CN207484742U - A kind of prestressed building blocks wall between windows - Google Patents

A kind of prestressed building blocks wall between windows Download PDF

Info

Publication number
CN207484742U
CN207484742U CN201721438516.XU CN201721438516U CN207484742U CN 207484742 U CN207484742 U CN 207484742U CN 201721438516 U CN201721438516 U CN 201721438516U CN 207484742 U CN207484742 U CN 207484742U
Authority
CN
China
Prior art keywords
wall
windows
wire drawing
drawing head
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721438516.XU
Other languages
Chinese (zh)
Inventor
信任
马鹏飞
谢启芳
任瑞
毛立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201721438516.XU priority Critical patent/CN207484742U/en
Application granted granted Critical
Publication of CN207484742U publication Critical patent/CN207484742U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of prestressed building blocks wall between windows, and being built including breast, on breast has wall between windows;Two horizontal plain bars are set in the screed between the first skin brick setting and the second skin brick setting of wall between windows;Two horizontal plain bars are also provided in screed at wall between windows medium position between two skin brick setting of top;The both ends of plain bar are equipped with end wire drawing head, and wire drawing head in end is stretched out outside wall between windows;Wall between windows both ends vertical wall places four pieces of perforated steel plate items, and the end wire drawing head of plain bar passes through the corresponding bolt hole on perforated steel plate item, and wire drawing head in end is fixed with corresponding perforated steel plate item by nut.The utility model, is not take up exceptional space, does not change structure function characteristic, is remarkably improved anti-seismic performance of the masonry structure wall between windows in earthquake.

Description

A kind of prestressed building blocks wall between windows
Technical field
The utility model belongs to building structure aseismatic reinforcement and repair technical field, between more particularly to a kind of prestressed building blocks window Wall.
Background technology
Masonry structure is as important architecture structure form, and ownership is very big in China's town building, and the amount of having is big, face It is wide that there are features.But the earthquake fortification level of this class formation their location is usually relatively low, is easily damaged in earthquake.Masonry Wall between windows participate in Structural Energy Dissipation as important anti-vibration defense lines, and more serious damage has occurred in earthquake.
Restorative procedure is predominantly removed to be damaged to mend as former state after wall and be built after being shaken at this stage for wall between windows, has not been considered secondary It is influenced caused by earthquake, damaged part often still destroys in lower secondary earthquake.And such reinforcement means is to structure Failure mode is not added with distinguishing, and the destruction sequence of component is also not required, reinforcement technique is not reasonable, and there are more serious peaces Full hidden danger.
In view of the shortcomings that above-mentioned tradition restoring and fastening method, be badly in need of compensating its defect with novel technical method.
Utility model content
The purpose of this utility model is to provide a kind of prestressed building blocks wall between windows, to solve above-mentioned technical problem.
The utility model is on the basis of existing conventional method shortcoming is summarized, with reference to the failure mode of masonry structure wall between windows With force-mechanism, using " pre-control " thought as guidance, in repairing and reinforcement after structure creates and shakes, propose a kind of period it is short, The scale of construction is small, constructing operation easily ruggedized construction.Tension mechanical property (ductility) of the structure based on reinforcing bar well, utilizes post-tensioning Good prestressed principle after method reinforced bar stretching can be provided region, realizes wall between windows prestressed reinforcement.In newly-built structure When building wall between windows by laying bricks or stones, the steel bar arrangement that both ends are carried hot candied head has built one layer of wall between windows by laying bricks or stones in the mortar joint of different skin bricks Place perforated steel plate item along straight wall at this wall between windows both ends afterwards, position using each reinforcing bar of each layer pass through bolt hole thereon as Standard.By manually tighten the nested nut in reinforcing bar both ends with realize reinforcing bar apply needed for prestressing force, after in perforated steel plate Paving slurry plastering is carried out on the outside of item.This method does not influence normal construction, is not take up exceptional space, does not change structure function characteristic, can Significantly improve anti-seismic performance of the masonry structure wall between windows in earthquake.
To achieve these goals, the utility model adopts the following technical solution:
A kind of prestressed building blocks wall between windows, being built including breast, on breast has wall between windows;First skin of wall between windows is brick Two horizontal plain bars are set in the screed between body and the second skin brick setting;At wall between windows medium position and top Two horizontal plain bars are also provided in screed between two skin brick settings;It is hot candied that the both ends of plain bar are equipped with end Head, end wire drawing head are stretched out outside wall between windows;Wall between windows both ends vertical wall places four pieces of perforated steel plate items, the end of plain bar Wire drawing head in portion's passes through the corresponding bolt hole on perforated steel plate item, and wire drawing head in end is consolidated with corresponding perforated steel plate item by nut It is fixed.
Further, nut is applied with prestressing force to corresponding plain bar.
Further, the intersection of end wire drawing head and corresponding nut is welded and fixed.
Further, perforated steel plate lateral surface is equipped with grout layer, wraps the end wire drawing head and spiral shell of plain bar It is female.
Further, a diameter of 8mm of plain bar.
Further, the length of end wire drawing head is 35mm.
Further, the thickness of perforated steel plate item is 4mm, width 30mm, and length is identical with the height of wall between windows.
Further, two plain bars in every layer be symmetrically arranged in corresponding brick setting surface far from edge 15mm at.
The utility model carries out end wire drawing after calculating interception by practical interfenestration to required tension reinforcing steel bar, presses Wall between windows height chooses steel plate strip and the trepanning in steel plate strip of corresponding position forms steel with holes on wall between windows by tension reinforcing steel bar Lath.It is aforementioned it is ready after start to build wall between windows by laying bricks or stones, build by laying bricks or stones to certain altitude, two steel be placed in parallel by regulation spacing Wall between windows both ends specific length is stretched out in muscle, each end of reinforcing bar, is laid with mortar later in brick layer and rebar surface specific thickness.Continue It builds by laying bricks or stones, repeats above-mentioned construction technology, until wall between windows build completion by laying bricks or stones, reinforcing bar laying finishes.At wall between windows both ends along its straight wall side Perforated steel plate item is placed to wall is adjacent to, position should ensure that reinforcing bar passes through bolt hole, and nested nut is in reinforcing bar later On end wire drawing head, by tightening nut to prestressing force needed for reinforcing bar application, each end junction is reliably welded, in band Paving slurry plastering is carried out on the outside of the steel plate strip of hole, conserving to the stipulated time can come into operation.
Required reinforcing bar be plain bar, a diameter of 8mm, length be the additional 40mm of interfenestration, additional 40mm length It is used as wall between windows both sides across perforated steel plate item with nested nut, length of string is each 35mm in both ends, for tightening nut It is used to specified value with applying prestressing force.Selecting for nut specification should be standard with the first cause of end reinforced wire drawing.Perforated steel plate Thickness is 4mm, width 30mm, and length takes the height of wall between windows to be advisable, by tension reinforcing steel bar on wall between windows corresponding position Advance machine drilling forms perforated steel plate item in steel plate strip, and hole diameter 9mm ensures that reinforcing bar without hindrance can pass freely through. The grades such as strong of masonry mortar and brick setting are chosen by normal requirement, and masonry way is using routine building method.
Relative to the prior art, the utility model has the advantages that:
The utility model enhances it as a kind of prestressed building blocks wall between windows while wall between windows wall stiffness is not increased Anti-seismic performance and ductility.By the stretch-draw prestressing force feature that reinforcing bar can be formed after tensioning, in newly-built wall between windows building wall Deformed bar is laid in along wall height among masonry wall in the process.By post stretching tension reinforcing steel bar, apply to wall between windows and in advance should Power.Increase the shearing strength of wall using the prestressing force being previously applied in seismic process, when being destroyed so as to reach delayed fracture Between purpose.The utility model improves the anti-seismic performance of wall, simplifies reinforcement technique scheme, newly-built structure with it is extensive after calamity It can be applied in multiple reconstruction, notable economic and social profit can be brought.
Description of the drawings
Fig. 1 is is damaged wall between windows elevation after shake;
Fig. 2 is the utility model wall between windows building process elevation;
Fig. 3 is the utility model wall between windows building process vertical view;
Fig. 4 is that (a) is end wire drawing head and nut connection figure;Fig. 4 (b) is the side elevational view of Fig. 4 (a);
Fig. 5 builds by laying bricks or stones for the utility model and completes elevation;
Fig. 6 (a) is the structure chart of end reinforced hot candied head;Fig. 6 (b) is the structure chart of reinforcing rod with holes;Fig. 6 (c) is spiral shell Female structure chart;
Elevation after Fig. 7 is repaired for the utility model wall between windows;
In figure:1 plain bar;2 end wire drawing heads;3 nuts;4 perforated steel plate items;5 wall between windows;6 brick settings;7 mortars;8 Side paving slurry;9 bolts hole;10 windows;11 collar tie beams;12 lintels;13 breasts.
Specific embodiment
It please refers to shown in Fig. 2 to Fig. 7, a kind of prestressed building blocks wall between windows of the utility model, including breast 13, breast Being built on 13 has wall between windows 5;Two water are set in the screed between the first skin brick setting 6 and the second skin brick setting of wall between windows 5 Flat plain bar 1;Two levels are also provided in screed at 5 medium position of wall between windows between two skin brick setting of top Plain bar 1;The both ends of plain bar 1 are equipped with end wire drawing head 2, and end wire drawing head 2 is stretched out outside wall between windows 5;Wall between windows 5 Both ends vertical wall places four pieces of perforated steel plate items 4, and the end wire drawing head 2 of plain bar 1 is passed through on perforated steel plate item 4 Nut 3 is screwed onto on end wire drawing head 2 by corresponding bolt hole 9 manually.
Nut 3 is tightened to specified value to apply required prestressing force to the plain bar 1 in wall between windows 5 by artificial wrench, It is 4mm (unilateral to back-out length or bilateral stubborn that the plain bar 1 wherein placed in hypodermis brick setting and epithelium brick setting, which back-outs length, Go out total length), the plain bar 1 placed in the brick setting of middle part is back-outed length and (is ibid required) for 2mm, to each light after tightening The end wire drawing head 2 and 3 intersection of nut of round bar 1 are reliably welded.
4 lateral surface of perforated steel plate item is equipped with grout layer, wraps the end wire drawing head 2 of plain bar 1 and nut 3.
A kind of construction method of prestressed building blocks wall between windows of the utility model, includes the following steps:
Step 1:Length interception plain bar 1 as required, required 1 a diameter of 8mm of plain bar, length are wall between windows 5 The additional 40mm of width, additional length are used as 5 both sides of wall between windows across perforated steel plate item 4 with nested nut 3;
Wire drawing is carried out to form end wire drawing head 2 at 1 both ends of plain bar using wire drawing pliers, and length of string is each for both ends 35mm is used for tightening nut 3 to specified value application prestressing force;The nut 3 for selecting specification consistent with end wire drawing head 2;System Make perforated steel plate item 4,4 thickness of perforated steel plate item is 4mm, and width 30mm, length is taken as the height of wall between windows 5, and presses tensioning In position corresponding to wall between windows wall, to form bolt hole 9,9 a diameter of 9mm of bolt hole is protected reinforcing bar for machine drilling in steel plate strip Card plain bar 1 without hindrance can pass freely through.
Step 2:It please refers to shown in Fig. 2, builds 5 wall of wall between windows by laying bricks or stones, mortar 7 is spread after the completion of the first skin brick setting 6 is built by laying bricks or stones If preceding, two horizontal plain bars 1 are placed on the first skin brick setting 6, two plain bars are arranged in parallel in brick setting 6 On, two plain bars 1 be symmetrically arranged in 6 surface of brick setting far from edge 15mm at, both ends stretch out wall between windows partial-length be 20mm is laid with mortar 7 on 1 and first skin brick setting 6 of plain bar later;
Step 3:Continue to build by laying bricks or stones, when building by laying bricks or stones at 5 medium position of wall between windows and at the next skin brick setting 6 in top, by step Rapid the method places plain bar 1, is laid with mortar 7;
Step 4:After completing the placement of plain bar 1 and the building by laying bricks or stones of wall between windows 5, placed along 5 both ends vertical wall of wall between windows Four pieces of perforated steel plate items 4, the bolt hole 9 that position makes the end wire drawing head 2 of plain bar 1 pass through on perforated steel plate item 4 are Nut 3 is screwed onto on end wire drawing head 2 by standard manually;
Step 5:It is required to apply to the plain bar 1 in wall between windows 5 to specified value that nut 3 is tightened by artificial wrench It is (unilateral to back-out length for 4mm that the plain bar 1 placed in prestressing force, wherein hypodermis brick setting and epithelium brick setting back-outs length Or bilateral back-out total length), the plain bar 1 placed in the brick setting of middle part is back-outed length and (is ibid required) for 2mm, tightens The end wire drawing head 2 of each plain bar 1 and 3 intersection of nut are reliably welded afterwards;
Step 6:8 plastering of paving slurry is carried out in 4 lateral surface of perforated steel plate item, thickness is pulled out to wrap the end of plain bar 1 Silk head 2 and nut 3 subject to, conserve to intensity it is up to standard after, you can use.

Claims (8)

1. a kind of prestressed building blocks wall between windows, which is characterized in that being built including breast (13), on breast (13) has wall between windows (5);Two horizontal light round steel are set in the screed between the first skin brick setting and the second skin brick setting of wall between windows (5) Muscle;Two horizontal plain bars are also provided in screed at wall between windows medium position between two skin brick setting of top; The both ends of plain bar are equipped with end wire drawing head (2), and it is external that end wire drawing head (2) stretches out wall between windows (5);Wall between windows (5) both ends Vertical wall places four pieces of perforated steel plate items (4), and the end wire drawing head (2) of plain bar (1) is across pair on perforated steel plate item The bolt hole (9) answered, end wire drawing head are fixed with corresponding perforated steel plate item by nut.
2. a kind of prestressed building blocks wall between windows according to claim 1, which is characterized in that nut is to corresponding plain bar It is applied with prestressing force.
3. a kind of prestressed building blocks wall between windows according to claim 1, which is characterized in that end wire drawing head and corresponding nut Intersection be welded and fixed.
4. a kind of prestressed building blocks wall between windows according to claim 1, which is characterized in that perforated steel plate lateral surface is equipped with Grout layer wraps the end wire drawing head and nut of plain bar.
A kind of 5. prestressed building blocks wall between windows according to claim 1, which is characterized in that a diameter of 8mm of plain bar.
6. a kind of prestressed building blocks wall between windows according to claim 1, which is characterized in that the length of end wire drawing head is 35mm。
7. a kind of prestressed building blocks wall between windows according to claim 1, which is characterized in that the thickness of perforated steel plate item is 4mm, width 30mm, length are identical with the height of wall between windows.
A kind of 8. prestressed building blocks wall between windows according to claim 1, which is characterized in that two plain bars in every layer Be symmetrically arranged in corresponding brick setting surface far from edge 15mm at.
CN201721438516.XU 2017-11-01 2017-11-01 A kind of prestressed building blocks wall between windows Expired - Fee Related CN207484742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721438516.XU CN207484742U (en) 2017-11-01 2017-11-01 A kind of prestressed building blocks wall between windows

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721438516.XU CN207484742U (en) 2017-11-01 2017-11-01 A kind of prestressed building blocks wall between windows

Publications (1)

Publication Number Publication Date
CN207484742U true CN207484742U (en) 2018-06-12

Family

ID=62478618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721438516.XU Expired - Fee Related CN207484742U (en) 2017-11-01 2017-11-01 A kind of prestressed building blocks wall between windows

Country Status (1)

Country Link
CN (1) CN207484742U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700700A (en) * 2017-11-01 2018-02-16 西安建筑科技大学 A kind of prestressed building blocks wall between windows and reinforcement means
CN114753668A (en) * 2022-04-14 2022-07-15 江苏海洋大学 Construction method for reinforcing brick masonry wall by unbonded prestressed steel wire ropes

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700700A (en) * 2017-11-01 2018-02-16 西安建筑科技大学 A kind of prestressed building blocks wall between windows and reinforcement means
CN114753668A (en) * 2022-04-14 2022-07-15 江苏海洋大学 Construction method for reinforcing brick masonry wall by unbonded prestressed steel wire ropes

Similar Documents

Publication Publication Date Title
CN109339828B (en) Tunnel prestress inverted arch structure and construction method thereof
CN202925922U (en) Combination reinforcing device for brick masonry wall
CN102979221B (en) Shear wall structure configured with crossed slant internal prestress and construction method of shear wall structure
CN104358422B (en) Pre-applied force equipment and the method in reinforcing wall crack
CN103993753A (en) Angle hoop tie reinforcement system of traditional stone masonry house and construction technology
CN204645268U (en) A kind of infilled wall tie bar built-in fitting
CN207484742U (en) A kind of prestressed building blocks wall between windows
CN107013040A (en) The construction method of floor is poured after a kind of sleeve built-in type
CN103306214A (en) Novel reinforcement device for reinforced concrete beam and floor slab and construction method thereof
CN204357147U (en) The composite reinforcing structure of prestressed reinforced concrete construction flexural member
CN108661345A (en) A kind of the masonry house wall body structure and its construction method of the reinforcing of bilayer strap
CN107338864A (en) A kind of prefabricated reinforced concrete frame structure node
CN206815376U (en) Open cut type is without post Metro Station Structure across arch greatly
CN104005556A (en) Shaped and fabricated formwork construction process used for shear wall at expansion and contraction joint
CN104989100B (en) Construction method for crack prevention on connecting portion of masonry wall and concrete wall column
CN107916797B (en) Construction method for improving bearing performance of old building
CN105862871B (en) Pre-applied force anchoring body assembly type frame hoop slope protection device and construction method
CN201778412U (en) Tie part for aerated concrete block walls
CN204238264U (en) A kind of sole plate post-poured strip structure
CN106522573A (en) Clamping piece type anchorage device applied to prestressed FRP gridding stretching and construction method of clamping piece type anchorage device
CN204385941U (en) Prestressing force buckling restrained brace
CN107700700A (en) A kind of prestressed building blocks wall between windows and reinforcement means
CN204139634U (en) The safe enclosed construction in a kind of fast-type hole
CN205954641U (en) Pin -connected panel sump pit of circulated use supports protector
CN205531422U (en) Reinforced concrete frame girder construction is consolidated to prefabricated checkered plate steel truss

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180612

Termination date: 20201101