CN207599143U - A kind of prefabricated integrated assembled sectional shelf-unit based on BIM - Google Patents

A kind of prefabricated integrated assembled sectional shelf-unit based on BIM Download PDF

Info

Publication number
CN207599143U
CN207599143U CN201721512411.4U CN201721512411U CN207599143U CN 207599143 U CN207599143 U CN 207599143U CN 201721512411 U CN201721512411 U CN 201721512411U CN 207599143 U CN207599143 U CN 207599143U
Authority
CN
China
Prior art keywords
montant
cross bar
component
bim
unit based
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721512411.4U
Other languages
Chinese (zh)
Inventor
黄崧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Dacheng Construction Engineering Co Ltd
Yunnan Zhonglin Geologic Investing & Design Co Ltd
Original Assignee
Yunnan Dacheng Construction Engineering Co Ltd
Yunnan Zhonglin Geologic Investing & Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Dacheng Construction Engineering Co Ltd, Yunnan Zhonglin Geologic Investing & Design Co Ltd filed Critical Yunnan Dacheng Construction Engineering Co Ltd
Priority to CN201721512411.4U priority Critical patent/CN207599143U/en
Application granted granted Critical
Publication of CN207599143U publication Critical patent/CN207599143U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

A kind of prefabricated integrated assembled sectional shelf-unit based on BIM, including the duct member being connect with pipeline, beams of concrete, cross bar component, montant component and connector, the utility model have the following advantages:1st, the utility model construction efficiency is high, saves the duration of a project, and the reduction of suspension and support reduces rolled steel dosage, saved cost;Scene effectively prevent the fire hazard caused by welding the high temperature of other structures and welding, and overcome broken ring of the welding to base material corrosion-inhibiting coating without welding;2nd, the utility model space utilization is flexible, and later stage pipeline maintenance and dilatation are convenient, can effectively solve the problems, such as part pipeline centralized arrangement;3rd, after the utility model is based on the arrangement installation of BIM pipelines, due to uniformly reasonably arranging comprehensive support so that pipeline is clearly beautiful;4th, flexibly installation U-tube folder can be needed according to site operation, reduces the wasting of resources, it is cost-effective.

Description

A kind of prefabricated integrated assembled sectional shelf-unit based on BIM
Technical field
The utility model is related to support technology fields, and in particular to one kind is by BIM technology, in pipeline layout design basis On integrated assembled sectional shelf-unit.
Background technology
The installation of existing stent is divided into common support bracket, finished product stent, para-seismic support etc. be all be installed separately by tripartite and Into connection mode takes welding and prebored hole, and installation is complete afterwards for stent it is difficult to adjust again
Most engineering electromechanics installation design drawing in, each special pipelines stent is individually designed, installed height mark according to Respectively profession requirement voluntarily determines that this has resulted in electromechanical engineering design, civil structural engineering design, fine fitment engineering design rank Connect incomplete, pipeline absolute altitude, spatial position intersection conflict are notable, and according to drawing construction, phenomenon of doing over again is extremely serious, management association It adjusts difficulty big, exerts heavy pressures on to project duration, also influence construction quality.The system function of mega project is increasingly complete at present Kind, the type and quantity of electromechanical equipment pipeline are more and more, in order to propose rational pipeline layout design side in a limited space Case, heavy construction public area and battery limits aisle region use assembled type pipe hanger system, can relatively efficiently solve Pipeline is installed concentratedly the problem of space is nervous, at the same there is sunpender not repeat, with structural member tie point is few, construction efficiency is high, empty Between saving, later stage pipeline maintenance, dilatation the features such as facilitating, still, majority is the systematicness solution carried out in work progress at the scene Certainly, there are waste of materials and manpower, and the problem of the damaging property of coating materials such as anti-corrosion to material.
Therefore it provides a kind of just will can between the parties carry out rational deployment setting in the design phase, structural integrity is carried out Optimization, simplifies budget, and for the assembled sectional shelf-unit that the external setting layer of material avoids damage to, being one is worth grinding The problem of studying carefully.
Utility model content
In view of above-mentioned deficiencies of the prior art, the purpose of this utility model is to provide a kind of prefabricated one based on BIM Change assembled sectional shelf-unit.
The technical solution of the utility model is specific as follows:A kind of prefabricated integrated assembled sectional shelf-unit based on BIM, packet The duct member being connect with pipeline, beams of concrete, cross bar component, montant component and connector are included, the connector includes fixed connect Fitting and active connection, the fixedly connected part are placed in the beams of concrete and/or the side of cross bar component and/or montant component Wall and positioned at the side wall side be equipped with more than one mount hole, the active connection be placed in the cross bar component and/or The end of montant component, the front end face of the active connection is equipped with hook and front end face edge is equipped with flange, the hook with The mount hole cooperation grafting coincide together, is bolted between the flange and the fixedly connected part;The fixation is even Fitting is equipped with the bolt hole that connection is matched with the flange;
The duct member is placed on the cross bar component.
Further, the montant component includes the first montant, the second montant and third montant, first montant, institute It states parallel between the second montant and the third montant and passes through the connector and connect with the beams of concrete and perpendicular to institute State beams of concrete;
The third montant is placed between first montant and second montant.
Further, the cross bar component includes the first cross bar, the second cross bar and third cross bar, first cross bar two End connects one of first montant and second montant in contrast to the connection beams of concrete respectively by the connector End;
The third montant is connected in contrast to described in connection by the connector at the medium position of second cross bar One end and both ends of beams of concrete connect the side wall of first montant and second montant by the connector respectively;
The third cross bar both ends connect the side of first montant and the third montant by the connector respectively Wall.
Further, first cross bar, second cross bar and the third cross bar are parallel and perpendicular to the montant Component.
Further, the duct member includes more than one p-type pipe clamp and more than one U-tube is pressed from both sides, and the U-tube is sandwiched In first cross bar towards in the one side wall of second cross bar, the p-type pipe clamp is placed in second cross bar towards described In the one side wall of third cross bar.
Further, first cross bar is equipped with more than two through holes for being used to fix the U-tube folder.
Further, air duct is equipped between first montant and the third montant, the air duct is located at the third Cross bar is in contrast to a side towards second cross bar;
Water pipe channel is equipped between second montant and the third montant, it is horizontal that the water pipe channel is located at described second Bar is in contrast to a side towards first cross bar.
Further, BIM locating plates are pasted on the cross bar component, montant component and the beams of concrete, it is described BIM locating plates carry location information, Kong Wei and angle information;The BIM locating plates are Quick Response Code or three codes.
The beneficial effects of the utility model are:Prefabricated integrated assembled sectional shelf-unit of the utility model based on BIM be The synthesis arrangements of the BIM after each special pipelines are fully considered, since stent is attached on pipeline and structure, compared to water Pipe, crane span structure, air hose are with greater need for accurately positioning and the factors such as the real space environment of construction site.Based on BIM technology, fill Divide the structure for considering building, accomplish the accurate matching with surrounding space environment in terms of the in-site installation of finished product stent, reduce material The waste of material and manpower, and all special pipelines are concentrated in a set of stent system, space utilization is flexible, effectively solves space and asks Topic, and has the following advantages:1st, the utility model construction efficiency is high, saves the duration of a project, and the reduction of suspension and support reduces steel Dosage has saved cost;Scene is effectively prevent without welding caused by welding the high temperature of other structures and welding Fire hazard, and overcome broken ring of the welding to base material corrosion-inhibiting coating;2nd, the utility model space utilization is flexible, later stage pipeline dimension Shield and dilatation are convenient, can effectively solve the problems, such as part pipeline centralized arrangement;3rd, the utility model is based on the arrangement installation of BIM pipelines Afterwards, due to uniformly reasonably arranging comprehensive support so that pipeline is clearly beautiful;4th, flexibly installation U can be needed according to site operation Type pipe clamp reduces the wasting of resources, cost-effective.
Description of the drawings
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the first montant described in the utility model and the beams of concrete connection diagram;
Fig. 3 is Moveable connecting piece structure schematic diagram described in the utility model;
Fig. 4 is the first cross bar through hole structure diagram;
In figure, label 1 is beams of concrete, 21 is the first montant, 22 is the second montant, 23 is third montant, 31 is first Cross bar, 32 be the second cross bar, 33 be third cross bar, 4 be connector, 41 be fixedly connected part, 411 be hook hole, 412 be bolt Hole, 42 be active connection, 421 be flange, 4211 be flange bolt hole, 422 be hook, 5 be water pipe channel, 6 be air duct, 7 For U-tube folder, 8 be p-type pipe clamp, 9 be BIM locating plates.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, is explained in further detail the utility model.It should be appreciated that specific embodiment described herein is used only for explaining The utility model is not used to limit the utility model.
On the contrary, the utility model cover it is any be defined by the claims do in the spirit and scope of the utility model Replacement, modification, equivalent method and scheme.Further, it is right below in order to which the public is made to have a better understanding the utility model It is detailed to describe some specific detail sections in the datail description of the utility model.Do not have for a person skilled in the art The description of these detail sections can also understand the utility model completely.Below in conjunction with the accompanying drawings with specific embodiment, to this reality With novel further explanation.
As shown in Figure 1, the overall structure diagram for the utility model, a kind of threshold value integration assembled based on BIM Sectional shelf-unit, including beams of concrete 1, cross bar component, montant component, duct member and connector 4, the montant component includes the One montant 21, the second montant 22 and third montant 23, first montant 21, second montant 22 and the third montant It is mutually parallel on a logical horizontal plane between 23 and passes through the connector 4 and connect and perpendicular to described with the beams of concrete 1 Beams of concrete 1, the third montant 23 are placed between first montant 21 and second montant 22;The duct member is placed in On the cross bar component.
The cross bar component includes the first cross bar 31, the second cross bar 32 and third cross bar 33,31 both ends of the first cross bar First montant 21 and second montant 22 are connected in contrast to the connection beams of concrete 1 by the connector 4 respectively One end;The third montant 23 is connected in contrast to connection by the connector 4 at the medium position of second cross bar 32 One end and both ends of the beams of concrete 1 connect first montant 21 and second montant by the connector 4 respectively 22 side wall;33 both ends of third cross bar connect first montant 21 by the connector 4 respectively and the third is erected The side wall of bar 23;First cross bar 31, second cross bar 32 and the third cross bar 33 are mutually parallel in the same plane And perpendicular to the montant component.
The duct member includes more than one p-type pipe clamp 7 and more than one U-tube folder 8, and the U-tube folder 8 is placed in institute The first cross bar 31 is stated towards in the one side wall of second cross bar 32, the p-type pipe clamp 7 is placed in second cross bar towards described In the one side wall of third cross bar 33.
Air duct 6 is equipped between first montant 21 and the third montant 23, the air duct 6 is located at third horizontal stroke Bar 33 is in contrast to a side towards second cross bar 32;Water is equipped between second montant 22 and the third montant 23 Tube passage 5, the water pipe channel 5 are located at second cross bar 32 in contrast to a side towards first cross bar 31.
As described in Fig. 2 and Fig. 3, for the first montant 21 described in the utility model and the beams of concrete connection diagram and institute State Moveable connecting piece structure schematic diagram;The connector 4 includes fixedly connected part 41 and active connection 42, and the fixation is even Fitting 41 is placed in the beams of concrete 1 and/or the side wall of the cross bar component and/or the montant component and positioned at the side wall Side be equipped with more than one mount hole 411, the active connection 42 is placed in the end of the cross bar component and/or montant component Portion, 42 front end face of active connection is equipped with hook 422 and front end face edge is equipped with flange 421, more than 422 institutes of the hook Stating mount hole 411 coordinates grafting to coincide together, is bolted between the flange 421 and the fixedly connected part 41, described Fixedly connected part 41 is equipped with the bolt hole 412 being connected with the flange 421.
BIM locating plates 9, the BIM are pasted on the cross bar component, the montant component and the beams of concrete 1 9 prefabricated position of locating plate, hole position and angle information, the design information comprising building element, construction technology information, material information and Link information between structure adjacent with other, the design information include position in whole building of component name, component, The shape of component, the installation site of component, the material of component, component engineering property.The working procedure information includes construction Process, method, progress, cost, quality requirement.The link information includes coupled component name, link position and company Connect mode.
As shown in figure 4, for the first cross bar pipe perforation structure schematic diagram described in the utility model, set on first cross bar 31 There are two above for fixing the through hole 311 of the U-tube folder 7;The peace of progress U-tube folder can be needed according to actual field Dress, it is convenient and efficient, it economizes on resources.
Prefabricated integrated assembled sectional shelf-unit of the utility model based on BIM, after fully considering each special pipelines BIM synthesis arrangements, since stent is attached on pipeline and structure, compared to water pipe, crane span structure, air hose with greater need for accurately The factors such as the real space environment of positioning and construction site.Based on BIM technology, the structure of building is fully considered, in finished product branch Accomplish the accurate matching with surrounding space environment in terms of the in-site installation of frame, reduce the waste of material and manpower, and all professions Pipeline is concentrated in a set of stent system, and space utilization is flexible, effectively solves space problem, and has the following advantages:1st, this reality With novel construction efficiency height, the duration of a project is saved, the reduction of suspension and support reduces rolled steel dosage, saved cost;It scene need not Welding effectively prevent the fire hazard caused by welding the high temperature of other structures and welding, and overcomes welding to base The broken ring of material corrosion-inhibiting coating;2nd, the utility model space utilization is flexible, and later stage pipeline maintenance and dilatation are convenient, can effective solution portion It is in charge of line centralized arrangement problem;3rd, after the utility model is based on the arrangement installation of BIM pipelines, since uniformly reasonably arrangement integrates Stent so that pipeline is clearly beautiful;4th, flexibly installation U-tube folder can be needed according to site operation, the wasting of resources is reduced, saves into This.

Claims (8)

1. a kind of prefabricated integrated assembled sectional shelf-unit based on BIM, including the duct member being connect with pipeline, beams of concrete, Cross bar component, montant component and connector, which is characterized in that the connector includes fixedly connected part and active connection, institute It states fixedly connected part and is placed in the beams of concrete and/or the side wall of cross bar component and/or montant component and positioned at the side wall Side is equipped with more than one mount hole, and the active connection is placed in the end of the cross bar component and/or montant component, described The front end face of active connection is equipped with hook and front end face edge is equipped with flange, the hook and mount hole cooperation grafting kiss It is combined, is bolted between the flange and the fixedly connected part;The fixedly connected part is equipped with and the flange Match the bolt hole of connection;
The duct member is placed on the cross bar component.
A kind of 2. prefabricated integrated assembled sectional shelf-unit based on BIM according to claim 1, which is characterized in that institute It states montant component and includes the first montant, the second montant and third montant, first montant, second montant and described the It is parallel and pass through the connector and connect with the beams of concrete and perpendicular to the beams of concrete between three montants;
The third montant is placed between first montant and second montant.
A kind of 3. prefabricated integrated assembled sectional shelf-unit based on BIM according to claim 2, which is characterized in that institute It states cross bar component and includes the first cross bar, the second cross bar and third cross bar, the first cross bar both ends are distinguished by the connector First montant and second montant are connected in contrast to the one end for connecting the beams of concrete;
The third montant is connected in contrast to the connection coagulation by the connector at the medium position of second cross bar One end and both ends of Tu Liang connects the side wall of first montant and second montant by the connector respectively;
The third cross bar both ends connect the side wall of first montant and the third montant by the connector respectively.
A kind of 4. prefabricated integrated assembled sectional shelf-unit based on BIM according to claim 3, which is characterized in that institute The first cross bar, second cross bar and the third cross bar are stated parallel and perpendicular to the montant component.
A kind of 5. prefabricated integrated assembled sectional shelf-unit based on BIM according to claim 4, which is characterized in that institute State duct member and include more than one p-type pipe clamp and more than one U-tube and press from both sides, the U-tube be folded in first cross bar towards In the one side wall of second cross bar, the p-type pipe clamp is placed in second cross bar towards in the one side wall of the third cross bar.
A kind of 6. prefabricated integrated assembled sectional shelf-unit based on BIM according to claim 5, which is characterized in that institute It states the first cross bar and is equipped with more than two through holes for being used to fix the U-tube folder.
A kind of 7. prefabricated integrated assembled sectional shelf-unit based on BIM according to claim 6, which is characterized in that institute It states and air duct is equipped between the first montant and the third montant, the air duct is located at the third cross bar in contrast to towards described the A side of two cross bars;
Water pipe channel is equipped between second montant and the third montant, the water pipe channel is located at the second cross bar phase Instead in a side towards first cross bar.
A kind of 8. prefabricated integrated assembled sectional shelf-unit based on BIM according to claim 1, which is characterized in that institute It states and BIM locating plates is pasted on cross bar component, montant component and the beams of concrete, the BIM locating plates carrying location information, Kong Wei and angle information;The BIM locating plates are Quick Response Code or three codes.
CN201721512411.4U 2017-11-14 2017-11-14 A kind of prefabricated integrated assembled sectional shelf-unit based on BIM Expired - Fee Related CN207599143U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721512411.4U CN207599143U (en) 2017-11-14 2017-11-14 A kind of prefabricated integrated assembled sectional shelf-unit based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721512411.4U CN207599143U (en) 2017-11-14 2017-11-14 A kind of prefabricated integrated assembled sectional shelf-unit based on BIM

Publications (1)

Publication Number Publication Date
CN207599143U true CN207599143U (en) 2018-07-10

Family

ID=62759145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721512411.4U Expired - Fee Related CN207599143U (en) 2017-11-14 2017-11-14 A kind of prefabricated integrated assembled sectional shelf-unit based on BIM

Country Status (1)

Country Link
CN (1) CN207599143U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114457911A (en) * 2022-02-28 2022-05-10 中交一公局集团有限公司 Prefabricated tie beam, supporting structure and prefabricated tie beam installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114457911A (en) * 2022-02-28 2022-05-10 中交一公局集团有限公司 Prefabricated tie beam, supporting structure and prefabricated tie beam installation method

Similar Documents

Publication Publication Date Title
CN204901084U (en) Prefabricated integration assembled sectional shelf -unit based on BIM
CN205639870U (en) A pipeline gallows is synthesized in heavy construction
CN207599143U (en) A kind of prefabricated integrated assembled sectional shelf-unit based on BIM
CN202577949U (en) Truss for supporting concrete shear wall templates and assembly structure
CN204266124U (en) The pre-assembled moulding bed of large sections steel box-girder
CN204921558U (en) A interim connecting device that is used for component and bracket to dock
CN103958821B (en) For installing the method and apparatus of Energy Chain
CN207211373U (en) A kind of simple steel I-beam column connected node
CN103473398B (en) The analogue system of a kind of integrated refrigeration station and emulation method
CN203475612U (en) Steel structure connecting piece
CN104179122A (en) Steel tower segment positioning device and method
CN202324202U (en) Adjustable device for connecting steel vertical component with steel horizontal component
CN208735013U (en) A kind of movable hanger of small size pipeline
CN107893480A (en) A kind of assembled connecting node of lattice beam and post
CN204346816U (en) Loading hole locating support
CN210342377U (en) Closed type combined floor support plate assembly
CN205935243U (en) Concatenation node of dysmorphism post
CN206054920U (en) For the accessory of comprehensive suspension bracket
CN207848609U (en) A kind of seat assembly of guiding and fixed pipeline
CN206299900U (en) For the shaped steel Two bors d's oeuveres combined bracket that electrical and mechanical comprehensive pipeline is installed
CN203514632U (en) Middle-connected steel beam
CN205077497U (en) Spelling formula underground is strutted and is enclosed purlin
CN207646870U (en) A kind of beam-to-column connection node of dismounting easy to install
CN204386187U (en) A kind of space tube truss erecting tools
CN210919054U (en) Shield constructs dismantlement structure of quick-witted D ring

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180710

Termination date: 20201114

CF01 Termination of patent right due to non-payment of annual fee