CN207525777U - Prefabricated utility tunnel multidimension degree directional installation car - Google Patents

Prefabricated utility tunnel multidimension degree directional installation car Download PDF

Info

Publication number
CN207525777U
CN207525777U CN201720937731.8U CN201720937731U CN207525777U CN 207525777 U CN207525777 U CN 207525777U CN 201720937731 U CN201720937731 U CN 201720937731U CN 207525777 U CN207525777 U CN 207525777U
Authority
CN
China
Prior art keywords
longitudinal
chassis
pipe gallery
oil cylinder
steering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720937731.8U
Other languages
Chinese (zh)
Inventor
姜云龙
刘铭君
柳旭
许坤
姜圣公
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201720937731.8U priority Critical patent/CN207525777U/en
Application granted granted Critical
Publication of CN207525777U publication Critical patent/CN207525777U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

一种预制综合管廊多维度定向安装车,包括驱动桥、转向桥、底盘、横向滑移系统、纵向滑移系统、垂直升降系统、前端油缸、内部油缸、配重以及夹紧机构,所述夹紧机构通过两个L形肩臂焊接在底盘上,夹紧机构由两个摆轴油缸、两根导杆、两个伸缩油缸连接抓插机构组成,所述夹紧机构通过设置于肩臂上的摆轴油缸控制夹紧机构升降,并由两个伸缩油缸控制抓插机构进行对位夹紧。本实用新型通过采用垂直升降系统、纵向滑移系统、横向滑移系统,借助管廊本体结构与混凝土垫层,实现预制综合管廊的纵向、横向、竖向的多维度定向安装工作,操作简单,利用遥控装置、手动操作装置即可完成,机械化安装效率高,不占用额外场地,安全性高。

A multi-dimensional directional installation vehicle for a prefabricated integrated pipe gallery comprises a driving axle, a steering axle, a chassis, a lateral sliding system, a longitudinal sliding system, a vertical lifting system, a front oil cylinder, an internal oil cylinder, a counterweight and a clamping mechanism. The clamping mechanism is welded to the chassis through two L-shaped shoulder arms. The clamping mechanism is composed of two swing shaft oil cylinders, two guide rods, and two telescopic oil cylinders connected to a grabbing and inserting mechanism. The clamping mechanism is controlled to rise and fall by the swing shaft oil cylinder arranged on the shoulder arm, and the grabbing and inserting mechanism is controlled by two telescopic oil cylinders to perform alignment clamping. The utility model realizes the longitudinal, transverse and vertical multi-dimensional directional installation of the prefabricated integrated pipe gallery by adopting a vertical lifting system, a longitudinal sliding system and a lateral sliding system, with the help of the pipe gallery body structure and a concrete cushion layer. The operation is simple and can be completed by using a remote control device or a manual operating device. The mechanized installation is efficient, does not occupy additional space, and has high safety.

Description

一种预制综合管廊多维度定向安装车A multi-dimensional directional installation vehicle for prefabricated comprehensive pipe gallery

技术领域technical field

本实用新型涉及管廊施工用器械,尤其是一种预制综合管廊多维度定向安装车。The utility model relates to an apparatus for construction of a pipe gallery, in particular to a multi-dimensional directional installation vehicle for a prefabricated comprehensive pipe gallery.

背景技术Background technique

目前,随着国家政策的不断利好,我国综合管廊工程建设已进入爆发期,各地根据工程的实际特点,考虑成本、工期、环境等因素往往需要采用预制综合管廊工艺。根据入廊管线的种类及数量,现阶段综合管廊主要以三舱室居多,个别还有五舱、六舱结构,这导致每节预制综合管廊体积和重量都越来越大,为了保证施工安全,在施工过程中往往需要在基坑一侧设置加厚临时施工便道,采用大型吊车或门式吊车进行逐节安装。At present, with the continuous improvement of national policies, the construction of my country's comprehensive pipe gallery project has entered an explosive period. According to the actual characteristics of the project, considering factors such as cost, construction period, and environment, it is often necessary to adopt the prefabricated comprehensive pipe gallery process. According to the type and quantity of pipelines entering the corridor, the comprehensive pipe corridor at this stage is mainly composed of three cabins, and some have five cabins and six cabins, which leads to the increasing volume and weight of each prefabricated comprehensive pipeline corridor. Safety, during the construction process, it is often necessary to set up a thickened temporary construction access road on one side of the foundation pit, and use a large crane or gantry crane to install it section by section.

现有方法技术缺点:Technical disadvantages of existing methods:

1、吊装式的拼装对接,往往需要两次、三次以上,受人员操作熟练度影响,安装效率偏低。1. The assembly and docking of hoisting type often needs more than two or three times. Due to the influence of personnel's operation proficiency, the installation efficiency is low.

2、需要投入大量的操作人员,进行不定时的协同联动操作,基坑内外需随时保持畅通的联系,保证指挥信号的正确传递,实际施工作业难度较大。2. A large number of operators are required to carry out unscheduled coordinated linkage operations. It is necessary to maintain smooth communication inside and outside the foundation pit at any time to ensure the correct transmission of command signals. The actual construction work is more difficult.

3、提供设备临时站位场地,若采用门式吊车,还需要铺设轨道,导致施工成本增加,不利于工艺的推广。3. To provide a temporary site for equipment, if a gantry crane is used, it is necessary to lay tracks, which will increase the construction cost and is not conducive to the promotion of the process.

4、若基坑深度较大,尚需考虑吊装过程中,保护好基坑内支撑的安全稳定,不利于风险控制。4. If the depth of the foundation pit is large, it is necessary to consider the safety and stability of the support in the foundation pit during the hoisting process, which is not conducive to risk control.

5、吊装作业受外部环境影响较大,如进厂道路、场地大小、吊装高度、是否有障碍物等,都是作业前必须考虑的。5. The hoisting operation is greatly affected by the external environment, such as the access road, the size of the site, the hoisting height, and whether there are obstacles, etc., which must be considered before the operation.

实用新型内容Utility model content

本实用新型的目的在于针对这些问题,研发出一种预制综合管廊多维度定向安装车,解决现有技术中存在预制综合管廊安装效率低、环境要求高、风险要求高及人力投入大的难题。The purpose of this utility model is to solve these problems by developing a multi-dimensional directional installation vehicle for a prefabricated comprehensive pipe gallery, which solves the problems of low installation efficiency, high environmental requirements, high risk requirements and large manpower investment in the prefabricated comprehensive pipe gallery in the prior art. problem.

一种预制综合管廊多维度定向安装车,包括驱动桥、转向桥、底盘、横向滑移系统、纵向滑移系统、垂直升降系统、前端油缸、内部油缸、配重以及夹紧机构,所述底盘前端安装有前端油缸,底盘上由上至下依次承载有垂直升降系统、纵向滑移系统以及横向滑移系统,底盘两侧安装有夹紧机构,底盘内中部安装有多部内部油缸,底盘底部前、后两端轴向对称设置有转向桥以及驱动桥,底盘后段设置有配重;所述夹紧机构通过两个L形肩臂焊接在底盘上,所述夹紧机构由两个摆轴油缸、两根导杆、两个伸缩油缸连接抓插机构组成,所述夹紧机构通过设置于肩臂上的摆轴油缸控制夹紧机构升降,并由两个伸缩油缸控制抓插机构进行对位夹紧。A multi-dimensional directional installation vehicle for a prefabricated integrated pipe gallery, including a drive axle, a steering axle, a chassis, a lateral sliding system, a longitudinal sliding system, a vertical lifting system, a front-end oil cylinder, an internal oil cylinder, a counterweight, and a clamping mechanism. The front end of the chassis is equipped with a front-end oil cylinder, and the chassis is equipped with a vertical lifting system, a longitudinal sliding system and a lateral sliding system in sequence from top to bottom. Clamping mechanisms are installed on both sides of the chassis, and multiple internal oil cylinders are installed in the middle of the chassis. The front and rear ends of the bottom are axially symmetrically provided with a steering axle and a drive axle, and a counterweight is provided at the rear of the chassis; the clamping mechanism is welded to the chassis through two L-shaped shoulder arms, and the clamping mechanism consists of two The pendulum shaft oil cylinder, two guide rods, and two telescopic oil cylinders are connected to the gripping and inserting mechanism. The clamping mechanism is controlled by the pendulum shaft oil cylinder set on the shoulder arm to control the lifting of the clamping mechanism, and the grasping and inserting mechanism is controlled by two telescopic oil cylinders. Perform alignment clamping.

而且,所述底盘由两根横向型钢作为主龙骨,多根横梁作为副龙骨,所述主龙骨前端设置有前端油缸基座,主龙骨上部设置有副龙骨钢板,该钢板上预制有用于安装横向滑移系统的连接栓孔;所述主龙骨中部位于两根副龙骨两端还制有内部油缸基座。Moreover, the chassis consists of two transverse section steels as the main keel, and multiple beams as the auxiliary keel. The front end of the main keel is provided with a front end oil cylinder base, and the upper part of the main keel is provided with an auxiliary keel steel plate. The connecting bolt hole of the sliding system; the middle part of the main keel is located at the two ends of the two auxiliary keels and an internal oil cylinder base is also made.

而且,所述转向桥包括前桥架、转向油缸、羊角轴总装、转向连杆、销轴、轮胎,所述前桥固装于底盘前部,前桥中部固装有转向油缸,转向油缸两端通过转向连杆及销轴控制轮胎转向。Moreover, the steering axle includes a front bridge frame, a steering oil cylinder, a claw shaft assembly, a steering connecting rod, pin shafts, and tires. The steering of the tires is controlled by the steering linkage and the pin shaft.

而且,所述驱动桥包括后桥、驱动电机、轮胎轮毂、轴承座以及链轮,所述后桥固装于底盘后部,后桥顶部安装有驱动电机,后桥底部设置有轴承座,轴承座内旋转安装有驱动轴,驱动电机通过设置于驱动轴上的链轮控制轮胎、轮毂旋转。Moreover, the drive axle includes a rear axle, a drive motor, a tire hub, a bearing seat and a sprocket wheel, the rear axle is fixed on the rear of the chassis, the top of the rear axle is equipped with a drive motor, the bottom of the rear axle is provided with a bearing seat, and the bearing A drive shaft is rotatably installed in the seat, and the drive motor controls the rotation of tires and hubs through a sprocket wheel arranged on the drive shaft.

而且,所述横向滑移系统包括横向驱动电机、横向减速机、横向滑行轨道,装配式车轮及顶部基板,所述横向滑行轨道固装于副龙骨钢板上的连接栓孔上,横向滑行轨道上通过横向驱动电机带动横向减速机进而控制装配式车轮及顶部基板沿横向滑行轨道移动。Moreover, the lateral sliding system includes a lateral driving motor, a lateral reducer, a lateral sliding rail, assembled wheels and a top base plate, and the lateral sliding rail is fixed on the connecting bolt hole on the auxiliary keel steel plate, and the lateral sliding rail The transverse reducer is driven by the transverse drive motor to control the assembled wheels and the top base plate to move along the transverse sliding track.

而且,所述纵向滑移系统由纵向驱动电机、纵向减速机、纵向滑行轨道、纵向装配式车轮及纵向顶部基板组成,所述纵向滑行轨道设置于横向滑移系统上,纵向滑行轨道上通过纵向驱动电机带动纵向减速机进而控制纵向装配式车轮及纵向顶部基板沿纵向滑行轨道移动。Moreover, the longitudinal sliding system is composed of a longitudinal driving motor, a longitudinal reducer, a longitudinal sliding track, a longitudinal assembled wheel and a longitudinal top base plate. The longitudinal sliding track is arranged on the transverse sliding system, and the longitudinal The drive motor drives the longitudinal speed reducer to control the longitudinal assembled wheels and the longitudinal top base plate to move along the longitudinal sliding track.

而且,所述垂直升降系统由垂直升降驱动电机、垂直升降减速机及垂直顶部基板组成,所述垂直升降驱动电机固装于纵向滑移系统上,通过垂直升降驱动电机带动垂直升降减速机进而使垂直顶部基板上、下升降。Moreover, the vertical lift system is composed of a vertical lift drive motor, a vertical lift reducer and a vertical top base plate, the vertical lift drive motor is fixed on the longitudinal sliding system, and the vertical lift drive motor drives the vertical lift reducer to make The vertical top substrate is lifted up and down.

本实用新型的优点和经济效果是:Advantage and economic effect of the present utility model are:

1、本实用新型通过采用多维度定向安装车的垂直升降系统、纵向滑移系统、横向滑移系统,借助管廊本体结构与混凝土垫层,实现预制综合管廊的纵向、横向、竖向的多维度定向安装工作,操作简单,利用遥控装置、手动操作装置即可完成,机械化安装效率高,不占用额外场地,安全性高,与传统吊装形式比,经济效果更佳。1. The utility model realizes the vertical, horizontal and vertical adjustment of the prefabricated comprehensive pipe gallery by adopting the vertical lifting system, the longitudinal sliding system, and the horizontal sliding system of the multi-dimensional directional installation vehicle, and by means of the main structure of the pipe gallery and the concrete cushion. Multi-dimensional directional installation work is easy to operate and can be completed by remote control device or manual operation device. Mechanized installation has high efficiency, does not occupy additional space, and has high safety. Compared with traditional hoisting methods, the economic effect is better.

2、本实用新型通过采用专用的夹紧装置,替代传统技术中的钢绞线张拉,实现预制综合管廊之间的涨紧工作,压缩比例可精确控制,提高施工质量。2. The utility model adopts a special clamping device to replace the steel strand tension in the traditional technology to realize the tension work between the prefabricated integrated pipe galleries, the compression ratio can be precisely controlled, and the construction quality is improved.

3、本实用新型人员配置少,在同一工作面作业,沟通顺畅,减少人力成本。3. The utility model has less staffing, works on the same working face, communicates smoothly, and reduces labor costs.

附图说明Description of drawings

图1为本实用新型的主视图;Fig. 1 is the front view of the utility model;

图2为图1的后视图;Fig. 2 is the back view of Fig. 1;

图3为本实用新型驱动桥的结构示意图;Fig. 3 is the structural representation of drive axle of the present utility model;

图4为本实用新型转向桥的结构示意图;Fig. 4 is the structural representation of the steering bridge of the utility model;

图5为图4的俯视图;Fig. 5 is the top view of Fig. 4;

图6为本实用新型底盘的结构示意图;Fig. 6 is the structural representation of chassis of the utility model;

图7为本实用新型横向滑移系统的侧视图;Fig. 7 is a side view of the lateral sliding system of the present invention;

图8为图7的后视图;Fig. 8 is the back view of Fig. 7;

图9为本实用新型纵向滑移系统侧视图;Fig. 9 is a side view of the utility model longitudinal sliding system;

图10为图9的后视图;Figure 10 is a rear view of Figure 9;

图11为本实用新型垂直升降系统的结构示意图;Fig. 11 is a structural schematic diagram of the utility model vertical lifting system;

图12为本实用新型夹紧机构的结构示意图;Fig. 12 is a structural schematic diagram of the clamping mechanism of the present invention;

图13为本实用新型综合管廊涨紧工作示意图。Fig. 13 is a schematic diagram of the tensioning work of the comprehensive pipe gallery of the present invention.

图中:1—驱动桥 2—转向桥 3—底盘 4—横向滑移系统 5—纵向滑移系统 6—垂直升降系统 7—前端油缸 8—内部油缸 9—配重 10—夹紧机构 11-待安装预制综合管廊 12-已安装完成预制综合管廊In the figure: 1—drive axle 2—steering axle 3—chassis 4—lateral sliding system 5—longitudinal sliding system 6—vertical lifting system 7—front end cylinder 8—internal cylinder 9—counterweight 10—clamping mechanism 11- Prefabricated comprehensive pipe gallery to be installed 12-installed prefabricated comprehensive pipe gallery

具体实施方式Detailed ways

为能进一步了解本实用新型的内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下。需要说明的是,本实施例是描述性的,不是限定性的,不能由此限定本实用新型的保护范围。In order to further understand the content, features and effects of the present utility model, the following examples are exemplified, and detailed descriptions are as follows in conjunction with the accompanying drawings. It should be noted that this embodiment is descriptive, not restrictive, and the protection scope of the present utility model cannot be limited thereby.

一种预制综合管廊多维度定向安装车,包括驱动桥1、转向桥2、底盘3、横向滑移系统 4、纵向滑移系统5、垂直升降系统6、前端油缸7、内部油缸8、配重9以及夹紧机构10,所述底盘前端安装有前端油缸,底盘上由上至下依次承载有垂直升降系统、纵向滑移系统以及横向滑移系统,底盘两侧安装有夹紧机构,底盘内中部安装有多部内部油缸,底盘底部前、后两端轴向对称设置有转向桥以及驱动桥,底盘后段设置有配重。A multi-dimensional directional installation vehicle for a prefabricated comprehensive pipe gallery, including a driving axle 1, a steering axle 2, a chassis 3, a lateral sliding system 4, a longitudinal sliding system 5, a vertical lifting system 6, a front-end oil cylinder 7, an internal oil cylinder 8, and a Weight 9 and clamping mechanism 10, the front end of the chassis is equipped with a front-end oil cylinder, and the chassis is sequentially loaded with a vertical lifting system, a longitudinal sliding system and a lateral sliding system from top to bottom, and clamping mechanisms are installed on both sides of the chassis. A plurality of internal oil cylinders are installed in the middle part of the chassis, a steering axle and a drive axle are arranged axially symmetrically at the front and rear ends of the bottom of the chassis, and a counterweight is arranged at the rear section of the chassis.

而且,所述底盘由两根横向型钢作为主龙骨,多根横梁作为副龙骨,所述主龙骨前端设置有前端油缸基座,主龙骨上部设置有副龙骨钢板,该钢板上预制有用于安装横向滑移系统的连接栓孔;所述主龙骨中部位于两根副龙骨两端还制有内部油缸基座。Moreover, the chassis consists of two transverse section steels as the main keel, and multiple beams as the auxiliary keel. The front end of the main keel is provided with a front end oil cylinder base, and the upper part of the main keel is provided with an auxiliary keel steel plate. The connecting bolt hole of the sliding system; the middle part of the main keel is located at the two ends of the two auxiliary keels and an internal oil cylinder base is also made.

而且,所述转向桥包括前桥架、转向油缸、羊角轴总装、转向连杆、销轴、轮胎,所述前桥固装于底盘前部,前桥中部固装有转向油缸,转向油缸两端通过转向连杆及销轴控制轮胎转向。Moreover, the steering axle includes a front bridge frame, a steering oil cylinder, a claw shaft assembly, a steering connecting rod, pin shafts, and tires. The steering of the tires is controlled by the steering linkage and the pin shaft.

而且,所述驱动桥包括后桥、驱动电机、轮胎轮毂、轴承座以及链轮,所述后桥固装于底盘后部,后桥顶部安装有驱动电机,后桥底部设置有轴承座,轴承座内旋转安装有驱动轴,驱动电机通过设置于驱动轴上的链轮控制轮胎、轮毂旋转。Moreover, the drive axle includes a rear axle, a drive motor, a tire hub, a bearing seat and a sprocket wheel, the rear axle is fixed on the rear of the chassis, the top of the rear axle is equipped with a drive motor, the bottom of the rear axle is provided with a bearing seat, and the bearing A drive shaft is rotatably installed in the seat, and the drive motor controls the rotation of tires and hubs through a sprocket wheel arranged on the drive shaft.

而且,所述横向滑移系统包括横向驱动电机、横向减速机、横向滑行轨道,装配式车轮及顶部基板,所述横向滑行轨道固装于副龙骨钢板上的连接栓孔上,横向滑行轨道上通过横向驱动电机带动横向减速机进而控制装配式车轮及顶部基板沿横向滑行轨道移动。Moreover, the lateral sliding system includes a lateral driving motor, a lateral reducer, a lateral sliding rail, assembled wheels and a top base plate, and the lateral sliding rail is fixed on the connecting bolt hole on the auxiliary keel steel plate, and the lateral sliding rail The transverse reducer is driven by the transverse drive motor to control the assembled wheels and the top base plate to move along the transverse sliding track.

而且,所述纵向滑移系统由纵向驱动电机、纵向减速机、纵向滑行轨道、纵向装配式车轮及纵向顶部基板组成,所述纵向滑行轨道设置于横向滑移系统上,纵向滑行轨道上通过纵向驱动电机带动纵向减速机进而控制纵向装配式车轮及纵向顶部基板沿纵向滑行轨道移动。Moreover, the longitudinal sliding system is composed of a longitudinal driving motor, a longitudinal reducer, a longitudinal sliding track, a longitudinal assembled wheel and a longitudinal top base plate. The longitudinal sliding track is arranged on the transverse sliding system, and the longitudinal The drive motor drives the longitudinal speed reducer to control the longitudinal assembled wheels and the longitudinal top base plate to move along the longitudinal sliding track.

而且,所述垂直升降系统由垂直升降驱动电机、垂直升降减速机及垂直顶部基板组成,所述垂直升降驱动电机固装于纵向滑移系统上,通过垂直升降驱动电机带动垂直升降减速机进而使垂直顶部基板上、下升降。Moreover, the vertical lift system is composed of a vertical lift drive motor, a vertical lift reducer and a vertical top base plate, the vertical lift drive motor is fixed on the longitudinal sliding system, and the vertical lift drive motor drives the vertical lift reducer to make The vertical top substrate is lifted up and down.

而且,所述夹紧机构通过两个L形肩臂焊接在底盘上,所述夹紧机构由两个摆轴油缸、两根导杆、两个伸缩油缸连接抓插机构组成,所述夹紧机构通过设置于肩臂上的摆轴油缸控制夹紧机构升降,并由两个伸缩油缸控制抓插机构进行对位夹紧。Moreover, the clamping mechanism is welded on the chassis through two L-shaped shoulder arms, and the clamping mechanism is composed of two swing shaft oil cylinders, two guide rods, and two telescopic oil cylinders connected with a grasping and inserting mechanism. The mechanism controls the lifting of the clamping mechanism through the pendulum oil cylinder set on the shoulder arm, and two telescopic oil cylinders control the grasping and inserting mechanism to perform alignment and clamping.

实施例1:Example 1:

(1)其中所述驱动桥1由大型驱动电机1-1、轮毂1-2、轴承座1-3、链轮1-4、轮胎 1-5等零部件组成,所述大型驱动电机1-1功率至少达到4KW,型号优选YVF2-131M1-6。(1) Wherein said drive axle 1 is made up of components such as large-scale drive motor 1-1, wheel hub 1-2, bearing seat 1-3, sprocket wheel 1-4, tire 1-5, and described large-scale drive motor 1- 1 The power should reach at least 4KW, and the model is preferably YVF2-131M1-6.

(2)其中所述转向桥2由前桥架2-1、转向油缸2-2、羊角轴总装2-3、转向连杆2-4、销轴2-5、轮胎2-6等零部件组成,要求所有焊接必须连续,焊缝6~8mm,所述转向油缸2-2缸径优选63mm,活塞杆35mm,形成左右±50mm的双向缓冲带,活塞杆连接使用单耳球铰链,活塞杆与铰链之间使用螺纹连接,油缸基型为工程液压缸SHG。(2) wherein the steering axle 2 is composed of front axle frame 2-1, steering cylinder 2-2, horn shaft assembly 2-3, steering connecting rod 2-4, pin shaft 2-5, tire 2-6 and other components , it is required that all welding must be continuous, the weld seam is 6-8mm, the bore of the steering cylinder 2-2 is preferably 63mm, and the piston rod is 35mm to form a two-way buffer zone of ±50mm left and right. Threaded connections are used between them, and the base type of the oil cylinder is the engineering hydraulic cylinder SHG.

(3)其中所述底盘3由多种规格的钢板、筋板、型钢等零部件组成,所述底盘与上部装置、驱动装置通过螺栓孔进行螺栓连接,具体地描述,底盘由两条长8.5m的型钢作为主龙骨 3-5,横向由五根1.6m型钢作为副龙骨3-3,配合多种规格的钢板、筋板拼焊而成,焊缝高度8~10mm,连续焊接,焊接完成后,要求纵梁型钢上面平整度≤5mm;在中部副龙骨两侧设置四个内部油缸8的基座3-2,制作形式,如图所示;在纵梁的前端设置前端油缸7的基座 3-4,制作形式如图所示;在图示位置设置大型驱动电机1-1、横向驱动电机4-1的基座,预留栓孔位置、数量按照图示制作,满足固定要求为准;在前端副龙骨钢板3-1上预留好横向滑行轨道4-3的连接栓孔。(3) Wherein the chassis 3 is made up of parts such as steel plates, stiffened plates, and section steels of various specifications, and the chassis is connected with the upper device and the driving device by bolts through bolt holes. Specifically, the chassis consists of two 8.5-inch lengths. The 3-5m section steel is used as the main keel 3-5, and five 1.6m section steels are used as the auxiliary keel 3-3 in the horizontal direction. It is tailor-welded with various specifications of steel plates and rib plates. The weld seam height is 8-10mm. Continuous welding is completed. Finally, it is required that the flatness of the upper surface of the longitudinal beam steel should be less than or equal to 5mm; the bases 3-2 of four internal oil cylinders 8 are arranged on both sides of the auxiliary keel in the middle, and the production form is as shown in the figure; the base of the front end oil cylinder 7 is arranged at the front end of the longitudinal beam Seat 3-4, the production form is as shown in the figure; set the base of the large-scale drive motor 1-1 and the horizontal drive motor 4-1 at the positions shown in the figure, and reserve the position and quantity of bolt holes as shown in the figure to meet the fixed requirements. Accurate; reserve the connecting bolt holes of the transverse sliding track 4-3 on the front auxiliary keel steel plate 3-1.

(4)其中所述横向滑移系统4由横向驱动电机4-1、横向减速机4-2、横向滑行轨道4-3、装配式车轮4-4及顶部基板4-5组成,所述横向滑移系统4形成±180mm移动范围。(4) wherein the lateral sliding system 4 is composed of a lateral drive motor 4-1, a lateral reducer 4-2, a lateral sliding track 4-3, an assembled wheel 4-4 and a top base plate 4-5, and the lateral The sliding system 4 forms a movement range of ±180mm.

(5)其中所述纵向滑移系统5由纵向驱动电机5-1、纵向减速机5-2、纵向滑行轨道5-3、装配式车轮5-4及顶部基板5-5组成,所述纵向滑移系统5形成500mm移动范围。(5) wherein the longitudinal sliding system 5 is composed of a longitudinal drive motor 5-1, a longitudinal reducer 5-2, a longitudinal sliding track 5-3, an assembled wheel 5-4 and a top base plate 5-5, the longitudinal The sliding system 5 forms a range of movement of 500 mm.

(6)其中所述垂直升降系统6由垂直升降驱动电机6-1、垂直升降减速机6-2及顶部基板6-3组成,所述垂直升降系统6形成620mm移动范围。(6) The vertical lift system 6 is composed of a vertical lift drive motor 6-1, a vertical lift reducer 6-2 and a top base plate 6-3, and the vertical lift system 6 forms a moving range of 620mm.

(7)其中所述前端油缸7,可形成1100mm的移动距离。(7) Wherein the front end oil cylinder 7 can form a moving distance of 1100mm.

(8)其中所述内部油缸8,可形成300mm的移动距离。(8) The internal oil cylinder 8 can form a moving distance of 300 mm.

(9)其中所述配重9,根据每节预制综合管廊重量,经过换算得到所需配重9大小,所述配重9可选择钢筋混凝土制作的块或钢制材料。(9) Wherein the counterweight 9, according to the weight of each section of the prefabricated comprehensive pipe gallery, is converted to obtain the size of the required counterweight 9, and the counterweight 9 can be a block made of reinforced concrete or a steel material.

(10)其中所述夹紧机构10通过两个肩臂L形焊接在底盘3上,所述夹紧机构10由两个摆轴油缸10-1、两根导杆10-2、两个伸缩油缸10-3连接抓插机构组成。夹紧机构的伸缩范围1260~1590mm,满足管廊对接及防水胶条压缩要求。(10) The clamping mechanism 10 is welded on the chassis 3 through two shoulder arms L-shaped, and the clamping mechanism 10 is composed of two swing shaft oil cylinders 10-1, two guide rods 10-2, two telescopic The oil cylinder 10-3 is connected with a grasping and inserting mechanism. The expansion and contraction range of the clamping mechanism is 1260-1590mm, which meets the requirements of pipe gallery docking and waterproof rubber strip compression.

本实用新型的操作步骤,配合预制综合管廊拼装描述:The operation steps of the utility model are combined with the assembly description of the prefabricated comprehensive pipe gallery:

(1)在混凝土垫层上铺一层薄砂,要求厚度≤5mm,为了控制垫层平整度,采用木刮杠刮平;然后沿综合管廊设计中心线,将预制综合管廊标准节粗略紧凑布置于垫层上。(1) Lay a thin layer of sand on the concrete cushion, requiring a thickness of ≤5mm. In order to control the flatness of the cushion, use a wooden scraper to scrape it; then along the design centerline of the comprehensive pipe gallery, roughly Compactly arranged on the cushion.

(2)视现场空间大小及便道情况,多维度定向安装车可自行驶入综合管廊,或采用QUY-200履带吊进入基坑就位,在预制综合管廊标准节内,完成安装车调试工作。(2) Depending on the size of the site space and the conditions of the access road, the multi-dimensional directional installation vehicle can drive into the comprehensive pipe gallery by itself, or use the QUY-200 crawler crane to enter the foundation pit and take place, and complete the installation vehicle debugging in the standard section of the prefabricated comprehensive pipe gallery Work.

如图1所示,利用遥控器启动多维度定向安装车,在大型驱动驱动电机1-1的作用下,安装车开始前进,轮胎1-5在已完成的综合管廊上行驶,使前端油缸7穿过待安装的预制综合管廊标准节,当垂直升降系统6的顶部基板6-3对准标准节中心位置时,停止行进。As shown in Figure 1, use the remote controller to start the multi-dimensional directional installation vehicle. Under the action of the large-scale driving drive motor 1-1, the installation vehicle starts to move forward, and the tires 1-5 drive on the completed comprehensive pipe gallery, so that the front end oil cylinder 7 Pass through the standard section of the prefabricated integrated pipe gallery to be installed, and stop traveling when the top base plate 6-3 of the vertical lifting system 6 is aligned with the center of the standard section.

(3)如图1所示,液压动力控制前端油缸7伸出支腿,落在综合管廊垫层上;然后液压动力控制内部油缸8伸出后支腿,落在已安装的综合管廊底板上;控制液压油缸调整前后支腿高度,确保安装车纵向车身与管廊坡度相符。(3) As shown in Figure 1, the hydraulic power controls the front end cylinder 7 to extend outriggers and land on the cushion of the comprehensive pipe gallery; then the hydraulic power controls the internal cylinder 8 to extend the rear legs and lands on the installed comprehensive pipe gallery On the bottom plate; control the hydraulic cylinder to adjust the height of the front and rear outriggers to ensure that the longitudinal body of the installation vehicle matches the slope of the pipe gallery.

(4)当所述综合管廊为双仓或多舱室时,根据计算可采用两台多维度定向安装车进行安装,利用无线遥控器同步联动控制,或分别控制两台安装车。(4) When the integrated pipe gallery is double-compartment or multi-compartment, according to the calculation, two multi-dimensional directional installation vehicles can be used for installation, and the wireless remote control can be used for synchronous linkage control, or the two installation vehicles can be controlled separately.

(5)如图1所示,先利横向滑移系统4调整预制综合管廊横向对准,侧面平齐;在利用垂直升降系统6上下移动对准,顶面、底面平齐;最后利用纵向滑移系统5进行预制综合管廊的拼装对接,三个方向的移动速度快慢均可调节;当上下左右平齐后,对预制综合管廊标准节进行纵向拼装对接,观察侧面管节之间的上下间隙,当间隙达到50mm左右时停止纵向滑移系统5,精准测量承插口间隙,误差控制在±1mm,继续拼装对接至两道密封胶条夹紧,滑台停止工作。本方法可确保预制综合管廊一次性完成拼装对接。(5) As shown in Figure 1, the Xianli horizontal sliding system 4 adjusts the horizontal alignment of the prefabricated comprehensive pipe gallery, and the sides are flush; when using the vertical lifting system 6 to move up and down, the top surface and the bottom surface are flush; finally, use the longitudinal The sliding system 5 carries out the assembly and docking of the prefabricated comprehensive pipe gallery, and the speed of movement in the three directions can be adjusted; when the top, bottom, left, and right are even, the longitudinal assembly and docking of the standard section of the prefabricated comprehensive pipe gallery is carried out, and the distance between the side pipe sections is observed. The upper and lower gaps, when the gap reaches about 50mm, stop the longitudinal sliding system 5, accurately measure the socket gap, the error is controlled within ±1mm, continue to assemble and connect until the two sealing strips are clamped, and the slide table stops working. This method can ensure that the assembly and connection of the prefabricated comprehensive pipe gallery can be completed at one time.

如图12、13所示,采用多维度定向安装车上的夹紧机构10对两节预制综合管廊进行涨紧,确保两道密封条达到设计压缩比例,保证密封效果,最后在预留好的孔位采用穿孔螺栓紧固,并做好后续嵌缝注浆及防水试验等工序。As shown in Figures 12 and 13, the clamping mechanism 10 on the multi-dimensional directional installation vehicle is used to tighten the two prefabricated integrated pipe galleries to ensure that the two sealing strips reach the design compression ratio and ensure the sealing effect. The hole positions are fastened with perforated bolts, and the follow-up procedures such as caulking grouting and waterproof test are done.

Claims (7)

1.一种预制综合管廊多维度定向安装车,包括驱动桥、转向桥、底盘、横向滑移系统、纵向滑移系统、垂直升降系统、前端油缸、内部油缸、配重以及夹紧机构,所述底盘前端安装有前端油缸,底盘上由上至下依次承载有垂直升降系统、纵向滑移系统以及横向滑移系统,底盘两侧安装有夹紧机构,底盘内中部安装有多部内部油缸,底盘底部前、后两端轴向对称设置有转向桥以及驱动桥,底盘后段设置有配重;其特征在于:所述夹紧机构通过两个L形肩臂焊接在底盘上,夹紧机构由摆轴油缸、导杆、两个伸缩油缸以及抓插机构组成;其中设置于肩臂上的摆轴油缸控制夹紧机构升降,通过一个伸缩油缸控制夹紧机构沿导杆进行定位,另一个油缸控制抓插机构进行夹紧。1. A prefabricated comprehensive pipe gallery multi-dimensional directional installation vehicle, including drive axle, steering axle, chassis, lateral sliding system, longitudinal sliding system, vertical lifting system, front-end oil cylinder, internal oil cylinder, counterweight and clamping mechanism, The front end of the chassis is equipped with a front-end oil cylinder, and the chassis carries a vertical lifting system, a longitudinal sliding system, and a lateral sliding system from top to bottom in sequence. Clamping mechanisms are installed on both sides of the chassis, and multiple internal oil cylinders are installed in the middle of the chassis. , the front and rear ends of the bottom of the chassis are axially symmetrically provided with a steering bridge and a drive bridge, and a counterweight is provided at the rear of the chassis; it is characterized in that: the clamping mechanism is welded on the chassis through two L-shaped shoulder arms, clamping The mechanism consists of a pendulum cylinder, a guide rod, two telescopic cylinders and a grasping and inserting mechanism; the pendulum cylinder set on the shoulder arm controls the lifting of the clamping mechanism, and a telescopic cylinder controls the positioning of the clamping mechanism along the guide rod. An oil cylinder controls the grab and insert mechanism for clamping. 2.根据权利要求1所述的一种预制综合管廊多维度定向安装车,其特征在于:所述底盘由两根横向型钢作为主龙骨,多根横梁作为副龙骨,所述主龙骨前端设置有前端油缸基座,主龙骨上部设置有副龙骨钢板,该钢板上预制有用于安装横向滑移系统的连接栓孔;所述主龙骨中部位于两根副龙骨两端还制有内部油缸基座。2. A multi-dimensional directional installation vehicle for a prefabricated integrated pipe gallery according to claim 1, characterized in that: the chassis consists of two transverse section steels as the main keel, a plurality of beams as the auxiliary keel, and the front end of the main keel is set There is a front-end oil cylinder base, and an auxiliary keel steel plate is arranged on the upper part of the main keel. The connecting bolt holes for installing the lateral sliding system are prefabricated on the steel plate; . 3.根据权利要求1所述的一种预制综合管廊多维度定向安装车,其特征在于:所述转向桥包括前桥架、转向油缸、羊角轴总装、转向连杆、销轴、轮胎,所述前桥固装于底盘前部,前桥中部固装有转向油缸,转向油缸两端通过转向连杆及销轴控制轮胎转向。3. A prefabricated integrated pipe gallery multi-dimensional directional installation vehicle according to claim 1, characterized in that: the steering bridge includes a front bridge frame, a steering oil cylinder, a claw shaft assembly, a steering connecting rod, a pin shaft, and tires, and the The front axle is fixed on the front part of the chassis, and the middle part of the front axle is fixed with a steering oil cylinder, and the two ends of the steering oil cylinder control the steering of the tires through the steering connecting rod and the pin shaft. 4.根据权利要求1所述的一种预制综合管廊多维度定向安装车,其特征在于:所述驱动桥包括后桥、驱动电机、轮胎轮毂、轴承座以及链轮,所述后桥固装于底盘后部,后桥顶部安装有驱动电机,后桥底部设置有轴承座,轴承座内旋转安装有驱动轴,驱动电机通过设置于驱动轴上的链轮控制轮胎、轮毂旋转。4. A multi-dimensional directional installation vehicle for a prefabricated integrated pipe gallery according to claim 1, wherein the drive axle includes a rear axle, a drive motor, a tire hub, a bearing seat and a sprocket, and the rear axle is fixed Installed in the rear of the chassis, the top of the rear axle is equipped with a drive motor, the bottom of the rear axle is provided with a bearing seat, and a drive shaft is installed in the bearing seat, and the drive motor controls the rotation of tires and hubs through the sprocket set on the drive shaft. 5.根据权利要求2所述的一种预制综合管廊多维度定向安装车,其特征在于:所述横向滑移系统包括横向驱动电机、横向减速机、横向滑行轨道,装配式车轮及顶部基板,所述横向滑行轨道固装于副龙骨钢板上的连接栓孔上,横向滑行轨道上通过横向驱动电机带动横向减速机进而控制装配式车轮及顶部基板沿横向滑行轨道移动。5. A multi-dimensional directional installation vehicle for a prefabricated comprehensive pipe gallery according to claim 2, wherein the lateral sliding system includes a lateral drive motor, a lateral reducer, a lateral sliding track, assembled wheels and a top base plate , the transverse sliding track is fixedly mounted on the connecting bolt hole on the auxiliary keel steel plate, and the transverse drive motor drives the transverse reducer on the transverse sliding track to control the assembled wheels and the top substrate to move along the transverse sliding track. 6.根据权利要求1所述的一种预制综合管廊多维度定向安装车,其特征在于:所述纵向滑移系统由纵向驱动电机、纵向减速机、纵向滑行轨道、纵向装配式车轮及纵向顶部基板组成,所述纵向滑行轨道设置于横向滑移系统上,纵向滑行轨道上通过纵向驱动电机带动纵向减速机进而控制纵向装配式车轮及纵向顶部基板沿纵向滑行轨道移动。6. A prefabricated comprehensive pipe gallery multi-dimensional directional installation vehicle according to claim 1, characterized in that: the longitudinal sliding system consists of a longitudinal drive motor, a longitudinal reducer, a longitudinal sliding track, a longitudinal assembled wheel and a longitudinal The top base plate is composed of the longitudinal sliding track set on the lateral sliding system, and the longitudinal drive motor drives the longitudinal reducer on the longitudinal sliding track to control the longitudinal assembled wheels and the longitudinal top base plate to move along the longitudinal sliding track. 7.根据权利要求1所述的一种预制综合管廊多维度定向安装车,其特征在于:所述垂直升降系统由垂直升降驱动电机、垂直升降减速机及垂直顶部基板组成,所述垂直升降驱动电机固装于纵向滑移系统上,通过垂直升降驱动电机带动垂直升降减速机进而使垂直顶部基板上、下升降。7. A prefabricated comprehensive pipe gallery multi-dimensional directional installation vehicle according to claim 1, characterized in that: the vertical lifting system is composed of a vertical lifting drive motor, a vertical lifting reducer and a vertical top base plate, and the vertical lifting The driving motor is fixed on the longitudinal sliding system, and the vertical lifting reducer is driven by the vertical lifting driving motor to make the vertical top substrate go up and down.
CN201720937731.8U 2017-07-31 2017-07-31 Prefabricated utility tunnel multidimension degree directional installation car Expired - Fee Related CN207525777U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720937731.8U CN207525777U (en) 2017-07-31 2017-07-31 Prefabricated utility tunnel multidimension degree directional installation car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720937731.8U CN207525777U (en) 2017-07-31 2017-07-31 Prefabricated utility tunnel multidimension degree directional installation car

Publications (1)

Publication Number Publication Date
CN207525777U true CN207525777U (en) 2018-06-22

Family

ID=62576038

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720937731.8U Expired - Fee Related CN207525777U (en) 2017-07-31 2017-07-31 Prefabricated utility tunnel multidimension degree directional installation car

Country Status (1)

Country Link
CN (1) CN207525777U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109295999A (en) * 2018-10-10 2019-02-01 中铁工程机械研究设计院有限公司 Prefabricated assembled pipe gallery fitting machine and its construction method
CN109811797A (en) * 2019-04-04 2019-05-28 安徽精工电缆桥架有限公司 A kind of rectangular piping lane support construction and its operating method convenient for adjusting
CN109928160A (en) * 2019-04-11 2019-06-25 中国建筑土木建设有限公司 Large-tonnage pipe gallery transporting and erecting all-in-one machine and using method
CN111254974A (en) * 2020-01-03 2020-06-09 中铁工程机械研究设计院有限公司 Floor transportation and installation method in pipe gallery construction
CN111270704A (en) * 2020-01-03 2020-06-12 中铁工程机械研究设计院有限公司 Adjusting mechanism of mounting vehicle
CN111287775A (en) * 2020-01-03 2020-06-16 中铁工程机械研究设计院有限公司 Integrated installation vehicle for tunnel construction

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109295999A (en) * 2018-10-10 2019-02-01 中铁工程机械研究设计院有限公司 Prefabricated assembled pipe gallery fitting machine and its construction method
CN109295999B (en) * 2018-10-10 2024-05-28 中铁科工集团装备工程有限公司 Prefabricated assembled comprehensive pipe rack mounting machine and construction method thereof
CN109811797A (en) * 2019-04-04 2019-05-28 安徽精工电缆桥架有限公司 A kind of rectangular piping lane support construction and its operating method convenient for adjusting
CN109928160A (en) * 2019-04-11 2019-06-25 中国建筑土木建设有限公司 Large-tonnage pipe gallery transporting and erecting all-in-one machine and using method
CN109928160B (en) * 2019-04-11 2024-05-24 中国建筑土木建设有限公司 Large-tonnage pipe gallery and transportation frame integrated machine and use method
CN111254974A (en) * 2020-01-03 2020-06-09 中铁工程机械研究设计院有限公司 Floor transportation and installation method in pipe gallery construction
CN111270704A (en) * 2020-01-03 2020-06-12 中铁工程机械研究设计院有限公司 Adjusting mechanism of mounting vehicle
CN111287775A (en) * 2020-01-03 2020-06-16 中铁工程机械研究设计院有限公司 Integrated installation vehicle for tunnel construction

Similar Documents

Publication Publication Date Title
CN113530553B (en) Three-step construction process based on tunnel excavation and support integrated trolley
CN103967050B (en) Construction method of a subway station
CN114622920B (en) Lateral split starting construction method for shield machine in narrow space
CN113530575B (en) An arch installation trolley for tunnel multi-function construction
CN113530554B (en) Full-section construction process based on tunnel excavation and support integrated trolley
CN103318768B (en) Assembling method of quayside with low posture
CN106437511B (en) A kind of modular multi-function drill jumbo system
CN111255469B (en) Modular disassembly construction method in closed narrow space of shield machine
CN113530552B (en) Tunnel comprehensive excavation trolley
CN103774856B (en) A kind of gliding construction method of different shape heavy type girder steel of large span on Super High roofing
CN116281606B (en) Shield machine crane assembly method
CN113090293A (en) Shield subway tunnel segment repairing and reinforcing mechanical arm equipment
CN109208639B (en) An underground pipe gallery pipe segment assembly device and construction method thereof
CN112523090B (en) Initial internode installation mode of steel truss girder cable-stayed bridge
CN110318798A (en) Crawler belt carries the mobile air crossing system of formula and construction method
CN205876339U (en) Boxing girder half -through is hydraulic pressure invert trestle by oneself
CN103982200A (en) Full-face inner sliding rail moving steel mould trolley
CN206092012U (en) Operation car is demolishd to subway deep tunnel reinforced concrete pipe piece
CN114893221A (en) Tunnel primary support steel arch mounting device and mounting method thereof
CN108203934A (en) Based on the whole segment lifting erection crane of the traversing cable-stayed bridge composite beam of unbalance loading
CN113818478A (en) Overweight prefabricated pipe gallery installation system and construction method thereof
CN106368718B (en) Subway deep tunnel reinforced concrete segment removes Operation Van
CN204716132U (en) Gantry type multifunctional rock drilling trolley
CN107140564A (en) Special lifting device on the type non-fragment orbit printed lines of high ferro CRTS III
CN111945736B (en) Intelligent pile driving machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180622

CF01 Termination of patent right due to non-payment of annual fee