CN108005681A CN201710968229.8A CN201710968229A CN108005681A CN 108005681 A CN108005681 A CN 108005681A CN 201710968229 A CN201710968229 A CN 201710968229A CN 108005681 A CN108005681 A CN 108005681A
Authority
CN
China
Prior art keywords
slip casting
injected hole
group
grouting
mini
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710968229.8A
Other languages
Chinese (zh)
Other versions
CN108005681B (en
Inventor
翟利华
农兴中
王凌
柳宪东
顾锋
阚少德
卢小莉
陈彦晖
朱文彬
何冠鸿
袁泉
阳彬武
黄子进
陈晓岚
韦永美
祝徐敏
欧林夏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Metro Design and Research Institute Co Ltd
Original Assignee
Guangzhou Metro Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Metro Design and Research Institute Co Ltd filed Critical Guangzhou Metro Design and Research Institute Co Ltd
Priority to CN201710968229.8A priority Critical patent/CN108005681B/en
Publication of CN108005681A publication Critical patent/CN108005681A/en
Application granted granted Critical
Publication of CN108005681B publication Critical patent/CN108005681B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention provides a kind of compaction grouting method, comprise the following steps:Injected hole is bored on the calibrated bolck of endless tube piece, injected hole includes being sequentially distributed from the bottom to top and in first group of injected hole, second group of injected hole and the 3rd group of injected hole of symmetrical structure;Mini-valve tube is installed in each injected hole, and check valve is installed on to the upper end of mini-valve tube;Injected hole is blocked with the gap that mini-valve tube outer wall is formed using accelerated cement mortar;From the bottom to top symmetrical slip casting is carried out in first group of injected hole, second group of injected hole and the 3rd group of injected hole successively;Slip casting effect is checked after the completion of slip casting, perforations adding slip casting is carried out for underproof location;Mini-valve tube, slip casting machine and mixer are cleaned after mortar depositing construction immediately.Using the compaction grouting method of technical solution of the present invention, slip casting efficiency can be improved, ensures the stability of tunnel structure on two sides, so that subway even running.

Description

A kind of compaction grouting method
Technical field
The present invention relates to compaction grouting technical field, and in particular to a kind of compaction grouting method.
Background technology
Guangzhou Underground No.1 line yellow sand~longevity road section is shield tunnel section, and the foundation pit and pile foundation of project construction are tight Adjacent station and running tunnel.Since in January, 2011, find downlink in 10 points~12 points of K5+400~K5+483 tunnel tops Position (towards yellow sand station) place section of jurisdiction longitudinal crack is more, and crackle is up to 4 on indivedual sections of jurisdiction, most of penetration of cracks monoblock sections of jurisdiction, Maximum crack width is about close to 0.58mm;Uplink 12 points~3 point position (facing yellow sand station) place section of jurisdiction at K5+411~K5+480 Most of to have longitudinal crack, crack site is substantially distributed with downlink in mirror image.12 points~1 point position section of jurisdiction is opened wherein at K5+440 What is split is more serious, maximum crack width about 0.5mm.Totally 72, uplink crack, 53, downlink crack, amounts to 125.Due to Huang Long section is in major injury state, in order to ensure the operation of Subway Line 1 and passenger survival property safety, is badly in need of looking for To a kind of reinforcement means, so as to carry out consolidation process to tunnel side stratum.
Compaction grouting is that thick slurries are injected the soil body, and hole is formed in the soil body, and with pressure rise, grouting amount increases Greatly, cavity expansion, and force surrounding soil mesopore pressure to rise, in a period of time after slip casting, pore pressure will gradually disappear Dissipate, surrounding soil intensity raising by densification, so as to achieve the purpose that consolidated subsoil.
Existing compaction grouting scheme uses single hole slip casting operation, and operating efficiency is low, and slip casting pore size distribution does not conform to Reason, hereafter carries out random or slip casting in a certain order in each injected hole, and when the grouting amount of each injected hole and slip casting Between it is inconsistent, be to sum up easy to cause tunnel both sides reinforce after structure it is inconsistent so that underground railway track out-of-flatness, causes ground Iron is in operation because unbalance stress influences train operation.
The content of the invention
It is an object of the present invention to provide a kind of compaction grouting method, which can improve slip casting efficiency, protect The stability of tunnel structure on two sides is demonstrate,proved, so that subway even running.
Based on this, the present invention proposes a kind of compaction grouting method, comprises the following steps:
1) injected hole is bored on the calibrated bolck of endless tube piece, the injected hole includes first group of note being sequentially distributed from the bottom to top Hole, second group of injected hole and the 3rd group of injected hole are starched, is the plane of reference to pass through face where the central axes in tunnel and the center line of rail, First group of injected hole, second group of injected hole and the 3rd group of injected hole include two on the plane of reference pair Claim the injected hole of distribution;
2) mini-valve tube is installed in each injected hole, and check valve is installed on to the upper end of the mini-valve tube;
3) injected hole is blocked with the gap that the mini-valve tube outer wall is formed using accelerated cement mortar;
4) symmetrically noted in first group of injected hole, second group of injected hole and the 3rd group of injected hole successively from the bottom to top Slurry;
5) slip casting effect is checked after the completion of slip casting, perforations adding slip casting is carried out for underproof location;
6) mini-valve tube, slip casting machine and mixer are cleaned after mortar depositing construction immediately.
Further, in step 1) during drilling, drilling machine is directed at the position of the injected hole, and adjust verticality guarantee Vertical pore-forming.
Further, in step 3) sealing region for the gap by ground to below ground 1m-1.5m in the range of.
Further, before slip casting is started, packer permeability test is carried out, selects suitable grouting parameter.
Further, the grouting parameter includes grouting amount, slip casting time and grouting pressure.
Further, the sedimentation during slip casting to tunnel, deformation and stress increment are monitored and record data.
Further, when being monitored to slip casting process as found following either case, reduce grouting pressure or stop Only slip casting:
A, occurs crack during slip casting;
B, the deflection of tunnel vault is more than 1mm;
C, the sedimentation of earth's surface more than 10mm or surface uplift more than 2mm;
D, the stress increment mutation of the endless tube piece.
Further, segmented slip casting is taken in step 4), slip casting step pitch chooses 0.6m~1m, during slip casting, The mini-valve tube, is moved up the length of a slip casting step pitch by pressure rise or when reaching grouting amount.
Further, in step 4), final grouting pressure 0.1MPa-0.2MPa.
Further, in step 5) specific inspection method using it is following any one:
A, analytic approach:Slip casting is recorded and carries out statistical analysis, judges note by analyzing grouting amount, final pressure value and voltage stabling control Starch effect;
B, water injection test method:Conducted oneself with dignity using water pump or water column, clear water is pressed into drilling test section, calculates the test section Permeability rate A, A≤10Lu is qualification;
C, borehole inspection method:After slip casting after 28 days, a detection hole is respectively taken in haunch both sides, is surveyed in the detection hole It is qualification to obtain unconfined compressive strength B, B >=0.15MPa.
Implement the embodiment of the present invention, have the advantages that:
1st, the compaction grouting method is symmetrically arranged with injected hole in the calibrated bolck of endless tube piece, during slip casting from the bottom to top Symmetrical slip casting is carried out in first group of injected hole, second group of injected hole and the 3rd group of injected hole successively, is improving the same of slip casting efficiency When, structure is consistent after ensureing the reinforcing of tunnel both sides so that and tunnel structure on two sides is stablized, so that underground railway track keeps smooth, And then ensure subway even running;Grouting sequence from the bottom to top causes after slip casting so that the structure positioned at bottom is first reinforced, according to Secondary to reinforce upwards, construction more rationally and causes structure more to stablize, and slip casting effect is checked during slip casting, thus Unqualified location is found in time and is repaired so that construction is smoothed out.
2nd, before slip casting is started, packer permeability test is carried out, according to pressure water head, examination segment length and stablizes infiltration water, can To judge the power of permeability of rock massf, grouting parameter is thus made choice, ensures that slip casting operation is smoothed out.
3rd, the sedimentation during slip casting to tunnel, deformation and stress increment are monitored and record data, in order to Pinpoint the problems in time in work progress, or operation offer task instruction from now on, easy to analyze slip casting operation, note Go wrong during slurry and stop slip casting in time or reduce grouting pressure, and then ensure the security of slip casting operation.
4th, segmented slip casting is taken, slip casting step pitch chooses 0.6m~1m, during slip casting, pressure rise or reaches slip casting During amount, mini-valve tube is moved up to the length of a slip casting step pitch, so that grouting amount is enough and ensures continuous grouting, and it is steady Surely displacement distance may be such that the structure formed after slip casting is more stablized.
Brief description of the drawings
Fig. 1 is the structure diagram of the slip casting process of the embodiment of the present invention.
In figure:1- endless tube pieces, first group of injected hole of 2-, second group of injected hole of 3-, the 3rd group of injected hole of 4-, 5- check valves.
Embodiment
Technical solution of the present invention is further illustrated with reference to the accompanying drawings and examples:
As shown in Figure 1, the compaction grouting method in the present embodiment, comprises the following steps:
1) injected hole is bored on the calibrated bolck of endless tube piece 1, the injected hole includes first group be sequentially distributed from the bottom to top 2, second groups of injected holes 3 of injected hole and the 3rd group of injected hole 4, are ginseng to pass through face where the central axes in tunnel and the center line of rail Face is examined, first group of injected hole, 2, second groups of injected holes 3 and the 3rd group of injected hole 4 are symmetrical on the plane of reference including two Injected hole, it is pointed out that need to survey the reinforcing bar distribution of underground during boring injected hole, can be to the position of injected hole It is finely adjusted, avoids reinforcing bar so that drilling is smooth;
2) mini-valve tube is installed in each injected hole, and check valve 5 is installed on to the upper end of the mini-valve tube, check valve 5 causes Slurries will not be flow backwards during slip casting so that slurries smoothly enter in the soil body, it is pointed out that pass through in the present embodiment Check valve 5 is connected by flange with mini-valve tube, and the structure of flange is simple and compact, the sleeve valve that may be such that check valve 5 is connected with mini-valve tube The bottom of pipe is down toward injected hole bottom, a distance and upper end of mini-valve tube is basseted;
3) injected hole is blocked with the gap that the mini-valve tube outer wall is formed using accelerated cement mortar, is thus prevented Grout occurs during slip casting;
4) carried out pair in described first group of injected hole, 2, second groups of injected holes 3 and the 3rd group of injected hole 4 successively from the bottom to top Claim slip casting, it is possible thereby to slip casting efficiency is improved, and symmetrical slip casting may be such that the soil body of slurries and tunnel side stratum while be pressed It is close, ensure uniform force after the stratum consolidation of whole tunnel side, underground railway track will not be caused because of side stress run-off the straight, and then It can guarantee that underground railway track evenness of road surface so that subway even running, and grouting sequence from the bottom to top causes position after causing slip casting Structure in bottom is first reinforced, and is reinforced upwards successively, and construction more rationally and causes structure more to stablize, it should be pointed out that Injecting paste material employed in the present embodiment determines to use superfine cement, cement mortar or dual slurry for experiment;
5) slip casting effect is checked after the completion of slip casting, carries out perforations adding slip casting for underproof location, thus in time Find unqualified location and repaired so that construction is smoothed out;
6) mini-valve tube, slip casting machine and mixer are cleaned after mortar depositing construction immediately, prevents slurries from sticking in the said equipment On, thus it is normally carried out easy to next subjob.
Based on above technical scheme, which is symmetrically arranged with injected hole in the calibrated bolck of endless tube piece 1, is noting Symmetrical slip casting is carried out in first group of injected hole, 2, second groups of injected holes 3 and the 3rd group of injected hole 4 successively from the bottom to top during slurry, While slip casting efficiency is improved, structure is consistent after ensureing the reinforcing of tunnel both sides so that and tunnel structure on two sides is stablized, so that Underground railway track keeps smooth, and then ensures subway even running;Grouting sequence from the bottom to top to be located at bottom after causing slip casting The structure in portion is first reinforced, and is reinforced upwards successively, and construction more rationally and causes structure more to stablize, and to slip casting during slip casting Effect is checked, is thus found unqualified location in time and is repaired so that construction is smoothed out.
Further, in step 1) during drilling, make the position of drilling machine alignment injected hole, and adjust verticality and ensure vertically Pore-forming, thus easy to mini-valve tube installation and cause slip casting it is more convenient.
Further, in step 3) sealing region for gap by ground to below ground 1m-1.5m in the range of, full On the premise of sufficient structural strength, construction cost is effectively reduced.
In the present embodiment, before slip casting is started, packer permeability test is carried out, selects suitable grouting parameter, packer permeability test It is that hydraulic pressure is entered drilling with high pressure mode, one kind original position for solution rock cranny situation and the water penetration of being let it pass according to rock body water absorption gauge Experiment.Packer permeability test is that the boring test section of certain length is isolated with special seal installation, then with fixed water Head is permeated to this section of fields water injection, water by the crack around hole wall into rock mass, and the water finally permeated can tend to one Stationary value.According to pressure water head, examination segment length and stablize infiltration water, it is possible to determine that the power of permeability of rock massf.Thus carry out Grouting parameter is selected, ensures that slip casting operation is smoothed out.Further, grouting parameter includes grouting amount, slip casting time and slip casting Pressure.
Sedimentation, deformation and stress increment of the present embodiment during slip casting to tunnel are monitored and record data, with Easy to pinpoint the problems in time in the construction process, or operation offer task instruction from now on, easy to be carried out to slip casting operation Analysis.Further, when being monitored to slip casting process as found following either case, reduce grouting pressure or stop note Slurry:
A, occurs crack during slip casting;
B, the deflection of tunnel vault is more than 1mm;
C, the sedimentation of earth's surface more than 10mm or surface uplift more than 2mm;
D, the stress increment mutation of endless tube piece 1.
Further, segmented slip casting is taken in step 4), slip casting step pitch chooses 0.6m~1m, during slip casting, Mini-valve tube, is moved up the length of a slip casting step pitch, so that grouting amount is enough by pressure rise or when reaching grouting amount And ensure continuous grouting, and stably displacement distance may be such that the structure of the formation after slip casting is more stablized.
Further, in step 4), final grouting pressure 0.1MPa-0.2MPa, final grouting pressure is selected in the bottom of injected hole 0.2MPa is taken, is 0.1MPa in position final grouting pressure of the injected hole close to ground, so that slip casting operation is smoothed out.
In the present embodiment step 5) specific inspection method using it is following any one:
A, analytic approach:Slip casting is recorded and carries out statistical analysis, judges note by analyzing grouting amount, final pressure value and voltage stabling control Starch effect;
B, water injection test method:Conducted oneself with dignity using water pump or water column, clear water is pressed into drilling test section, calculates the test section Permeability rate A, A≤10Lu is qualification;
C, borehole inspection method:After slip casting after 28 days, a detection hole is respectively taken in haunch both sides, is surveyed in the detection hole It is qualification to obtain unconfined compressive strength B, B >=0.15MPa.
Using the compaction grouting method of the embodiment of the present invention, which symmetrically sets in the calibrated bolck of endless tube piece 1 Injected hole is equipped with, from the bottom to top successively in first group of injected hole, 2, second groups of injected holes 3 and the 3rd group of slip casting during slip casting Hole 4 carries out symmetrical slip casting, and while slip casting efficiency is improved, structure is consistent after ensureing the reinforcing of tunnel both sides so that tunnel both sides Stable structure, so that underground railway track keeps smooth, and then ensures subway even running;Grouting sequence from the bottom to top causes So that the structure positioned at bottom is first reinforced after slip casting, to reinforce upwards successively, construction more rationally and causes structure more to stablize, and Slip casting effect is checked during slip casting, unqualified location is thus found in time and is repaired so that construction smoothly into OK.Before slip casting is started, packer permeability test is carried out, according to pressure water head, examination segment length and stablizes infiltration water, it is possible to determine that rock The power of body water penetration, thus makes choice grouting parameter, ensures that slip casting operation is smoothed out.To tunnel during slip casting Sedimentation, deformation and stress increment are monitored and record data, in order to pinpoint the problems in time in the construction process, or it is modern Rear operation provides task instruction, go wrong easy to analyze slip casting operation, during slip casting stop in time slip casting or Person reduces grouting pressure, and then ensures the security of slip casting operation.Segmented slip casting is taken, slip casting step pitch chooses 0.6m~1m, During slip casting, mini-valve tube is moved up the length of a slip casting step pitch, thus made by pressure rise or when reaching grouting amount Obtain grouting amount enough and ensure continuous grouting, and stably displacement distance may be such that the structure formed after slip casting is more stablized.
The above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, some improvement and replacement can also be made, these improve and replace Also it should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of compaction grouting method, it is characterised in that comprise the following steps:
1) injected hole is bored on the calibrated bolck of endless tube piece, the injected hole includes first group of slip casting being sequentially distributed from the bottom to top Hole, second group of injected hole and the 3rd group of injected hole, are the plane of reference to pass through face where the central axes in tunnel and the center line of rail, institute It is symmetrical on the plane of reference including two to state first group of injected hole, second group of injected hole and the 3rd group of injected hole The injected hole of distribution;
2) mini-valve tube is installed in each injected hole, and check valve is installed on to the upper end of the mini-valve tube;
3) injected hole is blocked with the gap that the mini-valve tube outer wall is formed using accelerated cement mortar;
4) symmetrical slip casting is carried out in first group of injected hole, second group of injected hole and the 3rd group of injected hole successively from the bottom to top;
5) slip casting effect is checked after the completion of slip casting, perforations adding slip casting is carried out for underproof location;
6) mini-valve tube, slip casting machine and mixer are cleaned after mortar depositing construction immediately.
2. compaction grouting method according to claim 1, it is characterised in that in step 1) during drilling, be directed at drilling machine The position of the injected hole, and adjust verticality and ensure vertical pore-forming.
3. compaction grouting method according to claim 1, it is characterised in that in step 3) sealing region for the gap by Ground is in the range of below ground 1m-1.5m.
4. compaction grouting method according to claim 1, it is characterised in that before slip casting is started, packer permeability test is carried out, Select suitable grouting parameter.
5. compaction grouting method according to claim 4, it is characterised in that the grouting parameter includes grouting amount, slip casting Time and grouting pressure.
6. compaction grouting method according to claim 1, it is characterised in that sedimentation, change during slip casting to tunnel Shape and stress increment are monitored and record data.
7. compaction grouting method according to claim 6, it is characterised in that be monitored to slip casting process as found such as During lower either case, reduce grouting pressure or stop slip casting:
A, occurs crack during slip casting;
B, the deflection of tunnel vault is more than 1mm;
C, the sedimentation of earth's surface more than 10mm or surface uplift more than 2mm;
D, the stress increment mutation of the endless tube piece.
8. compaction grouting method according to claim 1, it is characterised in that segmented slip casting is taken in step 4), is noted Starch step pitch and choose 0.6m~1m, during slip casting, the mini-valve tube is moved up one by pressure rise or when reaching grouting amount The length of a slip casting step pitch.
9. compaction grouting method according to claim 1, it is characterised in that in step 4), final grouting pressure is 0.1MPa-0.2MPa.
10. compaction grouting method according to claim 1, it is characterised in that specific inspection method uses in step 5) It is following any one:
A, analytic approach:Slip casting is recorded and carries out statistical analysis, judges that slip casting is imitated by analyzing grouting amount, final pressure value and voltage stabling control Fruit;
B, water injection test method:Conducted oneself with dignity using water pump or water column, clear water is pressed into drilling test section, calculates the saturating of the test section Water rate A, A≤10Lu are qualification;
C, borehole inspection method:After slip casting after 28 days, a detection hole is respectively taken in haunch both sides, nothing is measured in the detection hole Confined compressive strength B, B >=0.15MPa are qualification.
CN201710968229.8A 2017-10-16 2017-10-16 Compaction grouting method Active CN108005681B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710968229.8A CN108005681B (en) 2017-10-16 2017-10-16 Compaction grouting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710968229.8A CN108005681B (en) 2017-10-16 2017-10-16 Compaction grouting method

Publications (2)

Publication Number Publication Date
CN108005681A true CN108005681A (en) 2018-05-08
CN108005681B CN108005681B (en) 2022-04-29

Family

ID=62051698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710968229.8A Active CN108005681B (en) 2017-10-16 2017-10-16 Compaction grouting method

Country Status (1)

Country Link
CN (1) CN108005681B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109458194A (en) * 2018-12-24 2019-03-12 同济大学 A kind of section grouting technology processing method of regulation tunnel cross section deformation
CN112031826A (en) * 2020-08-31 2020-12-04 中铁四院集团工程建设有限责任公司 Method for remedying tunnel deformation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09158690A (en) * 1995-12-13 1997-06-17 Taisei Corp Forming method for slide arch center for tunnel lining and grout filling hole
US20020057948A1 (en) * 2000-08-10 2002-05-16 Steinar Roald Multi grouting system
CN103899323A (en) * 2014-05-06 2014-07-02 中铁二十五局集团轨道交通工程有限公司 Construction method of shield passing through railway yard
CN103953367A (en) * 2014-04-18 2014-07-30 中国水电顾问集团华东勘测设计研究院有限公司 Method of eliminating liquefaction in shield tunnel stratum in tunnel
CN104265326A (en) * 2014-08-06 2015-01-07 上海隧道工程有限公司 Method for controlling soil deformation in large rectangular pipe jacking

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09158690A (en) * 1995-12-13 1997-06-17 Taisei Corp Forming method for slide arch center for tunnel lining and grout filling hole
US20020057948A1 (en) * 2000-08-10 2002-05-16 Steinar Roald Multi grouting system
CN103953367A (en) * 2014-04-18 2014-07-30 中国水电顾问集团华东勘测设计研究院有限公司 Method of eliminating liquefaction in shield tunnel stratum in tunnel
CN103899323A (en) * 2014-05-06 2014-07-02 中铁二十五局集团轨道交通工程有限公司 Construction method of shield passing through railway yard
CN104265326A (en) * 2014-08-06 2015-01-07 上海隧道工程有限公司 Method for controlling soil deformation in large rectangular pipe jacking

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
滕海渤: "下穿不良及配卵石回填层的浅埋暗挖法隧道加固与初支施工技术", 《建筑施工》 *
竺维彬等: "广州复合地层中的盾构施工技术", 《2005上海国际隧道工程研讨会文集》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109458194A (en) * 2018-12-24 2019-03-12 同济大学 A kind of section grouting technology processing method of regulation tunnel cross section deformation
CN112031826A (en) * 2020-08-31 2020-12-04 中铁四院集团工程建设有限责任公司 Method for remedying tunnel deformation
CN112031826B (en) * 2020-08-31 2022-09-09 中铁四院集团工程建设有限责任公司 Method for remedying tunnel deformation

Also Published As

Publication number Publication date
CN108005681B (en) 2022-04-29

Similar Documents

Publication Publication Date Title
CN101994513B (en) Method for constructing tunnel by finishing full section curtain grouting from upper-half section
CN101638987B (en) Tunnel construction method for crossing high-pressure water-enriched fracture zone with curtain grouting and grout stopping wall
CN110821503B (en) Construction method for main body of ultra-deep shield section air shaft after tunnel advance
CN101832142B (en) Tunnel information tracing accurate grouting method
CN106437726B (en) Shallow-depth-excavation tunnel crosses ground fissure crushed zone construction method
CN106837351A (en) Tunnel Karst water detects Treatment Methods
CN104453946B (en) Advanced reinforcing construction method for building tunnel in soft surrounding rock
CN109083682A (en) A kind of construction method of mine working antiseepage high intensity fire dam
CN108005682A (en) A kind of shield tunnel reinforcement means
CN110130927A (en) A kind of carbonaceous slate serious deformation control construction method
CN108506015A (en) Excavate the construction method of artificial push pipe and application Pipe Jacking in a kind of Large Diameter Pipeline point storehouse
CN106968690A (en) The method for tunnel construction for soil property of caving in
CN111997624A (en) Shallow-buried large-section underground excavation rectangular tunnel construction method
CN112502720B (en) Method for passing open TBM through fault fracture zone
WO2021082843A1 (en) Weak stratum-based reinforcement method for shield tunnel covered by shallow soil
CN106049195A (en) Method for strengthening subgrade basement of existing high speed railway line
CN104234726A (en) Internal dewatering and drainage construction method for tunnel passing through water-rich unconformable contact zone
CN112177635A (en) Construction method of step multiple advanced small guide pipe and construction method of overlapped tunnel
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN108005681A (en) A kind of compaction grouting method
CN107191206A (en) A kind of step construction method of Shallow-buried Large-span Tunnel Unit two six
CN109518722A (en) The short underpass structure and its construction method of newly-built basement and existing subway station
CN112145203A (en) Full-face advancing type sectional grouting construction method and overlapped tunnel construction method
CN114233374B (en) Ground grouting construction method for reinforcing cavity collapse area of inclined shaft after mud burst and water burst
Xu et al. Case study of control technology of structural settlements due to tunnelling beneath a subway station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 510000 No. 204 Huanshi West Road, Yuexiu District, Guangzhou City, Guangdong Province

Applicant after: Guangzhou Metro Design and Research Institute Co., Ltd.

Address before: 510000 No. 204 Huanshi West Road, Yuexiu District, Guangzhou City, Guangdong Province

Applicant before: Guangzhou Metro Design & Research Institute Co., Ltd.

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant