CN207513078U - A kind of connection structure of exterior wall finish prefabricated concrete board - Google Patents

A kind of connection structure of exterior wall finish prefabricated concrete board Download PDF

Info

Publication number
CN207513078U
CN207513078U CN201721287227.4U CN201721287227U CN207513078U CN 207513078 U CN207513078 U CN 207513078U CN 201721287227 U CN201721287227 U CN 201721287227U CN 207513078 U CN207513078 U CN 207513078U
Authority
CN
China
Prior art keywords
prefabricated concrete
concrete board
corner portion
fitting
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721287227.4U
Other languages
Chinese (zh)
Inventor
徐慧敏
刘成伟
朱陈磊
盛昶凯
袁凌飞
李世海
缪建杨
叶文浩
包若涵
陈雅根
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201721287227.4U priority Critical patent/CN207513078U/en
Application granted granted Critical
Publication of CN207513078U publication Critical patent/CN207513078U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

A kind of connection structure of exterior wall finish prefabricated concrete board of the utility model, is related to structure peripheral decoration construction technical field.For the problem that existing prefabricated concrete board and the connection mode of agent structure, the operating mode of agent structure exterior wall closing can not be applied to.Prefabricated concrete board is vertically installed between constructing structure foundation beam and its superstructure beam, the built-in fitting one of L-shaped is respectively equipped on the outside of the corner portion of prefabricated concrete board bottom end, the built-in fitting two of L-shaped is respectively equipped on the outside of the corner portion of prefabricated concrete board top, on the outside of foundation beam Reinforced Concrete Corbels are equipped with the prefabricated concrete board bottom end corresponding position of corner portion, the corner portion on Reinforced Concrete Corbels top installs the first embedded part, the second embedded part is installed with the corresponding position of prefabricated concrete board top corner portion in structural beams bottom end, the second embedded part of the first embedded part and structural beams in foundation beam is respectively welded in the built-in fitting one and built-in fitting two at prefabricated concrete board both ends.

Description

A kind of connection structure of exterior wall finish prefabricated concrete board
Technical field
The utility model is related to structure peripheral decoration construction technical field, more particularly to a kind of exterior wall finish prefabricated concrete board Connection structure.
Background technology
Exterior wall finish prefabricated concrete board mainly plays peripheral protective and decoration function in agent structure, therefore in the construction process both Ensure safety and durability after prefabricated concrete board installation, and need to protect the alien invasion of prefabricated concrete board, avoid installing at it Occur to destroy or damage in the process.
At present, prefabricated concrete board and the connection construction of agent structure are mainly in a manner that constructional column adds steel corbel, specifically such as Under:Constructional column is set, and set on constructional column and prefabricated concrete board in agent structure according to the installation site of prefabricated concrete board Steel corbel;During construction, prefabricated concrete board is held on the steel corbel of constructional column and is welded to connect.As it can be seen that above-mentioned connection mode needs Larger construction space is wanted, and it is nearer apart from agent structure exterior wall in prefabricated concrete board, and the construction of agent structure external wall waterproof finishes In the case of can not implement.Therefore, the construction of prefabricated concrete board how is carried out under the operating mode of agent structure exterior wall closing, is ability The technical barrier that field technique personnel face.
Invention content
For existing prefabricated concrete board and the connection mode of agent structure, the work of agent structure exterior wall closing can not be applied to The problem of condition.The purpose of this utility model is to provide a kind of connection structure of exterior wall finish prefabricated concrete board, only need to be by prefabricated concrete board The steel member at both ends is fixed respectively with Reinforced Concrete Corbels and the first embedded part of structural beams, the second slugging, that is, is completed pre- Hanging plate processed and constructing structure are vertically and the fixation of horizontal direction, construction personnel only need to implement to weld in constructing structure periphery Operation does not influence original wall waterproof construction, and required work surface is less, and construction is more convenient.
Technical solution is used by the utility model solves its technical problem:A kind of connection of exterior wall finish prefabricated concrete board Structure, the prefabricated concrete board are vertically installed between constructing structure foundation beam and its superstructure beam, the prefabricated concrete board bottom The built-in fitting one of L-shaped is respectively equipped on the outside of the corner portion of end, L-shaped is respectively equipped on the outside of the corner portion of the prefabricated concrete board top Built-in fitting two, the foundation beam outside are equipped with reinforced concrete clay ox with the prefabricated concrete board bottom end corresponding position of corner portion Leg, the corner portion on the Reinforced Concrete Corbels top install the first embedded part, the structural beams bottom end and the prefabricated concrete board top Hold the corresponding position of corner portion that the second embedded part is installed, the built-in fitting one and built-in fitting two at the prefabricated concrete board both ends are respectively welded In the first embedded part of the foundation beam and the second embedded part of the structural beams.
Preferably, the built-in fitting one and the built-in fitting two are in including being embedded in described the several of prefabricated concrete board corner portion in advance The anchor rib of J-shaped or L-shaped and it is coated on the prefabricated concrete board corner portion and the L-shaped connecting plate being welded and fixed with the anchor rib.
Preferably, the anchor rib is horizontal by 45 degree of angles.
Preferably, first embedded part includes being embedded in several in the Reinforced Concrete Corbels in advance in J-shaped or L shapes First dowel and it is coated on the Reinforced Concrete Corbels corner portion and L-shaped being welded and fixed with first dowel One connecting plate.
Preferably, first dowel is horizontal by 45 degree of angles.
Preferably, second embedded part includes several second dowels for being embedded in the structural beams Basolateral in advance and setting In the structural beams corner portion outer end and the second connecting plate for being welded and fixed with the second dowel.
Preferably, it further includes the first cover board and the second cover board, and first cover board fits in first embedded part and institute It states the outside of built-in fitting one and is welded and fixed respectively with the two, second cover board fits in second embedded part and described pre-buried The outside of part two is simultaneously welded and fixed with the two respectively.
Preferably, one end of the joint bar set in the Reinforced Concrete Corbels is embedded in the Reinforced Concrete Corbels in advance Interior, the other end of the joint bar is embedded in advance in the foundation beam.
The effect of the utility model is:It has constructed for constructing structure exterior wall and its waterproof layer situation about finishing, this The connection structure of the exterior wall finish prefabricated concrete board of utility model takes the connection that vertical supporting member is separated with horizontal force component Mode, profit are used for the Reinforced Concrete Corbels and the first embedded part of vertical load-bearing in the installation of the outside of the foundation beam of constructing structure, The outside installation of structural beams bottom end above foundation beam is used for the second embedded part of horizontal force, moreover, on prefabricated concrete board top And corner portion of the bottom end far from constructing structure side sets steel member, i.e. built-in fitting one and built-in fitting two respectively, it is vertical to install During prefabricated concrete board, only need to by the steel member at prefabricated concrete board both ends respectively with Reinforced Concrete Corbels and the first embedded part of structural beams, Second slugging is fixed, that is, completes that prefabricated concrete board and constructing structure be vertical and the fixation of horizontal direction, so as to be effectively ensured The safety of prefabricated concrete board installation;The prefabricated concrete board is not required to connect with constructional column and steel corbel, structure and its construction step Suddenly it is simplified, improves work efficiency;Construction personnel only needs to implement weld job in constructing structure periphery, does not influence original Have wall waterproof construction, required work surface is less, construction it is more convenient, solve due to exterior wall closing and prefabricated concrete board with The problem of exterior wall spacing very little leads to no operatton space;Moreover, using the pre-buried of prefabricated concrete board and constructing structure end is located at Part is attached, and the installation site of prefabricated concrete board can accurately be adjusted using built-in fitting, improves positioning accuracy, is ensured The construction quality of exterior wall finish;In addition, prefabricated concrete board horizontal force component and vertical supporting member are provided separately, convenient for knot Structure safety checking computations and strengthening construction.
Description of the drawings
Fig. 1 is that the exterior wall finish prefabricated concrete board of one embodiment of the utility model is connected to the schematic diagram of constructing structure;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the structure diagram of the Reinforced Concrete Corbels of one embodiment of the utility model.
Figure label is as follows:
Foundation beam 10;Reinforced Concrete Corbels 11;First embedded part 12;First dowel 12a;First connecting plate 12b;Second buries Part 14;Second dowel 14a;Second connecting plate 14b;Joint bar 15;Structural beams 20;Prefabricated concrete board 30;Built-in fitting 1;Built-in fitting 2 32;Exterior wall 40;Waterproof layer 41;First cover board 51;Second cover board 52.
Specific embodiment
Below in conjunction with the drawings and specific embodiments to the utility model proposes a kind of exterior wall finish prefabricated concrete board connection Structure is described in further detail.According to following explanation and claims, the advantages of the utility model and feature will be more clear Chu.It should be noted that attached drawing is using very simplified form and uses non-accurate ratio, only to conveniently, lucidly Aid in illustrating the purpose of the utility model embodiment.Need in addition it illustrate, attached drawing makes using very simplified form and With non-accurate ratio, the purpose of the present embodiment is only aided in illustrating to convenience, lucidly.For sake of convenience, it is described below " on ", " under " the upper and lower direction with attached drawing is consistent, but this can't be the limitation of technical solutions of the utility model.
For the prefabricated concrete board 30 of the present embodiment by taking prefabricated clear-water concrete decoration panel as an example, prefabricated concrete board 30 installs preceding building Agent structure has been completed to construct, and then, implements the installation of prefabricated concrete board 30, the prefabricated extension of the present embodiment according to design requirement Plate 30 is the board-like component of armored concrete that mold pouring molding is used in factory or scene, it is that height is 3.47m, and width is The rectangular plate of 2.4m.Illustrate the connection structure of the exterior wall finish prefabricated concrete board of the utility model with reference to Fig. 1 to Fig. 3, in advance Hanging plate 30 processed is vertically installed between constructing structure foundation beam 10 and its superstructure beam 20, and 30 bottom end of prefabricated concrete board two turns The built-in fitting 1 of L-shaped is respectively equipped on the outside of corner, L-shaped is respectively equipped on the outside of the corner portion of two, 30 top of prefabricated concrete board Built-in fitting 2 32, the outside of foundation beam 10 set that there are two reinforced concretes with the corresponding position of corner portion of 30 bottom end of prefabricated concrete board two Clay ox leg 11,11 top corner portion of Reinforced Concrete Corbels install the first embedded part 12, and 20 bottom end of structural beams is pushed up with prefabricated concrete board 30 Hold the corresponding position of two corner portions that the second embedded part 14, the built-in fitting 1 at 30 both ends of prefabricated concrete board and built-in fitting 2 32 are installed The second embedded part 14 of the first embedded part 12 and structural beams 20 in foundation beam 10 is respectively welded, wherein " outside " is referred to far from A sides in the side of constructing structure, i.e. Fig. 2.
It has constructed for constructing structure exterior wall 40 and its waterproof layer 41 situation about finishing, the exterior wall 40 of the utility model is adornd The connection structure of face prefabricated concrete board 30 takes the connection mode that vertical supporting member is separated with horizontal force component, and profit is being constructed The outside installation of the foundation beam 10 of structure is used for 11 and first embedded part 12 of Reinforced Concrete Corbels of vertical load-bearing, in foundation beam 10 The outside installation of 20 bottom end of structural beams of top for horizontal force the second embedded part 14, moreover, on 30 top of prefabricated concrete board and Corner portion of the bottom end far from constructing structure side sets steel member, i.e. built-in fitting 1 and built-in fitting 2 32 respectively, vertical to pacify When filling prefabricated concrete board 30, only need to by the steel member at 30 both ends of prefabricated concrete board respectively with Reinforced Concrete Corbels 11 and structural beams 20 First embedded part 12, the second embedded part 14 are welded and fixed, that is, complete prefabricated concrete board 30 and constructing structure vertically and horizontal direction is consolidated It is fixed, so as to which the safety of 30 installation of prefabricated concrete board be effectively ensured;The prefabricated concrete board 30 is not required to and constructional column and steel corbel Connection, structure and its construction procedure are simplified, improve work efficiency;Construction personnel only needs real in the periphery of constructing structure Apply weld job, do not influence original wall waterproof construction, required work surface is less, construction it is more convenient, solve due to The problem of exterior wall 40 is closed and prefabricated concrete board 30 leads to no operatton space with 40 spacing very little of exterior wall;It is moreover, prefabricated using being located at Hanging plate 30 and the built-in fitting of constructing structure end are attached, can utilize built-in fitting to the installation site of prefabricated concrete board 30 into The accurate adjustment of row, improves positioning accuracy, has ensured the construction quality of 40 facing of exterior wall;In addition, by prefabricated concrete board 30 it is horizontal by Power component is provided separately with vertical supporting member, convenient for safety of structure checking computations and strengthening construction.
As shown in Fig. 2, built-in fitting 1 and built-in fitting 2 32 include being embedded in the several in J-shaped of 30 corner portion of prefabricated concrete board in advance Or L-shaped anchor rib and be coated on 30 corner portion of prefabricated concrete board and the L-shaped connecting plate being welded and fixed with anchor rib.It is embedded in advance pre- It can ensure that L-shaped connecting plate is stably connected on prefabricated concrete board 30 in the anchor rib of J-shaped or L-shaped in hanging plate 30 processed, be coated on pre- The L-shaped connecting plate of 30 corner portion of hanging plate processed is convenient for the connection with foundation beam 10 and structural beams 20.
To ensure that L-shaped connecting plate does not shift, and enhance its breakout capacity, anchor rib is horizontal by 45 degree of angles Setting.
Please continue to refer to Fig. 2, the first embedded part 12 includes being embedded in advance several in J shapes or L-shaped in Reinforced Concrete Corbels 11 The first dowel 12a and be coated on 11 corner portion of Reinforced Concrete Corbels and be welded and fixed with the first dowel 12a L-shaped First connecting plate 12b.Similar with principles described above, the first dowel 12a in J-shaped or L-shaped causes the first connecting plate 12b and steel The connection of reinforced concrete bracket 11 is more reliable and more stable, and two of two Reinforced Concrete Corbels 11 and 30 bottom end of prefabricated concrete board turn Corner is corresponding, and therefore, construction personnel can realize prefabricated concrete board 30 by adjusting the relative altitude of two the first connecting plate 12b The fine tuning of horizontal position, reduces the requirement of difficulty of construction and instrument of constructing, and construction is more convenient.
Above-mentioned first dowel 12a is horizontal by 45 degree of angles, to enhance the breakout capacity of the first connecting plate 12b.
As shown in Fig. 2, since constructing structure exterior wall 40 and 20 bottom surface of structural beams equipped with waterproof layer 41, are prevented to avoid damage to Water layer 41, the second embedded part 14 include being embedded in several second dowel 14a of 20 Basolateral of structural beams in advance and are set to structural beams 20 Corner portion outer end and the second connecting plate 14b being welded and fixed with the second dowel 14a.The setting of second embedded part 14 was both anti-from damaging Water layer 41, and being bonded convenient for prefabricated concrete board 30 and structural beams 20.
More preferably, as depicted in figs. 1 and 2, the connection structure of exterior wall finish prefabricated concrete board further includes the first cover board 51 and Two cover boards 52, the first cover board 51 fit in the outside of the first embedded part 12 and built-in fitting 1 and are welded and fixed respectively with the two, the Two cover boards 52 fit in the outside of the second embedded part 14 and built-in fitting 2 32 and are welded and fixed respectively with the two.First cover board 51 and The setting of two cover boards 52, enhances the bonding strength between prefabricated concrete board 30 and foundation beam 10, structural beams 20.
The joint bar 15 set in above-mentioned Reinforced Concrete Corbels 11 includes horizontal main reinforcement and horizontal hoop, and the one of joint bar 15 End is embedded in Reinforced Concrete Corbels 11 in advance, and the other end of joint bar 15 is embedded in advance in foundation beam 10, and above structure causes reinforcing bar to mix Connection between solidifying clay ox leg 11 and foundation beam 10 is more stablized, and is wanted so that the bearing capacity of Reinforced Concrete Corbels 11 meets design It asks.
Illustrate the work progress of the connection structure of exterior wall finish prefabricated concrete board with reference to Fig. 1 and Fig. 2:
First, plantation joint bar 15 and construction and prefabricated concrete board 30 bottom end two corner portion in the foundation beam 10 of constructing structure Corresponding two Reinforced Concrete Corbels 11, install the first embedded part 12, and utilize respectively on two Reinforced Concrete Corbels 11 Two the first connecting plate 12b carry out levelling, the second embedded part 14 of installation in structural beams 20;
2nd, hoisting prefabricated hanging plate 30 and be held on Reinforced Concrete Corbels 11, make the first cover board 51 respectively in advance One 31 and first embedded part 12 of built-in fitting of 30 bottom end of hanging plate processed is welded and fixed, and the second cover board 52 is made to be pushed up respectively with prefabricated concrete board 30 2 32 and second embedded part 14 of built-in fitting at end is welded and fixed.
Foregoing description is only the description to the utility model preferred embodiment, not to any limit of the scope of the utility model Calmly, any change, the modification that the those of ordinary skill in the utility model field does according to the disclosure above content, belonging to right will Seek range.

Claims (8)

1. a kind of connection structure of exterior wall finish prefabricated concrete board, the prefabricated concrete board be vertically installed on constructing structure foundation beam and Between upper part structural beams, it is characterised in that:The built-in fitting of L-shaped is respectively equipped on the outside of the corner portion of the prefabricated concrete board bottom end One, be respectively equipped with the built-in fitting two of L-shaped on the outside of the corner portion of the prefabricated concrete board top, on the outside of the foundation beam with it is described prefabricated The hanging plate bottom end corresponding position of corner portion is equipped with Reinforced Concrete Corbels, and the corner portion on the Reinforced Concrete Corbels top is pacified The first embedded part is filled, the second embedded part, institute are installed in the structural beams bottom end with the corresponding position of prefabricated concrete board top corner portion It states the built-in fitting one at prefabricated concrete board both ends and the first embedded part and the structural beams in the foundation beam is respectively welded in built-in fitting two The second embedded part.
2. connection structure according to claim 1, it is characterised in that:The built-in fitting one and the built-in fitting two include pre- Be embedded in several anchor ribs in J-shaped or L-shaped of the prefabricated concrete board corner portion and be coated on the prefabricated concrete board corner portion and with The L-shaped connecting plate that the anchor rib is welded and fixed.
3. connection structure according to claim 2, it is characterised in that:The anchor rib is horizontal by 45 degree of angles.
4. connection structure according to claim 1, it is characterised in that:First embedded part is mixed including being embedded in the reinforcing bar in advance The first dowel in J-shaped or L-shaped of several in solidifying clay ox leg and be coated on the Reinforced Concrete Corbels corner portion and with it is described The first L-shaped connecting plate that first dowel is welded and fixed.
5. connection structure according to claim 4, it is characterised in that:First dowel is horizontal by 45 degree of angles.
6. connection structure according to claim 1, it is characterised in that:Second embedded part includes being embedded in the structural beams in advance Several second dowels of Basolateral and it is set to the structural beams corner portion outer end and be welded and fixed with the second dowel second Connecting plate.
7. connection structure according to any one of claims 1 to 6, it is characterised in that:Further include the first cover board and the second lid Plate, first cover board fit in the outside of first embedded part and the built-in fitting one and are welded and fixed respectively with the two, institute The second cover board is stated to fit in the outside of second embedded part and the built-in fitting two and be welded and fixed with the two respectively.
8. connection structure according to claim 1, it is characterised in that:The joint bar set in the Reinforced Concrete Corbels One end is embedded in advance in the Reinforced Concrete Corbels, and the other end of the joint bar is embedded in advance in the foundation beam.
CN201721287227.4U 2017-09-30 2017-09-30 A kind of connection structure of exterior wall finish prefabricated concrete board Active CN207513078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721287227.4U CN207513078U (en) 2017-09-30 2017-09-30 A kind of connection structure of exterior wall finish prefabricated concrete board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721287227.4U CN207513078U (en) 2017-09-30 2017-09-30 A kind of connection structure of exterior wall finish prefabricated concrete board

Publications (1)

Publication Number Publication Date
CN207513078U true CN207513078U (en) 2018-06-19

Family

ID=62533949

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721287227.4U Active CN207513078U (en) 2017-09-30 2017-09-30 A kind of connection structure of exterior wall finish prefabricated concrete board

Country Status (1)

Country Link
CN (1) CN207513078U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532792A (en) * 2018-07-11 2018-09-14 山东圆梦绿色建筑科技有限公司 Assembled integrates exterior wall enclosure system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108532792A (en) * 2018-07-11 2018-09-14 山东圆梦绿色建筑科技有限公司 Assembled integrates exterior wall enclosure system

Similar Documents

Publication Publication Date Title
CN108643428B (en) But height-adjusting's assembled precast concrete coincide floor
CN104153462A (en) Staggered floor hanging type prefabricated bay window
CN103237942B (en) For building the disposable template of the modularization formwork for shallow foundation pouring piece
CN110284587A (en) A kind of prefabricated window and connection joints of steel structure and the construction method of floaing of staggered floor
CN109914781A (en) A kind of monoblock type overlapping board construction method
CN110185135A (en) A kind of basement bottom board and external wall waterproof structure and construction method
CN107859250A (en) A kind of assembled arthitecutral structure and its construction method
KR101844344B1 (en) the rigid connection structure between precast concrete column and precast concrete beam, the construction method of rigid connection structure using the same
CN207513078U (en) A kind of connection structure of exterior wall finish prefabricated concrete board
CN108755972A (en) Prefabricated component feet and its application method
CN107299678A (en) A kind of fabricated structure
CN110644624A (en) Building connection node and construction method thereof
CN207110214U (en) A kind of prefabricated interior fill concrete wallboard
CN107237448B (en) The prefabricated interior fill concrete wallboard of one kind and its manufacturing method
CN105756377A (en) Swimming pool and construction method thereof
JP2022175669A (en) Construction method of mat foundation
CN208815717U (en) A kind of autoclave aerated concrete building block filling wall
CN108978946A (en) A kind of autoclave aerated concrete building block filling wall and its construction method
CN108661224B (en) But height-adjusting's assembled concrete coincide floor
CN209723209U (en) Assembled window that wafts
CN208586938U (en) Light steel frame EPS modular house
CN101173530A (en) Construction method of concrete wall panel
KR101862567B1 (en) Standardization of Mat Foundation assembling House system
KR101836896B1 (en) the rigid connection structure between precast concrete column and precast concrete beam, the construction method of rigid connection structure using the same
CN209082681U (en) A kind of prefabricated assembled bay window constructing structure of residential building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant