CN207538221U - Frame wall filled with masonry steel tie bar embedded part - Google Patents
Frame wall filled with masonry steel tie bar embedded part Download PDFInfo
- Publication number
- CN207538221U CN207538221U CN201721228495.9U CN201721228495U CN207538221U CN 207538221 U CN207538221 U CN 207538221U CN 201721228495 U CN201721228495 U CN 201721228495U CN 207538221 U CN207538221 U CN 207538221U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- cock
- utility
- tail end
- embedded part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model discloses a kind of frame wall filled with masonry steel tie bar embedded part, including:Tail end annulus, sleeve and cock, the tail end annulus is fixedly connected with the sleeve, the sleeve inner has internal thread, the surface of the cock has screw thread, the sleeve is connect with the cock by internal thread and screw thread removable seal, the technical solution of the utility model eliminates drilling, borehole cleaning, bar planting link, saves reinforcing bar, saves artificial, the saving duration.
Description
Technical field
The utility model is related to Building Engineering Design and technical field of construction, more particularly to frame wall filled with masonry tension rib is pre-buried
Part.
Background technology
The setting of traditional architectural engineering frame wall filled with masonry tension rib, commonplace is the method using bar planting, usually
It is to drill on the base materials such as concrete column, concrete wall, is then injected into high-strength anchoring adhesive, be inserted into reinforcing bar or section bar, glue is solid
Reinforcing bar and substrate bonding are integrated after change, including processes such as drilling, borehole cleaning, anchoring adhesive injection, bar planting, curings.
Present inventor has found that this method is there are tedious process, lost labor, the duration is longer, is positioned under study for action
Influenced by frame reinforcing bar, drilling depth not enough, borehole cleaning it is unclean, using structure glue is undesirable, bar planting withdrawal resistance is universal
The problem of design and code requirement is not achieved has seriously affected the construction quality of secondary structure engineering, there is quality to be difficult to control,
The shortcomings that comprehensive cost is high.
Utility model content
The utility model embodiment provides a kind of frame wall filled with masonry steel tie bar embedded part, can save reinforcing bar, save it is artificial,
The duration is saved, is reliably connected with structural framing system, makes the more rational novel frame filling wall built-in fitting of building stress system,
Solve problems of the prior art.
The specific technical solution that the utility model embodiment provides is as follows:
A kind of frame wall filled with masonry steel tie bar embedded part, including:Tail end annulus, sleeve and cock, the tail end annulus and institute
It states sleeve to be fixedly connected, the sleeve inner has internal thread, and the surface of the cock has screw thread, the sleeve and the cock
It is connected by internal thread with screw thread removable seal.
Further, the tail end annulus can be welded and fixed by reinforcing bar short circuit and wall frame column main reinforcement.
Further, the internal diameter of the sleeve is 10mm, outer diameter 16mm.
Using technical solutions of the utility model, compared with available frame infilled wall tie bar reservation techniques, eliminate drilling,
Borehole cleaning, bar planting link save reinforcing bar, save artificial, the saving duration;It is reliably connected with structural framing system, makes building beaer
System is more reasonable;Screwed connection, eliminates that borehole cleaning is unfavorable, the underproof influence of anchoring adhesive, makes quality more secure, the duration is more
It is short;Process is simple, easy to operate, and popularization is high.
Description of the drawings
Fig. 1 is a kind of frame wall filled with masonry steel tie bar embedded part stereogram that the utility model embodiment provides.
Specific embodiment
Purpose, technical scheme and advantage to make the utility model embodiment are clearer, new below in conjunction with this practicality
Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched
The embodiment stated is the utility model part of the embodiment, instead of all the embodiments.Based on the implementation in the utility model
Example, those of ordinary skill in the art's all other embodiments obtained without making creative work, belongs to
The range of the utility model protection.
The utility model provides a kind of frame wall filled with masonry steel tie bar embedded part, referring to Fig. 1, including:Tail end annulus 1, sleeve 2
With cock 3, the tail end annulus 1 is fixedly connected with the sleeve 2, and 2 inside of sleeve has internal thread, the table of the cock 3
Face has screw thread, and the sleeve 2 is connect with the cock 3 by internal thread and screw thread removable seal.Cock 3 with screw thread,
It can be prevented cement mortar from entering in sleeve by plastic production when can prevent concrete from pouring into a mould, haved the function that seal sleeve.It pours and finishes
Afterwards, cock 3 is screwed out, then the tension rib of sleeve 2 and mantle fiber is subjected to screwed connection, sleeve 2 can be according to experiment using building site
Remaining material head.
The tail portion annulus can be welded and fixed by reinforcing bar short circuit and wall frame column main reinforcement, it is preferable that using reinforcing bar material
Head passes through tail end annulus and welds, and so as to reach reliable anchoring, ensures enough anchorage lengths.
The internal diameter of the sleeve is 10mm, outer diameter 16mm.The internal diameter and outer diameter of sleeve 2 can be according to reinforcing bars to be connected
Size and material Binding experiment determine that the waste material head that construction site may be used makes, and sleeve screw thread length can be true according to experiment
Fixed, in this application, used 2 internal diameter of sleeve is bigger 2mm than the reinforcing bar of code requirement, and sleeve screw thread length is 50mm, is being drawn
When knot muscle is broken, sleeve is still intact.
Although the preferred embodiment of the utility model has been described, those skilled in the art once know substantially
Creative concept can then make these embodiments other change and modification.So appended claims are intended to be construed to wrap
It includes preferred embodiment and falls into all change and modification of the scope of the utility model.
Obviously, those skilled in the art the utility model embodiment can be carried out various modification and variations without departing from
The spirit and scope of the utility model embodiment.In this way, if these modifications and variations of the utility model embodiment belong to this
Within the scope of the requirement of utility model right and its equivalent technologies, then the utility model is also intended to exist comprising these modification and variations
It is interior.
Claims (1)
1. a kind of frame wall filled with masonry steel tie bar embedded part, which is characterized in that including:Tail end annulus, sleeve and cock, the tail end
Annulus is fixedly connected with the sleeve, and the sleeve inner has an internal thread, and the surface of the cock has a screw thread, the sleeve with
The cock is connected by internal thread with screw thread removable seal, and the tail end annulus passes through reinforcing bar short circuit and wall frame column main reinforcement
It is welded and fixed, the internal diameter of the sleeve is 10mm, outer diameter 16mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721228495.9U CN207538221U (en) | 2017-09-24 | 2017-09-24 | Frame wall filled with masonry steel tie bar embedded part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721228495.9U CN207538221U (en) | 2017-09-24 | 2017-09-24 | Frame wall filled with masonry steel tie bar embedded part |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207538221U true CN207538221U (en) | 2018-06-26 |
Family
ID=62609597
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721228495.9U Expired - Fee Related CN207538221U (en) | 2017-09-24 | 2017-09-24 | Frame wall filled with masonry steel tie bar embedded part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207538221U (en) |
-
2017
- 2017-09-24 CN CN201721228495.9U patent/CN207538221U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202391019U (en) | End part thickened grouting connector of steel bar | |
CN105064619A (en) | Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method | |
CN104790394A (en) | Pressure anchor cable structure with prefabricated anchor head and construction method of pressure anchor cable structure | |
CN204703159U (en) | Prefabricated anchor head pressure anchor wire structure | |
CN203271766U (en) | Grouting pipe and grouting device of pipe shed advanced support | |
CN108265824A (en) | A kind of high ductility concrete beam and column node of assembled and connection method | |
CN107119682A (en) | A kind of soil nail wall and its construction method | |
CN107237424A (en) | A kind of agent structure and the drawknot construction method of filling wall | |
CN104532860A (en) | Recoverable soil nail | |
CN204435906U (en) | Planting reinforced bar into concrete device | |
CN113027127A (en) | Sleeve-free split screw and building template reinforcing method | |
CN2742121Y (en) | Quick expansion water blocking seal device | |
CN207538221U (en) | Frame wall filled with masonry steel tie bar embedded part | |
CN106480880B (en) | Recoverable soil nailing and the construction method for using recoverable soil nail | |
CN111379581B (en) | Deep roadway prestress full-anchor support construction equipment and construction method thereof | |
CN109853730A (en) | A kind of novel precast reinforced concrete frame joint and its method of construction | |
CN208396309U (en) | A kind of concrete component formwork opposite-pulling device and concrete component template component | |
CN104060609B (en) | The method of Full-thread fiber resin rod body and concrete binding is improved with cementing agent | |
CN104727551B (en) | Ring beam screw thread core pulling embedded steel bar construction method | |
CN207829927U (en) | A kind of block assembly formula allows pressure hollow grouting anchor | |
CN203769816U (en) | Pole connection device and anchor pole | |
CN212613016U (en) | Post-cast wire prefabricated connecting structure | |
CN211901889U (en) | Concrete-plastic composite pipe | |
CN203866972U (en) | Embedded component for filler wall tie bars | |
CN102852229A (en) | After-embedding mechanical cold connection wall body drawknot rib construction member and installation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180626 Termination date: 20200924 |