- outer curtain
- curtain wall
- arcuate building
- arcuate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses an outer curtain scaffold frame of arc building relates to construction technical field, to traditional scaffold frame because of increasing the problem that the waste material is many, occupation space is big of arranging the number and producing. This outer curtain scaffold frame of arc building passes through even wall spare and arc building structure post fixed connection by fixed connection's space frame and base, space frame, and the space frame includes single scaffold frame unit, and scaffold frame unit is formed by connecting through the fastener a plurality of transverse bars, longitudinal rod and pole setting, and it is unanimous with the inclination of the outer curtain of arc building that direction inclination is construct to the arc to the space frame.
Description
Technical field
This utility model is related to technical field of building construction, particularly to a kind of outer curtain wall scaffold of arcuate building.
Background technology
In recent years, the day of the development with Building technology and land resource is becoming tight, and the building of special shape is increasingly
Many.And because steel construction application is continuously increased, architectural appearance is increasingly sophisticated, as common conical shape.
The scaffold that job site mainly adopts at present is substantially vertical or partly outwards encorbelments.And conical shape
Building surface be to tilt, common scaffold cannot be adapted with such building profile.General single, double row's foot handss are difficult to
Set up, unstable.According to the scaffold form of common vertical posts, can only ensure to encorbelment by increasing scaffold row
Partially stabilized, have that waste material is many, take up room big problem.Therefore, how to provide a kind of waste material few, take up an area space little and meet
The outer curtain wall scaffold of console model arcuate building that the outer curtain wall construction of arcuate building requires, is those skilled in the art's urgent need to resolve
Technical problem.
Utility model content
The waste material producing because increasing row for the traditional console model scaffold being applied to the outer curtain wall construction of arcuate building
Many, take up room big problem, the purpose of this utility model is to provide a kind of save materials, take up an area outside the little arcuate building in space
Curtain wall scaffold.
This utility model solves its technical problem and be the technical scheme is that
A kind of outer curtain wall scaffold of arcuate building, including the space framework being fixedly connected and base, described space framework leads to
Cross wall-connecting piece to be fixedly connected with arcuate building structural column, described space framework includes single-row of scaffold unit, described scaffold list
Unit is formed by connecting by fastener by some transverse bars, longitudinal rod and vertical rod, and described space framework is to arcuate building direction inclination angle
Degree is consistent with the angle of inclination of the outer curtain wall of arcuate building.
Further, described wall-connecting piece is formed by axially arranged steel pipe manufacturing, described wall-connecting piece and described arcuate building
Structural column is fixedly connected.
Further, also include bridging, the two ends of described bridging are fixedly connected with described vertical rod and transverse bar respectively,
Described bridging is arranged at surrounding outside described scaffold unit.
Further, the interlaced setting of joint fastener of of vertically-adjacent two vertical rods.
Further, described base is made by channel-section steel, is provided with timber wedge between described base and ground.
Further, the level interval of described timber wedge is 1 meter.
Beneficial the having the technical effect that of this utility model
The outer curtain wall scaffold of arcuate building of the present utility model, including the space framework of single-row of scaffold unit composition, its
For console model scaffold, different from traditional vertical or part builder's jack, there is when it is set up certain angle of inclination,
This angle of inclination is identical with arcuate building angle of inclination.The outer curtain wall scaffold of this arcuate building not only floor space little, expend
In the case that material is few, the outer curtain wall construction for arcuate building provides operating platform, and solves traditional console model scaffold
Stablize that produced waste material is many, take up room big asking by increasing scaffold row and meeting arcuate building exterior wall surface and encorbelment
Topic.The outer curtain wall scaffold of this arcuate building is drawn materials conveniently, and dismounting is convenient, saves cost, has preferable promotional value.
Brief description
Fig. 1 is the site plan of the outer curtain wall scaffold of arcuate building of the present utility model;
Fig. 2 is the vertical cross section figure in the outer curtain wall scaffold of arcuate building of the present utility model;
Fig. 3 is the plane graph of the outer curtain wall scaffold of arcuate building of the present utility model and wall-connecting piece node;
Fig. 4 is the elevation of the outer curtain wall scaffold of arcuate building of the present utility model and wall-connecting piece node.
In figure:
10- structural column;20- space framework;30- base;40- cladding glass separator bar;50- curtain wall;60- fastener;70- indulges
To bar;80- circumference cross bar;90- radial direction cross bar.
Specific embodiment
Below in conjunction with the drawings and specific embodiments to the utility model proposes a kind of outer curtain wall scaffold of arcuate building make
Further describe.According to description below, advantages and features of the present utility model will become apparent from.Below will by cited it
Embodiment combines accompanying drawing, describes technology contents of the present utility model and feature in detail.Need in addition illustrate, accompanying drawing is all using non-
The form that often simplifies and all using non-accurately ratio, only in order to convenient, lucidly aid in illustrating this utility model embodiment
Purpose.For sake of convenience, described below " on ", D score consistent with accompanying drawing upper and lower direction, but this can not become this reality
Restriction with new technique scheme.
Embodiment one
In conjunction with Fig. 1 to Fig. 4, the outer curtain wall scaffold of arcuate building of the present utility model is described.
As shown in Figures 1 to 4, the outer curtain wall scaffold of a kind of arcuate building, including the space framework 20 being fixedly connected and bottom
Seat 30, space framework 20 is fixedly connected with arcuate building structural column 10 by wall-connecting piece (not shown), and space framework 20 includes list
Row's scaffold unit, scaffold unit is formed by connecting by fastener 60 by some transverse bars, longitudinal rod and vertical rod, space framework 20
Consistent with the angle of inclination of curtain wall outside arcuate building to arcuate building direction angle of inclination.
Specifically, in order to meet the construction scaffolding demand of the outer curtain wall of arcuate building, the exterior wall along arcuate building is taken
If with arcuate building angle of inclination identical console model scaffold.Meanwhile, in order to meet the stability of this scaffold, this scaffold
The space framework that forms for single-row of scaffold unit of space framework 20.Thus, the outer curtain wall foot of arcuate building of the present utility model
Hand cradle can not only provide operating platform for the outer curtain wall construction of arcuate building, and solve traditional console model scaffold and lead to
Cross increase scaffold row and stablize that produced waste material is many, take up room big asking to meet arcuate building exterior wall surface and encorbelment
Topic.
It is preferred that in order to ensure that this scaffold is fixedly connected with arcuate building structural column 10, this scaffold and arcuate building
Fixed as one structure by some spaced wall-connecting pieces between outer curtain wall.Wall-connecting piece is circumference by axially arranged steel pipe
Cross bar 80 is made, and wall-connecting piece is fixedly connected with arcuate building structural column 10.In order to realize scaffold and arcuate building exterior wall
Being stably connected with of structural column 10, simultaneously cost-effective, the spacing between adjacent wall-connecting piece is two steps one across wall-connecting piece is according to phase
Arranging, the circumferential cross bar 80 of wall-connecting piece is connected spacing between adjacent two cladding glass separator bars 40 with structural column 10 anchor ear,
Radial direction cross bar 90 is fixedly connected by fastener 60 with circumferential cross bar 80.
It is preferred that also including for the bridging (not shown) strengthening scaffold stability in the large, the two ends of bridging are divided
It is not fixedly connected with vertical rod (not shown) and transverse bar (not shown), bridging is arranged at surrounding outside scaffold unit.Shears
Across away from no more than 6 meters, vertically and horizontally spacing is less than 10 meters for support.Bridging along scaffold space framework 20 surrounding facade by
Bottom is continuously arranged to top, and bridging is maintained at 45 °~60 ° with the angle on ground.Bridging by rotary buckle be fixed on
Intersecting transverse bar and vertical rod on, and synchronously set up with transverse bar and vertical rod.
It is preferred that the interlaced setting of joint fastener of of vertically-adjacent two vertical rods, thus ensureing between vertical vertical rod
Connectivity robustness, the stability in the large of further hoisting scaffold.Sleeve couple in vertical rod answers interlaced arrangement;Two adjacent
The joint of vertical rod should not be arranged in synchronous, and in synchronization, two every a vertical rod are separated by the distance that joint staggers in short transverse
It is not preferably less than 500mm;Each connector center is not preferably greater than the 1/3 of step pitch to the distance of host node.
It is preferred that space framework 20 lower section pad is provided with base 30, such that it is able to increase the contact area of scaffold and ground,
And then the load of minimizing ground unit area, strengthen its stability in the large.Base 30 is made by 12# channel-section steel, channel-section steel with ground
Face is in 8 ° of angles.Below channel-section steel, pad sets timber wedge (not shown), and the level interval between adjacent timber wedge is 1 meter.Timber wedge is set by pad,
Make channel-section steel with plane at an angle, angle is basically identical with scaffold angle of inclination.
Please continue to refer to Fig. 1 to Fig. 4, the present embodiment additionally provides the outer curtain wall scaffold of arcuate building of the present utility model
Installation method
The installation method of the outer curtain wall scaffold of arcuate building, comprises the steps:
Step one, complete the installation of scaffold base 30 on ground.
Step 2, successively installation longitudinal rod 70, vertical rod and transverse bar on the base 30 of described step one, and each other
Connected by fastener, successively up form space framework 20, so far complete the installation of the outer curtain wall scaffold of whole arcuate building.Special
Not, in order to provide the operating platform of safety to workmen, the side of space framework 20 is additionally provided with railing, and railing is solid with vertical rod
Fixed connection.Certainly, in order to ensure the stability of scaffold itself, in step 2 also include arrange bridging, bridging by down to
On be continuously arranged at the outside surrounding of space framework 20, bridging is 45 °~60 ° with the angle on ground.Certainly, in order to further
Improve the safety of scaffold, provide a safe and reliable construction operation platform for workmen, also set in space framework 20
There are foot guard plate and scaffold board, space framework 20 top is provided with safety net.
It is preferred that also including step 3, after the outer curtain wall scaffold installation of arcuate building, start by top to bottom
Successively cladding glass is installed, and curtain wall scaffold outside the synchronous corresponding arcuate building by the dismounting of top to bottom.Remove scaffold
The connection of scaffold clasp should be built up, whether support system meets detailing requiments before comprehensively.During dismounting, after first installing
Tear open, the order first torn open installed afterwards, opened up by top layer, remove successively from top to bottom: remove the safety net that extension is found at top first;Its
Secondary dismounting railing;Then remove foot guard plate;Then remove scaffold board;Then remove longitudinal cross bar;Then remove bridging;Then
Remove wall-connecting piece;Then remove circumferential cross bar;Finally remove vertical rod, now cladding glass is synchronous from top to bottom installs,
Thus forming complete curtain wall 50.
Especially, in the present embodiment, with scaffold building height for 28.9 meters, arcuate building outboard cant angle degree is 9 °
Scaffold building as a example, according to traditional scaffold building method, ground to arcuate building top needs setting 4 rows that encorbelment
Scaffold, also needs to about 6 row's scaffolds stablizing come the part that to ensure to encorbelment outside it, and this utility model provides set up with
Arcuate building angle of inclination identical tilting scaffold only needs single-row of scaffold unit, and knowable to aforementioned comparison, this practicality is new
3/4 material at least saved by the scaffold of the outer curtain wall of the arcuate building of type embodiment, also saves substantial amounts of construction empty simultaneously
Between.
The outer curtain wall scaffold of arcuate building of the present utility model, the construction scaffolding meeting the outer curtain wall of arcuate building needs
Ask, the exterior wall along arcuate building when setting up is installed and sets up identical with arcuate building angle of inclination and be console model scaffold.With
When, in order to meet the stability of this scaffold, the space framework of this scaffold forms for single-row of scaffold unit.Thus, this reality
Operating platform can not only be provided for the outer curtain wall construction of arcuate building with the outer curtain wall scaffold of new arcuate building, and solve
The console model scaffold having determined traditional is encorbelmented stable generation by increasing scaffold row and meeting arcuate building exterior wall surface
Waste material many, take up room big problem.The outer curtain wall scaffold of this arcuate building is drawn materials conveniently, and dismounting is convenient, saves cost,
There is preferable promotional value.
Foregoing description is only the description to this utility model preferred embodiment, not any limit to this utility model scope
Fixed, any change that the those of ordinary skill in this utility model field does according to the disclosure above content, modification, belonging to right will
Seek the protection domain of book.
Claims (6)
1. a kind of outer curtain wall scaffold of arcuate building is it is characterised in that including space framework and the base being fixedly connected, described vertical
Body framework is fixedly connected with arcuate building structural column by wall-connecting piece, and described space framework includes single-row of scaffold unit, described
Scaffold unit is formed by connecting by fastener by some transverse bars, longitudinal rod and vertical rod, and described space framework is to arcuate building side
Consistent with the angle of inclination of curtain wall outside arcuate building to angle of inclination.
2. the outer curtain wall scaffold of arcuate building according to claim 1 is it is characterised in that described wall-connecting piece is by axially arranged
Steel pipe manufacturing form, described wall-connecting piece is fixedly connected with described arcuate building structural column.
3. the outer curtain wall scaffold of arcuate building according to claim 1 is it is characterised in that also include bridging, described cuts
The two ends of knife support are fixedly connected with described vertical rod and transverse bar respectively, and described bridging is arranged at four outside described scaffold unit
Week.
4. arcuate building according to claim 1 outer curtain wall scaffold is it is characterised in that of vertically-adjacent two vertical rods
The interlaced setting of joint fastener.
5. the outer curtain wall scaffold of arcuate building according to claim 1 is it is characterised in that described base is by channel-section steel making
Become, between described base and ground, be provided with timber wedge.
6. the outer curtain wall scaffold of arcuate building according to claim 5 is it is characterised in that the level interval of described timber wedge is
1 meter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620513085.8U CN205918081U (en) | 2016-05-31 | 2016-05-31 | Outer curtain scaffold frame of arc building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620513085.8U CN205918081U (en) | 2016-05-31 | 2016-05-31 | Outer curtain scaffold frame of arc building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205918081U true CN205918081U (en) | 2017-02-01 |
Family
ID=57876604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620513085.8U Active CN205918081U (en) | 2016-05-31 | 2016-05-31 | Outer curtain scaffold frame of arc building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205918081U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105863233A (en) * | 2016-05-31 | 2016-08-17 | 上海建工五建集团有限公司 | Scaffold for outer curtain wall of arc-shaped building and mounting method |
CN107338868A (en) * | 2017-08-28 | 2017-11-10 | 中国建筑第二工程局有限公司 | A kind of macrotype spherical screen installation system and its construction method |
CN113756574A (en) * | 2021-10-11 | 2021-12-07 | 北京建工集团有限责任公司 | High-precision low-cost arc-shaped step grandstand mold system and pouring method |
-
2016
- 2016-05-31 CN CN201620513085.8U patent/CN205918081U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105863233A (en) * | 2016-05-31 | 2016-08-17 | 上海建工五建集团有限公司 | Scaffold for outer curtain wall of arc-shaped building and mounting method |
CN107338868A (en) * | 2017-08-28 | 2017-11-10 | 中国建筑第二工程局有限公司 | A kind of macrotype spherical screen installation system and its construction method |
CN113756574A (en) * | 2021-10-11 | 2021-12-07 | 北京建工集团有限责任公司 | High-precision low-cost arc-shaped step grandstand mold system and pouring method |
CN113756574B (en) * | 2021-10-11 | 2022-04-22 | 北京建工集团有限责任公司 | High-precision low-cost arc-shaped step grandstand mold system and pouring method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102418313B (en) | Polycarbonate (PC) composite bridge with corrugated steel webs and construction method for PC composite bridge | |
CN108560719B (en) | Supporting and mounting method for super-large-span double-layer bidirectional suspension cable structure | |
CN205918081U (en) | Outer curtain scaffold frame of arc building | |
CN105863233A (en) | Scaffold for outer curtain wall of arc-shaped building and mounting method | |
CN105332506A (en) | Formwork support system for parallel multi-section stair and method for constructing same | |
CN103982014B (en) | A kind of reducing steel work spiral ramp and construction techniques thereof | |
CN103790229B (en) | A kind of multilayer cantilever steel construction and constructive method thereof | |
CN104929364A (en) | Auxiliary construction method for longspan cantilever entire laminated Vierendeel truss structure | |
CN107806182A (en) | A kind of multilayer cantilever steel construction and its constructive method | |
CN107675871A (en) | One kind is building rise long-span outrigger wall-connecting piece construction method | |
CN204959795U (en) | Self -supporting does not have row no mould basement flat slab floor | |
CN106013450A (en) | Core tube skip-floor construction method | |
CN202831628U (en) | Combined type bailey frame load-bearing shelving for pouring large span concrete beam | |
CN203230165U (en) | Template support platform for ultra-high cantilever structure | |
CN214302807U (en) | Attached lifting scaffold supported by specially-made stand columns | |
CN215671292U (en) | Prefabricated wallboard supporting system | |
CN201241309Y (en) | Steel tube beam viaduct | |
CN205206315U (en) | Run -in runs formwork support system of stair more | |
CN205224272U (en) | Steel construction factory building is with structure of encorbelmenting | |
CN107654057A (en) | Fix self-locking type steel pipe scaffold | |
CN204059793U (en) | A kind of reducing steel work spiral ramp | |
CN103711112B (en) | Build large-span concrete beam combined type Bailey bracket bearing bent frame | |
CN110616851A (en) | Floor system device with beam and provided with flat support column cap and construction method of floor system device | |
CN101644025A (en) | Steel pipe beam viaduct | |
CN204299144U (en) | Elevator internal mold operating platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |