CN207552951U - Prefabricated box culvert hoisting structure of passing by one's way - Google Patents

Prefabricated box culvert hoisting structure of passing by one's way Download PDF

Info

Publication number
CN207552951U
CN207552951U CN201721327783.XU CN201721327783U CN207552951U CN 207552951 U CN207552951 U CN 207552951U CN 201721327783 U CN201721327783 U CN 201721327783U CN 207552951 U CN207552951 U CN 207552951U
Authority
CN
China
Prior art keywords
box culvert
balance plate
passing
way
prefabricated box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721327783.XU
Other languages
Chinese (zh)
Inventor
杜玉虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201721327783.XU priority Critical patent/CN207552951U/en
Application granted granted Critical
Publication of CN207552951U publication Critical patent/CN207552951U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses prefabricated box culvert hoisting structures of passing by one's way, and are bolted between connecting rod and box culvert frame and connecting rod and balance plate, the rigid stress structure of the prefabricated box culvert lifting of passing by one's way of composition;Hydraulic stem on lifting hydraulic pressure platform, which can stretch, adjusts the upper-lower position of balance plate, the position of the prefabricated box culvert of passing by one's way of a successive step of going forward side by side;Equidistantly it is laid with several ribs on balance plate, rib is to the situation that prevents steel wire rope from having skidded;Whole device is matched by each flexible connection that is rigidly connected, and completes the adjustment of prefabricated box culvert Hoisting Position of passing by one's way;Entire utility model adjustment is flexible, has a safety feature;Lifting machine arm lifts prefabricated box culvert of passing by one's way to precalculated position, and the hydraulic stem being equipped with by lifting hydraulic pressure platform both sides is adjusted the position of balance plate;Balance plate is made of high strength alloy steel, and meets basic load;Steel wire rope is to ensure the force bearing adjustment of hoisting process balance plate, and rib is ensureing Hoisting Security.

Description

Prefabricated box culvert hoisting structure of passing by one's way
Technical field
The utility model is related to prefabricated box culvert hoisting structures of passing by one's way, and belong to box culvert hoisting technology field.
Background technology
Box culvert is very common in road and water supply and sewage work construction, and box culvert refers to barrel with reinforced concrete box The culvert that shape tube coupling is built.Box culvert is made of one or more rectangular or rectangular cross sections, generally by armored concrete or bricklaying system Into.
The integral prefabricated lifting of box culvert of passing by one's way is for ensureing that road box culvert later stage is spliced and second pouring connecting sewing is applied Work is extremely important.Therefore one kind is designed rationally using box culvert to conduct oneself with dignity, and ensure that the stable apparatus structure of hoisting process is extremely important.
Utility model content
The purpose of this utility model is that devising prefabricated box culvert hoisting structure of passing by one's way, the structural stability can is good, lifting Safety.
To achieve the above object, the technical solution adopted in the utility model be prefabricated box culvert hoisting structure of passing by one's way, the lifting Structure includes lifting machine arm 1, lifting hydraulic pressure platform 2, hydraulic stem 3, steel wire rope 4, balance plate 5, prefabricated box culvert 6 of passing by one's way, box culvert frame 7 With connecting rod 8.
The end of lifting machine arm 1 is fixed with lifting hydraulic pressure platform 2, and the both sides of lifting hydraulic pressure platform 2 are equipped with hydraulic stem 3, hydraulic pressure Bar 3 is connect with the end of balance plate 5, and the middle section of balance plate 5 is connect with lifting hydraulic pressure platform 2 by steel wire rope 4.
Prefabricated box culvert 6 of passing by one's way is fixed in box culvert frame 7, and box culvert frame 7 is connect with balance plate 5 by several connecting rods 8.Even It is bolted together between extension bar 8 and box culvert frame 7 and connecting rod 8 and balance plate 5.
Several ribs 9 are equidistantly laid on balance plate 5, steel wire rope 4 is bound on the balance plate 5 between two ribs 9.
Balance plate 5 is made of high strength alloy steel.
Compared with prior art, the utility model has the advantages that.
It is bolted between connecting rod and box culvert frame and connecting rod and balance plate, forms prefabricated box culvert of passing by one's way and hang The rigid stress structure of dress;Hydraulic stem on lifting hydraulic pressure platform, which can stretch, adjusts the upper-lower position of balance plate, a step of going forward side by side The position of whole prefabricated box culvert of passing by one's way;Equidistantly it is laid with several ribs on balance plate, rib is preventing steel wire rope from having skidded Situation;Whole device is matched by each flexible connection that is rigidly connected, and completes the adjustment of prefabricated box culvert Hoisting Position of passing by one's way;It is whole A utility model adjustment is flexible, has a safety feature.
Description of the drawings
Fig. 1 is the structure chart of the utility model.
Specific embodiment
As shown in Figure 1, prefabricated box culvert hoisting structure of passing by one's way, the hoisting structure include lifting machine arm 1, lifting hydraulic pressure platform 2, Hydraulic stem 3, steel wire rope 4, balance plate 5, prefabricated box culvert 6 of passing by one's way, box culvert frame 7 and connecting rod 8.
The end of lifting machine arm 1 is fixed with lifting hydraulic pressure platform 2, and the both sides of lifting hydraulic pressure platform 2 are equipped with hydraulic stem 3, hydraulic pressure Bar 3 is connect with the end of balance plate 5, and the middle section of balance plate 5 is connect with lifting hydraulic pressure platform 2 by steel wire rope 4.
Prefabricated box culvert 6 of passing by one's way is fixed in box culvert frame 7, and box culvert frame 7 is connect with balance plate 5 by several connecting rods 8.Even It is bolted together between extension bar 8 and box culvert frame 7 and connecting rod 8 and balance plate 5.
Several ribs 9 are equidistantly laid on balance plate 5, steel wire rope 4 is bound on the balance plate 5 between two ribs 9.
It is bolted between connecting rod and box culvert frame and connecting rod and balance plate, forms prefabricated box culvert of passing by one's way and hang The rigid stress structure of dress;Hydraulic stem on lifting hydraulic pressure platform, which can stretch, adjusts the upper-lower position of balance plate, a step of going forward side by side The position of whole prefabricated box culvert of passing by one's way;Equidistantly it is laid with several ribs on balance plate, rib is preventing steel wire rope from having skidded Situation;Whole device is matched by each flexible connection that is rigidly connected, and completes the adjustment of prefabricated box culvert Hoisting Position of passing by one's way;It is whole A utility model adjustment is flexible, has a safety feature.
Lifting calculating is carried out to entire hoisting structure, lifting machine arm lifts prefabricated box culvert of passing by one's way to precalculated position, leads to The hydraulic stem that lifting hydraulic pressure platform both sides are equipped with is crossed to be adjusted the position of balance plate;Balance plate uses high-strength alloy steel Into, and meet basic load;For steel wire rope to ensure the force bearing adjustment of hoisting process balance plate, rib lifts peace to ensure Entirely.

Claims (3)

1. prefabricated box culvert hoisting structure of passing by one's way, it is characterised in that:The hoisting structure includes lifting machine arm (1), lifting hydraulic pressure platform (2), hydraulic stem (3), steel wire rope (4), balance plate (5), prefabricated box culvert of passing by one's way (6), box culvert frame (7) and connecting rod (8);
The end of lifting machine arm (1) is fixed with lifting hydraulic pressure platform (2), and the both sides of lifting hydraulic pressure platform (2) are equipped with hydraulic stem (3), Hydraulic stem (3) is connect with the end of balance plate (5), and middle section and the lifting hydraulic pressure platform (2) of balance plate (5) pass through steel wire rope (4) it connects;
Prefabricated box culvert of passing by one's way (6) is fixed in box culvert frame (7), and box culvert frame (7) passes through several connecting rods (8) with balance plate (5) Connection;It is bolted together between connecting rod (8) and box culvert frame (7) and connecting rod (8) and balance plate (5).
2. prefabricated box culvert hoisting structure of passing by one's way according to claim 1, it is characterised in that:Equidistant cloth on balance plate (5) Equipped with several ribs (9), steel wire rope (4) binding is on the balance plate (5) between two ribs (9).
3. prefabricated box culvert hoisting structure of passing by one's way according to claim 1, it is characterised in that:Balance plate (5) is closed by high intensity Jin Gang is made.
CN201721327783.XU 2017-10-16 2017-10-16 Prefabricated box culvert hoisting structure of passing by one's way Expired - Fee Related CN207552951U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721327783.XU CN207552951U (en) 2017-10-16 2017-10-16 Prefabricated box culvert hoisting structure of passing by one's way

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721327783.XU CN207552951U (en) 2017-10-16 2017-10-16 Prefabricated box culvert hoisting structure of passing by one's way

Publications (1)

Publication Number Publication Date
CN207552951U true CN207552951U (en) 2018-06-29

Family

ID=62673332

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721327783.XU Expired - Fee Related CN207552951U (en) 2017-10-16 2017-10-16 Prefabricated box culvert hoisting structure of passing by one's way

Country Status (1)

Country Link
CN (1) CN207552951U (en)

Similar Documents

Publication Publication Date Title
CN206144172U (en) Equipment standard platform of unloading of encorbelmenting
CN105350454B (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
CN108862081A (en) A kind of chain block crane boom and the application in the adjusting of beam steel protective layer thickness
CN205604080U (en) Building construction platform
CN207552951U (en) Prefabricated box culvert hoisting structure of passing by one's way
CN203795311U (en) Multi-leg high pier and slip form construction device
CN204474202U (en) Large-tonnage steel member integrated hoisting fixture
CN104278628B (en) A kind of light hanging basket being applicable to bridge machinery and maintenance activity
CN203613464U (en) Slip form construction cargo transportation device
CN106703413A (en) Tower crane transportation concrete spreading device
CN108505449B (en) The construction method of bracket lifting system in a kind of CFST Arch Bridge water
CN106320178A (en) Bridge structure hoisting method and bridge hoisting mechanism slide device
CN104959491A (en) Fast steel bar straightener and method for utilizing straightener for straightening steel bars
CN206941596U (en) A kind of shoulder pole boom device for lifting steel reinforcement cage
CN201873949U (en) Bride prestress stretch-draw trolley
CN204401454U (en) A kind of light hanging basket being applicable to bridge machinery and maintenance activity
CN204325941U (en) A kind of bridge climbing frame turns over mould and Hanging Basket integrated device
CN203613461U (en) Slip form construction lifting system
CN204199185U (en) A kind of prestressed stretch-draw support
CN209686924U (en) A kind of large volume arc concrete steel lattice supporting framework
CN203795318U (en) Integral hoisting system for rebar cage for large members
CN203529811U (en) Hydraulic loading and unloading device of small prefabricated part in constructional engineering
CN204770359U (en) Straight machine of fast speed adjusting of reinforcing bar
CN206815861U (en) Assembled outfeed platforms
CN206476686U (en) A kind of gate-type hoisting bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou

Patentee after: CCCC FIRST HIGHWAY ENGINEERING GROUP Co.,Ltd.

Address before: 100024 Beijing, Guanzhuang, Chaoyang District, Zhou

Patentee before: CCCC FIRST HIGHWAY ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180629