CN207568622U - A kind of shield tunnel compaction grouting structure - Google Patents

A kind of shield tunnel compaction grouting structure Download PDF

Info

Publication number
CN207568622U
CN207568622U CN201721338303.XU CN201721338303U CN207568622U CN 207568622 U CN207568622 U CN 207568622U CN 201721338303 U CN201721338303 U CN 201721338303U CN 207568622 U CN207568622 U CN 207568622U
Authority
CN
China
Prior art keywords
shield tunnel
monitoring device
injected hole
grouting
slip casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721338303.XU
Other languages
Chinese (zh)
Inventor
农兴中
翟利华
王凌
柳宪东
顾锋
阚少德
卢小莉
陈彦晖
朱文彬
何冠鸿
袁泉
阳彬武
黄子进
陈晓岚
韦永美
祝徐敏
欧林夏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Design and Research Institute Co Ltd
Original Assignee
Guangzhou Metro Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Design and Research Institute Co Ltd filed Critical Guangzhou Metro Design and Research Institute Co Ltd
Priority to CN201721338303.XU priority Critical patent/CN207568622U/en
Application granted granted Critical
Publication of CN207568622U publication Critical patent/CN207568622U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model provides a kind of shield tunnel compaction grouting structure, including shield tunnel, grouting device and monitoring device, the both sides of shield tunnel are respectively equipped with injected hole, grouting device includes Grouting Pipe and slip casting machine, the both ends of Grouting Pipe are connected respectively with injected hole and slip casting machine, monitoring device is installed on shield tunnel, and monitoring device includes stress monitor device and subsidence monitoring device, and stress monitor device and subsidence monitoring device are electrically connected with the controller.Using the shield tunnel compaction grouting structure of technical solutions of the utility model, it can be achieved to monitor the variation of stress increment of shield tunnel and the sedimentation in tunnel during slip casting, regulation and control slip casting is carried out thus according to monitoring situation, ensures the structural stability in tunnel and the planarization of underground railway track.

Description

A kind of shield tunnel compaction grouting structure
Technical field
The utility model is related to shield tunnel field of reinforcement, and in particular to a kind of shield tunnel compaction grouting structure.
Background technology
Guangzhou Underground No.1 line yellow sand~longevity road section is shield tunnel section, and the foundation pit and pile foundation of project construction are tight Adjacent station and running tunnel.Since in January, 2011, find downlink in 10 points~12 points of K5+400~K5+483 tunnel tops Section of jurisdiction longitudinal crack is more at position (towards yellow sand station), and crackle is up to 4 on indivedual sections of jurisdiction, most of penetration of cracks monoblock sections of jurisdiction, Maximum crack width is about close to 0.58mm;At 12 points~3 point positions (facing yellow sand station) section of jurisdiction at K5+411~K5+480 for uplink Most of to have longitudinal crack, crack site is substantially distributed with downlink in mirror image.12 points~1 point position section of jurisdiction is opened at wherein K5+440 What is split is more serious, maximum crack width about 0.5mm.Totally 72, uplink crack, 53, downlink crack, 125 altogether.Due to Huang Long section has been in major injury state, in order to ensure the operation of Subway Line 1 and passenger survival property safety, is badly in need of looking for To a kind of reinforcement means, so as to carry out consolidation process to tunnel side stratum.
Compaction grouting is that thick slurries are injected the soil body, and hole is formed in the soil body, and with pressure rise, grouting amount increases Greatly, cavity expansion, and pore pressure in surrounding soil is forced to rise, in a period of time after slip casting, pore pressure will gradually disappear It dissipates, surrounding soil intensity raising by densification, so as to achieve the purpose that consolidated subsoil.
Slip casting operation is carried out just with slip casting machine in existing compaction grouting scheme, relies on team in operation process Slip casting experience carries out slip casting, and stringenter project under construction is required for stratum, needs to carry out accurate prison during slip casting Control prevents from occurring surface uplift after slip casting or tunnel vault declines, and surface uplift can cause underground railway track out-of-flatness to influence Subway even running, and the structural stability that tunnel vault decline will excessively influence entire tunnel, and then subway circulation is caused Harmful effect.
Invention content
The purpose of this utility model is that propose a kind of shield tunnel compaction grouting structure, the shield tunnel compaction grouting Structure monitors the variation of stress increment of shield tunnel and the sedimentation in tunnel during can realizing slip casting, thus according to monitoring situation Regulation and control slip casting is carried out, ensures the structural stability in tunnel and the planarization of underground railway track.
Based on this, the utility model proposes a kind of shield tunnel compaction grouting structure, including shield tunnel, grouting device And monitoring device, the both sides of the shield tunnel are respectively equipped with injected hole, the grouting device includes Grouting Pipe and slip casting machine, institute The both ends for stating Grouting Pipe are connected respectively with the injected hole and the slip casting machine, and the monitoring device is installed on the shield tunnel Road, the monitoring device include stress monitor device and subsidence monitoring device, the stress monitor device and the subsidence monitoring Device is electrically connected with the controller.
Further, the injected hole include be sequentially distributed from the bottom to top first group of injected hole, second group of injected hole and Third group injected hole is the plane of reference to pass through face where the central axes of the shield tunnel and the center line of underground railway track, described the One group of injected hole, second group of injected hole and the third group injected hole are symmetrical about the plane of reference including two Injected hole.
Further, the Grouting Pipe is mini-valve tube.
Further, the injected hole and the gap that the mini-valve tube outer wall is formed are accelerated cement mortar sealing region.
Further, the sealing region for the gap by ground to below ground 1m-1.5m in the range of.
Further, check valve is further included, the check valve is installed on the upper end of the mini-valve tube.
Further, the stress monitor device is uniformly arranged on the inner wall of the shield tunnel.
Further, the subsidence monitoring device includes the first subsidence monitoring device and the second subsidence monitoring device, described First subsidence monitoring device is installed on the vault of the shield tunnel, and the second subsidence monitoring device is installed on underground railway track On center line.
Further, the second subsidence monitoring device sets one per 40m-50m along the underground railway track length direction It is a.
Implement the utility model embodiment, have the advantages that:
1st, it during slip casting, realizes and the sedimentation of the stress increment and tunnel in tunnel is monitored, so as in slip casting process In pinpoint the problems in time, and grouting parameter and grouting program are adjusted, avoid damage to shield tunnel structural integrity and The planarization of underground railway track ensures the even running of subway.
2nd, symmetrical injected hole so that the structure on two sides of shield tunnel after slip casting is consistent, with ensureing entire tunnel side Uniform force after layer is reinforced, will not lead to underground railway track because of side stress run-off the straight, and then can guarantee that underground railway track road surface is put down Structural stability that is whole and then improving shield tunnel.
3rd, the gap that injected hole and mini-valve tube outer wall are formed is accelerated cement mortar sealing region, is thus prevented in slip casting Occur grout in journey, and sealing region for gap by ground to below ground 1m-1.5m in the range of, meet block after tie Under the premise of structure intensity, construction cost is effectively reduced.
4th, the upper end of mini-valve tube is equipped with check valve so that slurries will not be flow backwards during slip casting so that slurries are suitable Profit enters in the soil body.
5th, subsidence monitoring device includes the first subsidence monitoring device and the second subsidence monitoring device, the first subsidence monitoring device The vault of shield tunnel is installed on, thus can monitor the settling amount of the vault of shield tunnel, the second subsidence monitoring device is installed on On the center line of underground railway track, so as to monitor the protuberance of underground railway track and decline, and the adjustment of slip casting is carried out, and then ensure subway rail The planarization in road.
6th, the second subsidence monitoring device sets one per 40m-50m along underground railway track length direction, thus can monitor whole The settling amount of underground railway track, and whole underground railway track need to ensure that bulk settling is uniform, thus do not have and jolt during subway circulation, into And ensure subway even running.
Description of the drawings
Fig. 1 is the structure diagram of the shield tunnel compaction grouting structure of the utility model embodiment.
Fig. 2 is the utility model embodiment mini-valve tube and the matched structure diagram of injected hole.
In figure:1- injected holes, 2- shield tunnels, 3- mini-valve tubes, 4- stress monitor devices, 5- subsidence monitoring devices, 6- envelopes Stifled region, 7- check valves, 8- underground railway tracks;First group of injected hole of 1a-, second group of injected hole of 1b-, 1c- third group injected holes, 5a- the first subsidence monitoring devices, 5b- the second subsidence monitoring devices.
Specific embodiment
Technical solutions of the utility model are further illustrated with reference to the accompanying drawings and examples:
As shown in Figure 1 to Figure 2:The present embodiment provides a kind of shield tunnel compaction grouting structure, including shield tunnel 2, note Sizing device and monitoring device, the both sides of shield tunnel 2 are respectively equipped with injected hole 1, and grouting device includes Grouting Pipe and slip casting machine, note The both ends of slurry pipe are connected respectively with the injected hole 1 and slip casting machine, it should be pointed out that the bottom of Grouting Pipe is down toward injected hole 1 bottom, and the upper end of Grouting Pipe is basseted and a distance and is connect with slip casting machine, thereby guarantees that being smoothed out for slip casting, monitors Device is installed on shield tunnel 2, and monitoring device includes stress monitor device 4 and subsidence monitoring device 5,4 He of stress monitor device Subsidence monitoring device 5 is electrically connected with the controller, and thus during slip casting, is realized to the stress increment in tunnel and sinking for tunnel Drop is monitored, and so as to pinpoint the problems in time during slip casting, and grouting parameter is adjusted, avoids damage to shield tunnel 2 structural integrity and the planarization of underground railway track 8, ensure the even running of subway.
Based on above technical scheme, during slip casting, realize and the sedimentation of the stress increment and tunnel in tunnel is supervised Control so as to pinpoint the problems in time during slip casting, and grouting parameter and grouting program are adjusted, avoids damage to shield tunnel The structural integrity in road 2 and the planarization of underground railway track 8, ensure the even running of subway.
Further, injected hole 1 include first group of injected hole, 1, second group of injected hole 1b for being sequentially distributed from the bottom to top and Third group injected hole 1c, to pass through shield tunnel 2 central axes and underground railway track 8 center line where face be the plane of reference, first group Injected hole 1a, second group of injected hole 1b and third group injected hole 1c include two injected holes 1 symmetrical about the plane of reference, Symmetrical injected hole 1 is so that the structure on two sides of shield tunnel 2 is consistent after slip casting, and then the structure for improving shield tunnel 2 is steady It is qualitative.It should be pointed out that slip casting process choosing is from the bottom to top successively in first group of injected hole 1a, second group of note in the present embodiment It starches hole 1b and third group injected hole 1c and carries out symmetrical slip casting, it is possible thereby to improve slip casting efficiency, and symmetrical slip casting may be such that slurries The soil body with tunnel side stratum ensures uniform force after the stratum consolidation of entire tunnel side, will not lead to ground simultaneously by densification Rail road 8 can guarantee 8 evenness of road surface of underground railway track because of side stress run-off the straight, and grouting sequence from the bottom to top makes So that the structure positioned at bottom is first reinforced, and reinforces upwards successively after obtaining slip casting, construct more reasonable and structure is more stablized.
The Grouting Pipe of the present embodiment is mini-valve tube 3, and 3 slip casting of mini-valve tube being capable of timing, positioning, quantitative, easy to operate and energy Ensure that slip casting effect is good.Further, injected hole 1 blocks area with the gap that 3 outer wall of mini-valve tube is formed for accelerated cement mortar Thus domain 6 prevents that grout occurs during slip casting.In addition, sealing region 6 for gap by ground to below ground 1m-1.5m In the range of, after closure is met under the premise of structural strength, effectively reduce construction cost.Further, check valve is further included 7, check valve 7 is installed on the upper end of mini-valve tube 3 so that slurries will not be flow backwards during slip casting so that slurries smoothly enter In the soil body, it is pointed out that check valve 7 is connect with mini-valve tube 3 by flange in the present embodiment, the structure of flange it is simple and It is compact to may be such that check valve 7 is connect with mini-valve tube 3.
Further, stress monitor device 4 is uniformly arranged on the inner wall of shield tunnel 2, thus can be comprehensive to shield tunnel The stress increment in road 2 is monitored, and slip casting effect assessment is carried out by the stress increment variation in each orientation.
Subsidence monitoring device 5 in the present embodiment includes the first subsidence monitoring device 5a and the second subsidence monitoring device 5b, First subsidence monitoring device 5a is installed on the vault of shield tunnel 2, thus can monitor the settling amount of the vault of shield tunnel 2, the Two subsidence monitoring device 5b are installed on the center line of underground railway track 8, so as to monitor the protuberance of underground railway track 8 and decline, and are carried out The adjustment of slip casting, and then ensure the planarization of underground railway track 8.Further, the second subsidence monitoring device 5b is grown along underground railway track 8 It spends direction and one is set per 40m-50m, thus can monitor the settling amount of whole underground railway track 8, and whole underground railway track 8 needs to protect It is uniform to demonstrate,prove bulk settling, does not thus have and jolts during subway circulation, and then ensures subway even running.
Using the shield tunnel compaction grouting structure of the utility model embodiment, during slip casting, realize and tunnel is answered The sedimentation of power increment and tunnel is monitored, so as to pinpoint the problems in time during slip casting, and to grouting parameter and slip casting side Case is adjusted, and avoids damage to the structural integrity of shield tunnel 2 and the planarization of underground railway track 8, ensures the steady fortune of subway Row.Symmetrical injected hole 1 ensures that entire tunnel side stratum adds so that the structure on two sides of shield tunnel 2 is consistent after slip casting Gu uniform force after, will not lead to underground railway track 8 because of side stress run-off the straight, and then can guarantee 8 evenness of road surface of underground railway track And then improve the structural stability of shield tunnel 2.Injected hole 1 is accelerated cement mortar with the gap that 3 outer wall of mini-valve tube is formed Thus sealing region 6 prevents that grout occurs during slip casting, and sealing region 6 for gap by ground to below ground 1m- In the range of 1.5m, after closure is met under the premise of structural strength, construction cost is effectively reduced.The upper end installation of mini-valve tube 3 There is check valve 7 so that slurries will not be flow backwards during slip casting so that slurries smoothly enter in the soil body.Subsidence monitoring device 5 Shield tunnel 2 is installed on including the first subsidence monitoring device 5a and the second subsidence monitoring device 5b, the first subsidence monitoring device 5a Vault, thus can monitor the settling amount of the vault of shield tunnel 2, the second subsidence monitoring device 5b is installed on two underground railway tracks Between 8, so as to monitor the protuberance of underground railway track 8 and decline, and the adjustment of slip casting is carried out, and then ensure the smooth of underground railway track 8 Property.Second subsidence monitoring device 5b sets one per 40m-50m along 8 length direction of underground railway track, thus can monitor whole subway The settling amount of track 8, and whole underground railway track 8 need to ensure that bulk settling is uniform, thus do not have and jolt during subway circulation, and then Ensure subway even running.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, under the premise of the utility model technical principle is not departed from, several improvement and replacement can also be made, these change The scope of protection of the utility model is also should be regarded as into replacement.

Claims (9)

1. a kind of shield tunnel compaction grouting structure, it is characterised in that:Including shield tunnel, grouting device and monitoring device, institute The both sides for stating shield tunnel are respectively equipped with injected hole, and the grouting device includes Grouting Pipe and slip casting machine, and the two of the Grouting Pipe End is connected respectively with the injected hole and the slip casting machine, and the monitoring device is installed on the shield tunnel, the monitoring Device includes stress monitor device and subsidence monitoring device, the stress monitor device and the subsidence monitoring device with control Device is electrically connected.
2. shield tunnel compaction grouting structure according to claim 1, it is characterised in that:The injected hole include by down toward On the first group of injected hole, second group of injected hole and the third group injected hole that are sequentially distributed, to pass through the axis of the shield tunnel Face where the center line of line and underground railway track is the plane of reference, first group of injected hole, second group of injected hole and the third Group injected hole includes two injected holes symmetrical about the plane of reference.
3. shield tunnel compaction grouting structure according to claim 1, it is characterised in that:The Grouting Pipe is mini-valve tube.
4. shield tunnel compaction grouting structure according to claim 3, it is characterised in that:The injected hole and the sleeve valve The gap that pipe outer wall is formed is accelerated cement mortar sealing region.
5. shield tunnel compaction grouting structure according to claim 4, it is characterised in that:Between the sealing region is described In the range of gap is by ground to below ground 1m-1.5m.
6. shield tunnel compaction grouting structure according to claim 5, it is characterised in that:Further include check valve, the list The upper end of the mini-valve tube is installed on to valve.
7. shield tunnel compaction grouting structure according to any one of claims 1 to 6, it is characterised in that:The stress prison Control device is uniformly arranged on the inner wall of the shield tunnel.
8. shield tunnel compaction grouting structure according to any one of claims 1 to 6, it is characterised in that:The sedimentation prison It controls device and includes the first subsidence monitoring device and the second subsidence monitoring device, the first subsidence monitoring device is installed on the shield The vault in structure tunnel, the second subsidence monitoring device are installed on the center line of underground railway track.
9. shield tunnel compaction grouting structure according to claim 8, it is characterised in that:The second subsidence monitoring device One is set per 40m-50m along the underground railway track length direction.
CN201721338303.XU 2017-10-16 2017-10-16 A kind of shield tunnel compaction grouting structure Active CN207568622U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721338303.XU CN207568622U (en) 2017-10-16 2017-10-16 A kind of shield tunnel compaction grouting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721338303.XU CN207568622U (en) 2017-10-16 2017-10-16 A kind of shield tunnel compaction grouting structure

Publications (1)

Publication Number Publication Date
CN207568622U true CN207568622U (en) 2018-07-03

Family

ID=62695355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721338303.XU Active CN207568622U (en) 2017-10-16 2017-10-16 A kind of shield tunnel compaction grouting structure

Country Status (1)

Country Link
CN (1) CN207568622U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111577333A (en) * 2020-05-18 2020-08-25 北京市政建设集团有限责任公司 Shield tunnel compaction grouting structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111577333A (en) * 2020-05-18 2020-08-25 北京市政建设集团有限责任公司 Shield tunnel compaction grouting structure
CN111577333B (en) * 2020-05-18 2022-01-18 北京市政建设集团有限责任公司 Shield tunnel compaction grouting structure

Similar Documents

Publication Publication Date Title
CN102562075B (en) Large cross-section weak surrounding rock tunnel three-step and six-part short-distance construction method
CN100501124C (en) Construction method for tunnel contact passage in shield section of underground railway
CN109208637B (en) Construction method for newly adding open cut station on existing tunnel foundation
US9322137B2 (en) Method for building structures, particularly passages under operating railways or the like
CN106049193B (en) One kind being used for roadbed section ballastless track of high-speed railway center line method for correcting error
CN110924961B (en) Construction method for starting shield tunneling machine to pass through existing station
CN104120731B (en) A kind of tunnel subsidence protector and construction method thereof
CN111236957B (en) Mechanical pipe jacking construction process
CN203960700U (en) The closed road structure of stake holder U-lag
CN103556579A (en) Box culvert pushing construction method integrating comprehensive grouting, pressure maintaining and pipe roof support
CN104612696B (en) Overpass column hole method construction method is passed through in big cross section tunneling subway station in fine sand layer
WO2021082843A1 (en) Weak stratum-based reinforcement method for shield tunnel covered by shallow soil
CN106245526A (en) The splicing structure of mining under railways protecting wall, straight wall and shield and construction method
JP7394252B1 (en) Protruding type wind duct structure perpendicular to the vertical direction and construction method at deep subway station
CN107401161A (en) High ferro shield tunnel construction method is worn under pipe-roof method and MJS method joint reinforcements
CN102817621B (en) Comprehensive construction method applicable to controlling arch basement sedimentation for tunnel in unfavorable geological conditions
CN108005682A (en) A kind of shield tunnel reinforcement means
CN202970719U (en) Relay chamber-free jacking construction device for ultra-long pipe roof
CN104532714A (en) Roadbed structure for treating deep soft soil karst foundation
CN103437779B (en) The construction method of regulation tunnel lining pore gas flow
CN207568622U (en) A kind of shield tunnel compaction grouting structure
CN107387092B (en) A kind of multiple rectangular top pipes are connected in parallel on the engineering method of the formation underground space under complex environment
CN111997043A (en) Segmented reinforcement cage and diaphragm wall construction method under low-clearance high-voltage line
CN108005681A (en) A kind of compaction grouting method
CN203891047U (en) Equipment equipped with steel platform for foundation construction of land bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 510000 No. 204 Huanshi West Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee after: Guangzhou Metro Design and Research Institute Co., Ltd.

Address before: 510000 No. 204 Huanshi West Road, Yuexiu District, Guangzhou City, Guangdong Province