CN204960416U - Assembly type structure of transformer substation thing based on modularization combination technique - Google Patents

Assembly type structure of transformer substation thing based on modularization combination technique Download PDF

Info

Publication number
CN204960416U
CN204960416U CN201520624564.2U CN201520624564U CN204960416U CN 204960416 U CN204960416 U CN 204960416U CN 201520624564 U CN201520624564 U CN 201520624564U CN 204960416 U CN204960416 U CN 204960416U
Authority
CN
China
Prior art keywords
room
roof
comprehensive
main body
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520624564.2U
Other languages
Chinese (zh)
Inventor
刘强兴
田家运
韩德斌
靳全
冯青山
窦青峰
杜银波
夏磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
NARI Technology Co Ltd
NARI Tech Nanjing Control System Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
NARI Technology Co Ltd
NARI Tech Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd, NARI Technology Co Ltd, NARI Tech Nanjing Control System Co Ltd filed Critical Electric Power Research Institute of State Grid Chongqing Electric Power Co Ltd
Priority to CN201520624564.2U priority Critical patent/CN204960416U/en
Application granted granted Critical
Publication of CN204960416U publication Critical patent/CN204960416U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

本实用新型公开一种基于模块化组合技术的变电站装配式建筑物,基于模块化组合技术的变电站装配式建筑物采用标准模块化组件搭建设计,包括一次设备室、二次设备室及综合室,并且选用新型轻质建材,具有节地、节能、节水、节材、环保和便于运输的优势,并且能够在获得传统建筑物的使用功能的同时,减少了现场施工的工作量,提高了现场建设效率,并可依据用户要求进行扩展。

The utility model discloses a substation prefabricated building based on the modular combination technology. The substation prefabricated building based on the modular combination technology adopts standard modular components to build and design, including a primary equipment room, a secondary equipment room and a comprehensive room. And the selection of new lightweight building materials has the advantages of land saving, energy saving, water saving, material saving, environmental protection and convenient transportation, and can reduce the workload of on-site construction while obtaining the use functions of traditional buildings, and improve on-site construction efficiency. Construction efficiency, and can be expanded according to user requirements.

Description

一种基于模块化组合技术的变电站装配式建筑物A Substation Prefabricated Building Based on Modular Combination Technology

技术领域technical field

本实用新型属于输变电设备技术领域,涉及一种基于模块化组合技术的变电站装配式建筑物。The utility model belongs to the technical field of power transmission and transformation equipment, and relates to a substation assembly building based on modular combination technology.

背景技术Background technique

目前变电站建筑物普遍采用钢筋混凝土结构或者砖混结构建造方式。该建造方式存在涉及的工种多,人员多,湿加工多,现场工作量大,施工周期长,安全文明施工压力大,受地域和季节环境的影响大,对周围环境的影响大等缺陷。另外,在对应的用电环境发生变化时,不便于快速扩展。同时,在一些临时用电区域需要搭建临时变电站时,采用传统的建造方式显然成本过高且建造及拆卸均很麻烦。At present, substation buildings generally adopt reinforced concrete structure or brick-concrete structure construction. This construction method has defects such as many types of work involved, many personnel, many wet processes, heavy on-site workload, long construction period, high pressure on safe and civilized construction, great impact on the regional and seasonal environment, and great impact on the surrounding environment. In addition, when the corresponding power consumption environment changes, it is not convenient for rapid expansion. At the same time, when temporary substations need to be built in some temporary power consumption areas, the traditional construction method is obviously costly and troublesome to construct and disassemble.

故,需要一种新的技术方案以解决上述问题。Therefore, a new technical solution is needed to solve the above problems.

实用新型内容Utility model content

公开本实用新型要解决的技术问题是提供一种基于模块化组合技术的变电站装配式建筑物,具有轻质、便于运输、提高现场建设效率、便于扩展的优点。The technical problem to be solved by the disclosed utility model is to provide a substation prefabricated building based on modular combination technology, which has the advantages of light weight, easy transportation, improved site construction efficiency, and easy expansion.

为达到上述目的,本实用新型可采用如下技术方案:In order to achieve the above object, the utility model can adopt the following technical solutions:

一种基于模块化组合技术的变电站装配式建筑物,包括一次设备室、二次设备室及综合室;二次设备室位于一次设备室及综合室之间;所述一次设备室包括建筑框架、位于建筑框架一端的可拆卸端板、位于建筑框架两侧的可拆卸挡板、覆盖于建筑框架上的第一屋顶;而建筑框架的另一端为对接端,该对接端设有两侧立柱、位于两侧立柱之间并与两侧立柱平行的中柱、横向安装在两侧立柱及中柱顶端的上横梁及横向安装在两侧立柱及中柱底端的下横梁;二次设备室包括二次室主体及覆盖于二次室主体上的第二屋顶;二次室主体面对一次设备室的一端固定在一次设备室的对接端;综合室包括综合室主体及覆盖于综合室主体上的第三屋顶;所述综合室主体面对二次设备室的一端与二次室主体固定;所述第一屋顶与第二屋顶对接,第二屋顶与第三屋顶对接,且第一屋顶与第二屋顶对接处覆盖有密封带,第二屋顶与第三屋顶对接处同样覆盖有密封带。A substation prefabricated building based on modular combination technology, including a primary equipment room, a secondary equipment room and a comprehensive room; the secondary equipment room is located between the primary equipment room and the comprehensive room; the primary equipment room includes a building frame, The detachable end plate located at one end of the building frame, the detachable baffle plate located on both sides of the building frame, and the first roof covering the building frame; the other end of the building frame is a butt end, and the butt end is provided with columns on both sides, The central column located between the uprights on both sides and parallel to the uprights on both sides, the upper beam horizontally installed on the top of the uprights on both sides and the top of the central column, and the lower beam horizontally installed on the bottom of the uprights on both sides and the bottom of the central column; the secondary equipment room includes two The main body of the secondary room and the second roof covering the main body of the secondary room; the end of the main body of the secondary room facing the primary equipment room is fixed at the docking end of the primary equipment room; the comprehensive room includes the main body of the comprehensive room and the roof covering the main body of the comprehensive room The third roof; the end of the main body of the comprehensive room facing the secondary equipment room is fixed to the main body of the secondary room; the first roof is connected to the second roof, the second roof is connected to the third roof, and the first roof is connected to the second roof. The junction of the two roofs is covered with a sealing tape, and the junction of the second roof and the third roof is also covered with a sealing tape.

相对于现有技术,本实用新型基于模块化组合技术的变电站装配式建筑物采用标准模块化组件组合设计,并且墙体与屋面均为新型轻质建材制成,具有便于运输的优势,并且能够获得传统建筑物的使用功能的同时,减少了现场施工的工作量,提高了现场建设效率。同时,采用模块化设计,方便进行扩展,提高适应变电站规模和环境的弹性。Compared with the prior art, the substation prefabricated building based on the modular combination technology of the utility model adopts a standard modular component combination design, and the walls and roofs are made of new lightweight building materials, which has the advantage of being convenient for transportation, and can While obtaining the use functions of traditional buildings, it reduces the workload of on-site construction and improves the efficiency of on-site construction. At the same time, the modular design is adopted to facilitate expansion and improve the flexibility to adapt to the scale and environment of the substation.

附图说明Description of drawings

图1是本实用新型基于模块化组合技术的变电站装配式建筑物的立体图。Fig. 1 is a perspective view of a substation prefabricated building based on the modular combination technology of the present invention.

图2是本实用新型基于模块化组合技术的变电站装配式建筑物的立体分解示意图。Fig. 2 is a three-dimensional exploded schematic diagram of a substation assembly building based on the modular combination technology of the present invention.

具体实施方式detailed description

请参阅图1至图2所示,本实用新型公开了一种基于模块化组合技术的变电站装配式建筑物,包括一次设备室1、二次设备室2及综合室3。二次设备室2位于一次设备室1及综合室3之间。其中一次设备室采用标准模块化的组件现场搭建而成。所述二次设备室和综合室采用工厂整体预制的生产方式,具体的结构如下介绍。Please refer to FIG. 1 to FIG. 2 , the utility model discloses a substation prefabricated building based on modular combination technology, including a primary equipment room 1 , a secondary equipment room 2 and a comprehensive room 3 . The secondary equipment room 2 is located between the primary equipment room 1 and the comprehensive room 3 . One of the equipment rooms was built on site using standard modular components. The secondary equipment room and comprehensive room adopt the production method of factory overall prefabrication, and the specific structure is introduced as follows.

所述一次设备室1包括建筑框架11、位于建筑框架11一端的可拆卸端板12、位于建筑框架11两侧的可拆卸挡板13、覆盖于建筑框架11上的第一屋顶14。而建筑框架的另一端为对接端,该对接端设有两侧立柱15、位于两侧立柱15之间并与两侧立柱平行的中柱16、横向安装在两侧立柱15及中柱16顶端的上横梁17及横向安装在两侧立柱15及中柱16底端的下横梁18。二次设备室2包括二次室主体21及覆盖于二次室主体21上的第二屋顶22。二次室主体21面对一次设备室1的一端固定在一次设备室1的对接端。综合室3包括综合室主体31及覆盖于综合室主体31上的第三屋顶32。所述综合室主体31面对二次设备室2的一端与二次室主体21固定。所述二次室主体21包括二次室框架23及固定于二次室框架23两侧的第一侧壁板24,且由前所示,该第一侧壁板24及二次室框架23为整体预制后直接搬运到搭建现场,不需要在搭建现场再次搭建。综合室主体31包括综合室框架33及固定于综合室框架33两侧的第二侧壁板34,同样的,第二侧壁板34及综合室框架33也为整体预制。在本实施方式中,所述可拆卸端板12、可拆卸挡板13、第一屋顶14、第二屋顶22、第一侧壁板24、第三屋顶32及第二侧壁板34均为轻质板状,包括ALC(AAC)板、或者硅碳酸板、或者玻镁板、或者无机复合板、或者玻璃纤维增强水泥轻质多孔隔墙条板,以及其他现有的轻质板材或轻质墙体均可以使用。而所述建筑框架11、二次室框架23及综合室框架33均由中空的梁或中空的柱组成。The primary equipment room 1 includes a building frame 11 , a detachable end plate 12 at one end of the building frame 11 , detachable baffles 13 at both sides of the building frame 11 , and a first roof 14 covering the building frame 11 . The other end of the building frame is a butt joint, and the butt joint is provided with uprights 15 on both sides, a central column 16 between the uprights 15 on both sides and parallel to the uprights on both sides, and is installed on the tops of the uprights 15 on both sides and the top of the central column 16 horizontally. The upper crossbeam 17 and the lower crossbeam 18 that are horizontally installed on both sides column 15 and center column 16 bottoms. The secondary equipment room 2 includes a secondary room main body 21 and a second roof 22 covering the secondary room main body 21 . One end of the secondary chamber main body 21 facing the primary equipment chamber 1 is fixed at the butt end of the primary equipment chamber 1 . The comprehensive room 3 includes a comprehensive room main body 31 and a third roof 32 covering the comprehensive room main body 31 . One end of the comprehensive room main body 31 facing the secondary equipment room 2 is fixed to the secondary room main body 21 . The secondary chamber main body 21 includes a secondary chamber frame 23 and a first side wall plate 24 fixed on both sides of the secondary chamber frame 23, and as shown above, the first side wall plate 24 and the secondary chamber frame 23 It is directly transported to the construction site after being prefabricated as a whole, and there is no need to build it again at the construction site. The main body 31 of the comprehensive room includes a frame 33 of the comprehensive room and second side wall panels 34 fixed on both sides of the frame 33 of the comprehensive room. Similarly, the second side wall panels 34 and the frame 33 of the comprehensive room are also integrally prefabricated. In this embodiment, the detachable end plate 12, the detachable baffle 13, the first roof 14, the second roof 22, the first side wall 24, the third roof 32 and the second side wall 34 are all Lightweight boards, including ALC (AAC) boards, or silicic acid boards, or glass magnesium boards, or inorganic composite boards, or glass fiber reinforced cement lightweight porous partition wall strips, and other existing lightweight boards or lightweight boards All solid walls can be used. The building frame 11, the secondary room frame 23 and the comprehensive room frame 33 are all made up of hollow beams or hollow columns.

所述第一屋顶14与第二屋顶22对接,第二屋顶22与第三屋顶32对接。且第一屋顶14与第二屋顶22对接处覆盖有密封带4。第二屋顶与第三屋顶对接处同样覆盖有密封带。所述第一屋顶14、第二屋顶22及第三屋顶32的横截面均为三角形。在本实施方式中,所述二次室主体21、第二屋顶22、综合室主体31和第三屋顶32的体积应满足道路运输要求。二次设备室中集成电力二次设备及屏柜、办公设施(未图示)等。综合室集成工器具、生活设施等(未图示),以实现出厂前完成安装调试,整体运输,现场快速投运的目标。所有墙体和屋面安装完成后在接缝处进行密封、防水处理。The first roof 14 is in contact with the second roof 22 , and the second roof 22 is in contact with the third roof 32 . And the joint of the first roof 14 and the second roof 22 is covered with a sealing tape 4 . The junction of the second roof and the third roof is also covered with sealing tape. The cross sections of the first roof 14 , the second roof 22 and the third roof 32 are all triangular. In this embodiment, the volumes of the secondary chamber main body 21 , the second roof 22 , the comprehensive chamber main body 31 and the third roof 32 should meet road transportation requirements. The secondary equipment room integrates power secondary equipment, screen cabinets, office facilities (not shown), etc. The comprehensive room integrates tools, living facilities, etc. (not shown) to achieve the goal of completing installation and commissioning before leaving the factory, overall transportation, and rapid commissioning on site. After all walls and roofs are installed, the seams are sealed and waterproofed.

另外,本实用新型的具体实现方法和途径很多,以上所述仅是本实用新型的优选实施方式。对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。本实施例中未明确的各组成部分均可用现有技术加以实现。In addition, there are many specific implementation methods and approaches of the utility model, and the above descriptions are only preferred implementation modes of the utility model. For those of ordinary skill in the art, without departing from the principle of the utility model, some improvements and modifications can also be made, and these improvements and modifications should also be regarded as the protection scope of the utility model. All components that are not specified in this embodiment can be realized by existing technologies.

Claims (4)

1.一种基于模块化组合技术的变电站装配式建筑物,其特征在于:包括一次设备室、二次设备室及综合室;二次设备室位于一次设备室及综合室之间; 1. A substation prefabricated building based on modular combination technology, characterized in that: it includes a primary equipment room, a secondary equipment room and a comprehensive room; the secondary equipment room is located between the primary equipment room and the comprehensive room; 所述一次设备室包括建筑框架、位于建筑框架一端的可拆卸端板、位于建筑框架两侧的可拆卸挡板、覆盖于建筑框架上的第一屋顶;而建筑框架的另一端为对接端,该对接端设有两侧立柱、位于两侧立柱之间并与两侧立柱平行的中柱、横向安装在两侧立柱及中柱顶端的上横梁及横向安装在两侧立柱及中柱底端的下横梁; The primary equipment room includes a building frame, a detachable end plate at one end of the building frame, a detachable baffle plate at both sides of the building frame, and a first roof covering the building frame; and the other end of the building frame is a butt end, The butt end is provided with uprights on both sides, a center post between the uprights on both sides and parallel to the uprights on both sides, an upper beam horizontally installed on the top of the uprights on both sides and the top of the center post, and a crossbeam installed horizontally on the bottom of the uprights on both sides and the center post. lower beam; 二次设备室包括二次室主体及覆盖于二次室主体上的第二屋顶;二次室主体面对一次设备室的一端固定在一次设备室的对接端; The secondary equipment room includes the main body of the secondary room and the second roof covering the main body of the secondary room; the end of the main body of the secondary room facing the primary equipment room is fixed at the docking end of the primary equipment room; 综合室包括综合室主体及覆盖于综合室主体上的第三屋顶;所述综合室主体面对二次设备室的一端与二次室主体固定; The comprehensive room includes a main body of the comprehensive room and a third roof covering the main body of the comprehensive room; the end of the main body of the comprehensive room facing the secondary equipment room is fixed to the main body of the secondary room; 所述第一屋顶与第二屋顶对接,第二屋顶与第三屋顶对接,且第一屋顶与第二屋顶对接处覆盖有密封带,第二屋顶与第三屋顶对接处同样覆盖有密封带。 The first roof is connected to the second roof, the second roof is connected to the third roof, and the joint between the first roof and the second roof is covered with a sealing tape, and the joint between the second roof and the third roof is also covered with a sealing tape. 2.根据权利要求1所述的基于模块化组合技术的变电站装配式建筑物,其特征在于:二次设备室中集成有电力二次设备、办公设施,综合室集有成工器具、生活设施。 2. The substation prefabricated building based on modular combination technology according to claim 1, characterized in that: the secondary equipment room is integrated with power secondary equipment and office facilities, and the comprehensive room is integrated with tools and living facilities . 3.根据权利要求1所述的基于模块化组合技术的变电站装配式建筑物,其特征在于:所述第一屋顶、第二屋顶及第三屋顶的横截面均为三角形。 3. The substation prefabricated building based on modular combination technology according to claim 1, wherein the cross-sections of the first roof, the second roof and the third roof are all triangular. 4.根据权利要求1所述的基于模块化组合技术的变电站装配式建筑物,其特征在于:所述二次室主体包括二次室框架及固定于二次室框架两侧的第一侧壁板;综合室主体包括综合室框架及固定于综合室框架两侧的第二侧壁板;所述可拆卸端板、可拆卸挡板、第一侧壁板、第二侧壁板及屋顶均为轻质板体。 4. The substation prefabricated building based on modular combination technology according to claim 1, characterized in that: the main body of the secondary room includes a frame of the secondary room and first side walls fixed on both sides of the frame of the secondary room board; the main body of the comprehensive room includes the frame of the comprehensive room and the second side wall panels fixed on both sides of the frame of the comprehensive room; For light board.
CN201520624564.2U 2015-08-18 2015-08-18 Assembly type structure of transformer substation thing based on modularization combination technique Expired - Fee Related CN204960416U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520624564.2U CN204960416U (en) 2015-08-18 2015-08-18 Assembly type structure of transformer substation thing based on modularization combination technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520624564.2U CN204960416U (en) 2015-08-18 2015-08-18 Assembly type structure of transformer substation thing based on modularization combination technique

Publications (1)

Publication Number Publication Date
CN204960416U true CN204960416U (en) 2016-01-13

Family

ID=55055490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520624564.2U Expired - Fee Related CN204960416U (en) 2015-08-18 2015-08-18 Assembly type structure of transformer substation thing based on modularization combination technique

Country Status (1)

Country Link
CN (1) CN204960416U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888315A (en) * 2016-04-12 2016-08-24 华信咨询设计研究院有限公司 Equipment room
CN106088701A (en) * 2016-07-18 2016-11-09 中国电力科学研究院 A kind of 35kV assembled intelligent substation building method
CN106088703A (en) * 2016-07-27 2016-11-09 国家电网公司 A kind of assembled transformer station using modularity base
CN107558766A (en) * 2017-09-13 2018-01-09 新能量科技股份有限公司 A kind of prefabricated cabin antistatic mounting seat and modularization nacelle
CN108291397A (en) * 2015-08-14 2018-07-17 维克托布洛克公司 Connector for modular building
CN111255085A (en) * 2016-07-07 2020-06-09 福州欧冠创新工业设计有限公司 Double Track Double Frame Deformation House

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108291397A (en) * 2015-08-14 2018-07-17 维克托布洛克公司 Connector for modular building
CN108291397B (en) * 2015-08-14 2022-02-25 Z-模块控股公司 Connector for modular building
CN105888315A (en) * 2016-04-12 2016-08-24 华信咨询设计研究院有限公司 Equipment room
CN111255085B (en) * 2016-07-07 2021-05-14 福州欧冠创新工业设计有限公司 Double-track double-frame deformable house
CN111255085A (en) * 2016-07-07 2020-06-09 福州欧冠创新工业设计有限公司 Double Track Double Frame Deformation House
CN111255084A (en) * 2016-07-07 2020-06-09 福州欧冠创新工业设计有限公司 Double Track Double Frame Deformation House
CN111255086A (en) * 2016-07-07 2020-06-09 福州欧冠创新工业设计有限公司 Double Track Double Frame Deformation House
CN111255084B (en) * 2016-07-07 2021-05-14 福州欧冠创新工业设计有限公司 Double Track Double Frame Deformation House
CN111255086B (en) * 2016-07-07 2021-05-14 福州欧冠创新工业设计有限公司 Double-track double-frame deformable house
CN106088701A (en) * 2016-07-18 2016-11-09 中国电力科学研究院 A kind of 35kV assembled intelligent substation building method
CN106088703B (en) * 2016-07-27 2019-04-26 国网山东省电力公司经济技术研究院 A prefabricated substation using a modular base
CN106088703A (en) * 2016-07-27 2016-11-09 国家电网公司 A kind of assembled transformer station using modularity base
CN107558766A (en) * 2017-09-13 2018-01-09 新能量科技股份有限公司 A kind of prefabricated cabin antistatic mounting seat and modularization nacelle

Similar Documents

Publication Publication Date Title
CN204960416U (en) Assembly type structure of transformer substation thing based on modularization combination technique
JP3218530U (en) Central assembly steel structure
CN205444458U (en) Integrated assembled steel construction building
CN103216115B (en) Modular integrally-movable house
CN105421818B (en) Built-in steel Standard house
CN205637106U (en) Building structure system of completely assembling formula steel construction
CN105863067A (en) Modular low-layer assembling type house system of special-shaped column steel structure
CN207260319U (en) Integrated module assembled arthitecutral structure
CN106337500A (en) Modularized assembly type steel structure house building system
CN101457552A (en) Composite hollow slab house and building method thereof
CN104631857A (en) Trailer
CN203613645U (en) Modular prefabricated movable house
CN105926982A (en) Assembly lightweight steel stilted building
CN205296893U (en) Embedded steel construction assembly house
CN108590025B (en) Bamboo green assembled house and construction method thereof
CN202865990U (en) Novel steel structure building system
CN201924626U (en) Fabricated steel-structure house for transformer substation
CN1632252B (en) Light steel sealed column framework construction system
CN104032828B (en) Industrialized modular multilayer and high-rise assembling type steel structure center support system
CN110725412A (en) Integrated house system with embedded steel structure
CN206174124U (en) Articulated steel frame door shape bearing structure of short house of assembled dysmorphism post
CN205617566U (en) Combined -type steel structure house
CN203613646U (en) Prefabricated house convenient for wiring
CN203613826U (en) Mobile house
CN107130683A (en) A kind of assembled box building and its Modular building module

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113