CN205918081U - Outer curtain scaffold frame of arc building - Google Patents

Outer curtain scaffold frame of arc building Download PDF

Info

Publication number
CN205918081U
CN205918081U CN201620513085.8U CN201620513085U CN205918081U CN 205918081 U CN205918081 U CN 205918081U CN 201620513085 U CN201620513085 U CN 201620513085U CN 205918081 U CN205918081 U CN 205918081U
Authority
CN
China
Prior art keywords
scaffold
outer curtain
curtain wall
arcuate building
arcuate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620513085.8U
Other languages
Chinese (zh)
Inventor
李敏捷
周寰亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 5 Group Co Ltd filed Critical Shanghai Construction No 5 Group Co Ltd
Priority to CN201620513085.8U priority Critical patent/CN205918081U/en
Application granted granted Critical
Publication of CN205918081U publication Critical patent/CN205918081U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses an outer curtain scaffold frame of arc building relates to construction technical field, to traditional scaffold frame because of increasing the problem that the waste material is many, occupation space is big of arranging the number and producing. This outer curtain scaffold frame of arc building passes through even wall spare and arc building structure post fixed connection by fixed connection's space frame and base, space frame, and the space frame includes single scaffold frame unit, and scaffold frame unit is formed by connecting through the fastener a plurality of transverse bars, longitudinal rod and pole setting, and it is unanimous with the inclination of the outer curtain of arc building that direction inclination is construct to the arc to the space frame.

Description

A kind of outer curtain wall scaffold of arcuate building
Technical field
This utility model is related to technical field of building construction, particularly to a kind of outer curtain wall scaffold of arcuate building.
Background technology
In recent years, the day of the development with Building technology and land resource is becoming tight, and the building of special shape is increasingly Many.And because steel construction application is continuously increased, architectural appearance is increasingly sophisticated, as common conical shape.
The scaffold that job site mainly adopts at present is substantially vertical or partly outwards encorbelments.And conical shape Building surface be to tilt, common scaffold cannot be adapted with such building profile.General single, double row's foot handss are difficult to Set up, unstable.According to the scaffold form of common vertical posts, can only ensure to encorbelment by increasing scaffold row Partially stabilized, have that waste material is many, take up room big problem.Therefore, how to provide a kind of waste material few, take up an area space little and meet The outer curtain wall scaffold of console model arcuate building that the outer curtain wall construction of arcuate building requires, is those skilled in the art's urgent need to resolve Technical problem.
Utility model content
The waste material producing because increasing row for the traditional console model scaffold being applied to the outer curtain wall construction of arcuate building Many, take up room big problem, the purpose of this utility model is to provide a kind of save materials, take up an area outside the little arcuate building in space Curtain wall scaffold.
This utility model solves its technical problem and be the technical scheme is that
A kind of outer curtain wall scaffold of arcuate building, including the space framework being fixedly connected and base, described space framework leads to Cross wall-connecting piece to be fixedly connected with arcuate building structural column, described space framework includes single-row of scaffold unit, described scaffold list Unit is formed by connecting by fastener by some transverse bars, longitudinal rod and vertical rod, and described space framework is to arcuate building direction inclination angle Degree is consistent with the angle of inclination of the outer curtain wall of arcuate building.
Further, described wall-connecting piece is formed by axially arranged steel pipe manufacturing, described wall-connecting piece and described arcuate building Structural column is fixedly connected.
Further, also include bridging, the two ends of described bridging are fixedly connected with described vertical rod and transverse bar respectively, Described bridging is arranged at surrounding outside described scaffold unit.
Further, the interlaced setting of joint fastener of of vertically-adjacent two vertical rods.
Further, described base is made by channel-section steel, is provided with timber wedge between described base and ground.
Further, the level interval of described timber wedge is 1 meter.
Beneficial the having the technical effect that of this utility model
The outer curtain wall scaffold of arcuate building of the present utility model, including the space framework of single-row of scaffold unit composition, its For console model scaffold, different from traditional vertical or part builder's jack, there is when it is set up certain angle of inclination, This angle of inclination is identical with arcuate building angle of inclination.The outer curtain wall scaffold of this arcuate building not only floor space little, expend In the case that material is few, the outer curtain wall construction for arcuate building provides operating platform, and solves traditional console model scaffold Stablize that produced waste material is many, take up room big asking by increasing scaffold row and meeting arcuate building exterior wall surface and encorbelment Topic.The outer curtain wall scaffold of this arcuate building is drawn materials conveniently, and dismounting is convenient, saves cost, has preferable promotional value.
Brief description
Fig. 1 is the site plan of the outer curtain wall scaffold of arcuate building of the present utility model;
Fig. 2 is the vertical cross section figure in the outer curtain wall scaffold of arcuate building of the present utility model;
Fig. 3 is the plane graph of the outer curtain wall scaffold of arcuate building of the present utility model and wall-connecting piece node;
Fig. 4 is the elevation of the outer curtain wall scaffold of arcuate building of the present utility model and wall-connecting piece node.
In figure:
10- structural column;20- space framework;30- base;40- cladding glass separator bar;50- curtain wall;60- fastener;70- indulges To bar;80- circumference cross bar;90- radial direction cross bar.
Specific embodiment
Below in conjunction with the drawings and specific embodiments to the utility model proposes a kind of outer curtain wall scaffold of arcuate building make Further describe.According to description below, advantages and features of the present utility model will become apparent from.Below will by cited it Embodiment combines accompanying drawing, describes technology contents of the present utility model and feature in detail.Need in addition illustrate, accompanying drawing is all using non- The form that often simplifies and all using non-accurately ratio, only in order to convenient, lucidly aid in illustrating this utility model embodiment Purpose.For sake of convenience, described below " on ", D score consistent with accompanying drawing upper and lower direction, but this can not become this reality Restriction with new technique scheme.
Embodiment one
In conjunction with Fig. 1 to Fig. 4, the outer curtain wall scaffold of arcuate building of the present utility model is described.
As shown in Figures 1 to 4, the outer curtain wall scaffold of a kind of arcuate building, including the space framework 20 being fixedly connected and bottom Seat 30, space framework 20 is fixedly connected with arcuate building structural column 10 by wall-connecting piece (not shown), and space framework 20 includes list Row's scaffold unit, scaffold unit is formed by connecting by fastener 60 by some transverse bars, longitudinal rod and vertical rod, space framework 20 Consistent with the angle of inclination of curtain wall outside arcuate building to arcuate building direction angle of inclination.
Specifically, in order to meet the construction scaffolding demand of the outer curtain wall of arcuate building, the exterior wall along arcuate building is taken If with arcuate building angle of inclination identical console model scaffold.Meanwhile, in order to meet the stability of this scaffold, this scaffold The space framework that forms for single-row of scaffold unit of space framework 20.Thus, the outer curtain wall foot of arcuate building of the present utility model Hand cradle can not only provide operating platform for the outer curtain wall construction of arcuate building, and solve traditional console model scaffold and lead to Cross increase scaffold row and stablize that produced waste material is many, take up room big asking to meet arcuate building exterior wall surface and encorbelment Topic.
It is preferred that in order to ensure that this scaffold is fixedly connected with arcuate building structural column 10, this scaffold and arcuate building Fixed as one structure by some spaced wall-connecting pieces between outer curtain wall.Wall-connecting piece is circumference by axially arranged steel pipe Cross bar 80 is made, and wall-connecting piece is fixedly connected with arcuate building structural column 10.In order to realize scaffold and arcuate building exterior wall Being stably connected with of structural column 10, simultaneously cost-effective, the spacing between adjacent wall-connecting piece is two steps one across wall-connecting piece is according to phase Arranging, the circumferential cross bar 80 of wall-connecting piece is connected spacing between adjacent two cladding glass separator bars 40 with structural column 10 anchor ear, Radial direction cross bar 90 is fixedly connected by fastener 60 with circumferential cross bar 80.
It is preferred that also including for the bridging (not shown) strengthening scaffold stability in the large, the two ends of bridging are divided It is not fixedly connected with vertical rod (not shown) and transverse bar (not shown), bridging is arranged at surrounding outside scaffold unit.Shears Across away from no more than 6 meters, vertically and horizontally spacing is less than 10 meters for support.Bridging along scaffold space framework 20 surrounding facade by Bottom is continuously arranged to top, and bridging is maintained at 45 °~60 ° with the angle on ground.Bridging by rotary buckle be fixed on Intersecting transverse bar and vertical rod on, and synchronously set up with transverse bar and vertical rod.
It is preferred that the interlaced setting of joint fastener of of vertically-adjacent two vertical rods, thus ensureing between vertical vertical rod Connectivity robustness, the stability in the large of further hoisting scaffold.Sleeve couple in vertical rod answers interlaced arrangement;Two adjacent The joint of vertical rod should not be arranged in synchronous, and in synchronization, two every a vertical rod are separated by the distance that joint staggers in short transverse It is not preferably less than 500mm;Each connector center is not preferably greater than the 1/3 of step pitch to the distance of host node.
It is preferred that space framework 20 lower section pad is provided with base 30, such that it is able to increase the contact area of scaffold and ground, And then the load of minimizing ground unit area, strengthen its stability in the large.Base 30 is made by 12# channel-section steel, channel-section steel with ground Face is in 8 ° of angles.Below channel-section steel, pad sets timber wedge (not shown), and the level interval between adjacent timber wedge is 1 meter.Timber wedge is set by pad, Make channel-section steel with plane at an angle, angle is basically identical with scaffold angle of inclination.
Please continue to refer to Fig. 1 to Fig. 4, the present embodiment additionally provides the outer curtain wall scaffold of arcuate building of the present utility model Installation method
The installation method of the outer curtain wall scaffold of arcuate building, comprises the steps:
Step one, complete the installation of scaffold base 30 on ground.
Step 2, successively installation longitudinal rod 70, vertical rod and transverse bar on the base 30 of described step one, and each other Connected by fastener, successively up form space framework 20, so far complete the installation of the outer curtain wall scaffold of whole arcuate building.Special Not, in order to provide the operating platform of safety to workmen, the side of space framework 20 is additionally provided with railing, and railing is solid with vertical rod Fixed connection.Certainly, in order to ensure the stability of scaffold itself, in step 2 also include arrange bridging, bridging by down to On be continuously arranged at the outside surrounding of space framework 20, bridging is 45 °~60 ° with the angle on ground.Certainly, in order to further Improve the safety of scaffold, provide a safe and reliable construction operation platform for workmen, also set in space framework 20 There are foot guard plate and scaffold board, space framework 20 top is provided with safety net.
It is preferred that also including step 3, after the outer curtain wall scaffold installation of arcuate building, start by top to bottom Successively cladding glass is installed, and curtain wall scaffold outside the synchronous corresponding arcuate building by the dismounting of top to bottom.Remove scaffold The connection of scaffold clasp should be built up, whether support system meets detailing requiments before comprehensively.During dismounting, after first installing Tear open, the order first torn open installed afterwards, opened up by top layer, remove successively from top to bottom: remove the safety net that extension is found at top first;Its Secondary dismounting railing;Then remove foot guard plate;Then remove scaffold board;Then remove longitudinal cross bar;Then remove bridging;Then Remove wall-connecting piece;Then remove circumferential cross bar;Finally remove vertical rod, now cladding glass is synchronous from top to bottom installs, Thus forming complete curtain wall 50.
Especially, in the present embodiment, with scaffold building height for 28.9 meters, arcuate building outboard cant angle degree is 9 ° Scaffold building as a example, according to traditional scaffold building method, ground to arcuate building top needs setting 4 rows that encorbelment Scaffold, also needs to about 6 row's scaffolds stablizing come the part that to ensure to encorbelment outside it, and this utility model provides set up with Arcuate building angle of inclination identical tilting scaffold only needs single-row of scaffold unit, and knowable to aforementioned comparison, this practicality is new 3/4 material at least saved by the scaffold of the outer curtain wall of the arcuate building of type embodiment, also saves substantial amounts of construction empty simultaneously Between.
The outer curtain wall scaffold of arcuate building of the present utility model, the construction scaffolding meeting the outer curtain wall of arcuate building needs Ask, the exterior wall along arcuate building when setting up is installed and sets up identical with arcuate building angle of inclination and be console model scaffold.With When, in order to meet the stability of this scaffold, the space framework of this scaffold forms for single-row of scaffold unit.Thus, this reality Operating platform can not only be provided for the outer curtain wall construction of arcuate building with the outer curtain wall scaffold of new arcuate building, and solve The console model scaffold having determined traditional is encorbelmented stable generation by increasing scaffold row and meeting arcuate building exterior wall surface Waste material many, take up room big problem.The outer curtain wall scaffold of this arcuate building is drawn materials conveniently, and dismounting is convenient, saves cost, There is preferable promotional value.
Foregoing description is only the description to this utility model preferred embodiment, not any limit to this utility model scope Fixed, any change that the those of ordinary skill in this utility model field does according to the disclosure above content, modification, belonging to right will Seek the protection domain of book.

Claims (6)

1. a kind of outer curtain wall scaffold of arcuate building is it is characterised in that including space framework and the base being fixedly connected, described vertical Body framework is fixedly connected with arcuate building structural column by wall-connecting piece, and described space framework includes single-row of scaffold unit, described Scaffold unit is formed by connecting by fastener by some transverse bars, longitudinal rod and vertical rod, and described space framework is to arcuate building side Consistent with the angle of inclination of curtain wall outside arcuate building to angle of inclination.
2. the outer curtain wall scaffold of arcuate building according to claim 1 is it is characterised in that described wall-connecting piece is by axially arranged Steel pipe manufacturing form, described wall-connecting piece is fixedly connected with described arcuate building structural column.
3. the outer curtain wall scaffold of arcuate building according to claim 1 is it is characterised in that also include bridging, described cuts The two ends of knife support are fixedly connected with described vertical rod and transverse bar respectively, and described bridging is arranged at four outside described scaffold unit Week.
4. arcuate building according to claim 1 outer curtain wall scaffold is it is characterised in that of vertically-adjacent two vertical rods The interlaced setting of joint fastener.
5. the outer curtain wall scaffold of arcuate building according to claim 1 is it is characterised in that described base is by channel-section steel making Become, between described base and ground, be provided with timber wedge.
6. the outer curtain wall scaffold of arcuate building according to claim 5 is it is characterised in that the level interval of described timber wedge is 1 meter.
CN201620513085.8U 2016-05-31 2016-05-31 Outer curtain scaffold frame of arc building Active CN205918081U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620513085.8U CN205918081U (en) 2016-05-31 2016-05-31 Outer curtain scaffold frame of arc building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620513085.8U CN205918081U (en) 2016-05-31 2016-05-31 Outer curtain scaffold frame of arc building

Publications (1)

Publication Number Publication Date
CN205918081U true CN205918081U (en) 2017-02-01

Family

ID=57876604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620513085.8U Active CN205918081U (en) 2016-05-31 2016-05-31 Outer curtain scaffold frame of arc building

Country Status (1)

Country Link
CN (1) CN205918081U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863233A (en) * 2016-05-31 2016-08-17 上海建工五建集团有限公司 Scaffold for outer curtain wall of arc-shaped building and mounting method
CN107338868A (en) * 2017-08-28 2017-11-10 中国建筑第二工程局有限公司 A kind of macrotype spherical screen installation system and its construction method
CN113756574A (en) * 2021-10-11 2021-12-07 北京建工集团有限责任公司 High-precision low-cost arc-shaped step grandstand mold system and pouring method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863233A (en) * 2016-05-31 2016-08-17 上海建工五建集团有限公司 Scaffold for outer curtain wall of arc-shaped building and mounting method
CN107338868A (en) * 2017-08-28 2017-11-10 中国建筑第二工程局有限公司 A kind of macrotype spherical screen installation system and its construction method
CN113756574A (en) * 2021-10-11 2021-12-07 北京建工集团有限责任公司 High-precision low-cost arc-shaped step grandstand mold system and pouring method
CN113756574B (en) * 2021-10-11 2022-04-22 北京建工集团有限责任公司 High-precision low-cost arc-shaped step grandstand mold system and pouring method

Similar Documents

Publication Publication Date Title
CN102418313B (en) Polycarbonate (PC) composite bridge with corrugated steel webs and construction method for PC composite bridge
CN108560719B (en) Supporting and mounting method for super-large-span double-layer bidirectional suspension cable structure
CN205918081U (en) Outer curtain scaffold frame of arc building
CN105863233A (en) Scaffold for outer curtain wall of arc-shaped building and mounting method
CN210288697U (en) Inverted hanging building structure system
CN105350639B (en) A kind of facade intersects grid structure peripheral frame and its installation method
CN104929364A (en) Auxiliary construction method for longspan cantilever entire laminated Vierendeel truss structure
CN105332506A (en) Formwork support system for parallel multi-section stair and method for constructing same
CN103982014B (en) A kind of reducing steel work spiral ramp and construction techniques thereof
CN103790229B (en) A kind of multilayer cantilever steel construction and constructive method thereof
CN203213019U (en) Cast-in-situ construction bracket system of long cantilever bent cap
CN203230165U (en) Template support platform for ultra-high cantilever structure
CN107675871A (en) One kind is building rise long-span outrigger wall-connecting piece construction method
CN218970801U (en) Thin waist television tower steel structure
CN204959795U (en) Self -supporting does not have row no mould basement flat slab floor
CN115538817B (en) Dismantling system for high-rise building cantilever structure and construction method
CN106013450A (en) Core tube skip-floor construction method
CN202831628U (en) Combined type bailey frame load-bearing shelving for pouring large span concrete beam
CN214302807U (en) Attached lifting scaffold supported by specially-made stand columns
CN201241309Y (en) Steel tube beam viaduct
CN212478544U (en) Regularization stair template braced system
CN205206315U (en) Run -in runs formwork support system of stair more
CN205224272U (en) Steel construction factory building is with structure of encorbelmenting
CN204059793U (en) A kind of reducing steel work spiral ramp
CN103711112B (en) Build large-span concrete beam combined type Bailey bracket bearing bent frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant