CN104989100B CN201510269343.2A CN201510269343A CN104989100B CN 104989100 B CN104989100 B CN 104989100B CN 201510269343 A CN201510269343 A CN 201510269343A CN 104989100 B CN104989100 B CN 104989100B
Authority
CN
China
Prior art keywords
wall
concrete
cracking
concrete wall
stones
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510269343.2A
Other languages
Chinese (zh)
Other versions
CN104989100A (en
Inventor
刘宝堂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201510269343.2A priority Critical patent/CN104989100B/en
Publication of CN104989100A publication Critical patent/CN104989100A/en
Application granted granted Critical
Publication of CN104989100B publication Critical patent/CN104989100B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Retaining Walls (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses a construction method for crack prevention on a connecting portion of a masonry wall and a concrete wall column. The method comprises following construction steps: (1) wall steel tie bars are reserved; (2) the axis and side lines of the wall are snapped according to the position of the brick wall before bricks are laid, and the bricks are arranged so as to set the width of mortar joints during a brick laying process, wherein cracks of the bricks are staggered; (3) the bricks are laid in a bite racking and staggered manner at an exterior wall corner and a longitudinal and lateral wall cross joint during the brick laying process; (4) two story poles are pulled out; and (5) a crack prevention net is laid on the connecting portion of the masonry wall and the reinforced concrete column. The method is advantageous in that concrete is convenient to cast, the construction efficiency is improved, the construction can be conveniently carried out, the connection is reliable, and cracks can be effectively prevented from forming at the connecting portion of the masonry wall and the concrete wall column.

Description

Masonry panel and concrete wall column junction cracking-proof construction method
Technical field
The present invention relates to a kind of construction techniques, is to be related to a kind of masonry panel and concrete wall column in particular Junction cracking-proof construction method.
Background technology
Masonry belongs in itself fragile material, and its strength grade is low, water absorption rate is high, contraction distortion is big.For the breathing of masonry, Different positions differ, and often two is big and centre is little, and when filling, the connection between masonry and concrete wall column is strong When less and materials for wall the tensile strength of degree is larger, deformation occurs in interface, produce interface seam.Currently in concrete walls Easily there is crack in the position that post is contacted with masonry, it has also become the common common quality defect of architectural engineering.The presence in crack reduces wall The quality of body, affects the globality of body of wall, durability and anti-seismic performance, at the same the crack of body of wall to occupant on sense organ and the heart Harmful effect is also resulted in reason.
The content of the invention
The present invention is directed to the deficiencies in the prior art, and provides one kind and be effectively prevented masonry panel with concrete wall column handing-over There is crack in place, improves efficiency of construction, reduces the masonry panel and concrete wall column junction cracking-proof construction party of construction cost Method.
The masonry panel of the present invention and concrete wall column junction cracking-proof construction method, including following construction procedure:
Step one body of wall steel tie is reserved:Before post wall reinforcement construction, the pre-buried extrusion molding foam first in concrete wall column Plate, by extrusion molding foam-board colligation on post wall steel wire binding bar, then carries out envelope template, the form removal after concrete setting, then will squeeze Modeling cystosepiment cleaning, is finally welded on body of wall steel tie on post wall steel wire binding bar, mixes the water with the same label of swelling agent Cement mortar is mended real smooth;
Before step 2 is built by laying bricks or stones, first axis and sideline are ejected according to brick wall position, first carry out putting brick discharge mortar joint loose when building by laying bricks or stones Degree, the crack of each skin brick is mutually staggered;
When step 3 is built by laying bricks or stones, first the building block point skin of exterior wall corner and longitudinal cross wall junction is stung raft, staggeredly takes block, The mutual fissure of displacement of upper hypodermis building block of exterior wall takes block, and the lap of splice is not less than 1/3rd of building block length, the vertical lap seam of body of wall With window hole sideline not on same gap, then in each embedding root skin number in side both sides of body of wall and concrete wall column junction Bar, the building block is concordant with marked rod to build by laying bricks or stones, the space cement mortar or pea gravel concreten between two marked rods with build with Filling is closely knit;
After the completion of step 4 building wall, two marked rods are extracted out, a groove is formed on body of wall, groove is being built Build closely knit with C20 expansion pea gravel concreten fillings after completing 15 days;
Step 5 lays anti-cracking net in blockwork and reinforced column junction, repairs metope ash seam defect, cleaning Basic unit, 2 days in advance moistening metope outer surfaces, then plasters;Concrete wall column absorbs water with the bi-material of masonry panel junction Rate is inconsistent, and bi-material is sprinkled water respectively during moistening metope outer surface.
Marked rod is made up of batten described in step 3 and step 4, and the thickness and width of marked rod are 30mm.
Concrete described in step 4 is that C20 expands pea gravel concreten.
Anti-cracking net described in step 5 is made up of alkali resistant glass fibre open weave cloth or hot-galvanized steel silk screen, and the width of anti-cracking net is not little In 300mm.
The fixing point of anti-cracking net arranges that the spacing of fixing point is not according to regular hexagon when the anti-cracking net is laid in step 5 More than 200mm.
The invention has the beneficial effects as follows:(1)Concreting is convenient, improves efficiency of construction, reduces construction cost;(2)Apply Work connection is reliable, is effectively prevented masonry panel and crack occurs with concrete wall column junction.
Specific embodiment
Below the invention will be further described.
Tension rib method to set up at the masonry panel and xoncrete structure interface of the present invention, including following construction procedure:
Step one body of wall steel tie is reserved:Before post wall reinforcement construction, the pre-buried extrusion molding foam first in concrete wall column Plate, by extrusion molding foam-board colligation on post wall steel wire binding bar, then carries out envelope template, the form removal after concrete setting, then will squeeze Modeling cystosepiment cleaning, is finally welded on body of wall steel tie on post wall steel wire binding bar, mixes the water with the same label of swelling agent Cement mortar is mended real smooth;
Before step 2 is built by laying bricks or stones, first axis and sideline are ejected according to brick wall position, first carry out putting brick discharge mortar joint loose when building by laying bricks or stones Degree, the crack of each skin brick is mutually staggered;
When step 3 is built by laying bricks or stones, first the building block point skin of exterior wall corner and longitudinal cross wall junction is stung raft, staggeredly takes block, The mutual fissure of displacement of upper hypodermis building block of exterior wall takes block, and the lap of splice is not less than 1/3rd of building block length, the vertical lap seam of body of wall With window hole sideline not on same gap, then in each embedding root skin number in side both sides of body of wall and concrete wall column junction Bar, the building block is concordant with marked rod to build by laying bricks or stones, the space cement mortar or pea gravel concreten between two marked rods with build with Filling is closely knit;
After the completion of step 4 building wall, two marked rods are extracted out, a groove is formed on body of wall, groove is being built Build closely knit with C20 expansion pea gravel concreten fillings after completing 15 days;
Step 5 lays anti-cracking net in blockwork and reinforced column junction, repairs metope ash seam defect, cleaning Basic unit, 2 days in advance moistening metope outer surfaces, then plasters;Concrete wall column absorbs water with the bi-material of masonry panel junction Rate is inconsistent, and bi-material is sprinkled water respectively during moistening metope outer surface.
Marked rod is made up of batten described in step 3 and step 4, and the thickness and width of marked rod are 30mm.Step Concrete described in four is that C20 expands pea gravel concreten.Anti-cracking net described in step 5 is by alkali resistant glass fibre open weave cloth or galvanizing Steel wire is made, and the width of anti-cracking net is not less than 300mm.When the anti-cracking net is laid in step 5 the fixing point of anti-cracking net according to Regular hexagon arranges that the spacing of fixing point is not more than 200mm.
Masonry panel is handed over seam crossing to arrange and is plastered again after anti-cracking net with xoncrete structure, crack is increased as far as possible and is easily sent out The elasticity of raw position coat of plaster, to reduce crack occurrence probability.Meanwhile, cracking-proof measure is also carried out to coat of plaster.
Block can be effectively prevented using tension rib method to set up at the masonry panel and xoncrete structure interface of the present invention There is crack with concrete wall column junction in walling body.

Claims (4)

1. a kind of masonry panel and concrete wall column junction cracking-proof construction method, it is characterised in that including following construction step Suddenly:
Step one body of wall steel tie is reserved:Before post wall reinforcement construction, the pre-buried extrusion molding foam-board first in concrete wall column, By extrusion molding foam-board colligation on post wall steel wire binding bar, envelope template, the form removal after concrete setting are then carried out, then extrusion molding is steeped Foam plate is cleared up, and finally body of wall steel tie is welded on post wall steel wire binding bar, mixes the cement bonded sand with the same label of swelling agent Slurry is mended real smooth;
Before step 2 is built by laying bricks or stones, first axis and sideline are ejected according to brick wall position, first carry out putting brick discharge mortar joint width when building by laying bricks or stones, Mutually stagger in the crack of each skin brick;
When step 3 is built by laying bricks or stones, first the building block point skin of exterior wall corner and longitudinal cross wall junction is stung raft, staggeredly takes block, exterior wall The mutual fissure of displacement of upper hypodermis building block of body takes block, and the lap of splice is not less than 1/3rd of building block length, the vertical lap seam and window of body of wall Hole sideline not on same gap, then in each embedding marked rod in side both sides of body of wall and concrete wall column junction, The building block is concordant with marked rod to build by laying bricks or stones, and the space cement mortar or pea gravel concreten between two marked rods is with block with filling It is closely knit;
After the completion of step 4 building wall, two marked rods are extracted out, a groove is formed on body of wall, groove is being built by laying bricks or stones It is closely knit with C20 expansion pea gravel concreten fillings into after 15 days;
Step 5 lays anti-cracking net in blockwork and reinforced column junction, repairs metope ash seam defect, clears up base Layer, 2 days in advance moistening metope outer surfaces, then plasters;Concrete wall column and the bi-material water absorption rate of masonry panel junction It is inconsistent, bi-material is sprinkled water respectively during moistening metope outer surface.
2. masonry panel according to claim 1 and concrete wall column junction cracking-proof construction method, it is characterised in that Marked rod is made up of batten described in step 3 and step 4, and the thickness and width of marked rod are 30mm.
3. masonry panel according to claim 1 and concrete wall column junction cracking-proof construction method, it is characterised in that Anti-cracking net described in step 5 is made up of alkali resistant glass fibre open weave cloth or hot-galvanized steel silk screen, and the width of anti-cracking net is not less than 300mm.
4. masonry panel according to claim 1 and concrete wall column junction cracking-proof construction method, it is characterised in that The fixing point of anti-cracking net is arranged according to regular hexagon when the anti-cracking net is laid in step 5, and the spacing of fixing point is not more than 200mm。
CN201510269343.2A 2015-05-25 2015-05-25 Construction method for crack prevention on connecting portion of masonry wall and concrete wall column Active CN104989100B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510269343.2A CN104989100B (en) 2015-05-25 2015-05-25 Construction method for crack prevention on connecting portion of masonry wall and concrete wall column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510269343.2A CN104989100B (en) 2015-05-25 2015-05-25 Construction method for crack prevention on connecting portion of masonry wall and concrete wall column

Publications (2)

Publication Number Publication Date
CN104989100A CN104989100A (en) 2015-10-21
CN104989100B true CN104989100B (en) 2017-05-10

Family

ID=54300981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510269343.2A Active CN104989100B (en) 2015-05-25 2015-05-25 Construction method for crack prevention on connecting portion of masonry wall and concrete wall column

Country Status (1)

Country Link
CN (1) CN104989100B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105908864B (en) * 2016-05-25 2018-02-27 新宇建设有限公司 Fill masonry and the construction method of frame-shear wall prevention Interface Crack structure
CN106245807A (en) * 2016-08-25 2016-12-21 中国十七冶集团有限公司 There is the body of wall in crack in a kind of junction being avoided that with beams of concrete
CN111305419A (en) * 2020-03-30 2020-06-19 四川华远建设工程有限公司 Masonry engineering construction process
CN112411805A (en) * 2020-11-27 2021-02-26 上海宝冶集团有限公司 Heat-insulation building method for shear wall and filler wall of heat-insulation integrated system

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2001288133A1 (en) * 2000-08-08 2002-02-25 Epifanio Sanchez Tirado Structural building system for walls and lightened slabs
CN101858142B (en) * 2010-06-25 2012-01-04 中天建设集团有限公司天津分公司 Construction method for preventing vertical cracking between main structure and filled wall
CN102477797B (en) * 2010-11-24 2016-06-01 五冶集团上海有限公司 A kind of construction method preventing infilled wall crack
CN202767257U (en) * 2012-07-23 2013-03-06 青岛建安建设集团有限公司 Plastered free concrete wall and plastered concrete wall connection anti-fissure structure
CN103266767B (en) * 2013-05-27 2015-06-10 中国航天建设集团有限公司 Construction method for preventing and treating cracks between concrete structure and filler wall
CN103469939B (en) * 2013-09-24 2015-09-09 中国建筑第二工程局有限公司 A kind of masonry filler wall and main body flexibly connect earthquake resistant structure and construction method thereof
CN103615114B (en) * 2013-12-02 2018-03-06 浙江中联建设集团有限公司 Brick setting concrete drawknot anticracking board belt construction engineering method

Also Published As

Publication number Publication date
CN104989100A (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CN103266767B (en) Construction method for preventing and treating cracks between concrete structure and filler wall
CN103410332B (en) A kind of concrete hollow block reinforcement wall construction technology
CN102116061B (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN103233520B (en) Self-waterproof construction method of building external wall structure
CN104989100B (en) Construction method for crack prevention on connecting portion of masonry wall and concrete wall column
CN102808513B (en) Crack controlling construction method for lightweight wall
CN207959612U (en) A kind of frame, shear wall cast-in-place structural fill wall with assembled light
CN104746772A (en) Ash concrete hollow partition board anti-cracking construction method
CN203514570U (en) Square bar keel partition wall
CN107013040A (en) The construction method of floor is poured after a kind of sleeve built-in type
CN110792200A (en) Masonry construction method without post-picking and pipe wrapping structure thereof
CN105298015A (en) Light anti-seismic partition plate with integrated architectural surface and wall body and manufacturing method thereof
CN205134717U (en) Take frame mould integration light antidetonation partition plate of architectural surface
CN110107001A (en) Modified foaming concrete lightweight partition wall construction method
CN108560861A (en) A kind of connection structure and its construction method of cast-in-place concrete and decoration of exterior wall wall
CN102182316A (en) Building method for controlling temperature cracks of masonry
CN204510813U (en) L-type cladding panel structure under a kind of novel frame Liang Liang
CN103437440A (en) Fixing device for thermal insulating prefabricated slab of building and construction method for thermal insulation of building by using reverse building method
CN216075741U (en) Anti-crack structure at joint of filler wall and shear wall
CN102535847B (en) Method for constructing gypsum self-insulation outer wall block masonry
CN102767284B (en) Semi-prefabricating construction process for concrete thin-wall lower return eave
CN108824810A (en) A kind of laying construction technique of steel skeleton composite building top plate
CN104612315A (en) Concrete self-temperature-preservation composite block and construction method
CN204225295U (en) A kind of cracking resistance heat bridge node of steam pressure sand aerated concrete masonry self-insulation system
CN218758240U (en) Masonry structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant