CN207552951U - Prefabricated box culvert hoisting structure of passing by one's way - Google Patents
Prefabricated box culvert hoisting structure of passing by one's way Download PDFInfo
- Publication number
- CN207552951U CN207552951U CN201721327783.XU CN201721327783U CN207552951U CN 207552951 U CN207552951 U CN 207552951U CN 201721327783 U CN201721327783 U CN 201721327783U CN 207552951 U CN207552951 U CN 207552951U
- Authority
- CN
- China
- Prior art keywords
- box culvert
- balance plate
- passing
- way
- prefabricated box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 14
- 239000010959 steel Substances 0.000 claims abstract description 14
- 239000004744 fabric Substances 0.000 claims 1
- 229910000851 Alloy steel Inorganic materials 0.000 abstract description 3
- 238000000034 method Methods 0.000 abstract description 3
- 239000000203 mixture Substances 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 2
- 239000004567 concrete Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 238000009958 sewing Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Abstract
The utility model discloses prefabricated box culvert hoisting structures of passing by one's way, and are bolted between connecting rod and box culvert frame and connecting rod and balance plate, the rigid stress structure of the prefabricated box culvert lifting of passing by one's way of composition;Hydraulic stem on lifting hydraulic pressure platform, which can stretch, adjusts the upper-lower position of balance plate, the position of the prefabricated box culvert of passing by one's way of a successive step of going forward side by side;Equidistantly it is laid with several ribs on balance plate, rib is to the situation that prevents steel wire rope from having skidded;Whole device is matched by each flexible connection that is rigidly connected, and completes the adjustment of prefabricated box culvert Hoisting Position of passing by one's way;Entire utility model adjustment is flexible, has a safety feature;Lifting machine arm lifts prefabricated box culvert of passing by one's way to precalculated position, and the hydraulic stem being equipped with by lifting hydraulic pressure platform both sides is adjusted the position of balance plate;Balance plate is made of high strength alloy steel, and meets basic load;Steel wire rope is to ensure the force bearing adjustment of hoisting process balance plate, and rib is ensureing Hoisting Security.
Description
Technical field
The utility model is related to prefabricated box culvert hoisting structures of passing by one's way, and belong to box culvert hoisting technology field.
Background technology
Box culvert is very common in road and water supply and sewage work construction, and box culvert refers to barrel with reinforced concrete box
The culvert that shape tube coupling is built.Box culvert is made of one or more rectangular or rectangular cross sections, generally by armored concrete or bricklaying system
Into.
The integral prefabricated lifting of box culvert of passing by one's way is for ensureing that road box culvert later stage is spliced and second pouring connecting sewing is applied
Work is extremely important.Therefore one kind is designed rationally using box culvert to conduct oneself with dignity, and ensure that the stable apparatus structure of hoisting process is extremely important.
Utility model content
The purpose of this utility model is that devising prefabricated box culvert hoisting structure of passing by one's way, the structural stability can is good, lifting
Safety.
To achieve the above object, the technical solution adopted in the utility model be prefabricated box culvert hoisting structure of passing by one's way, the lifting
Structure includes lifting machine arm 1, lifting hydraulic pressure platform 2, hydraulic stem 3, steel wire rope 4, balance plate 5, prefabricated box culvert 6 of passing by one's way, box culvert frame 7
With connecting rod 8.
The end of lifting machine arm 1 is fixed with lifting hydraulic pressure platform 2, and the both sides of lifting hydraulic pressure platform 2 are equipped with hydraulic stem 3, hydraulic pressure
Bar 3 is connect with the end of balance plate 5, and the middle section of balance plate 5 is connect with lifting hydraulic pressure platform 2 by steel wire rope 4.
Prefabricated box culvert 6 of passing by one's way is fixed in box culvert frame 7, and box culvert frame 7 is connect with balance plate 5 by several connecting rods 8.Even
It is bolted together between extension bar 8 and box culvert frame 7 and connecting rod 8 and balance plate 5.
Several ribs 9 are equidistantly laid on balance plate 5, steel wire rope 4 is bound on the balance plate 5 between two ribs 9.
Balance plate 5 is made of high strength alloy steel.
Compared with prior art, the utility model has the advantages that.
It is bolted between connecting rod and box culvert frame and connecting rod and balance plate, forms prefabricated box culvert of passing by one's way and hang
The rigid stress structure of dress;Hydraulic stem on lifting hydraulic pressure platform, which can stretch, adjusts the upper-lower position of balance plate, a step of going forward side by side
The position of whole prefabricated box culvert of passing by one's way;Equidistantly it is laid with several ribs on balance plate, rib is preventing steel wire rope from having skidded
Situation;Whole device is matched by each flexible connection that is rigidly connected, and completes the adjustment of prefabricated box culvert Hoisting Position of passing by one's way;It is whole
A utility model adjustment is flexible, has a safety feature.
Description of the drawings
Fig. 1 is the structure chart of the utility model.
Specific embodiment
As shown in Figure 1, prefabricated box culvert hoisting structure of passing by one's way, the hoisting structure include lifting machine arm 1, lifting hydraulic pressure platform 2,
Hydraulic stem 3, steel wire rope 4, balance plate 5, prefabricated box culvert 6 of passing by one's way, box culvert frame 7 and connecting rod 8.
The end of lifting machine arm 1 is fixed with lifting hydraulic pressure platform 2, and the both sides of lifting hydraulic pressure platform 2 are equipped with hydraulic stem 3, hydraulic pressure
Bar 3 is connect with the end of balance plate 5, and the middle section of balance plate 5 is connect with lifting hydraulic pressure platform 2 by steel wire rope 4.
Prefabricated box culvert 6 of passing by one's way is fixed in box culvert frame 7, and box culvert frame 7 is connect with balance plate 5 by several connecting rods 8.Even
It is bolted together between extension bar 8 and box culvert frame 7 and connecting rod 8 and balance plate 5.
Several ribs 9 are equidistantly laid on balance plate 5, steel wire rope 4 is bound on the balance plate 5 between two ribs 9.
It is bolted between connecting rod and box culvert frame and connecting rod and balance plate, forms prefabricated box culvert of passing by one's way and hang
The rigid stress structure of dress;Hydraulic stem on lifting hydraulic pressure platform, which can stretch, adjusts the upper-lower position of balance plate, a step of going forward side by side
The position of whole prefabricated box culvert of passing by one's way;Equidistantly it is laid with several ribs on balance plate, rib is preventing steel wire rope from having skidded
Situation;Whole device is matched by each flexible connection that is rigidly connected, and completes the adjustment of prefabricated box culvert Hoisting Position of passing by one's way;It is whole
A utility model adjustment is flexible, has a safety feature.
Lifting calculating is carried out to entire hoisting structure, lifting machine arm lifts prefabricated box culvert of passing by one's way to precalculated position, leads to
The hydraulic stem that lifting hydraulic pressure platform both sides are equipped with is crossed to be adjusted the position of balance plate;Balance plate uses high-strength alloy steel
Into, and meet basic load;For steel wire rope to ensure the force bearing adjustment of hoisting process balance plate, rib lifts peace to ensure
Entirely.
Claims (3)
1. prefabricated box culvert hoisting structure of passing by one's way, it is characterised in that:The hoisting structure includes lifting machine arm (1), lifting hydraulic pressure platform
(2), hydraulic stem (3), steel wire rope (4), balance plate (5), prefabricated box culvert of passing by one's way (6), box culvert frame (7) and connecting rod (8);
The end of lifting machine arm (1) is fixed with lifting hydraulic pressure platform (2), and the both sides of lifting hydraulic pressure platform (2) are equipped with hydraulic stem (3),
Hydraulic stem (3) is connect with the end of balance plate (5), and middle section and the lifting hydraulic pressure platform (2) of balance plate (5) pass through steel wire rope
(4) it connects;
Prefabricated box culvert of passing by one's way (6) is fixed in box culvert frame (7), and box culvert frame (7) passes through several connecting rods (8) with balance plate (5)
Connection;It is bolted together between connecting rod (8) and box culvert frame (7) and connecting rod (8) and balance plate (5).
2. prefabricated box culvert hoisting structure of passing by one's way according to claim 1, it is characterised in that:Equidistant cloth on balance plate (5)
Equipped with several ribs (9), steel wire rope (4) binding is on the balance plate (5) between two ribs (9).
3. prefabricated box culvert hoisting structure of passing by one's way according to claim 1, it is characterised in that:Balance plate (5) is closed by high intensity
Jin Gang is made.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721327783.XU CN207552951U (en) | 2017-10-16 | 2017-10-16 | Prefabricated box culvert hoisting structure of passing by one's way |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721327783.XU CN207552951U (en) | 2017-10-16 | 2017-10-16 | Prefabricated box culvert hoisting structure of passing by one's way |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207552951U true CN207552951U (en) | 2018-06-29 |
Family
ID=62673332
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721327783.XU Expired - Fee Related CN207552951U (en) | 2017-10-16 | 2017-10-16 | Prefabricated box culvert hoisting structure of passing by one's way |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207552951U (en) |
-
2017
- 2017-10-16 CN CN201721327783.XU patent/CN207552951U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206144172U (en) | Equipment standard platform of unloading of encorbelmenting | |
CN105350454B (en) | Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge | |
CN108862081A (en) | A kind of chain block crane boom and the application in the adjusting of beam steel protective layer thickness | |
CN205604080U (en) | Building construction platform | |
CN207552951U (en) | Prefabricated box culvert hoisting structure of passing by one's way | |
CN203795311U (en) | Multi-leg high pier and slip form construction device | |
CN204474202U (en) | Large-tonnage steel member integrated hoisting fixture | |
CN104278628B (en) | A kind of light hanging basket being applicable to bridge machinery and maintenance activity | |
CN203613464U (en) | Slip form construction cargo transportation device | |
CN106703413A (en) | Tower crane transportation concrete spreading device | |
CN108505449B (en) | The construction method of bracket lifting system in a kind of CFST Arch Bridge water | |
CN106320178A (en) | Bridge structure hoisting method and bridge hoisting mechanism slide device | |
CN104959491A (en) | Fast steel bar straightener and method for utilizing straightener for straightening steel bars | |
CN206941596U (en) | A kind of shoulder pole boom device for lifting steel reinforcement cage | |
CN201873949U (en) | Bride prestress stretch-draw trolley | |
CN204401454U (en) | A kind of light hanging basket being applicable to bridge machinery and maintenance activity | |
CN204325941U (en) | A kind of bridge climbing frame turns over mould and Hanging Basket integrated device | |
CN203613461U (en) | Slip form construction lifting system | |
CN204199185U (en) | A kind of prestressed stretch-draw support | |
CN209686924U (en) | A kind of large volume arc concrete steel lattice supporting framework | |
CN203795318U (en) | Integral hoisting system for rebar cage for large members | |
CN203529811U (en) | Hydraulic loading and unloading device of small prefabricated part in constructional engineering | |
CN204770359U (en) | Straight machine of fast speed adjusting of reinforcing bar | |
CN206815861U (en) | Assembled outfeed platforms | |
CN206476686U (en) | A kind of gate-type hoisting bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Patentee after: CCCC FIRST HIGHWAY ENGINEERING GROUP Co.,Ltd. Address before: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou Patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180629 |
|
CF01 | Termination of patent right due to non-payment of annual fee |