precipitated in receiving space 740 and is separated from water, between first Gap 750 makes mud mixture enter receiving space 740 from close to the bottom of receiving space 740, further improves mud and water Separating effect, the good separating effect of mud and water is conducive to the utilization again of mud and water.
It is equipped with tiltedly material in the present embodiment, in receiving space 740 and is intubated layer 760, tiltedly material intubation layer 760 is used for receiving space 740 are separated into clear water zone 742 and mud area 744.In a kind of embodiment, tiltedly material intubation layer 760 is placed horizontally at receiving space Position among 740, is separated into clear water zone 742 and mud area 744, wherein mud area 744 is close to bottom wall by receiving space 740 714, opening of the clear water zone 742 close to the first staving 710.Specifically, tiltedly material intubation layer 760 includes multiple skies being mutually linked together Heart pipe, hollow pipe favour the placement of bottom wall 714.In a kind of embodiment, the angle of hollow pipe and horizontal plane is 45 °~60 °, tiltedly Material intubation layer 760 plays the role of filtering, and the water in mud mixture enters clear water zone 742 after tiltedly expecting to be intubated layer 760, And mud sediment is to mud area 744.
In the present embodiment, bottom wall 714 is equipped with first discharge port 772, first discharge port 772 be connected to receiving space 740 with it is outer Boundary, for the mud in mud area 744 to be discharged.Specifically, first discharge port 772 connects efferent duct, by suction pump by mud It is extracted out from first discharge port 772, and mud is sent into next process.
In the present embodiment, the junction of the first peripheral wall 712 and bottom wall 714 is equipped with first slope 782, the second peripheral wall 722 Outside wall surface and the junction of bottom wall 714 are equipped with the second slope 784, and first discharge port 772 is located at first slope 782 and the second slope 784 between the upright projection of bottom wall 714, and first slope 782 and the second slope 784 are used to guide in the mud in mud area 744 To first discharge port 772.Specifically, first slope 782 makes the bottom end of receiving space 740 form similar leakage with the second slope 784 The shape of bucket, first discharge port 772 are located at the most osculum position of funnel, and the mud that mud area 744 is precipitated downwards is directed to One outlet 772 improves the efficiency of mud discharge.
In the present embodiment, bottom wall 714 is additionally provided with the second outlet 774, and the second outlet 774 is connected to the second staving 720 It is internal and extraneous, for the mud in the second staving 720 to be discharged.Specifically, the second outlet 774 connects efferent duct, pass through Suction pump extracts mud from the second outlet 774 out, and mud is sent into next process.In the present embodiment, refuse receptacle 302 into The separation of mud twice and water is gone, wherein the mud mixture natural sedimentation inside the second staving 720, mud is from the second discharge Mouth 774 is discharged.It is not detached further in receiving space 740 by separation mud mixture in the second staving 720.
In the present embodiment, the internal face of the second peripheral wall 722 is equipped with third slope 786, second row with the junction of bottom wall 714 Outlet 774 is located at third slope 786 between the upright projection of bottom wall 714, and third slope 786 is used for will be in the second staving 720 Mud guide to the second outlet 774.Specifically, third slope 786 makes the bottom end inside the second staving 720 form similar leakage The shape of bucket, the second outlet 774 are located at the most osculum position of funnel, and the mud precipitated downwards is directed to the second outlet 774, improve the efficiency of mud discharge.
In the present embodiment, the first peripheral wall 712 is equipped with third outlet 76, and the position of third outlet 76 corresponds to clear water zone 742, third outlet 76 is used to be discharged the water of clear water zone 742.Specifically, third outlet 76 is close to the top of the first peripheral wall 712 Water in clear water zone 742 is discharged at end.
In the present embodiment, sleeve 730 includes the first end face 3022 away from bottom wall 714, and the second staving 720 includes deviating from bottom The second end face 3021 of wall 714, the mud mixture in the second staving 720 flow into the after the opening of second end face 3021 spilling One gap 750, the distance between first end face 3022 and bottom wall 714 not less than between second end face 3021 and bottom wall 714 away from From so that the mud mixture overflowed from the opening of second end face 3021 all flows into the first gap 750.Specifically, first end The horizontal position in face 3022 is higher than the horizontal position of second end face 3021, avoids mud mixture from the opening of second end face 3021 It is sputtered onto receiving space 740 other than the first gap 750 when spilling, to the muddy water that will be overflowed from the opening of second end face 3021 Mixture all enters receiving space 740 by the first gap 750 from the bottom of receiving space 740.
In the present embodiment, refuse receptacle 302 further includes input pipe 790, and input pipe 790 is inserted in the second staving 720.Specifically , input pipe 790 is at least partially inserted into the second staving 720, with prevent mud mixture input the second staving 720 in when due to Flow is larger and sputters.
It is delivered to the precipitation first in the second staving 720 of the mud mixture in the second staving 720, completes preliminary mud With the separation of water, mud mixture flows into receiving space 740 after the second staving 720 spilling by the first gap 750, and mud exists It further precipitates and is separated from water in receiving space 740, the first gap 750 makes mud mixture from close to receiving space 740 Bottom enters receiving space 740, is conducive to mud and precipitates downwards, further improves the separating effect of mud and water, mud with The good separating effect of water is conducive to the utilization again of mud and water.
Above disclosed is only a kind of the utility model better embodiment, cannot limit this reality with this certainly With novel interest field, one of ordinary skill in the art will appreciate that realize all or part of flow of the above embodiment, And equivalent variations made according to the claim of the utility model, it still falls within the scope of the utility model.

Claims (10)

1. a kind of water circulation system for building waste processing, which is characterized in that include for washing the first husky pond, second Pond and sand washer, third pond and the 6th pond for storing mud, the first eddy flow point for detaching sandstone and mud From device, the first refuse receptacle, the first Pulp pump and Duo Tai filter presses for detaching mud, the water circulation system further includes clear water Pond, the clear water reserviors are respectively connected to first pond, second pond, the third pond, described equipped with pipeline The water of six ponds, first refuse receptacle and the multiple filter press, the multiple filter press separation is described clear through pipeline inflow In pond, the clear water reserviors are respectively to first pond, second pond, the sand washer, the third pond, described 6th pond and first refuse receptacle supply water, and the mud that first pond is washed after sand enters the third pond, and described the Mud in the third pond is separated into sandstone and the entrance described first in entrance the 6th pond by one cyclone separator The mud of refuse receptacle.
2. as described in claim 1 for building waste processing water circulation system, which is characterized in that the third pond with It is connected with the first water channel between first pond, is connected between first cyclone separator and first refuse receptacle One dredging tube, the mud that first cyclone separator is isolated through first dredging tube be delivered to first refuse receptacle into Row precipitation, the mud of the first refuse receptacle bottom precipitation are delivered to the filter press, the press filtration through first Pulp pump Machine obtains mud after squeezing mud, and detaches water outlet.
3. the water circulation system for building waste processing as claimed in claim 2, which is characterized in that further include for storing 4th pond of mud and the 5th pond detach the second cyclone separator, the third cyclone separator and the 4th of sandstone and mud Cyclone separator, the second refuse receptacle, third refuse receptacle, the second Pulp pump and third Pulp pump for detaching mud, the described 4th It is also associated with the second water channel between pond and second pond, is also associated between the 5th pond and the sand washer Three water channels, the mud that the 4th pond is isolated are delivered to second refuse receptacle, the 5th pond through third dredging tube The mud isolated is delivered to the third refuse receptacle through the 4th dredging tube, and the mud that the 6th pond is isolated is defeated through second Mud pipe is delivered to the third refuse receptacle, and the mud of the second refuse receptacle bottom precipitation is delivered to institute through second Pulp pump Filter press is stated, the mud of the third refuse receptacle bottom precipitation is delivered to the filter press through the third Pulp pump.
4. the water circulation system for building waste processing as claimed in claim 3, which is characterized in that the clear water reserviors set the One water route, the second water route and third water route, first water route are delivered to first water respectively after clear water reserviors extraction Pond, second pond and the sand washer;Second water route is delivered to the third respectively after clear water reserviors extraction Pond, the 4th pond, the 5th pond and the 6th pond;The third water route from the clear water reserviors extraction after, It is respectively delivered to first refuse receptacle, second refuse receptacle and the third refuse receptacle.
5. the water circulation system for building waste processing as claimed in claim 4, which is characterized in that in first pond The mud for washing the partially aqueous after sand flows into the third pond through first water channel, also has in first pond and partly contains Water sandstone enter second pond;The partially aqueous mud washed in second pond after sand enters institute through second water channel The 4th pond is stated, also has partially aqueous sandstone to enter the sand washer in second pond;In the sand washer wash sand after Mud through the third water channel enter the 5th pond.
6. the water circulation system for building waste processing as claimed in claim 5, which is characterized in that further include rough sand dehydration Machine also has in the sand washer partially aqueous sandstone to enter the rough sand dewaterer, and the rough sand dewaterer is additionally provided with pipeline will Dewatered water is delivered to the 5th pond.
7. the water circulation system for building waste processing as claimed in claim 3, which is characterized in that further include fine sand dehydration Machine and the 4th conveyer belt, first cyclone separator, the third cyclone separator and the 4th cyclone separator separation The aqueous sandstone gone out are delivered to the 6th pond through the 4th conveyer belt, and the fine sand dewaterer is additionally provided with pipeline and will be dehydrated Water afterwards is delivered to the 6th pond.
8. the water circulation system for building waste processing as described in claim 1, which is characterized in that first refuse receptacle Including the first staving, including the first peripheral wall and the bottom wall for being fixedly connected on first peripheral wall one end;Second peripheral wall, described second One end of peripheral wall is fixedly attached to the bottom wall and forms the second staving, and second staving is located in first staving;Sleeve, It is sheathed on outside second staving, forms receiving space between the sleeve and first peripheral wall, the sleeve and described the The first gap is formed between two peripheral walls;After second staving fills with mud mixture, the mud mixture is from described second Staving overflows, and the receiving space is flowed into behind first gap.
9. the water circulation system for building waste processing as claimed in claim 8, which is characterized in that in the receiving space Equipped with oblique material intubation layer, the oblique material intubation floor is used to the receiving space being separated into clear water zone and mud area.
10. the water circulation system for building waste processing as claimed in claim 9, which is characterized in that the bottom wall is equipped with First discharge port, the first discharge port are connected to the receiving space and the external world, for the mud in the mud area to be discharged.
CN201721624098.3U 2017-11-28 2017-11-28 Water circulation system for building waste processing Active CN207641641U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721624098.3U CN207641641U (en) 2017-11-28 2017-11-28 Water circulation system for building waste processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721624098.3U CN207641641U (en) 2017-11-28 2017-11-28 Water circulation system for building waste processing

Publications (1)

Publication Number Publication Date
CN207641641U true CN207641641U (en) 2018-07-24

Family

ID=62881709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721624098.3U Active CN207641641U (en) 2017-11-28 2017-11-28 Water circulation system for building waste processing

Country Status (1)

Country Link
CN (1) CN207641641U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108160315A (en) * 2017-11-28 2018-06-15 深圳市万佳晟环保产业有限公司 For the water circulation system of building waste processing
CN108160315B (en) * 2017-11-28 2024-04-19 深圳江氏恩泽实业有限公司 Water circulation system for construction waste treatment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108160315A (en) * 2017-11-28 2018-06-15 深圳市万佳晟环保产业有限公司 For the water circulation system of building waste processing
CN108160315B (en) * 2017-11-28 2024-04-19 深圳江氏恩泽实业有限公司 Water circulation system for construction waste treatment

Similar Documents

Publication Publication Date Title
CN105000783B (en) Pipe duct sludge reduction and innocent treatment technology and device
CN207899575U (en) Building waste processing system
CN104874591B (en) The remaining sludge treatment technology of building and system
CN207170486U (en) A kind of MSW Incineration Plant clinker recycling and regenerated aggregate are classified preparation system
CN111203315B (en) Engineering dregs and sand separating system
CN108015094A (en) Building waste sorter
CN112452502A (en) Fine basalt machine-made sandstone aggregate production line and process flow thereof
CN207887309U (en) Building waste processing system
CN110116041A (en) A kind of building waste classification crushing apparatus
CN111282705A (en) Construction waste treatment device
CN207641643U (en) Building waste processing system
CN207899574U (en) Building waste processing system
CN207641642U (en) Building waste processing system
CN207899576U (en) Building waste processing system
CN203508174U (en) Garbage breaking classification recycling system
CN206701660U (en) Sand-stone separator separator and sand-stone separator
CN207641641U (en) Water circulation system for building waste processing
CN108160314A (en) Building waste processing system
CN108160316A (en) Building waste processing system
CN207887310U (en) Building waste processing system
CN108160319A (en) Building waste processing system
CN108160315A (en) For the water circulation system of building waste processing
CN108160317A (en) Building waste processing system
CN108160318A (en) Building waste processing system
CN214975509U (en) Grit sieving mechanism for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221019

Address after: 518000 704, Building 1, Excellence Century Center and Huanggang Business Center, southeast of the junction of Fuhua 3rd Road and Jintian Road, Fushan Community, Futian Street, Futian District, Shenzhen, Guangdong

Patentee after: Shenzhen Jiangshi Enze Industrial Co.,Ltd.

Address before: 518000 902, Building 1, Huanggang Business Center, Jintian Road, Futian Street, Futian District, Shenzhen, Guangdong

Patentee before: SHENZHEN WANJIASHENG ENVIRONMENTAL PROTECTION INDUSTRY CO.,LTD.

TR01 Transfer of patent right