CN207513190U - A kind of wall pouring can - Google Patents

A kind of wall pouring can Download PDF

Info

Publication number
CN207513190U
CN207513190U CN201721636653.4U CN201721636653U CN207513190U CN 207513190 U CN207513190 U CN 207513190U CN 201721636653 U CN201721636653 U CN 201721636653U CN 207513190 U CN207513190 U CN 207513190U
Authority
CN
China
Prior art keywords
fixed plate
lead
connecting rod
squeeze board
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721636653.4U
Other languages
Chinese (zh)
Inventor
李业锋
陈大伟
陈金江
李业凯
施洪旭
许贞伟
刘相超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhongtian Sheng Automation Equipment Co Ltd
Original Assignee
Shandong Zhongtian Sheng Automation Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhongtian Sheng Automation Equipment Co Ltd filed Critical Shandong Zhongtian Sheng Automation Equipment Co Ltd
Priority to CN201721636653.4U priority Critical patent/CN207513190U/en
Application granted granted Critical
Publication of CN207513190U publication Critical patent/CN207513190U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model is related to a kind of wall pouring cans,Including hopper,Positioning plate and squeeze board,The hopper is set as inverted truncated rectangular pyramids structure,It is internally provided with fixed plate,It is 2 pieces that the positioning plate, which is oppositely arranged,,And it is equipped with lead on the opposite face of 2 pieces of positioning plates,The squeeze board is arranged in parallel with fixed plate,And its both ends offsets respectively with lead,The connecting rod through fixed plate is connected on the squeeze board,The top of the connecting rod is equipped with handle,The utility model passes through driving handle,Squeeze board is pushed to be moved along lead,Concrete is pressed into wall crack,It ensure that uniformity of the concrete in wall crack,Enhance the strength of wall body after the cementation of fissures,Pouring can the continuous moving cementation of fissures,Improve cementation of fissures efficiency,Waste when reducing artificial blind to concrete,Improve concrete utilization rate,Simultaneously,Pouring can carries positioning plate,Save artificial installation temporary concrete baffle process,Reduce the amount of labour.

Description

A kind of wall pouring can
Technical field
The utility model belongs to technical field of building construction, relates in particular to a kind of wall pouring can.
Background technology
Frame structure is using most structure type in current China's building engineering, in frame structure extensive use While, filling wall is also more and more appeared in architectural engineering.Wall is filled generally using the larger concrete block masonry of volume and Into, this but also filling wall vertical mortar joint cannot as calculon by shove into seam, but need the independent cementation of fissures, meanwhile, by Larger in the volume of building block, vertical mortar joint is deeper, and mortar joint grouting is full, closely knit relatively difficult.
The vertical mortar joint cementation of fissures method of now widely used blockwork wall is mainly clamping plate cementation of fissures method.Crack cementation of fissures method It is two sides for clamping vertical mortar joint with two blocks of wood laths after building worker by laying bricks or stones and having built one layer of building block by laying bricks or stones, it will with reinforcing bar clamp Two pieces of wood laths hooks tightly, are then built worker by laying bricks or stones and are starched with the big top surface back-up sand shoveled to vertical mortar joint is built by laying bricks or stones, with shoveling sand greatly conveniently Slurry is disclosed into vertical mortar joint, after worker feels that mortar joint fills, is removed reinforcing bar clamp, is removed two wooden splints, finally again with smoothing out with the fingers son Mortar joint is smoothed out with the fingers flat.This method is more time-consuming, and speed of application is slow, and cannot be guaranteed mortar joint in mortar it is full, closely knit, It can not ensure the total quality of wall.
Utility model content
For various deficiencies of the prior art, to solve the above-mentioned problems, it is proposed that a kind of wall pouring can.
To achieve the above object, the utility model provides following technical solution:
A kind of wall pouring can, including:
Hopper is set as inverted truncated rectangular pyramids structure, is internally provided with fixed plate, and the fixed plate is set along horizontal direction It puts;
Positioning plate, it is 2 pieces, and the top of 2 pieces of positioning plates is connect respectively with the side of hopper to be oppositely arranged, described 2 pieces Lead, the positioning plate and lead is equipped on the opposite face of positioning plate to set each along vertical direction;
Squeeze board is arranged in parallel with fixed plate, and its both ends offsets respectively with lead, is connected on the squeeze board Through the connecting rod of fixed plate, the top of the connecting rod is equipped with handle.
Further, the fixed plate is equipped with through-hole, and the connecting rod runs through through-hole.
Further, the diameter of the connecting rod is less than the aperture of through-hole.
Further, the top of the lead is connect with fixed plate.
Further, the both ends of the squeeze board are set as the arc structure to match with lead.
Further, the length of the connecting rod is less than the length of lead.
The beneficial effects of the utility model are:
By driving handle, squeeze board is pushed to be moved along lead, concrete is pressed into wall crack, ensure that mixed Uniformity of the solidifying soil in wall crack, enhances the strength of wall body after the cementation of fissures, pouring can the continuous moving cementation of fissures, improve filling Efficiency is stitched, waste when reducing artificial blind to concrete improves concrete utilization rate, meanwhile, pouring can carries positioning Plate saves artificial installation temporary concrete baffle process, reduces the amount of labour.
Description of the drawings
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the overall structure vertical view of the utility model;
Fig. 3 is the structure diagram of the squeeze board of the utility model.
In attached drawing:1- hoppers, 2- positioning plates, 3- squeeze boards, 301- arc structures, 4- fixed plates, 5- connecting rods, 6- hands Handle, 7- leads.
Specific embodiment
In order to which those skilled in the art is made to more fully understand the technical solution of the utility model, with reference to the utility model Attached drawing carries out the technical solution of the utility model clear, complete description, and based on the embodiment in the application, this field is general Other similar embodiments that logical technical staff is obtained under the premise of creative work is not made, should all belong to the application The range of protection.In addition, the direction word mentioned in following embodiment, such as " on " " under " " left side " " right side " etc. is only refer to the attached drawing Direction, therefore, the direction word used is for illustrative and not limiting the invention.
The utility model is described in further detail with preferred embodiment below in conjunction with the accompanying drawings.
Embodiment one:
As shown in Figs. 1-3, a kind of wall pouring can, including hopper 1, positioning plate 2 and squeeze board 3, the hopper 1 is set as down The truncated rectangular pyramids structure put, and its top and bottom is set as hatch frame, is internally provided with cavity, the hopper 1 is internally provided with edge Horizontally arranged fixed plate 4, the inner wall of the both ends of the fixed plate 4 with hopper 1 is connect.The positioning plate 2 is opposite 2 pieces are set as, and side of the top of 2 pieces of positioning plates 2 respectively with hopper 1 is connect, that is to say, that positioning plate 2 is located at hopper 1 Lower section.
Lead 7 is equipped on the opposite face of 2 pieces of positioning plates 2, the positioning plate 2 and lead 7 are each along vertical Direction is set, and the squeeze board 3 is arranged in parallel with fixed plate 4, and its both ends offsets respectively with lead 7, in addition, the compacting The connecting rod 5 through fixed plate 4 is connected on plate 3, the fixed plate 4 is equipped with through-hole, and the connecting rod 5 runs through through-hole, and The diameter of connecting rod 5 is less than the aperture of through-hole, that is to say, that connecting rod 5 can freely be moved relative to fixed plate 4 along vertical direction It is dynamic, and then squeeze board 3 is driven to be moved up and down along lead 7.For the ease of mobile connection bar 5, the top of the connecting rod 5 is set There is handle 6.In order to improve the stability of lead 7, the top of the lead 7 is connect with fixed plate 4, the squeeze board 3 Both ends are set as the arc structure to match with lead 7 301.
During the practical cementation of fissures, 2 pieces of positioning plates 2 are located at the both ends of wall crack respectively, save artificial install additional and mix temporarily Solidifying soil baffle process, reduces the amount of labour, and operating personnel above carry squeeze board 3 to fixed plate 4, meanwhile, operating personnel are by coagulation Soil is inserted in hopper 1, by driving handle 6, squeeze board 3 is pushed to be moved along lead 7, concrete is pressed into wall crack In, it ensure that uniformity of the concrete in wall crack, enhance the strength of wall body after the cementation of fissures, meanwhile, pouring can be continuous The mobile cementation of fissures, improves cementation of fissures efficiency, and waste when reducing artificial blind to concrete improves concrete utilization rate.
The utility model is described in detail above, it is described above, only the preferred embodiment of the utility model and , it is when the utility model practical range cannot be limited, i.e., all to make equivalent changes and modifications according to the application range, it all should still belong to this In utility model covering scope.

Claims (6)

1. a kind of wall pouring can, which is characterized in that including:
Hopper is set as inverted truncated rectangular pyramids structure, is internally provided with fixed plate, the fixed plate is along horizontally arranged;
Positioning plate, it is 2 pieces, and the top of 2 pieces of positioning plates is connect respectively with the side of hopper to be oppositely arranged, 2 pieces of positioning Lead, the positioning plate and lead is equipped on the opposite face of plate to set each along vertical direction;
Squeeze board is arranged in parallel with fixed plate, and its both ends offsets respectively with lead, is connected with and runs through on the squeeze board The connecting rod of fixed plate, the top of the connecting rod are equipped with handle.
2. a kind of wall pouring can according to claim 1, which is characterized in that the fixed plate is equipped with through-hole, described Connecting rod runs through through-hole.
3. a kind of wall pouring can according to claim 2, which is characterized in that the diameter of the connecting rod is less than through-hole Aperture.
4. a kind of wall pouring can according to claim 1, which is characterized in that the top of the lead connects with fixed plate It connects.
5. a kind of wall pouring can according to claim 4, which is characterized in that the both ends of the squeeze board are set as and are oriented to The arc structure that column matches.
6. according to a kind of any wall pouring cans of claim 1-5, which is characterized in that the length of the connecting rod is less than The length of lead.
CN201721636653.4U 2017-11-29 2017-11-29 A kind of wall pouring can Expired - Fee Related CN207513190U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721636653.4U CN207513190U (en) 2017-11-29 2017-11-29 A kind of wall pouring can

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721636653.4U CN207513190U (en) 2017-11-29 2017-11-29 A kind of wall pouring can

Publications (1)

Publication Number Publication Date
CN207513190U true CN207513190U (en) 2018-06-19

Family

ID=62542391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721636653.4U Expired - Fee Related CN207513190U (en) 2017-11-29 2017-11-29 A kind of wall pouring can

Country Status (1)

Country Link
CN (1) CN207513190U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206789A (en) * 2020-02-18 2020-05-29 山西三建集团有限公司 Vertical mortar joint one-step forming tool and method for infilled wall
CN113308964A (en) * 2021-06-10 2021-08-27 中国二十二冶集团有限公司 Curb crack pouring method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111206789A (en) * 2020-02-18 2020-05-29 山西三建集团有限公司 Vertical mortar joint one-step forming tool and method for infilled wall
CN113308964A (en) * 2021-06-10 2021-08-27 中国二十二冶集团有限公司 Curb crack pouring method

Similar Documents

Publication Publication Date Title
CN203429831U (en) Split-free composite heat insulation template for pouring concrete
CN207513190U (en) A kind of wall pouring can
CN104790436A (en) High-rise building basement roof settlement post-pouring joint advanced water stop construction method
CN108277895A (en) A kind of composite heat preserving external wall system and construction method
CN104453257A (en) Mortar spreading bucket and mortar spreading method using same
CN206109997U (en) Two -sided sliding chute device
CN209723369U (en) Light sandwich concrete masonry is used for the structure and wall body structure of cold district
CN207829495U (en) Control the combination tool of building wall level, vertical mortar joint plumpness and thickness
CN203594050U (en) Novel internal bracing wall
CN207131073U (en) A kind of wall construction template
CN206319404U (en) A kind of building precast exterior sheathing
CN204663015U (en) Paving ash bucket
CN109455996A (en) A kind of danger external wall insulation grouting and reinforcing mortar
CN104763158A (en) Joggle joint type lightweight aggregate interlocking block construction method
CN204418425U (en) Steel-structure factory building exterior wall and steel-structure factory building exterior wall corner column framed
CN204551765U (en) Buffer isolator between building structure
CN208815724U (en) A kind of regeneration lightweight aggregate concrete architectural lay wire wall body structure with insulating layer
CN203684498U (en) Building block
CN203373872U (en) Cast-in-place concrete self-warm-keeping wall with dismounting-free outer formworks
CN102535847A (en) Method for constructing gypsum self-insulation outer wall block masonry
CN206220057U (en) Open drain one-time-shaped mould
CN205955208U (en) Multi -functional split bolt sleeve pipe
CN206070944U (en) A kind of new insert-type wooden decorative wallboard
CN206289782U (en) LSD non-bearing building block composite self-insulation systems
CN204456890U (en) The prefabricated edge band of a kind of concrete pavement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180619

Termination date: 20211129