CN207620293U - Installation part - Google Patents
Installation part Download PDFInfo
- Publication number
- CN207620293U CN207620293U CN201720730207.3U CN201720730207U CN207620293U CN 207620293 U CN207620293 U CN 207620293U CN 201720730207 U CN201720730207 U CN 201720730207U CN 207620293 U CN207620293 U CN 207620293U
- Authority
- CN
- China
- Prior art keywords
- substrate
- installation part
- decoration panel
- lug boss
- shaped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model belongs to construction and installation technical field, and embodiment discloses a kind of installation part, including:Substrate with multiple bolts hole and the multiple adjusting bolts connecting are screwed with multiple bolts hole, stretched out from the back side of substrate against wall some or all of in multiple bolts, each bolt stretches out the adjustable in length of substrate back;The front of substrate further includes the connection structure being connect with decoration panel.Installation part is in use, decoration panel is mounted in the connection structure of substrate front side, using this installation part during decoration panel is installed, advance leveling need not be carried out to metope, directly installation part can be fixed on the wall, since each bolt stretches out the adjustable in length of the substrate back, therefore the relative distance between multiple adjusting bolt adjustable walls and installation part is utilized, relative distance between decoration panel on mountings and metope is installed, construction procedure can be reduced, the construction time is saved, effectively shortens the duration.
Description
Technical field
The utility model is related to decoration panel mounting technique fields, particularly with regard to a kind of installation part.
Background technology
Currently, decoration panel needs to be installed and fixed on the metope of Shunping County during the installation process in the prior art,
Therefore it also needs to carry out metope advance leveling by cement plaster or keel before decoration panel is installed, cause
The complex installation process of decoration panel, and it is time-consuming longer, operation is inconvenient.
Utility model content
The utility model embodiment provides a kind of installation part, it is intended to which how solution avoids carrying out advance leveling, contracts
The problem of installation steps of the installation period of jacket and shorts decoration panel and simplified decoration panel.For some sides of the embodiment to disclosure
There are one basic understandings in face, and simple summary is shown below.The summarized section is not extensive overview, nor to determine pass
Key/important composition element or the protection domain for describing these embodiments.Its sole purpose is that some are presented generally with simple form
It reads, in this, as the preamble of following detailed description.
According to the utility model embodiment in a first aspect, provide a kind of installation part, including:Base with multiple bolts hole
Plate and the multiple adjusting bolts connecting are screwed with multiple bolts hole, stretched out from the back side of substrate some or all of in multiple bolts
Against wall, each bolt stretches out the adjustable in length of substrate back;The front of substrate further includes the company being connect with decoration panel
Binding structure.
In the present invention, in use, decoration panel is mounted in the connection structure of substrate front side installation part,
Using this installation part during decoration panel is installed, it is not necessary to advance leveling is carried out to metope, it can be directly by peace
Piece installing is fixed on the wall, since each bolt stretches out the adjustable in length of the substrate back, utilizes multiple adjusting bolts
Relative distance between adjustable wall and installation part, that is, install between decoration panel on mountings and metope it is opposite away from
From can reduce construction procedure, save the construction time, effectively shorten the duration.
It should be understood that above general description and following detailed description is only exemplary and explanatory, not
The utility model can be limited.
Description of the drawings
The drawings herein are incorporated into the specification and forms part of this specification, and shows and meets the utility model
Embodiment, and for explaining the principles of the present invention together with specification.
Fig. 1 is the structural schematic diagram of the installation part of one embodiment of the utility model;
Fig. 2 is the structural schematic diagram of the installation part of another view direction of one embodiment of the utility model;
Fig. 3 is the structural schematic diagram of the installation part of one embodiment of the utility model;
Fig. 4 is the structural schematic diagram of the installation part of another view direction of Fig. 3;
Fig. 5 is the structural schematic diagram of the decoration panel structure of one embodiment of the utility model;
Fig. 6 is the structural schematic diagram of the decoration panel structure of another view direction of one embodiment of the utility model.
Reference sign:100, installation part;110, substrate;111, bolt hole;112, connection structure;1121, lug boss;
1122, extension;113, fixing groove;114, mounting groove;115, strip bulge;116, weight loss groove;117, longitudinally convex;118, circle
Shape protrusion;119, lateral projection;120, adjusting bolt;130, nailing;200, decoration panel;210, groove;300, ornamental strip.
Specific implementation mode
The following description and drawings fully show the specific embodiment of the utility model, so that those skilled in the art
Them can be put into practice.Embodiment only represents possible variation.Unless explicitly requested, otherwise individual components and functionality is optional
's.The part of some embodiments and feature can be included in or replace part and the feature of other embodiments.This practicality
The range of novel embodiment includes equivalent obtained by the entire scope of claims and all of claims
Object.Herein, each embodiment individually or can be indicated generally with term " utility model ", this is just for the sake of side
Just, it and if in fact disclosing the utility model more than one, is not meant to automatically limit the ranging from any of the application
Single utility model or utility model design.Herein, relational terms such as first and second and the like are used only for one
A entity is distinguished with another entity, without requiring either to imply between these entities there are any actual relationship or
Sequentially.Moreover, the terms "include", "comprise" or any other variant thereof is intended to cover non-exclusive inclusion, so that
Include not only those elements including a series of elements, but also includes other elements that are not explicitly listed.Each reality herein
It applies example to describe by the way of progressive, each embodiment focuses on the differences from other embodiments, Ge Geshi
Just to refer each other for identical similar portion between applying example.For structure, product etc. disclosed in embodiment, due to itself and implementation
Part is corresponding disclosed in example, so description is fairly simple, reference may be made to the description of the method.
In the present invention, "upper", "lower", refer to it is upper and lower in view direction as shown in Figure 1.It is new in this practicality
In type, the longitudinal direction of installation part refers to the vertical direction of installation part in a state of use, and the transverse direction of installation part, which refers to installation part, to be made
With the horizontal direction under state.
The utility model first embodiment discloses a kind of installation part 100, as shown in Figures 1 to 4, including:With multiple spiral shells
The substrate 110 of keyhole 111 and the multiple adjusting bolts 120 connecting are screwed with multiple bolts hole 111, in multiple adjusting bolts 120
Some or all of stretched out from the back side of substrate 110 against wall, each bolt stretches out the adjustable in length at 110 back side of substrate;
110 front of substrate further includes the connection structure 112 being connect with decoration panel 200.
The front of wherein substrate 110 refers to installing the one side far from wall on metacoxal plate 110, and the back side of substrate 110 refers to
One side close to wall on metacoxal plate 110 is installed.
In the present invention, in use, decoration panel 200 is mounted on 110 positive company of substrate to installation part 100
On binding structure 112, using this installation part 100 during decoration panel 200 are installed, it is not necessary to carry out in advance levelling to metope
Processing can directly fix installation part 100 on the wall, since each bolt stretches out the adjustable in length of the substrate back,
Therefore using the relative distance between multiple 120 adjustable walls of adjusting bolt and installation part 100, that is, it is mounted on installation part 100
On decoration panel 200 and metope between relative distance, can reduce construction procedure, save the construction time, effectively shorten work
Phase.
Optionally, in the above-described embodiments, as shown in Figures 1 to 4, connection structure 112 is longitudinally extended along substrate 110
L-shaped protrusion, L-shaped protrusion include and substrate front side lug boss 1121 connected vertically and integrally vertical with the top of lug boss 1121
The extension 1122 of connection, extension 1122 can be with the groove grafting at 200 edge of decoration panel.In the present embodiment, it will decorate
Panel 200 is plugged on extension, enables the connection between decoration panel 200 and installation part 100 more firm.
Optionally, in the above-described embodiments, multiple as shown in Figure 1, L-shaped protrusion is located at the lateral intermediate position of substrate 110
Adjusting bolt 120 sets up separately in L-shaped protrusion both sides.In the present embodiment, L-shaped protrusion is located at the lateral intermediate position of substrate 110, because
This decoration panel 200 is plugged in the intermediate position of substrate 110, enables in the hand of substrate 110 more uniformly, therefore enable decoration panel
Connection between 200 and installation part 100 is more firm, and multiple adjusting bolts 120 set up separately in L-shaped protrusion both sides, enable substrate 110
It is more uniformly stressed, substrate 110 and connection between the walls are more firm.
Optionally, in any of the above-described embodiment, as shown in Fig. 1 or Fig. 3, substrate 110 is fixed on wall using nailing 130
On, on substrate 110 fixing groove 113, fixing groove 113 are additionally provided with close to the side at 110 edge of substrate positioned at lug boss 1121
Between L-shaped protrusion and multiple bolts hole 111, nailing 130 is located in fixing groove 113.In the present embodiment, nailing 130 is enabled
In in fixing groove 113, enabling the front of substrate 110 more smooth, it is plugged on extension 1122 convenient for decoration panel 200.
In any of the above-described embodiment, there are many set-up modes of installation part 100, as the optional embodiment party of one of which
Formula, as depicted in figs. 1 and 2, the front of substrate 110 includes two L-shaped protrusions, and the lug boss of two L-shaped protrusions is spaced and parallel, and two
The extension 1122 of a L-shaped protrusion is oppositely extending.In the present embodiment, since the interval of lug boss 1121 of two L-shaped protrusions is flat
Row, therefore the mounting groove 114 for fixing ornamental strip 300 can be formed between two L-shaped protrusions, ornamental strip 300 is fixed on
In mounting groove 114, the mechanical erection of mounting bar is realized using mounting groove 114, is avoided using glue, can be avoided glue aging band
Come installation loosely the problem of, enable the installation of ornamental strip more firm.
As the embodiment of another optional mounting plate, as shown in Figure 3 and Figure 4, the front of substrate 110 includes one
L-shaped protrusion and a strip bulge 115;The lug boss 1121 and strip bulge 115 of L-shaped protrusion are spaced and parallel, and L-shaped protrusion is prolonged
Extending portion 1122 extends to the direction far from strip bulge 115.In the present embodiment, the lug boss 1121 of L-shaped protrusion and bar shaped are convex
It rises 115 spaced and parallel, therefore can be formed between the lug boss 1121 and strip bulge 115 of L-shaped protrusion for fixing ornamental strip
300 mounting groove 114, ornamental strip 300 is fixed in mounting groove 114, realizes that the machinery of mounting bar is pacified using mounting groove 114
Dress avoids using glue, can avoid the problem that installation that glue aging is brought loosely, enables the installation of ornamental strip more firm.
Optionally, in the above-described embodiments, as shown in Figure 2 and Figure 4, the back side of substrate 110 includes multiple weight loss grooves 116,
Include longitudinally convex 117 be longitudinally extended along substrate 110 between multiple weight loss grooves 116, longitudinally convex 117 be located at L-shaped protrusion with
The relative position that substrate 110 connects.In the present embodiment, the back side of substrate 110 includes multiple weight loss grooves 116, can not only be subtracted
100 weight of itself of light installation part, additionally it is possible to save material, economize on resources, while 110 back side of substrate further includes longitudinally convex
117, and longitudinally convex 117 are located at the relative position that lug boss 1121 is connect with substrate 110, therefore substrate 110 can be increased
The intensity of body enables installation part 100 be less likely to be damaged.
Optionally, in the above-described embodiments, as shown in Figure 2 and Figure 4, substrate 110 includes multiple circles close to the side of metope
Shape protrusion 118, multiple circular protrusions 118 are located in the multiple weight loss grooves in part 116, and it is convex that multiple bolts hole 111 are located at multiple circles
It rises in 118.
Optionally, in the above-described embodiments, as shown in Figure 2 and Figure 4, further include lateral projection between multiple weight loss grooves 116
119, lateral projection 119 is located at side of the circular protrusions 118 far from 110 edge of substrate.
Optionally, in the above-described embodiments, as shown in Figures 1 to 4, substrate 110 is rectangle, each side of rectangular substrate 110
It is connected using arc transition between side, adjusting bolt 120 is 4, and bolt hole 111 is 4, and is divided into the interior angle of substrate 110
Near.
The utility model second embodiment discloses a kind of 200 structure of decoration panel, as shown in Figure 5 and Figure 6, including multiple dresses
Installation part 100 in decoration panel 200 and any of the above-described embodiment, one or more decoration panels 200 utilize multiple installation parts 100
It is fixed on metope, adjusting each bolt of multiple installation parts 100 can be such that multiple decoration panels 200 are generally aligned in the same plane.
In the present invention, 200 structure of decoration panel includes installation part 100 and decoration panel 200, decoration panel 200
In 110 positive connection structure 112 of substrate, using this installation part 100 during decoration panel 200 are installed, no
Advance leveling must be carried out to metope, can directly be fixed installation part 100 on the wall, since each bolt stretches out substrate
The adjustable in length at the back side, therefore the relative distance between multiple 120 adjustable walls of adjusting bolt and installation part 100 is utilized,
It is mounted on the decoration panel 200 on installation part 100 and the relative distance between metope, construction procedure can be reduced, saving is applied
Between working hour, the duration is effectively shortened.
Optionally, in the above-described embodiments, as shown in fig. 6, the edge of decoration panel 200 has groove 210.Installation part
100 connection structure 112 is the L-shaped protrusion being longitudinally extended along substrate, and L-shaped protrusion includes and substrate front side protrusion connected vertically
Portion 1121 and integrally extension 1122 connected vertically, extension 1122 can be with decoration panels 200 with the top of lug boss 1121
210 grafting of groove at edge.In the present embodiment, decoration panel 200 is plugged on extension, enables decoration panel 200 and peace
Connection between piece installing 100 is more firm.
Optionally, in the above-described embodiments, as shown in fig. 6, further including ornamental strip 300, ornamental strip 300 be fixed on colleague or
In mounting groove on same column installation part 100.Wherein, the installation part 100 of colleague or same column includes main installation part 100 and side installation part
100;The L-shaped protrusion of main installation part 100 is two, and the extension of two L-shaped protrusions extends to two opposite directions, two
The mounting groove for fixing ornamental strip 300 is formed between the lug boss of L-shaped protrusion;Side installation part 100 further includes along substrate longitudinal direction
The strip bulge of extension, the extension on side installation part 100 extend to the direction far from strip bulge;Strip bulge and lug boss
Between form mounting groove for fixing ornamental strip 300.In the present embodiment, the protrusion of two L-shaped protrusions or a L-shaped protrusion
The mounting groove 114 for fixing ornamental strip 300 can be formed between portion 1121 and strip bulge 115, and ornamental strip 300 is fixed on
In mounting groove 114, the mechanical erection of mounting bar is realized using mounting groove 114, is avoided using glue, can be avoided glue aging band
Come installation loosely the problem of, enable the installation of ornamental strip 300 more firm.
It should be understood that the utility model is not limited to the flow and knot that are described above and are shown in the accompanying drawings
Structure, and various modifications and changes may be made without departing from the scope thereof.The scope of the utility model is only wanted by appended right
It asks to limit.
Claims (10)
1. a kind of installation part, which is characterized in that including:Substrate with multiple bolts hole and screw company with the multiple bolt hole
The multiple bolts connect are stretched out from the back side of the substrate against wall, each bolt some or all of in the multiple bolt
The adjustable in length of the substrate back is stretched out, the front of the substrate further includes the connection structure being connect with decoration panel.
2. installation part as described in claim 1, which is characterized in that the connection structure is the L being longitudinally extended along the substrate
Shape protrusion, the L-shaped protrusion include the top one with substrate front side lug boss connected vertically and with the lug boss
Extension connected vertically, the extension can be with the groove grafting at the decoration panel edge.
3. installation part as claimed in claim 2, which is characterized in that the L-shaped protrusion is located at the middle part of substrate transverse direction
Position, the multiple bolt set up separately in L-shaped protrusion both sides.
4. installation part as claimed in claim 2, which is characterized in that the substrate is fixed on the wall using nailing, the substrate
Upper to be additionally provided with fixing groove close to the side of the substrate edges positioned at the lug boss, it is convex that the fixing groove is located at the L-shaped
It rises between the multiple bolt hole, the nailing is located in the fixing groove.
5. installation part as claimed in claim 2, which is characterized in that the front of the substrate includes two L-shaped protrusions, institute
The lug boss for stating two L-shaped protrusions is spaced and parallel, and the extension of described two L-shaped protrusions is oppositely extending.
6. installation part as claimed in claim 2, which is characterized in that the front of the substrate include L-shaped protrusion and
One strip bulge;The lug boss and the strip bulge of the L-shaped protrusion are spaced and parallel, the extension of the L-shaped protrusion to
Direction far from the strip bulge extends.
7. installation part as claimed in claim 2, which is characterized in that the back side of the substrate includes multiple weight loss grooves, described more
Include between a weight loss groove be longitudinally extended along the substrate it is longitudinally convex, it is described it is longitudinally convex be located at it is opposite with the lug boss
Position.
8. a kind of decoration panel structure, including multiple decoration panels and multiple installations as described in any one of claim 1 to 7
Part, one or more of decoration panels are fixed on using the multiple installation part on metope, and the multiple installation part is adjusted
Each bolt can be such that the multiple decoration panel is generally aligned in the same plane.
9. decoration panel structure as claimed in claim 8, which is characterized in that the edge of the decoration panel has groove.
10. decoration panel structure as claimed in claim 9, which is characterized in that further include ornamental strip, the ornamental strip is fixed on
Colleague or same column installation part on mounting groove in;
Wherein, the installation part of colleague or same column includes main installation part and side installation part;The L-shaped protrusion of the main installation part is two
It is a, and the extension of two L-shaped protrusions extends to two opposite directions, between the lug boss of described two L-shaped protrusions
Form the mounting groove for fixing the ornamental strip;The side installation part further includes that the bar shaped that is longitudinally extended along the substrate is convex
It rises, the extension on the side installation part extends to the direction far from the strip bulge;The strip bulge and the protrusion
The mounting groove for fixing the ornamental strip is formed between portion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720730207.3U CN207620293U (en) | 2017-06-21 | 2017-06-21 | Installation part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720730207.3U CN207620293U (en) | 2017-06-21 | 2017-06-21 | Installation part |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207620293U true CN207620293U (en) | 2018-07-17 |
Family
ID=62817648
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720730207.3U Expired - Fee Related CN207620293U (en) | 2017-06-21 | 2017-06-21 | Installation part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207620293U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110485665A (en) * | 2019-09-20 | 2019-11-22 | 上海万渠建材有限公司 | A kind of wall brick combination paving platform |
-
2017
- 2017-06-21 CN CN201720730207.3U patent/CN207620293U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110485665A (en) * | 2019-09-20 | 2019-11-22 | 上海万渠建材有限公司 | A kind of wall brick combination paving platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109162582A (en) | A kind of installation method of doorframe | |
CN104989024A (en) | Dismounting and mounting type corner suspended ceiling layer and forming method thereof | |
KR102122685B1 (en) | A Finishing Material Fixing Assembly For Building Wall | |
CN204898991U (en) | Reassembling type corner furred ceiling layer | |
CN106284779A (en) | A kind of bright hidden frame of curtain wall connects auxiliary frame, curtain wall system and construction method thereof | |
CN108952053A (en) | Shingle nail installation assembly and its installation method | |
CN111962792A (en) | Wall surface hanging system and mounting method | |
CN207110319U (en) | One kind exempts from keel assembling type outer wall board mounting structure | |
CN207620293U (en) | Installation part | |
JP5861903B1 (en) | Indirect lighting structure unit parts | |
CN110056150A (en) | A kind of hanging structure of assembled wallboard | |
CN108240089B (en) | Metope component and metope installation method | |
CN110821084B (en) | Fast-assembling wall surface structure and installation method | |
CN108560862B (en) | Adjustable sliding anchoring piece of heat-insulating decorative board | |
CN207513099U (en) | Band is located by connecting the monoblock type curtain wall curved arc ornamental strip of piece | |
CN212427880U (en) | Wall surface hanging system | |
CN107130732B (en) | Wallboard is assembled to canned type | |
CN203834877U (en) | Installation assembly of decorating plates at exposed corner | |
CN202500243U (en) | Stone pendant and stone curtain wall | |
CN104975673A (en) | Clamp holder applied to disassembly and assembly corner ceiling | |
CN212427881U (en) | Wall surface hanging integral external corner system | |
CN205296686U (en) | Take decorative board of anchor metal mesh piece | |
CN211058187U (en) | Assembling structure for decorative plate | |
CN212478354U (en) | Convex structure seamless heat preservation structure decoration integrated system omitting keel welding | |
CN105178482B (en) | A kind of pottery clay plates add the hybrid curtain wall construction of glass |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180717 Termination date: 20190621 |