CN207554109U - Gold mine Bottom of Stope cuts tunnel filling Concrete false bottom - Google Patents

Gold mine Bottom of Stope cuts tunnel filling Concrete false bottom Download PDF

Info

Publication number
CN207554109U
CN207554109U CN201721785071.2U CN201721785071U CN207554109U CN 207554109 U CN207554109 U CN 207554109U CN 201721785071 U CN201721785071 U CN 201721785071U CN 207554109 U CN207554109 U CN 207554109U
Authority
CN
China
Prior art keywords
stope
reinforced liner
gold mine
false bottom
plastic film
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721785071.2U
Other languages
Chinese (zh)
Inventor
刘家瑞
姚树标
李海磊
关鑫磊
武茂超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG GOLD MINING (LINGLONG) CO Ltd
Original Assignee
SHANDONG GOLD MINING (LINGLONG) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG GOLD MINING (LINGLONG) CO Ltd filed Critical SHANDONG GOLD MINING (LINGLONG) CO Ltd
Priority to CN201721785071.2U priority Critical patent/CN207554109U/en
Application granted granted Critical
Publication of CN207554109U publication Critical patent/CN207554109U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is a kind of gold mine Bottom of Stope cutting tunnel filling Concrete false bottom, it includes blotter(1), blotter(1)Upper surface is covered with plastic film(2), plastic film(2)Upper surface is equipped with reinforced liner(3), in reinforced liner(3)On built concrete cushion by laying bricks or stones(4).The utility model is applied to oper cylinler shallow hole shrinkage method Bottom of Stope as Concrete false bottom and cuts roadway construction, and certain supporting role can be played to upper lower burrs country rock, improves Stope safty, reduces the occurrence probability of roof fall accident.And it can press with more effectively controlling.

Description

Gold mine Bottom of Stope cuts tunnel filling Concrete false bottom
Technical field
The utility model is related to a kind of gold mine Bottom of Stope to cut tunnel filling Concrete false bottom, is mainly used for bottomless Column shallow hole shrinkage method stope.
Background technology
In gold mine mining, when carrying out back production using oper cylinler shallow hole shrinkage method, after a large amount of ore removals of stope, due to spine Loss there are, still there are part ore, causing stope quadratic loss larger in stope the problem of.In back production waste fill ore deposit During the corresponding bottom mineral building in room, it must stop back production when back production is to stope sill 4-5 meters away from top stage casing and set fore-set to stay, this Sample can cause once to lose, the primary loss up to 10% or so.
Utility model content
The utility model is so the technical issues of solving is to provide a kind of gold mine Bottom of Stope cutting tunnel filling coagulation Native vacation bottom, to reduce mining loss ratio and press with controlling.
The technical solution of the utility model is as follows:
Gold mine Bottom of Stope cuts tunnel filling Concrete false bottom, it is characterised in that it includes blotter, rubble pad Layer upper surface is covered with plastic film, and plastic film upper surface is equipped with reinforced liner, has built concrete mats by laying bricks or stones on reinforced liner Layer.
The reinforced liner includes bar-mat reinforcement, and the rail as rinforcement bar is fixed on bar-mat reinforcement, and two of rail are outer End has been respectively fixedly connected with round steel.
The utility model has the positive effect that:
First, the utility model is applied as Concrete false bottom applied to oper cylinler shallow hole shrinkage method Bottom of Stope cutting tunnel Work can play upper lower burrs country rock certain supporting role, improve Stope safty, and the generation for reducing roof fall accident is several Rate.And it can press with more effectively controlling.
2nd, mining loss ratio is reduced, reduces ore resources waste, improves Economic Effects in Mine Enterprices.
3rd, reduce barren rock freight volume, reduce labor intensity.
Description of the drawings
Fig. 1 is the structure diagram of the utility model.
Fig. 2 is the structure diagram of the reinforced liner of the utility model, the overlook direction which is Fig. 1.
Specific embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples.
Such as Fig. 1, the embodiment of the utility model includes blotter 1, and 1 upper surface of blotter is covered with plastic film 2, moulds 2 upper surface of material film is equipped with reinforced liner 3, has built concrete cushion 4 by laying bricks or stones on reinforced liner 3.
Such as Fig. 2, the reinforced liner 3 includes bar-mat reinforcement 31, the rail 32 as rinforcement bar is fixed on bar-mat reinforcement 31, Two outer ends of rail 32 are fixedly connected with round steel 33 respectively.
Round steel 33 welds, the reinforcing bar of bar-mat reinforcement 31 is crisscross for being inserted into upper lower burrs between bar-mat reinforcement 31 and rail 32 It is tied up using iron wire at place.
The construction procedure of the utility model is as follows:
Preparation:After adopting quasi- engineering construction, Xian Duiqie chooses ore deposit in lane, chooses to design height;Simultaneously under stope one Stubble big gun cloth eye.It caunches again to disk on ore removal Chuan Chuqie lanes.
Before construction ore removal wears Concrete false bottom, by design and construction reinforced liner 3, rail 32(The discarded rail of interception Road)It is both needed to weld between round steel 33, rail 32 and bar-mat reinforcement 31.
Construction:Concrete false bottom carries out successively according to bottom-up sequence.First, in the rubble pad for cutting lane laying 200mm Layer 1;2nd, plastic film 2 is laid on blotter 1;3rd, reinforced liner 3 is laid on plastic film 2;4th, in reinforced liner Construct on 3 the concrete cushion 4 of 1m, at the same each ore removal of constructing wear and ore removal wear between concrete slope, reinforced liner 3 need to build by laying bricks or stones In concrete.Rubble lumpiness is not greater than 50 × 50 ㎜ 2.
Maintenance:Curing period is five to seven days after Concrete false bottom is constructed, after Concrete false bottom intensity reaches requirement It can dig up mine.

Claims (2)

1. gold mine Bottom of Stope cuts tunnel filling Concrete false bottom, it is characterised in that it includes blotter(1), rubble pad Layer(1)Upper surface is covered with plastic film(2), plastic film(2)Upper surface is equipped with reinforced liner(3), in reinforced liner(3)On Concrete cushion is built by laying bricks or stones(4).
2. gold mine Bottom of Stope as described in claim 1 cuts tunnel filling Concrete false bottom, it is characterised in that:Described Reinforced liner(3)Including bar-mat reinforcement(31), bar-mat reinforcement(31)On be fixed with rail as rinforcement bar(32), rail(32)Two A outer end is fixedly connected with round steel respectively(33).
CN201721785071.2U 2017-12-20 2017-12-20 Gold mine Bottom of Stope cuts tunnel filling Concrete false bottom Expired - Fee Related CN207554109U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721785071.2U CN207554109U (en) 2017-12-20 2017-12-20 Gold mine Bottom of Stope cuts tunnel filling Concrete false bottom

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721785071.2U CN207554109U (en) 2017-12-20 2017-12-20 Gold mine Bottom of Stope cuts tunnel filling Concrete false bottom

Publications (1)

Publication Number Publication Date
CN207554109U true CN207554109U (en) 2018-06-29

Family

ID=62663705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721785071.2U Expired - Fee Related CN207554109U (en) 2017-12-20 2017-12-20 Gold mine Bottom of Stope cuts tunnel filling Concrete false bottom

Country Status (1)

Country Link
CN (1) CN207554109U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114776373A (en) * 2022-06-20 2022-07-22 长春黄金研究院有限公司 Artificial false bottom for thin-vein stope and manufacturing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114776373A (en) * 2022-06-20 2022-07-22 长春黄金研究院有限公司 Artificial false bottom for thin-vein stope and manufacturing method
CN114776373B (en) * 2022-06-20 2022-10-11 长春黄金研究院有限公司 Artificial false bottom for thin-vein stope and manufacturing method

Similar Documents

Publication Publication Date Title
CN105839850B (en) Precompressed construction method is poured into a mould after basement top-down method shaft
CN104632220B (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN110118089B (en) Mining FRP grid-coal gangue-self-compacting concrete regenerated top plate and construction method thereof
CN109595029B (en) Goaf partial stowage supporting structure and its construction method under the conditions of tight roof
CN111878117B (en) Construction method of artificial roof facility by downward approach filling method
CN107805987A (en) The hassock layer Foam lightweight soil road structure and construction method in deep soft foundation section
CN113914860B (en) Roof-cutting gob-side entry retaining method for non-compact solid filling working face
CN106499405A (en) Tunnel lining structure
CN106089207B (en) Super high seam working face gob side entry driving thin coal pillar stays equipment, method
CN107288684A (en) The segmented filling process and method in a kind of excessively complicated empty lane of high working face comprehensive coal face
CN104358202B (en) Road surface structare layer and its paving method
CN206707726U (en) A kind of gob side entry retaining roadside support system
CN207554109U (en) Gold mine Bottom of Stope cuts tunnel filling Concrete false bottom
CN104747191A (en) Construction method for connecting structure of shaft and shaft station
CN106759464A (en) A kind of hypogee and its construction method
CN109252873B (en) Design and construction method for multiple cross mountain road and railway tunnels
CN104695315B (en) Frame structure of deep foundation pit under existing railway and layered jacking method for construction of frame structure
CN108691559A (en) One kind helping hard and soft cooperative control method for gob side entry coal column
CN105840234B (en) A kind of pile pillar filling template and its application method
CN105909290B (en) The apparatus and method that controlroof sinks in a kind of filling mining of pillar part
CN207452609U (en) A kind of hassock layer Foam lightweight soil road structure in deep soft foundation section
CN114109490A (en) Construction process for key layer of artificial false roof of prefabricated reinforced concrete slab
CN114352350A (en) Artificial false roof construction and recovery method
CN110541729A (en) artificial false bottom and manufacturing method thereof
CN104564136A (en) Artificial false bottom and manufacturing method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180629