CN207582737U - A kind of modular assembling light steel keel partition - Google Patents
A kind of modular assembling light steel keel partition Download PDFInfo
- Publication number
- CN207582737U CN207582737U CN201721059744.6U CN201721059744U CN207582737U CN 207582737 U CN207582737 U CN 207582737U CN 201721059744 U CN201721059744 U CN 201721059744U CN 207582737 U CN207582737 U CN 207582737U
- Authority
- CN
- China
- Prior art keywords
- plasterboard
- keel
- steel joist
- lightgage steel
- centre keel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of modular assembling light steel keel partitions, and including the lightgage steel joist unit being connected with each other, lightgage steel joist unit includes:First centre keel, the second centre keel, transom and plasterboard, transom and the first centre keel and the second centre keel vertical connection;Plasterboard includes mutual spaced first plasterboard and the second plasterboard;It is connect on the outside of first vertical end of plasterboard and the starting stave of the second centre keel, the second vertical end of plasterboard is mounted between the first clamping plate and second clamping plate of the first centre keel.Since modular assembling light steel keel partition carries out concatenation construction using lightgage steel joist unit, lightgage steel joist unit is assembled into integral unit plate in factory process in advance by the width of plasterboard, then the whole building-site that transports to is by carrying out assembly, it is made to save the field-installed time when large area light steel keel partition is installed, is accelerated construction progress.
Description
Technical field
The utility model belongs to architecture indoor partition wall technical field of construction, more particularly to a kind of modular light steel dragon of assembling
Scleroseptum wall.
Background technology
Construction fast pace is getting faster at present, and big multiple-project is all that heavy workload, duration are tight.In order to accelerate the duration,
The workload and set-up time for simplifying construction site become more and more important.A large amount of work when traditional light steel keel partition is constructed
Construction site has all been placed on to carry out, a large amount of keel assembling, the installation of various pipelines, the installation and pollution of plasterboard
Serious Puttying work, this results in traditional light steel keel partition to construct and is increasingly not suitable with this construction fast pace.This
Outside at the construction field (site) there are Puttying link, environmental pollution is increased, it is difficult to meet the requirement of the construction of environmental protection that country advocates.
Utility model content
The purpose of this utility model is to provide a kind of modular assembling light steel keel partition, to solve traditional lightgage steel joist
The problem of partition wall speed of application is slow.
The technical solution that the utility model solves above-mentioned technical problem is as follows:A kind of modular assembling light steel keel partition,
Lightgage steel joist unit including interconnection, the lightgage steel joist unit include:
First centre keel, the first centre keel include middle part connecting plate, two first clamping plates, two second clamping plates, two sides
Connecting plate;First clamping plate respectively with the both sides vertical connection of middle part side connecting plate;Second clamping plate is separately positioned on corresponding first folder
The outside of plate, side connecting plate vertical connection first clamping plate and second clamping plate;
Second centre keel, second centre keel include starting stave and two the second risers, and the second riser is respectively with the
The both sides vertical connection of one riser;The distance between two first clamping plate medial surfaces of first centre keel are more than or equal to the second perpendicular dragon
The distance between two second riser lateral surfaces of bone;
Transom, the transom and the first centre keel and the second centre keel vertical connection;
Plasterboard, the plasterboard include mutual spaced first plasterboard and the second plasterboard;Plasterboard
The first vertical end and the starting stave of the second centre keel on the outside of connect, the second vertical end of plasterboard is mounted on first and erects
Between the first clamping plate and second clamping plate of keel.
The utility model modular assembling light steel keel partition as described above, further, the lightgage steel joist of interconnection
Unit is the first lightgage steel joist unit and the second lightgage steel joist unit;In the first lightgage steel joist unit and the second lightgage steel joist unit
Docking location have following structure:It is perpendicular that first centre keel of the first lightgage steel joist unit is inserted into the second lightgage steel joist unit second
Keel are set between the side connecting plate of the first centre keel of the plasterboard and the first lightgage steel joist unit of the second lightgage steel joist unit
Put fluid sealant.
The utility model modular assembling light steel keel partition as described above, further, in the first lightgage steel joist unit
The first centre keel on the outside of and with setting splicing item on the outside of the plasterboard of the corresponding second lightgage steel joist unit of fluid sealant.
The utility model modular assembling light steel keel partition as described above, further, the first of the plasterboard are perpendicular
Pass through self-drilling connection on the outside of to the starting stave of end face and the second centre keel;Second inwall of vertical of plasterboard is perpendicular with first
The first clamping plate of keel passes through self-drilling connection.
The utility model modular assembling light steel keel partition as described above, further, further includes keelson, the side
Keel are fixedly connected by nailing with existing wall;It is set between the plasterboard and wall of the lightgage steel joist unit of existing wall
Put splicing item;Filling-foam glue in the cavity that splicing item, plasterboard, the second centre keel and keelson surround.
The utility model modular assembling light steel keel partition as described above, further, further includes ground fixinig plate, ground
Face fixinig plate is fixedly connected by expansion bolt or nailing with the ground of building;The transom of lightgage steel joist unit passes through self tapping
Screw is connect with ground fixinig plate.
The utility model modular assembling light steel keel partition as described above, further, further includes skirting, described to kick
It the outside for the plasterboard that payment to a porter is mounted on and is connect with the ground of building.
The utility model modular assembling light steel keel partition as described above, further, further includes top surface fixinig plate, pushes up
Face fixinig plate is fixedly connected by expansion bolt or nailing with the roof of building;The transom of lightgage steel joist unit passes through self tapping
Screw is connect with top surface fixinig plate.
The beneficial effects of the utility model are:
Since modular assembling light steel keel partition carries out concatenation construction using lightgage steel joist unit, lightgage steel joist unit is pressed
The width of plasterboard is assembled into integral unit plate in factory process in advance, then whole to transport building-site to by being spelled
Dress, makes it save the field-installed time when large area light steel keel partition is installed, accelerates construction progress.In addition it is traditional light
Steel joist partition wall is all that material loose mail is transported to building-site, and then installer scene carries out group installation, the waste of material and
Disrepair phenomenon is very serious.And in the modular assembling light steel keel partition of the utility model, lightgage steel joist unit plate material
It is neat there is no the phenomenon that waste of material and badly broken.It also simplifies and sets in design aspect lightgage steel joist unit plate
Meter, reduces the cumbersome calculation material process of construction material, quantity and a small amount of installation for only calculating lightgage steel joist unit plate are attached
Part.
Description of the drawings
By the detailed description made in conjunction with the following drawings, the above-mentioned and/or otherwise advantage of the utility model will
It becoming more apparent upon and is easier to understand, these attached drawings are only schematical, are not intended to limit the utility model, wherein:
Fig. 1 is a kind of lightgage steel joist cell schematics of embodiment of the utility model;
Fig. 2 is a kind of the first centre keel schematic cross-section of embodiment of the utility model;
Fig. 3 is a kind of the second centre keel schematic cross-section of embodiment of the utility model;
Fig. 4 is fixedly connected with schematic diagram for lightgage steel joist unit with existing wall;
Fig. 5 is fixedly connected with schematic diagram for lightgage steel joist unit with the ground of building;
Fig. 6 is fixedly connected with schematic diagram for lightgage steel joist unit with the roof of building;
Schematic diagram before Fig. 7 is assembled between lightgage steel joist unit;
Schematic diagram after Fig. 8 is assembled between lightgage steel joist unit.
In attached drawing, parts list represented by the reference numerals are as follows:
1st, the first centre keel, 11, middle part connecting plate, 12, first clamping plate, 13, side connecting plate, 14, second clamping plate;
2nd, the second centre keel, 21, starting stave, the 22, second riser;
3rd, plasterboard, the 31, first plasterboard, the 32, second plasterboard;
4th, transom;
5th, splice item;
6th, keelson;
7th, tapping screw;
8th, foamed glue;
9th, fluid sealant;
100th, ground fixinig plate;
101st, top surface fixinig plate;
102nd, skirting;
103rd, nailing.
Specific embodiment
Hereinafter, the embodiment of the modular assembling light steel keel partition of the utility model is described with reference to the accompanying drawings.
The embodiment recorded herein is the specific specific embodiment of the utility model, for illustrating the utility model
Design, is explanatory and illustrative, should not be construed as the limit to the utility model embodiment and the scope of the utility model
System.In addition to the embodiment recorded herein, those skilled in the art also are able to public based on the application claims and specification institute
The content opened includes doing using the embodiment to recording herein using obvious other technical solutions, these technical solutions
Go out the technical solution of any obvious substitutions and modifications.
The attached drawing of this specification is schematic diagram, aids in illustrating the design of the utility model, it is schematically indicated each section
Shape and its correlation.Note that for the ease of clearly show the utility model embodiment each component structure, respectively
It is not drawn between attached drawing according to identical ratio.Identical reference marker is used to represent identical part.
The modular assembling light steel keel partition of a kind of embodiment of the utility model, including the lightgage steel joist being connected with each other
Unit, as shown in Figure 1, lightgage steel joist unit includes:
First centre keel 1, as shown in Fig. 2, the first centre keel 1 includes the first clamping plate 12, two of middle part connecting plate 11, two
14, two side connecting plates 13 of second clamping plate;First clamping plate 12 respectively with the both sides vertical connection of middle part connecting plate 11;Second clamping plate
14 are separately positioned on the outside of corresponding first clamping plate 12,13 vertical connection first clamping plate 12 of side connecting plate and second clamping plate 14;
Second centre keel 2, as shown in figure 3, the second centre keel 2 include starting stave 21 and two the second risers 22, second
Riser 22 respectively with the both sides vertical connection of starting stave 21;Between two 12 medial surfaces of first clamping plate of the first centre keel 1
Distance is more than or equal to the distance between two 22 lateral surfaces of the second riser of the second centre keel 2;It is preferred that two of the first centre keel 1
The distance between 12 medial surface of first clamping plate is bigger than the distance between two 22 lateral surfaces of the second riser of the second centre keel 2
0.5mm~1mm;
Transom 4,4 and first centre keel 1 of transom and 2 vertical connection of the second centre keel;
Plasterboard 3, plasterboard 3 include mutual spaced first plasterboard, 31 and second plasterboard 32;Gypsum
First vertical end of plate 3 is connect with 21 outside of starting stave of the second centre keel 1, the second vertical end installation of plasterboard 3
Between the first clamping plate 12 of the first centre keel 2 and second clamping plate 14.
When being constructed using the lightgage steel joist unit of above-described embodiment, as shown in Figure 7 and Figure 8, the light steel of interconnection
Keel unit is the first lightgage steel joist unit and the second lightgage steel joist unit;In the first lightgage steel joist unit and the second lightgage steel joist
The docking location of unit has following structure:First centre keel 1 of the first lightgage steel joist unit is inserted into the second lightgage steel joist unit
Second centre keel 2 connects in the side of the first centre keel 1 of the 3 and first lightgage steel joist unit of plasterboard of the second lightgage steel joist unit
Fluid sealant 9 is set between fishplate bar 13.The outside of the first centre keel 1 of the first lightgage steel joist unit and with fluid sealant 9 it is corresponding
The 3 outside setting splicing item 5 of plasterboard of second lightgage steel joist unit.
Since modular assembling light steel keel partition carries out concatenation construction using lightgage steel joist unit, lightgage steel joist unit is pressed
The width of plasterboard is assembled into integral unit plate in factory process in advance, then whole to transport building-site to by being spelled
Dress, makes it save the field-installed time when large area light steel keel partition is installed, accelerates construction progress.
In the modular assembling light steel keel partition of above-described embodiment, the first inwall of vertical of plasterboard 3 is perpendicular with first
21 outside of starting stave of keel 1 is connected by tapping screw 7;The of second inwall of vertical of plasterboard 3 and the first centre keel
One clamping plate 12 is connected by tapping screw 7.The advantages of being installed using tapping screw is the easy to operate of assembly crewman, this
Outside, above-mentioned connection can also be carried out using screw bolt and nut.
In the position that lightgage steel joist unit is fixedly connected with existing wall, as shown in figure 4, modular assembling lightgage steel joist every
Wall further includes keelson 6, and keelson 6 is fixedly connected by nailing 103 with existing wall;Close to the lightgage steel joist list of existing wall
Setting splicing item 5 between the plasterboard 3 and wall of member;The sky that splicing item 5, plasterboard 3, the second centre keel 2 and keelson 6 surround
Intracavitary filling-foam glue 8, the square position setting fluid sealant 9 that this exterior wall is formed with splicing item.
In the position that lightgage steel joist unit is fixedly connected with the ground of building, as shown in figure 5, the light steel dragon of modular assembling
Scleroseptum wall further includes ground fixinig plate 100, and ground fixinig plate 100 is consolidated by expansion bolt or nailing 103 and the ground of building
Fixed connection;The transom 4 of lightgage steel joist unit is connect by tapping screw with ground fixinig plate 100.
It damages and pollutes, the modular assembling lightgage steel joist of above-described embodiment close to the plasterboard of surface location in order to prevent
Partition wall further includes skirting 102, the outside of plasterboard 3 that skirting 102 is mounted on and is connect with the ground of building.
In the position that lightgage steel joist unit is fixedly connected with the roof of building, as shown in fig. 6, the light steel dragon of modular assembling
Scleroseptum wall further includes top surface fixinig plate 101, and top surface fixinig plate 101 is consolidated by expansion bolt or nailing 103 and the roof of building
Fixed connection;The transom 4 of lightgage steel joist unit is connect by tapping screw with top surface fixinig plate 101.
Each technical characteristic of above-mentioned disclosure is not limited to disclosed and other feature combination, and those skilled in the art are also
Other combinations between each technical characteristic can be carried out according to the purpose of invention, are subject to the purpose for realizing the utility model.
Claims (8)
1. a kind of modular assembling light steel keel partition, which is characterized in that the lightgage steel joist unit including interconnection is described light
Steel joist unit includes:
First centre keel, the first centre keel include middle part connecting plate, two first clamping plates, two second clamping plates, two side connections
Plate;First clamping plate respectively with the both sides vertical connection of middle part side connecting plate;Second clamping plate is separately positioned on corresponding first clamping plate
Outside, side connecting plate vertical connection first clamping plate and second clamping plate;
Second centre keel, second centre keel include starting stave and two the second risers, and the second riser is perpendicular with first respectively
The both sides vertical connection of plate;The distance between two first clamping plate medial surfaces of first centre keel are more than or equal to the second centre keel
The distance between two second riser lateral surfaces;
Transom, the transom and the first centre keel and the second centre keel vertical connection;
Plasterboard, the plasterboard include mutual spaced first plasterboard and the second plasterboard;The of plasterboard
It is connect on the outside of one vertical end and the starting stave of the second centre keel, the second vertical end of plasterboard is mounted on the first centre keel
First clamping plate and second clamping plate between.
2. modular assembling light steel keel partition according to claim 1, which is characterized in that the lightgage steel joist of interconnection
Unit is the first lightgage steel joist unit and the second lightgage steel joist unit;In the first lightgage steel joist unit and the second lightgage steel joist unit
Docking location have following structure:It is perpendicular that first centre keel of the first lightgage steel joist unit is inserted into the second lightgage steel joist unit second
Keel are set between the side connecting plate of the first centre keel of the plasterboard and the first lightgage steel joist unit of the second lightgage steel joist unit
Put fluid sealant.
3. modular assembling light steel keel partition according to claim 2, which is characterized in that in the first lightgage steel joist unit
The first centre keel on the outside of and with setting splicing item on the outside of the plasterboard of the corresponding second lightgage steel joist unit of fluid sealant.
4. modular assembling light steel keel partition according to claim 1, which is characterized in that the first of the plasterboard is perpendicular
Pass through self-drilling connection on the outside of to the starting stave of end face and the second centre keel;Second inwall of vertical of plasterboard is perpendicular with first
The first clamping plate of keel passes through self-drilling connection.
5. modular assembling light steel keel partition according to claim 1, which is characterized in that keelson is further included, it is described
Keelson is fixedly connected by nailing with existing wall;Between the plasterboard and wall of the lightgage steel joist unit of existing wall
Setting splicing item;Filling-foam glue in the cavity that splicing item, plasterboard, the second centre keel and keelson surround.
6. modular assembling light steel keel partition according to claim 1, which is characterized in that ground fixinig plate is further included,
The ground fixinig plate is fixedly connected by expansion bolt or nailing with the ground of building;The transom of lightgage steel joist unit is led to
Tapping screw is crossed to connect with ground fixinig plate.
7. modular assembling light steel keel partition according to claim 6, which is characterized in that skirting is further included, it is described
It the outside for the plasterboard that skirting is mounted on and is connect with the ground of building.
8. modular assembling light steel keel partition according to claim 1, which is characterized in that top surface fixinig plate is further included,
The top surface fixinig plate is fixedly connected by expansion bolt or nailing with the roof of building;The transom of lightgage steel joist unit is led to
Tapping screw is crossed to connect with top surface fixinig plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721059744.6U CN207582737U (en) | 2017-08-23 | 2017-08-23 | A kind of modular assembling light steel keel partition |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721059744.6U CN207582737U (en) | 2017-08-23 | 2017-08-23 | A kind of modular assembling light steel keel partition |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207582737U true CN207582737U (en) | 2018-07-06 |
Family
ID=62717810
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721059744.6U Expired - Fee Related CN207582737U (en) | 2017-08-23 | 2017-08-23 | A kind of modular assembling light steel keel partition |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207582737U (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339294A (en) * | 2018-11-05 | 2019-02-15 | 王工 | Light partition wall |
CN110453822A (en) * | 2019-08-27 | 2019-11-15 | 金螳螂精装科技(苏州)有限公司 | A kind of lightgage steel joist component and its installation method for exempting from false keel |
CN110872878A (en) * | 2018-08-30 | 2020-03-10 | 北新集团建材股份有限公司 | Assembled wall unit |
CN111608298A (en) * | 2019-04-16 | 2020-09-01 | 北新集团建材股份有限公司 | Mounting method of assembled wall |
CN111608299A (en) * | 2019-04-16 | 2020-09-01 | 北新集团建材股份有限公司 | Assembled wall body |
CN112832419A (en) * | 2020-12-31 | 2021-05-25 | 北新集团建材股份有限公司 | T-shaped assembly type wall structure and installation method |
CN114482343A (en) * | 2022-02-25 | 2022-05-13 | 浙江亚厦装饰股份有限公司 | Frame body coated type partition panel wall and installation method thereof |
CN114809374A (en) * | 2022-04-21 | 2022-07-29 | 北新集团建材股份有限公司 | Shaft wall and installation method thereof |
-
2017
- 2017-08-23 CN CN201721059744.6U patent/CN207582737U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110872878A (en) * | 2018-08-30 | 2020-03-10 | 北新集团建材股份有限公司 | Assembled wall unit |
CN109339294A (en) * | 2018-11-05 | 2019-02-15 | 王工 | Light partition wall |
CN111608298A (en) * | 2019-04-16 | 2020-09-01 | 北新集团建材股份有限公司 | Mounting method of assembled wall |
CN111608299A (en) * | 2019-04-16 | 2020-09-01 | 北新集团建材股份有限公司 | Assembled wall body |
CN110453822A (en) * | 2019-08-27 | 2019-11-15 | 金螳螂精装科技(苏州)有限公司 | A kind of lightgage steel joist component and its installation method for exempting from false keel |
CN112832419A (en) * | 2020-12-31 | 2021-05-25 | 北新集团建材股份有限公司 | T-shaped assembly type wall structure and installation method |
CN114482343A (en) * | 2022-02-25 | 2022-05-13 | 浙江亚厦装饰股份有限公司 | Frame body coated type partition panel wall and installation method thereof |
CN114809374A (en) * | 2022-04-21 | 2022-07-29 | 北新集团建材股份有限公司 | Shaft wall and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207582737U (en) | A kind of modular assembling light steel keel partition | |
CN201972286U (en) | Combined wood floor cover | |
CN107299699B (en) | Assembled cavity shear wall horizontal joint Alveolus type dry type connection structure | |
US20160348369A1 (en) | Modular building systems, components, and methods | |
WO2019178905A1 (en) | Assembling structure for assembled steel structure building | |
CN207314549U (en) | A kind of steel tubular beam and the connecting node for quadrate steel pipe column of putting more energy into well word | |
CN204960416U (en) | Assembly type structure of transformer substation thing based on modularization combination technique | |
CN207211444U (en) | A kind of mounting clip pieces coordinated with groove and tognue type Light trabses | |
US20160348368A1 (en) | Modular building systems, components, and methods | |
CN103993691A (en) | Integrated floor module and assembling method thereof | |
CN100494592C (en) | Assembly type shock resistant frame in use for house | |
CN102900149A (en) | Novel steel structure building system | |
CN210067045U (en) | Assembled energy-saving house | |
CN215519142U (en) | Lap joint assembly type energy-saving building | |
CN211396109U (en) | Steel pipe column combination wall | |
CN103485538B (en) | A kind of energy-saving heat preserving Waterproof wood truss Roof system construction method | |
CN202865990U (en) | Novel steel structure building system | |
CN102900150A (en) | Steel structure building system | |
CN105804243B (en) | A kind of assembled beam-column connection method of light house structure | |
CN206784924U (en) | A kind of combined type structure post steel form | |
CN105544857B (en) | Close rib composite plate structure system | |
CN112196117B (en) | Assembled building unit body and tectosome | |
CN204112548U (en) | A kind of integrated form flooring module | |
CN102900151A (en) | Steel structure building system | |
CN202899294U (en) | Steel structure building system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180706 Termination date: 20210823 |
|
CF01 | Termination of patent right due to non-payment of annual fee |