CN207499009U - The horizontal static load device of super-large diameter single-pile foundation - Google Patents

The horizontal static load device of super-large diameter single-pile foundation Download PDF

Info

Publication number
CN207499009U
CN207499009U CN201721593414.5U CN201721593414U CN207499009U CN 207499009 U CN207499009 U CN 207499009U CN 201721593414 U CN201721593414 U CN 201721593414U CN 207499009 U CN207499009 U CN 207499009U
Authority
CN
China
Prior art keywords
anchor cable
pulley
super
movable pulley
large diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721593414.5U
Other languages
Chinese (zh)
Inventor
王其标
张成芹
邱松
吴锋
钟扬
黄周泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Shanghai Harbour Engineering Design and Research Institute Co Ltd
Original Assignee
CCCC Shanghai Harbour Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Shanghai Harbour Engineering Design and Research Institute Co Ltd filed Critical CCCC Shanghai Harbour Engineering Design and Research Institute Co Ltd
Priority to CN201721593414.5U priority Critical patent/CN207499009U/en
Application granted granted Critical
Publication of CN207499009U publication Critical patent/CN207499009U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses the horizontal static load devices of super-large diameter single-pile foundation, including the tensile machine being arranged on pile body, the grip mechanism being arranged on outside pile body, pulley assembly and multistage anchor cable, anchor cable includes first section anchor cable, interlude anchor cable and latter end anchor cable, one end of first section anchor cable is connect with tensile machine, and the other end is connect with pulley assembly;One end of latter end anchor cable is connect with pulley assembly, and the other end is connect with grip mechanism;Interlude anchor cable is set around pulley assembly.Compared with prior art, the utility model has many advantages, such as that simple in structure, easy to operate, the economic, practical property of cost is strong.

Description

The horizontal static load device of super-large diameter single-pile foundation
Technical field
The utility model belongs to architecture foundation pile detection technique field, and in particular to a kind of super-large diameter single-pile foundation level is quiet It carries and puts.
Background technology
Horizontal static load test is to judge that pile foundation level bearing capacity the most directly with accurate method, passes through static load test The rational rated figure of ground earth resistance and corresponding flexibly base system can be determined in the hope of the lateral subgrade reaction of foundation soil Number, and obtain the horizontal bearing capacity of test pile.
Marine single pile, particularly marine super-large diameter single pile Its ultimate bearing capacity is much larger than normal dia pile foundation and erects Similar to bearing capacity static load test, horizontal force experiment equally exists the problem of loading method is with tonnage is loaded.For conventional water The horizontal force of work building such as Pile Foundation of Wharf or offshore wind turbine foundation sea single pile is tested, if continuing to use past counter-force stake pattern, Single pile is beaten as counter-force stake, only the fee of material of counter-force single pile just millions of members, and the not yet expenses such as consideration ship machine easily.Cause This must take into consideration new counter-force pattern, reduce test pile expense.
Utility model content
For the above-mentioned prior art the shortcomings that or deficiency, the technical problem to be solved by the present invention is to provide a kind of structures It is simple and convenient to operate, the horizontal static load device of super-large diameter single-pile foundation that the economic, practical property of cost is strong.
In order to solve the above technical problems, the utility model has following form:
The horizontal static load device of super-large diameter single-pile foundation, including tensile machine, grip mechanism, pulley assembly and multistage anchor Rope, the tensile machine are arranged on pile body, and the grip mechanism is arranged on the outside of the pile body and throws to seabed, the anchor cable Including first section anchor cable, interlude anchor cable and latter end anchor cable, one end of the first section anchor cable is fixedly connected with the tensile machine, The other end is fixedly connected with the pulley assembly;One end of the latter end anchor cable is fixedly connected with the pulley assembly, the other end It is fixedly connected with the grip mechanism;The interlude anchor cable is set around the pulley assembly.
The pulley assembly includes fixed pulley, at least one column and at least one movable pulley, the fixed pulley and institute Column is stated to be fixedly mounted on the pile body;The movable pulley is arranged on the outside of the pile body;Described first section anchor cable one end is fixed In the tensile machine, the other end is fixedly mounted on the column, and intermediate portion winds the fixed pulley and institute State movable pulley setting;One end of the latter end anchor cable is fixed on the central shaft of the last one movable pulley, and the other end is fixedly mounted In the grip mechanism;The interlude anchor cable winds the fixed pulley and movable pulley setting, wherein, the interlude One end of anchor cable is fixed on the column, is set successively around the fixed pulley and the movable pulley, and the other end fixes peace On the central shaft of a upper movable pulley.
The column is identical with the setting quantity of the movable pulley.
One fewer than the setting quantity of the column or the movable pulley of the setting quantity of the interlude anchor cable.
It is additionally provided on the pile body and strengthens steel construction job platform.
The tensile machine is hoist engine.
The grip mechanism is high holding power anchor.
Compared with prior art, the utility model has the following technical effect that:
The utility model can realize in-site installation and dismounting, easy to operate, reusable, eliminate making counter-force The high cost of stake, fixed counterforce device or the transport of ballast platform, greatly reduces input cost;
The utility model changes Impact direction using pulley assembly, and due to province's force characteristic of pulley assembly, hoist engine is only It need to be placed at the top of pile body and only need to apply the actual loading load much smaller than pile body, you can meet the needs of horizontal addload;This The pluck power that utility model is generated by hoist engine achievees the purpose that the horizontal static load of super-large diameter single-pile foundation application, and coordinates Normal direction high holding power anchor provides tensioning stable horizontal pull;
The utility model use high holding power anchor have stabilising fin, it is thick and solid and roomy, to various substrates it is adaptable, nibble Soil is rapid, grabs the advantages that bottom stability is good, holding power to weight ratio is high.
Description of the drawings
By reading the detailed description made to non-limiting example made with reference to the following drawings, the application's is other Feature, objects and advantages will become more apparent upon:
Fig. 1:The horizontal static load apparatus structure schematic diagram of the utility model super-large diameter single-pile foundation;
Fig. 2:The vertical view of structure as shown in Figure 1;
Fig. 3:The structure diagram of grip component in the utility model.
Specific embodiment
The technique effect of the design of the utility model, concrete structure and generation is made furtherly below with reference to attached drawing It is bright, to be fully understood from the purpose of this utility model, feature and effect.
As shown in Figure 1 to Figure 2, the horizontal static load device of the present embodiment super-large diameter single-pile foundation, including being arranged on pile body 10 On tensile machine 20, be arranged on the outside of pile body 10 and throw to the grip mechanism 30 in seabed, pulley assembly and multistage anchor cable 50, The anchor cable 50 includes first section anchor cable, interlude anchor cable and latter end anchor cable, one end and the puller system of the first section anchor cable Structure 20 is fixedly connected, and the other end is fixedly connected with the pulley assembly;One end of the latter end anchor cable is consolidated with the pulley assembly Fixed connection, the other end are fixedly connected with the grip mechanism 30;The interlude anchor cable is set around the pulley assembly.This reality In-site installation and dismounting can be realized by applying example, easy to operate, reusable, eliminated and made counter-force stake, fixed counterforce device Or the high cost of ballast platform transport, greatly reduce input cost.
The pulley assembly includes fixed pulley 12, at least one column 11 and at least one movable pulley 40, described to determine cunning Wheel 12 and the column 11 are fixedly mounted on the pile body 10;The movable pulley 40 is arranged on 10 outside of pile body;It is described First section anchor cable one end is fixedly mounted in the tensile machine 20, and the other end is fixedly mounted on the column 11, intermediate portion The winding fixed pulley 12 and the movable pulley 40 is divided to set;One end of the latter end anchor cable is fixed on the last one movable pulley 40 Central shaft on, the other end is fixedly mounted in the grip mechanism 30;The interlude anchor cable winds 12 He of fixed pulley The movable pulley 40 is set, wherein, one end of the interlude anchor cable is fixed on the column 11, determines cunning successively around described Wheel 12 and the movable pulley 40 are set, and the other end is fixedly mounted on the central shaft of a movable pulley 40.Using pulley assembly Changeable Impact direction, and due to province's force characteristic of movable pulley, hoist engine only needs to be placed at the top of pile body and only needs to apply remote small In the actual loading load of pile body, you can meet the needs of horizontal addload.
The column 11 is identical with the setting quantity of the movable pulley 40, described in the setting quantity ratio of the interlude anchor cable The setting quantity of column 11 or the movable pulley 40 is one few.To increase sliding stability, first section anchor cable or interlude anchor cable according to It is secondary around the movable pulley 40 and fixed pulley 12, the other end be fixedly mounted on on the 40 corresponding column 11 of movable pulley. In the present embodiment, the setting quantity of the movable pulley 40 is not limited to as shown in Figure 1 two, to be further reduced hoist engine The pulling force of offer, the setting quantity of increase movable pulley 40 that can be suitably, the quantity of the column 11 and interlude anchor cable also phase It should increase.
It is additionally provided on the pile body 10 and strengthens steel construction job platform 13, the reinforcement steel construction job platform 13 can increase The intensity and rigidity of strong pile body 10, while provide job platform for test pile.
The tensile machine 20 is preferably hoist engine or other can provide the mechanism of larger pluck power.
The grip mechanism 30 of the present embodiment is preferably high holding power anchor.The type of anchor is more, can by its structure and purposes difference It is divided into stocked anchor, patent anchor, high holding power anchor and extraordinary anchor etc..Stocked anchor is simple in structure, and pawl power is big (holding power to weight ratio 4~8), and it is steady to grab bottom It is qualitative preferable;But its inconvenience of casting anchor and collect, easily snarls anchor cable, hull bottom is easily scratched in shallow water anchorage.Two when patent anchor grabs soil Pawl buries simultaneously, simple in structure, throw anchor operation and collection is convenient;But its grip is small (holding power to weight ratio 2.5~4), and when circulation is easy It harrows loose soil and causes and drag of anchor.High holding power anchor point has bar high holding power anchor and without bar high holding power anchor, its main feature is that anchor fluke is wide and long, nibbles Soil is deep, stability is good and holding power to weight ratio is big.The design feature of extraordinary anchor is different from common anchor, is generally used for buoy, light boat, floating dock And the permanent mooring such as floating wharf.Marine anchor market at this stage is with first generation patent anchor (mainly Hall'sanchor and speke anchor Deng) and second generation patent anchor (i.e. without bar high holding power anchor, mainly AC-14 types anchor etc.) based on, the former be suitable for big-and-middle type ship, The latter is suitable for super large marine.
The present embodiment requirement anchor has preferable position stability.The sub-sea conditions of anchorage be very soft sill clay, ground Matter is preferable.Analyzed with reference to type and the purposes of anchor, the AC-14 type anchors in high holding power anchor, have stabilising fin it is thick and solid and roomy, to each Kind of substrate it is adaptable, nibble it is native it is rapid, grab that bottom stability is good and holding power to weight ratio height (value 12~14), also, AC-14 types are big The grip of grip anchor is at least the common patent anchor of equivalent weight more than twice.To sum up, grip mechanism 30 described in the present embodiment is preferred For the AC-14 types anchor (as shown in Figure 3) in high holding power anchor.
The present embodiment super-large diameter single-pile foundation horizontally loading test method, includes the following steps:
Step 1:Tensile machine 20 on the pile body 10 is set, hoist engine is preferably mounted on to the top of the pile body 10 Portion;
Step 2:Grip mechanism 30, the AC-14 type anchors being preferably provided in high holding power anchor are set outside the pile body 10;
Step 3:Install pulley assembly, one end of the first section anchor cable is fixedly connected with the hoist engine, the other end and The pulley assembly is fixedly connected;The interlude anchor cable is set around the pulley assembly;By the one of the latter end anchor cable End is fixedly connected with the pulley assembly, and the other end is fixedly connected with the high holding power anchor.
In above-mentioned steps three, to set there are four the embodiments of movable pulley 40 to be specifically described:
In the present embodiment, four movable pulleys are named as the first movable pulley, second movable pulley, third and move successively Pulley and the 4th movable pulley, the interlude anchor cable being corresponding in turn to the movable pulley entitled first interlude anchor successively Rope, the second interlude anchor cable and third interlude anchor cable, are named as successively with the column that the movable pulley is corresponding in turn to First column, the second column, third column and the 4th column.
One end of the first section anchor cable is fixedly mounted on the hoist engine, intermediate portion wind the fixed pulley and First movable pulley is set, and the other end is fixedly mounted on the first column;One end of the first interlude anchor cable is fixed on It on two columns, is set successively around the fixed pulley and the second movable pulley, the other end is fixedly mounted in the first movable pulley In mandrel;One end of the second interlude anchor cable is fixed on third column, bypasses the fixed pulley and third successively Movable pulley is set, and the other end is fixedly mounted on the central shaft of the second movable pulley;One end of the third interlude anchor cable is consolidated It is scheduled on the 4th column, is set successively around the fixed pulley and the 4th movable pulley, the other end is fixedly mounted on the 4th dynamic cunning On the central shaft of wheel;One end of the latter end anchor cable is fixed on the central shaft of the 4th movable pulley, the other end is fixedly mounted on On the AC-14 types anchor.
The utility model changes the direction of stress using pulley assembly, and due to province's force characteristic of pulley assembly, hoist engine It only needs to be placed at the top of pile body and only needs to apply much smaller than pile body actual loading load, you can meet the needs of horizontal addload.It adopts It is exerted a force with hoist engine and pulling force is provided, the direction of hoist engine offer power is provided jointly using pulley assembly and AC-14 types anchor, be super large Single-pile foundation provides the self-reaction force of horizontal direction;The utility model can realize in-site installation and dismounting, easy to operate, repeat It uses, eliminates the cost for making counter-force stake, fixed counterforce device or the transport of ballast platform, greatly reduce input cost;Cause This, the utility model has good market application foreground.
Above example is only to illustrate the technical solution of the utility model and non-limiting, reference only to preferred embodiment pair The utility model is described in detail.It it will be understood by those of ordinary skill in the art that can be to the technology of the utility model Scheme is modified or equivalent replacement, without departing from the spirit and scope of technical solutions of the utility model, should all cover in this reality With in novel right.

Claims (7)

1. the horizontal static load device of super-large diameter single-pile foundation, which is characterized in that
Including tensile machine (20), grip mechanism (30), pulley assembly and multistage anchor cable (50),
The tensile machine (20) is arranged on pile body (10),
The grip mechanism (30) is arranged on the outside of the pile body (10),
The anchor cable (50) includes first section anchor cable, interlude anchor cable and latter end anchor cable,
One end of the first section anchor cable is fixedly connected with the tensile machine (20), and the other end is fixed with the pulley assembly to be connected It connects;
One end of the latter end anchor cable is fixedly connected with the pulley assembly, the other end and the fixed company of the grip mechanism (30) It connects;
The interlude anchor cable is set around the pulley assembly.
2. the horizontal static load device of super-large diameter single-pile foundation according to claim 1, which is characterized in that the pulley assembly Including fixed pulley (12), at least one column (11) and at least one movable pulley (40),
The fixed pulley (12) and the column (11) are fixedly mounted on the pile body (10);
The movable pulley (40) is arranged on the outside of the pile body (10);
Described first section anchor cable one end is fixedly mounted in the tensile machine (20), and the other end is fixedly mounted on the column (11) On, intermediate portion winds the fixed pulley (12) and the movable pulley (40) setting;
One end of the latter end anchor cable is fixed on the central shaft of the last one movable pulley (40), and the other end is fixedly mounted on described In grip mechanism (30);
The interlude anchor cable winds the fixed pulley (12) and the movable pulley (40) setting, wherein, the interlude anchor cable One end be fixed on the column (11), successively around the fixed pulley (12) and the movable pulley (40) setting, the other end It is fixedly mounted on the central shaft of a movable pulley (40).
3. the horizontal static load device of super-large diameter single-pile foundation according to claim 2, which is characterized in that the column (11) It is identical with the setting quantity of the movable pulley (40).
4. the horizontal static load device of super-large diameter single-pile foundation according to Claims 2 or 3, which is characterized in that the centre One fewer than the setting quantity of the column (11) or the movable pulley (40) of the setting quantity of section anchor cable.
5. the horizontal static load device of super-large diameter single-pile foundation according to claim 1, which is characterized in that the pile body (10) On be additionally provided with strengthen steel construction job platform (13).
6. the horizontal static load device of super-large diameter single-pile foundation according to claim 1, which is characterized in that the tensile machine (20) it is hoist engine.
7. the horizontal static load device of super-large diameter single-pile foundation according to claim 1, which is characterized in that the grip mechanism (30) it is high holding power anchor.
CN201721593414.5U 2017-11-24 2017-11-24 The horizontal static load device of super-large diameter single-pile foundation Active CN207499009U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721593414.5U CN207499009U (en) 2017-11-24 2017-11-24 The horizontal static load device of super-large diameter single-pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721593414.5U CN207499009U (en) 2017-11-24 2017-11-24 The horizontal static load device of super-large diameter single-pile foundation

Publications (1)

Publication Number Publication Date
CN207499009U true CN207499009U (en) 2018-06-15

Family

ID=62506072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721593414.5U Active CN207499009U (en) 2017-11-24 2017-11-24 The horizontal static load device of super-large diameter single-pile foundation

Country Status (1)

Country Link
CN (1) CN207499009U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107794957A (en) * 2017-11-24 2018-03-13 中交上海港湾工程设计研究院有限公司 The horizontal static load device of super-large diameter single-pile foundation and test method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107794957A (en) * 2017-11-24 2018-03-13 中交上海港湾工程设计研究院有限公司 The horizontal static load device of super-large diameter single-pile foundation and test method

Similar Documents

Publication Publication Date Title
US9856621B2 (en) Method of construction, installation, and deployment of an offshore wind turbine on a concrete tension leg platform
CN101565091B (en) Installation equipment of above-water wind generator and construction method thereof
CN205365991U (en) Cable arrangement structure of hybrid spar platform
CN102079476A (en) Fan-holding equipment and mobile waterborne platform
CN101812849A (en) Offshore single-pile base structure and installation method thereof
AU2011201391A1 (en) Device and method for erecting at sea a large slender body, such as the monopile of a wind turbine
CN104480865B (en) A kind of Large Steel open caisson accurate positioning method
CN102328732A (en) Offshore pile driving, pile pressing and installing united engineering ship
CN107804437A (en) Sit bottom jack up wind-powered electricity generation pile driving barge
CN101078211A (en) Underwater anchorage system auxiliary wooden stool structure platform and construction method thereof
WO2011102738A2 (en) A method and vessel for offshore transport and installation of windmill assemblies
CN107401118A (en) A kind of suspension bridge pier-stage type prestressing force anchorage
CN207499009U (en) The horizontal static load device of super-large diameter single-pile foundation
US20140248091A1 (en) Construction and installation process to deploy a wind turbine "WTG" on a tension leg platform/spar in medium to deep water
CN106719218B (en) Single-point anchoring type circular deepwater net cage
CN101871207B (en) Offshore wind turbine bearing device
CN102337746B (en) Installation and construction method of offshore wind power generation tower foundation and structure
CN106351121A (en) Suspension cable bridge abutment type pre-stress anchorage
CN107795438B (en) A kind of construction method of assistance platform
CN107794957A (en) The horizontal static load device of super-large diameter single-pile foundation and test method
CN106665445A (en) Deepwater cage single-point dual-anchor anchoring system and mounting method thereof
CN206713803U (en) A kind of single-point anchoring type circular deep water net cage
CN206591438U (en) A kind of suspension bridge pier-stage type prestressing force anchorage
CN115679913A (en) Large-diameter float-blocking main cable river-crossing construction method
DK2440708T3 (en) Foundation for offshore tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant