CN207498959U - Double pile-anchor system - Google Patents

Double pile-anchor system Download PDF

Info

Publication number
CN207498959U
CN207498959U CN201720992593.3U CN201720992593U CN207498959U CN 207498959 U CN207498959 U CN 207498959U CN 201720992593 U CN201720992593 U CN 201720992593U CN 207498959 U CN207498959 U CN 207498959U
Authority
CN
China
Prior art keywords
campshed
anchor
pile
soil body
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720992593.3U
Other languages
Chinese (zh)
Inventor
张志威
王振宇
李波
亓立刚
崔爱珍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201720992593.3U priority Critical patent/CN207498959U/en
Application granted granted Critical
Publication of CN207498959U publication Critical patent/CN207498959U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model is related to a kind of double pile-anchor systems, including the first campshed, enclose set on margin of foundation pit;Second campshed is enclosed on the outside of first campshed and is connect with the top of first campshed;The first campshed lower part drawknot is fixed on the soil body by the first anchor structure by first anchor structure;And second anchor structure, the second row stake top portion drawknot is fixed on by the soil body by second anchor structure.Wherein, first campshed includes multiple the first support piles being arranged in parallel;Second campshed includes multiple the second support piles being arranged in parallel;Twice of spacing of the spacing between two neighboring first support pile between two neighboring second support pile.The beneficial effects of the utility model are:By setting double-row pile, under the premise of pattern foundation pit supporting structure safety is ensured, using only two layers of anchor structure, so as to achieve the effect that optimize anchor pole number of rows, accelerate construction progress.

Description

Double pile-anchor system
Technical field
The utility model is related to technical field of building construction, refer in particular to a kind of double pile-anchor system.
Background technology
The anchor type of deep foundation pit supporting structure is varied, by structure type can be divided into anchorage pile (reinforced concrete pile, Steel sheet pile, steel-pipe pile, piling bar, steel tube concrete pile etc.) and anchor tie wall (armored concrete diaphram wall etc.), it is arranged by anchor pole Several points have individual layer anchor structure and multilayer anchor structure, have shallow embedding formula anchor structure and deep embeded type anchoring knot by stress characteristic point Structure.
Single armored concrete piled anchor system, using more generally, is wanted in base pit engineering with the development foundation depth in city Ask increasingly deeper, it is more universal with reference to the way of multilayer anchoring on this basis, but anchor pole number of rows is more, when working procedure occupies Between it is longer, be unfavorable for earthwork construction and work continuously, and avoid engineering pile adjacent anchor pole intersection and have some impact on, influence to construct into Degree.
Utility model content
The purpose of the utility model is to overcome a kind of double pile-anchor system the defects of the prior art, is provided, can solve The problem of anchor pole number of rows excessively influences construction speed.
Realizing the technical solution of above-mentioned purpose is:
The utility model provides a kind of double pile-anchor system, including:
First campshed, encloses set on margin of foundation pit;
Second campshed is enclosed on the outside of first campshed and is connect with the top of first campshed;
The first campshed lower part drawknot is fixed on the soil body by the first anchor structure by first anchor structure;With And
The second row stake top portion drawknot is fixed on the soil body by the second anchor structure by second anchor structure.
The beneficial effects of the utility model are, by setting double-row pile, under the premise of pattern foundation pit supporting structure safety is ensured, only make With two layers of anchor structure, so as to achieve the effect that optimize anchor pole number of rows, accelerate construction progress.
The double pile-anchor system of the utility model further improvement lies in that,
First campshed includes multiple spaced first support piles;
Second campshed includes multiple spaced second support piles;
Twice of spacing of the spacing between two neighboring first support pile between two neighboring second support pile.
The double pile-anchor system of the utility model further improvement lies in that, first campshed, which further includes, is connected to described The first Guan Liang at the top of one support pile.
The double pile-anchor system of the utility model further improvement lies in that, second campshed, which further includes, is connected to described The second Guan Liang at the top of two support piles and the connecting plate being connected between second Guan Liang and first Guan Liang, described second Campshed is connect by the connecting plate with the top of first campshed.
The double pile-anchor system of the utility model further improvement lies in that,
The top surface of second Guan Liang is formed with an inclined-plane at the connecting plate;
Second anchor structure includes the second anchor rod, and one end of second anchor rod is consolidated by one second anchoring piece At the inclined-plane in second Guan Liang, the other end be anchored in the soil body on the outside of second campshed, so as to by institute It states second row stake top portion drawknot and is fixed on the soil body.
The double pile-anchor system of the utility model further improvement lies in that, second anchor rod is perpendicular to the inclined-plane.
The double pile-anchor system of the utility model further improvement lies in that, first anchor structure include waist rail and first Anchor rod, the waist rail are fixedly arranged on the medial surface of the first campshed lower part, and one end of first anchor rod passes through the first anchor Firmware is fixed on the waist rail, the other end is anchored in the soil body on the outside of first campshed, thus will be under first campshed Portion's drawknot is fixed on the soil body.
Description of the drawings
Fig. 1 is the structure diagram of the double pile-anchor system of the utility model.
Fig. 2 is the side view of the double pile-anchor system of the utility model.
Fig. 3 is the vertical view of the double pile-anchor system of the utility model.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments.
Refering to Fig. 1, the utility model provides a kind of double pile-anchor system, under the premise of pattern foundation pit supporting structure safety is ensured, Reduce influence of the anchor bolt construction process to earthwork, accelerate construction progress, improve single piled anchor architecture, by increasing by one The stake of placing of reinforcement concrete support and Guan Liang increase supporting construction overall stiffness and stability, optimize anchor pole number of rows, quickening construct into Degree.
To the utility model, double pile-anchor system illustrates below in conjunction with the accompanying drawings.
As shown in Figure 1 to Figure 3, the double pile-anchor system of the utility model includes the first campshed, the second campshed, the first anchoring knot Structure and the second anchor structure.
Wherein, the first campshed is enclosed set on margin of foundation pit, including multiple the first support piles 11 being vertically arranged and is connected to First Guan Liang 12 at 11 top of the first support pile.Preferably, the second Guan Liang 12 and the second support pile 11 are armored concrete knot Structure.
First anchor structure is used to the first campshed drawknot being fixed on the soil body, and the first anchor structure includes waist rail 13, the One anchor rod 14 and the first anchoring piece 15.Waist rail 13 is elongated structure, and the horizontal gear of waist rail 13 is set on the lower part of the first campshed, It is posted and fixed with the medial surface of the first campshed, side of the waist rail 13 far from the first campshed is formed with a support tilted upward Face, and the through-hole passed through for the first anchor rod 14 is offered on waist rail 13.It is formed between two adjacent the first support piles 11 Gap, one end of the first anchor rod 14 through the gap and pass through corresponding through-hole and fixed one first anchoring piece on waist rail 13 15th, the other end is anchored in the soil body on the outside of the first campshed, which is resisted against the supporting surface of waist rail 13, due to this Supporting surface is the face tilted upward so that the first anchor rod 14 is anchored in the soil body inclined downward, and the first anchor rod 14 hangs down Directly in the supporting surface, increase the intensity of drawknot.
Second campshed is enclosed set on the outside of the first campshed, including multiple the second support piles 21 being vertically arranged, is connected to Second Guan Liang 22 at two support piles, 21 top and the connecting plate 23 being connected between the second Guan Liang 22 and the first Guan Liang 12.It is preferred that Ground, the spacing between the second support pile 21 and the first support pile 11 are 2.5m.Second campshed passes through the connecting plate 23 and first row The top connection of stake.Spacing of the spacing between two neighboring first support pile 11 between two neighboring second support pile 21 Twice, so as to reduce working procedure, reduce construction cost.By setting second campshed, pattern foundation pit supporting structure safety ensure that.It is excellent Selection of land, the second Guan Liang 22 and the second support pile 21 are reinforced concrete structure.
Second anchor structure is used to the second campshed drawknot being fixed on the soil body, including the second anchor rod 24 and the second anchoring Part 25.The top of second Guan Liang 22 is formed with an inclined-plane at connecting plate 23, shape between adjacent two the second support piles 21 Into there is gap, one end of the second anchor rod 24, which runs through the gap and the second Guan Liang 22 and passes through the second anchoring piece 25, is fixed on second At inclined-plane in Guan Liang 22, the other end be anchored in the soil body on the outside of the second campshed, the second anchoring piece 25 is resisted against the second Guan Liang 22 inclined-plane, since the inclined-plane is the face that tilts upward so that the second anchor rod 24 is anchored in the soil body inclined downward, and Second anchor rod 24 increases the intensity of drawknot perpendicular to the inclined-plane.And second anchor rod 24 pass through the second Guan Liang 22, be pass through by Second anchor rod 24 is placed in what the second Guan Liang of after-pouring 22 in 22 casting space of the second Guan Liang was formed, and the second anchor rod 24 is also logical The top that the second Guan Liang 22 is anchored in the second campshed is crossed, strengthens the anchoring strength of the second anchor rod 24.
The double pile-anchor system of the utility model has the beneficial effect that:
By setting double-row pile, under the premise of pattern foundation pit supporting structure safety is ensured, using only two layers of anchor structure, so as to reach Optimization anchor pole number of rows, the effect that accelerates construction progress.
The utility model is described in detail above in association with attached drawing embodiment, those skilled in the art can root Many variations example is made to the utility model according to above description.Thus, certain details in embodiment should not be formed to this practicality Novel restriction, the utility model will be using the ranges that the appended claims define as the scope of protection of the utility model.

Claims (3)

1. a kind of double pile-anchor system, which is characterized in that including:
First campshed is enclosed set on margin of foundation pit, and first campshed includes multiple spaced first support piles and is connected to The first Guan Liang at the top of first support pile;
Second campshed is enclosed on the outside of first campshed and is connect with the top of first campshed, the second campshed packet It includes multiple spaced second support piles, the second Guan Liang being connected at the top of second support pile and is connected to described second Connecting plate between Guan Liang and first Guan Liang, the top that second campshed passes through the connecting plate and first campshed Connection, the top surface of second Guan Liang is formed with an inclined-plane at the connecting plate;
The first campshed lower part drawknot is fixed on the soil body by the first anchor structure by first anchor structure;And
The second row stake top portion drawknot is fixed on the soil body by the second anchor structure by second anchor structure, and described Two anchor structures include the second anchor rod, and second hat is fixed in one end of second anchor rod by one second anchoring piece At the inclined-plane on beam, the other end be anchored in the soil body on the outside of second campshed, so as to by the second row stake top portion Drawknot is fixed on the soil body, and second anchor rod is perpendicular to the inclined-plane.
2. double pile-anchor system as described in claim 1, which is characterized in that the spacing between two neighboring second support pile is Twice of spacing between two neighboring first support pile.
3. double pile-anchor system as described in claim 1, which is characterized in that first anchor structure includes waist rail and first Anchor rod, the waist rail are fixedly arranged on the medial surface of the first campshed lower part, and one end of first anchor rod passes through the first anchor Firmware is fixed on the waist rail, the other end is anchored in the soil body on the outside of first campshed, thus will be under first campshed Portion's drawknot is fixed on the soil body.
CN201720992593.3U 2017-08-09 2017-08-09 Double pile-anchor system Expired - Fee Related CN207498959U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720992593.3U CN207498959U (en) 2017-08-09 2017-08-09 Double pile-anchor system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720992593.3U CN207498959U (en) 2017-08-09 2017-08-09 Double pile-anchor system

Publications (1)

Publication Number Publication Date
CN207498959U true CN207498959U (en) 2018-06-15

Family

ID=62496151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720992593.3U Expired - Fee Related CN207498959U (en) 2017-08-09 2017-08-09 Double pile-anchor system

Country Status (1)

Country Link
CN (1) CN207498959U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113802574A (en) * 2021-09-30 2021-12-17 王宝林 Roadbed rapid supporting structure for roadbed-side foundation pit construction and construction method thereof
CN114045815A (en) * 2021-12-03 2022-02-15 广东建基基础工程有限公司 PRC (prestressed concrete pipe) pipe pile for deep foundation pit supporting and pile splicing method thereof
CN114837199A (en) * 2022-07-04 2022-08-02 中国建筑第六工程局有限公司 Oval foundation pit supporting method of local rigidity reinforced unsupported anchor structure

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113802574A (en) * 2021-09-30 2021-12-17 王宝林 Roadbed rapid supporting structure for roadbed-side foundation pit construction and construction method thereof
CN113802574B (en) * 2021-09-30 2022-12-23 王宝林 Roadbed rapid supporting structure for roadbed-side foundation pit construction and construction method thereof
CN114045815A (en) * 2021-12-03 2022-02-15 广东建基基础工程有限公司 PRC (prestressed concrete pipe) pipe pile for deep foundation pit supporting and pile splicing method thereof
CN114837199A (en) * 2022-07-04 2022-08-02 中国建筑第六工程局有限公司 Oval foundation pit supporting method of local rigidity reinforced unsupported anchor structure
CN114837199B (en) * 2022-07-04 2022-11-01 中国建筑第六工程局有限公司 Oval foundation pit supporting method of local rigidity reinforced unsupported anchor structure

Similar Documents

Publication Publication Date Title
CN203145038U (en) Latticed column type tower crane foundation
CN207498959U (en) Double pile-anchor system
CN105155548B (en) A kind of drag-line double-row pile (wall) supporting construction
CN202323962U (en) Composite supporting structure of drainage pipe pile and soil nailing wall
CN205975658U (en) Steel platform tower crane foundation
CN103603358A (en) Multi-platform retaining structure and construction method
CN205205833U (en) Soil nail and stock combined type double row pile underground structure
CN207525758U (en) A kind of reinforced Structure About Soldier Pile
CN204551490U (en) A kind of suspension type reinforced concrete fortifield village purlin
CN107227741B (en) Basement supporting construction
CN103603357A (en) Multi-platform inner-support-free self-waterproof foundation pit retaining structure and construction method thereof
CN205188976U (en) Drag -line double row pile supporting construction
CN106013174A (en) Oblique supporting method for foundation pit shoring and oblique supporting structure
CN216515701U (en) Miniature stake raft board combination foundation structure
CN206015663U (en) A kind of precast concrete pile and dash gear civil engineering building structure
CN204875811U (en) Combined type multirow stake underground structure
CN212801551U (en) Rectangular shape deep basal pit supporting device
CN204780939U (en) Masts type double row pile struts system
CN208792356U (en) Pile group foundation with star-shaped through holes
CN208293583U (en) A kind of double-row pile heel row anchor drawing foundation pit supporting construction
CN207794098U (en) Supporting construction is supportted in a kind of oblique throwing convenient for construction of bottom plates
CN211948521U (en) Be used for peripheral firm type structure of building pile foundation
CN217811076U (en) Composite double-row pile supporting structure
CN215759042U (en) Batter pile bearing structure
CN212642298U (en) Improve wall structure of water intake tower crowd shock resistance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180615