CN207568148U - A kind of easy-to-mount template scaffold - Google Patents

A kind of easy-to-mount template scaffold Download PDF

Info

Publication number
CN207568148U
CN207568148U CN201721687601.XU CN201721687601U CN207568148U CN 207568148 U CN207568148 U CN 207568148U CN 201721687601 U CN201721687601 U CN 201721687601U CN 207568148 U CN207568148 U CN 207568148U
Authority
CN
China
Prior art keywords
matched
steel pipe
mounting hole
groove
easy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721687601.XU
Other languages
Chinese (zh)
Inventor
刘俊梅
张艳峰
荆媛艳
闫风起
张冬红
贾发杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721687601.XU priority Critical patent/CN207568148U/en
Application granted granted Critical
Publication of CN207568148U publication Critical patent/CN207568148U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of easy-to-mount template scaffolds, including several upright bars and cross bar, more upright bar matrix arrangements are connected between adjacent upright bar by more cross bars, several pedestals are further included, every upright bar includes several end to end steel pipes;The lower end of each steel pipe is equipped with stepped protrusion, and upper end is equipped with and the matched cascade groove of protrusion;The outer wall of steel pipe is equipped with multiple wheels and detains, and wheel, which is buckled, is evenly distributed with four groups of mounting holes, and every group of mounting hole includes at least two through-holes;The both ends of each cross bar are arranged with boss, and the outside of boss is equipped with and the matched plate of mounting hole;The level interval of the plate lower end and boss is more than the spacing of wheel button edge and mounting hole;It is equipped on the inside of the upper end of the pedestal and is mounted on pedestal with the matched groove of protrusion, the upright bar.The utility model is not only convenient for dismounting, and by the cooperation between all parts, can climbing shuttering scaffold overall stability.

Description

A kind of easy-to-mount template scaffold
Technical field
The utility model is related to a kind of template scaffold, specifically a kind of easy-to-mount template scaffold.
Background technology
Template scaffold is the shelf that fixed form is used in construction, can prevent template movement, existing template Scaffold all has the advantages that convenient for disassembly and assembly, is suitble to assembly and disassembly quick at the construction field (site), but existing template scaffold portion The stability of part is to be improved.
Utility model content
The utility model provides a kind of easy-to-mount template scaffold, can improve the overall stability of template scaffold.
A kind of easy-to-mount template scaffold, including several upright bars and cross bar, more upright bar matrix arrangements are adjacent Upright bar between connected by more cross bars, further include several pedestals, every upright bar includes several end to end steel pipes; The lower end of each steel pipe is equipped with stepped protrusion, and upper end is equipped with and the matched cascade groove of protrusion;On the outer wall of steel pipe Equipped with multiple wheel buttons, wheel, which is buckled, is evenly distributed with four groups of mounting holes, and every group of mounting hole includes at least two through-holes;Each cross bar Both ends are arranged with boss, and the outside of boss is equipped with and the matched plate of mounting hole;The plate lower end and the level of boss Spacing is more than the spacing of wheel button edge and mounting hole;Be equipped on the inside of the upper end of the pedestal with the matched groove of protrusion, it is described Upright bar is mounted on pedestal.
Preferably, the plate includes two cannon plugs, and the position of face mounting hole is set on the outer wall of the steel pipe There is arc groove, the arc groove is formed and the matched circular socket holes of cannon plug with through-hole.
Preferably, strip groove is equipped at the arc groove center, the cannon plug is equipped with and strip groove Matched strip projected parts.
Preferably, the quantity of the through-hole is three, and three through-holes are wired to positive triangle.
Preferably, the top of the plate is equipped with limit protrusion, and the corresponding outer wall of steel pipe is equipped with and limit protrusion Matched limiting groove.
The utility model is not only convenient for dismounting, and by the cooperation between all parts, can climbing shuttering scaffold it is whole Body stability.
Description of the drawings
It in order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the structure diagram of the utility model steel pipe and pedestal;
Fig. 3 is the top perspective view of steel pipe;
Fig. 4 is the enlarged structure schematic diagram of cross bar.
Reference sign:
1- steel pipes, 110- mounting holes, 11- wheel buttons, 12- protrusions, 13- grooves, the first ladders of 131-, the second ladders of 132-, 2- pedestals, 3- cross bars, 31- limit protrusions, 32- plates.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
As shown in Figures 1 to 4, a kind of easy-to-mount template scaffold, including several upright bars and cross bar 3, more vertical Bar matrix arrangement is connected between adjacent upright bar by more cross bars 3, further includes several pedestals 2, if every upright bar includes Dry end to end steel pipe 1;The lower end of each steel pipe 1 is equipped with stepped raised 12, and upper end is equipped with matched with protrusion 12 Cascade groove 13;1 outer wall of steel pipe is equipped with multiple wheels and buckles 11, is evenly distributed with four groups of mounting holes 110 on wheel button 11, often Group mounting hole 110 includes at least two through-holes;The both ends of each cross bar 3 are arranged with boss, and the outside of boss is equipped with and installation 110 matched plate 32 of hole;The level interval of 32 lower end of plate and boss is more than wheel 11 edges of button and mounting hole 110 Spacing;It is equipped on the inside of the upper end of the pedestal 2 and is mounted on pedestal 2 with raised 12 matched grooves, the upright bar.Wherein, Described raised 12 be two layers of protrusion ladder, sets that there are two concave ladder, 131 Hes of respectively the first ladder in corresponding groove 13 Second ladder 132.The pedestal 2 is whole in the T-type structure to stand upside down, and the both sides of pedestal, which correspond to, offers positioning used for positioning Hole is inserted into the positioning of location hole realization pedestal and top upright bar using bolt or other positioning elements, further increases entirety Stability.
Preferably, the plate 32 includes two cannon plugs, the position of face mounting hole on the outer wall of the steel pipe 1 Equipped with arc groove, the arc groove is formed with through-hole and the matched circular socket holes of cannon plug, and connection is more firm.
Preferably, strip groove is equipped at the arc groove center, the cannon plug is equipped with and strip groove Matched strip projected parts.Contact surface between the two is further increased, so as to increase stability.
Preferably, the quantity of the through-hole is three, and three through-holes are wired to positive triangle, at this point, connection is more firm.
Preferably, the top of the plate 32 is equipped with limit protrusion 31, and corresponding 1 outer wall of steel pipe is equipped with and limiting Raised 31 matched limiting grooves.After grafting two can be further increased by the cooperation of limit protrusion 31 and limiting groove again Stable connection between person, and then promote whole stability.
In use, can as described above mode as needed directly by multiple 1 head and the tail grafting of steel pipe into desired height Upright bar, and will be in 1 inserted base 2 of the lowermost steel pipe.Then, multiple cross bars 3 are sequentially inserted into two adjacent upright bars, it is horizontal The plate 32 of 3 end of bar is inserted directly into the mounting hole on wheel button 11.Finally, the utility model passes through between above-mentioned component Cooperation, corresponding assembly and disassembly can be carried out, be not only convenient for dismounting, and can climbing shuttering scaffold overall stability.
Obviously, those skilled in the art can carry out the utility model various modification and variations without departing from this practicality Novel spirit and scope.If in this way, these modifications and variations of the present invention belong to the utility model claims and Within the scope of its equivalent technologies, then the utility model is also intended to include these modifications and variations.

Claims (5)

1. a kind of easy-to-mount template scaffold, including several upright bars and cross bar (3), more upright bar matrix arrangements, phase It is connected between adjacent upright bar by more cross bars (3), which is characterized in that several pedestals (2) are further included, if every upright bar includes Dry end to end steel pipe (1);The lower end of each steel pipe (1) is equipped with stepped raised (12), and upper end is equipped with and raised (12) Matched cascade groove (13);Steel pipe (1) outer wall is equipped with multiple wheels and buckles (11), is evenly distributed on wheel button (11) Four groups of mounting holes (110), every group of mounting hole (110) include at least two through-holes;The both ends of each cross bar (3) are arranged with convex Platform, the outside of boss are equipped with and mounting hole (110) matched plate (32);Between the level of plate (32) lower end and boss Away from the spacing more than wheel button (11) edge and mounting hole (110);
It is equipped on the inside of the upper end of the pedestal (2) and is mounted on pedestal (2) with raised (12) matched groove, the upright bar.
2. a kind of easy-to-mount template scaffold as described in claim 1, which is characterized in that the plate (32) is including two A cannon plug, the position of face mounting hole is equipped with arc groove on the outer wall of the steel pipe (1), the arc groove with it is logical Hole is formed and the matched circular socket holes of cannon plug.
3. a kind of easy-to-mount template scaffold as claimed in claim 2, which is characterized in that at the arc groove center Equipped with strip groove, the cannon plug is equipped with and the matched strip projected parts of strip groove.
4. a kind of easy-to-mount template scaffold as described in claim 1, which is characterized in that the quantity of the through-hole is three A, three through-holes are wired to positive triangle.
A kind of 5. easy-to-mount template scaffold as described in claim 1, which is characterized in that the top of the plate (32) Equipped with limit protrusion (31), corresponding steel pipe (1) outer wall is equipped with and limit protrusion (31) matched limiting groove.
CN201721687601.XU 2017-12-06 2017-12-06 A kind of easy-to-mount template scaffold Expired - Fee Related CN207568148U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721687601.XU CN207568148U (en) 2017-12-06 2017-12-06 A kind of easy-to-mount template scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721687601.XU CN207568148U (en) 2017-12-06 2017-12-06 A kind of easy-to-mount template scaffold

Publications (1)

Publication Number Publication Date
CN207568148U true CN207568148U (en) 2018-07-03

Family

ID=62687186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721687601.XU Expired - Fee Related CN207568148U (en) 2017-12-06 2017-12-06 A kind of easy-to-mount template scaffold

Country Status (1)

Country Link
CN (1) CN207568148U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565928A (en) * 2019-07-26 2019-12-13 江苏兴厦建设工程集团有限公司 Fast-assembling, quick detach formula scaffold frame for construction of building outer wall
CN112177306A (en) * 2020-09-26 2021-01-05 深圳千里马装饰集团有限公司 Energy-saving assembly type building construction platform and use method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110565928A (en) * 2019-07-26 2019-12-13 江苏兴厦建设工程集团有限公司 Fast-assembling, quick detach formula scaffold frame for construction of building outer wall
CN110565928B (en) * 2019-07-26 2021-08-31 江苏兴厦建设工程集团有限公司 Fast-assembling, quick detach formula scaffold frame for construction of building outer wall
CN112177306A (en) * 2020-09-26 2021-01-05 深圳千里马装饰集团有限公司 Energy-saving assembly type building construction platform and use method thereof
CN112177306B (en) * 2020-09-26 2021-10-01 深圳千里马装饰集团有限公司 Energy-saving assembly type building construction platform and use method thereof

Similar Documents

Publication Publication Date Title
CN207568148U (en) A kind of easy-to-mount template scaffold
CN205476387U (en) Scaffold
CN211647203U (en) Scaffold for building construction
CN213806469U (en) Scaffold frame body
CN205918081U (en) Outer curtain scaffold frame of arc building
CN207092504U (en) A kind of scaffold for building
CN208899958U (en) A kind of line bar builds ground stabilizing base
CN213573385U (en) Rail guard for building engineering
CN213268865U (en) Connecting structure for building plate buckle
CN203977833U (en) A kind of wall-attached builder's jack
CN210828248U (en) Assembly beam structure for assembly building
CN107939016B (en) A kind of construction wall automatic plastering device and application method
CN209129335U (en) A kind of construction carrier
CN215717005U (en) Concrete box culvert template construction is with scaffold frame that has protective structure
CN208563806U (en) A kind of Z-shape steel beam-PC step plate stair
CN204456804U (en) A kind of construction steel structure construction roof beam structure
CN104912325A (en) Stairway pouring template
CN205259636U (en) Combined pavilion
CN205369887U (en) High strength footboard that construction scaffolding frame was used
CN206688085U (en) Combined health training aids
CN205116067U (en) Protective barrier
CN215803529U (en) Bridge type splicing stage
CN211817517U (en) Assembled steel construction stair
CN205396963U (en) Base is put things in good order to whole steel pipe on scaffold
CN212562403U (en) Overhanging scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180703

Termination date: 20181206