CN207599143U - A kind of prefabricated integrated assembled sectional shelf-unit based on BIM - Google Patents
A kind of prefabricated integrated assembled sectional shelf-unit based on BIM Download PDFInfo
- Publication number
- CN207599143U CN207599143U CN201721512411.4U CN201721512411U CN207599143U CN 207599143 U CN207599143 U CN 207599143U CN 201721512411 U CN201721512411 U CN 201721512411U CN 207599143 U CN207599143 U CN 207599143U
- Authority
- CN
- China
- Prior art keywords
- montant
- cross bar
- component
- bim
- unit based
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
A kind of prefabricated integrated assembled sectional shelf-unit based on BIM, including the duct member being connect with pipeline, beams of concrete, cross bar component, montant component and connector, the utility model have the following advantages:1st, the utility model construction efficiency is high, saves the duration of a project, and the reduction of suspension and support reduces rolled steel dosage, saved cost;Scene effectively prevent the fire hazard caused by welding the high temperature of other structures and welding, and overcome broken ring of the welding to base material corrosion-inhibiting coating without welding;2nd, the utility model space utilization is flexible, and later stage pipeline maintenance and dilatation are convenient, can effectively solve the problems, such as part pipeline centralized arrangement;3rd, after the utility model is based on the arrangement installation of BIM pipelines, due to uniformly reasonably arranging comprehensive support so that pipeline is clearly beautiful;4th, flexibly installation U-tube folder can be needed according to site operation, reduces the wasting of resources, it is cost-effective.
Description
Technical field
The utility model is related to support technology fields, and in particular to one kind is by BIM technology, in pipeline layout design basis
On integrated assembled sectional shelf-unit.
Background technology
The installation of existing stent is divided into common support bracket, finished product stent, para-seismic support etc. be all be installed separately by tripartite and
Into connection mode takes welding and prebored hole, and installation is complete afterwards for stent it is difficult to adjust again
Most engineering electromechanics installation design drawing in, each special pipelines stent is individually designed, installed height mark according to
Respectively profession requirement voluntarily determines that this has resulted in electromechanical engineering design, civil structural engineering design, fine fitment engineering design rank
Connect incomplete, pipeline absolute altitude, spatial position intersection conflict are notable, and according to drawing construction, phenomenon of doing over again is extremely serious, management association
It adjusts difficulty big, exerts heavy pressures on to project duration, also influence construction quality.The system function of mega project is increasingly complete at present
Kind, the type and quantity of electromechanical equipment pipeline are more and more, in order to propose rational pipeline layout design side in a limited space
Case, heavy construction public area and battery limits aisle region use assembled type pipe hanger system, can relatively efficiently solve
Pipeline is installed concentratedly the problem of space is nervous, at the same there is sunpender not repeat, with structural member tie point is few, construction efficiency is high, empty
Between saving, later stage pipeline maintenance, dilatation the features such as facilitating, still, majority is the systematicness solution carried out in work progress at the scene
Certainly, there are waste of materials and manpower, and the problem of the damaging property of coating materials such as anti-corrosion to material.
Therefore it provides a kind of just will can between the parties carry out rational deployment setting in the design phase, structural integrity is carried out
Optimization, simplifies budget, and for the assembled sectional shelf-unit that the external setting layer of material avoids damage to, being one is worth grinding
The problem of studying carefully.
Utility model content
In view of above-mentioned deficiencies of the prior art, the purpose of this utility model is to provide a kind of prefabricated one based on BIM
Change assembled sectional shelf-unit.
The technical solution of the utility model is specific as follows:A kind of prefabricated integrated assembled sectional shelf-unit based on BIM, packet
The duct member being connect with pipeline, beams of concrete, cross bar component, montant component and connector are included, the connector includes fixed connect
Fitting and active connection, the fixedly connected part are placed in the beams of concrete and/or the side of cross bar component and/or montant component
Wall and positioned at the side wall side be equipped with more than one mount hole, the active connection be placed in the cross bar component and/or
The end of montant component, the front end face of the active connection is equipped with hook and front end face edge is equipped with flange, the hook with
The mount hole cooperation grafting coincide together, is bolted between the flange and the fixedly connected part;The fixation is even
Fitting is equipped with the bolt hole that connection is matched with the flange;
The duct member is placed on the cross bar component.
Further, the montant component includes the first montant, the second montant and third montant, first montant, institute
It states parallel between the second montant and the third montant and passes through the connector and connect with the beams of concrete and perpendicular to institute
State beams of concrete;
The third montant is placed between first montant and second montant.
Further, the cross bar component includes the first cross bar, the second cross bar and third cross bar, first cross bar two
End connects one of first montant and second montant in contrast to the connection beams of concrete respectively by the connector
End;
The third montant is connected in contrast to described in connection by the connector at the medium position of second cross bar
One end and both ends of beams of concrete connect the side wall of first montant and second montant by the connector respectively;
The third cross bar both ends connect the side of first montant and the third montant by the connector respectively
Wall.
Further, first cross bar, second cross bar and the third cross bar are parallel and perpendicular to the montant
Component.
Further, the duct member includes more than one p-type pipe clamp and more than one U-tube is pressed from both sides, and the U-tube is sandwiched
In first cross bar towards in the one side wall of second cross bar, the p-type pipe clamp is placed in second cross bar towards described
In the one side wall of third cross bar.
Further, first cross bar is equipped with more than two through holes for being used to fix the U-tube folder.
Further, air duct is equipped between first montant and the third montant, the air duct is located at the third
Cross bar is in contrast to a side towards second cross bar;
Water pipe channel is equipped between second montant and the third montant, it is horizontal that the water pipe channel is located at described second
Bar is in contrast to a side towards first cross bar.
Further, BIM locating plates are pasted on the cross bar component, montant component and the beams of concrete, it is described
BIM locating plates carry location information, Kong Wei and angle information;The BIM locating plates are Quick Response Code or three codes.
The beneficial effects of the utility model are:Prefabricated integrated assembled sectional shelf-unit of the utility model based on BIM be
The synthesis arrangements of the BIM after each special pipelines are fully considered, since stent is attached on pipeline and structure, compared to water
Pipe, crane span structure, air hose are with greater need for accurately positioning and the factors such as the real space environment of construction site.Based on BIM technology, fill
Divide the structure for considering building, accomplish the accurate matching with surrounding space environment in terms of the in-site installation of finished product stent, reduce material
The waste of material and manpower, and all special pipelines are concentrated in a set of stent system, space utilization is flexible, effectively solves space and asks
Topic, and has the following advantages:1st, the utility model construction efficiency is high, saves the duration of a project, and the reduction of suspension and support reduces steel
Dosage has saved cost;Scene is effectively prevent without welding caused by welding the high temperature of other structures and welding
Fire hazard, and overcome broken ring of the welding to base material corrosion-inhibiting coating;2nd, the utility model space utilization is flexible, later stage pipeline dimension
Shield and dilatation are convenient, can effectively solve the problems, such as part pipeline centralized arrangement;3rd, the utility model is based on the arrangement installation of BIM pipelines
Afterwards, due to uniformly reasonably arranging comprehensive support so that pipeline is clearly beautiful;4th, flexibly installation U can be needed according to site operation
Type pipe clamp reduces the wasting of resources, cost-effective.
Description of the drawings
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the first montant described in the utility model and the beams of concrete connection diagram;
Fig. 3 is Moveable connecting piece structure schematic diagram described in the utility model;
Fig. 4 is the first cross bar through hole structure diagram;
In figure, label 1 is beams of concrete, 21 is the first montant, 22 is the second montant, 23 is third montant, 31 is first
Cross bar, 32 be the second cross bar, 33 be third cross bar, 4 be connector, 41 be fixedly connected part, 411 be hook hole, 412 be bolt
Hole, 42 be active connection, 421 be flange, 4211 be flange bolt hole, 422 be hook, 5 be water pipe channel, 6 be air duct, 7
For U-tube folder, 8 be p-type pipe clamp, 9 be BIM locating plates.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation
Example, is explained in further detail the utility model.It should be appreciated that specific embodiment described herein is used only for explaining
The utility model is not used to limit the utility model.
On the contrary, the utility model cover it is any be defined by the claims do in the spirit and scope of the utility model
Replacement, modification, equivalent method and scheme.Further, it is right below in order to which the public is made to have a better understanding the utility model
It is detailed to describe some specific detail sections in the datail description of the utility model.Do not have for a person skilled in the art
The description of these detail sections can also understand the utility model completely.Below in conjunction with the accompanying drawings with specific embodiment, to this reality
With novel further explanation.
As shown in Figure 1, the overall structure diagram for the utility model, a kind of threshold value integration assembled based on BIM
Sectional shelf-unit, including beams of concrete 1, cross bar component, montant component, duct member and connector 4, the montant component includes the
One montant 21, the second montant 22 and third montant 23, first montant 21, second montant 22 and the third montant
It is mutually parallel on a logical horizontal plane between 23 and passes through the connector 4 and connect and perpendicular to described with the beams of concrete 1
Beams of concrete 1, the third montant 23 are placed between first montant 21 and second montant 22;The duct member is placed in
On the cross bar component.
The cross bar component includes the first cross bar 31, the second cross bar 32 and third cross bar 33,31 both ends of the first cross bar
First montant 21 and second montant 22 are connected in contrast to the connection beams of concrete 1 by the connector 4 respectively
One end;The third montant 23 is connected in contrast to connection by the connector 4 at the medium position of second cross bar 32
One end and both ends of the beams of concrete 1 connect first montant 21 and second montant by the connector 4 respectively
22 side wall;33 both ends of third cross bar connect first montant 21 by the connector 4 respectively and the third is erected
The side wall of bar 23;First cross bar 31, second cross bar 32 and the third cross bar 33 are mutually parallel in the same plane
And perpendicular to the montant component.
The duct member includes more than one p-type pipe clamp 7 and more than one U-tube folder 8, and the U-tube folder 8 is placed in institute
The first cross bar 31 is stated towards in the one side wall of second cross bar 32, the p-type pipe clamp 7 is placed in second cross bar towards described
In the one side wall of third cross bar 33.
Air duct 6 is equipped between first montant 21 and the third montant 23, the air duct 6 is located at third horizontal stroke
Bar 33 is in contrast to a side towards second cross bar 32;Water is equipped between second montant 22 and the third montant 23
Tube passage 5, the water pipe channel 5 are located at second cross bar 32 in contrast to a side towards first cross bar 31.
As described in Fig. 2 and Fig. 3, for the first montant 21 described in the utility model and the beams of concrete connection diagram and institute
State Moveable connecting piece structure schematic diagram;The connector 4 includes fixedly connected part 41 and active connection 42, and the fixation is even
Fitting 41 is placed in the beams of concrete 1 and/or the side wall of the cross bar component and/or the montant component and positioned at the side wall
Side be equipped with more than one mount hole 411, the active connection 42 is placed in the end of the cross bar component and/or montant component
Portion, 42 front end face of active connection is equipped with hook 422 and front end face edge is equipped with flange 421, more than 422 institutes of the hook
Stating mount hole 411 coordinates grafting to coincide together, is bolted between the flange 421 and the fixedly connected part 41, described
Fixedly connected part 41 is equipped with the bolt hole 412 being connected with the flange 421.
BIM locating plates 9, the BIM are pasted on the cross bar component, the montant component and the beams of concrete 1
9 prefabricated position of locating plate, hole position and angle information, the design information comprising building element, construction technology information, material information and
Link information between structure adjacent with other, the design information include position in whole building of component name, component,
The shape of component, the installation site of component, the material of component, component engineering property.The working procedure information includes construction
Process, method, progress, cost, quality requirement.The link information includes coupled component name, link position and company
Connect mode.
As shown in figure 4, for the first cross bar pipe perforation structure schematic diagram described in the utility model, set on first cross bar 31
There are two above for fixing the through hole 311 of the U-tube folder 7;The peace of progress U-tube folder can be needed according to actual field
Dress, it is convenient and efficient, it economizes on resources.
Prefabricated integrated assembled sectional shelf-unit of the utility model based on BIM, after fully considering each special pipelines
BIM synthesis arrangements, since stent is attached on pipeline and structure, compared to water pipe, crane span structure, air hose with greater need for accurately
The factors such as the real space environment of positioning and construction site.Based on BIM technology, the structure of building is fully considered, in finished product branch
Accomplish the accurate matching with surrounding space environment in terms of the in-site installation of frame, reduce the waste of material and manpower, and all professions
Pipeline is concentrated in a set of stent system, and space utilization is flexible, effectively solves space problem, and has the following advantages:1st, this reality
With novel construction efficiency height, the duration of a project is saved, the reduction of suspension and support reduces rolled steel dosage, saved cost;It scene need not
Welding effectively prevent the fire hazard caused by welding the high temperature of other structures and welding, and overcomes welding to base
The broken ring of material corrosion-inhibiting coating;2nd, the utility model space utilization is flexible, and later stage pipeline maintenance and dilatation are convenient, can effective solution portion
It is in charge of line centralized arrangement problem;3rd, after the utility model is based on the arrangement installation of BIM pipelines, since uniformly reasonably arrangement integrates
Stent so that pipeline is clearly beautiful;4th, flexibly installation U-tube folder can be needed according to site operation, the wasting of resources is reduced, saves into
This.
Claims (8)
1. a kind of prefabricated integrated assembled sectional shelf-unit based on BIM, including the duct member being connect with pipeline, beams of concrete,
Cross bar component, montant component and connector, which is characterized in that the connector includes fixedly connected part and active connection, institute
It states fixedly connected part and is placed in the beams of concrete and/or the side wall of cross bar component and/or montant component and positioned at the side wall
Side is equipped with more than one mount hole, and the active connection is placed in the end of the cross bar component and/or montant component, described
The front end face of active connection is equipped with hook and front end face edge is equipped with flange, the hook and mount hole cooperation grafting kiss
It is combined, is bolted between the flange and the fixedly connected part;The fixedly connected part is equipped with and the flange
Match the bolt hole of connection;
The duct member is placed on the cross bar component.
A kind of 2. prefabricated integrated assembled sectional shelf-unit based on BIM according to claim 1, which is characterized in that institute
It states montant component and includes the first montant, the second montant and third montant, first montant, second montant and described the
It is parallel and pass through the connector and connect with the beams of concrete and perpendicular to the beams of concrete between three montants;
The third montant is placed between first montant and second montant.
A kind of 3. prefabricated integrated assembled sectional shelf-unit based on BIM according to claim 2, which is characterized in that institute
It states cross bar component and includes the first cross bar, the second cross bar and third cross bar, the first cross bar both ends are distinguished by the connector
First montant and second montant are connected in contrast to the one end for connecting the beams of concrete;
The third montant is connected in contrast to the connection coagulation by the connector at the medium position of second cross bar
One end and both ends of Tu Liang connects the side wall of first montant and second montant by the connector respectively;
The third cross bar both ends connect the side wall of first montant and the third montant by the connector respectively.
A kind of 4. prefabricated integrated assembled sectional shelf-unit based on BIM according to claim 3, which is characterized in that institute
The first cross bar, second cross bar and the third cross bar are stated parallel and perpendicular to the montant component.
A kind of 5. prefabricated integrated assembled sectional shelf-unit based on BIM according to claim 4, which is characterized in that institute
State duct member and include more than one p-type pipe clamp and more than one U-tube and press from both sides, the U-tube be folded in first cross bar towards
In the one side wall of second cross bar, the p-type pipe clamp is placed in second cross bar towards in the one side wall of the third cross bar.
A kind of 6. prefabricated integrated assembled sectional shelf-unit based on BIM according to claim 5, which is characterized in that institute
It states the first cross bar and is equipped with more than two through holes for being used to fix the U-tube folder.
A kind of 7. prefabricated integrated assembled sectional shelf-unit based on BIM according to claim 6, which is characterized in that institute
It states and air duct is equipped between the first montant and the third montant, the air duct is located at the third cross bar in contrast to towards described the
A side of two cross bars;
Water pipe channel is equipped between second montant and the third montant, the water pipe channel is located at the second cross bar phase
Instead in a side towards first cross bar.
A kind of 8. prefabricated integrated assembled sectional shelf-unit based on BIM according to claim 1, which is characterized in that institute
It states and BIM locating plates is pasted on cross bar component, montant component and the beams of concrete, the BIM locating plates carrying location information,
Kong Wei and angle information;The BIM locating plates are Quick Response Code or three codes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721512411.4U CN207599143U (en) | 2017-11-14 | 2017-11-14 | A kind of prefabricated integrated assembled sectional shelf-unit based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721512411.4U CN207599143U (en) | 2017-11-14 | 2017-11-14 | A kind of prefabricated integrated assembled sectional shelf-unit based on BIM |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207599143U true CN207599143U (en) | 2018-07-10 |
Family
ID=62759145
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721512411.4U Expired - Fee Related CN207599143U (en) | 2017-11-14 | 2017-11-14 | A kind of prefabricated integrated assembled sectional shelf-unit based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207599143U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114457911A (en) * | 2022-02-28 | 2022-05-10 | 中交一公局集团有限公司 | Prefabricated tie beam, supporting structure and prefabricated tie beam installation method |
-
2017
- 2017-11-14 CN CN201721512411.4U patent/CN207599143U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114457911A (en) * | 2022-02-28 | 2022-05-10 | 中交一公局集团有限公司 | Prefabricated tie beam, supporting structure and prefabricated tie beam installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204901084U (en) | Prefabricated integration assembled sectional shelf -unit based on BIM | |
CN205639870U (en) | A pipeline gallows is synthesized in heavy construction | |
CN207599143U (en) | A kind of prefabricated integrated assembled sectional shelf-unit based on BIM | |
CN202577949U (en) | Truss for supporting concrete shear wall templates and assembly structure | |
CN204266124U (en) | The pre-assembled moulding bed of large sections steel box-girder | |
CN204921558U (en) | A interim connecting device that is used for component and bracket to dock | |
CN103958821B (en) | For installing the method and apparatus of Energy Chain | |
CN207211373U (en) | A kind of simple steel I-beam column connected node | |
CN103473398B (en) | The analogue system of a kind of integrated refrigeration station and emulation method | |
CN203475612U (en) | Steel structure connecting piece | |
CN104179122A (en) | Steel tower segment positioning device and method | |
CN202324202U (en) | Adjustable device for connecting steel vertical component with steel horizontal component | |
CN208735013U (en) | A kind of movable hanger of small size pipeline | |
CN107893480A (en) | A kind of assembled connecting node of lattice beam and post | |
CN204346816U (en) | Loading hole locating support | |
CN210342377U (en) | Closed type combined floor support plate assembly | |
CN205935243U (en) | Concatenation node of dysmorphism post | |
CN206054920U (en) | For the accessory of comprehensive suspension bracket | |
CN207848609U (en) | A kind of seat assembly of guiding and fixed pipeline | |
CN206299900U (en) | For the shaped steel Two bors d's oeuveres combined bracket that electrical and mechanical comprehensive pipeline is installed | |
CN203514632U (en) | Middle-connected steel beam | |
CN205077497U (en) | Spelling formula underground is strutted and is enclosed purlin | |
CN207646870U (en) | A kind of beam-to-column connection node of dismounting easy to install | |
CN204386187U (en) | A kind of space tube truss erecting tools | |
CN210919054U (en) | Shield constructs dismantlement structure of quick-witted D ring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180710 Termination date: 20201114 |
|
CF01 | Termination of patent right due to non-payment of annual fee |