CN104358422B - Pre-applied force equipment and the method in reinforcing wall crack - Google Patents

Pre-applied force equipment and the method in reinforcing wall crack Download PDF

Info

Publication number
CN104358422B
CN104358422B CN201410715193.9A CN201410715193A CN104358422B CN 104358422 B CN104358422 B CN 104358422B CN 201410715193 A CN201410715193 A CN 201410715193A CN 104358422 B CN104358422 B CN 104358422B
Authority
CN
China
Prior art keywords
bolt
wall
crack
many bars
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410715193.9A
Other languages
Chinese (zh)
Other versions
CN104358422A (en
Inventor
宋双阳
崔士起
孙建东
楼昕
石磊
李海文
成勃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Provincial Academy of Building Research
Original Assignee
Shandong Provincial Academy of Building Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Provincial Academy of Building Research filed Critical Shandong Provincial Academy of Building Research
Priority to CN201410715193.9A priority Critical patent/CN104358422B/en
Publication of CN104358422A publication Critical patent/CN104358422A/en
Application granted granted Critical
Publication of CN104358422B publication Critical patent/CN104358422B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The pre-applied force equipment and the method that the invention discloses reinforcing wall crack, belong to technical field of buildings, and its structure comprises many bars bolt, backing plate and clamp nut; Many bars bolt comprises a connector and multiple bolt column, and multiple bolt columns comprise two stay bolt posts that are arranged on connector middle part and the multiple lag bolt posts that are arranged on both ends, connector left and right; Many bars bolt comprises multiple, and multiple bolt columns penetrate respectively body of wall, and wherein two stay bolt posts pass respectively body of wall, and its end is provided with screw thread, and fastening by clamp nut, on the stay bolt post between clamp nut and body of wall, is also provided with backing plate. The invention also discloses the method that uses said apparatus reinforcing wall crack, the present invention has many bars bolt and bears a certain amount of pulling force of wall section, by afterburning size, controls the size of crack occurrence; The common work of many bars bolt and body of wall is stressed; Greatly save amount of reinforcement, can effectively control the size in crack, overall economic efficiency high.

Description

Pre-applied force equipment and the method in reinforcing wall crack
Technical field
The present invention relates to a kind of technical field of buildings, the pre-applied force equipment in especially a kind of reinforcing wall crackAnd method.
Background technology
In present stage house, the building of brick mixed building body structure has accounted for sizable ratio, usually because material existsThe contraction of expanding with heat and contract with cold, cause under moisture expansion and drying shrinkage condition is inconsistent and cause wall crazing; In addition, tie at masonryIn structure, often because (blow out) vibration or uneven settlement of foundation cause wall crazing, thereby affect buildingAttractive in appearance and use function, the crack problem of masonry structure becomes the maximum problem of house customer complaint. Masonry belongs toFragile material, the existence in crack has reduced the quality of body of wall, as globality, durability and anti-seismic performance, andTo occupant in perception with cause psychologically harmful effect.
With this type of crack of pre-treatment, adopt joint filling method, mud jacking, outer screening sheet method and displacement method etc. more, andAccording to requirement of engineering, these Combination of Methods use. Adopt existing these modes to process crack, although can be temporaryCrack is filled and led up in time sealing, but because development also can be continued in crack under temperature in four seasons from now on and humidity alternate cycles,Existing these method for repairing and mending can not tackle the problem at its root, and cross after certain hour, and its wall body slit also can showExisting, even expand, also need to repeat to repair, be difficult to thoroughly process crack problem.
Pick seam and bury muscle method once as the method for traditional reinforcing masonry structure, owing to can not well controlling crackSize, be not added into " masonry structure Design of Reinforcement specification " GB50702-2011, make us that it's rather a pity.
At present, the solution also not had.
Summary of the invention
Technical assignment of the present invention is to provide the pre-of a kind of reinforcing wall crack for above-mentioned deficiency of the prior artAfterburning equipment and method, the pre-applied force equipment in this reinforcing wall crack and method have and can exist arbitrarilyOn many bars bolt, add accurate power, allow many bars bolt bear a certain amount of pulling force of wall section, by afterburning size,Control the size of crack occurrence; In the time that body of wall is stressed, many bars bolt and body of wall are worked jointly; With total cross-section steelMuscle net is reinforced thermal cracking and is compared, and greatly saves amount of reinforcement, buries compared with muscle method Ke Yiyou with traditional seam that picksEffect is controlled the size in crack, the feature that overall economic efficiency is high.
The technical solution adopted for the present invention to solve the technical problems is:
The pre-applied force equipment in reinforcing wall crack: it comprises many bars bolt, backing plate and clamp nut;
Described many bars bolt comprises a connector and multiple bolt column, and described multiple bolt columns arrange respectivelyAt the homonymy of connector, described multiple bolt columns comprise and are arranged on two stay bolt posts at connector middle part and establishPut the multiple lag bolt posts at both ends, connector left and right, the lag bolt post of connector left part and right part is along connectingJunctor middle part is symmetrical arranged, and the length of two described stay bolt posts is greater than the width of body of wall, the length of lag bolt postDegree is less than the width of body of wall, and described connector and multiple bolt column are made up of reinforcing bar respectively;
Described many bars bolt comprises multiple, respectively centered by crack between the upper and lower every setting, each many bars boltMultiple bolt columns penetrate respectively body of wall, wherein middle part two stay bolt posts pass respectively body of wall, establish its endBe equipped with screw thread, and fastening by clamp nut, on the stay bolt post between described clamp nut and body of wall, also establishBe equipped with backing plate.
Described lag bolt post comprises two, is symmetricly set on respectively the two ends, left and right of connector.
On the excircle of two described lag bolt posts, be respectively arranged with screw thread, its front end is respectively pointed design.
The two ends, front side of described backing plate are respectively arranged with reinforcement, and described reinforcement comprises cylindrical portion and spinePortion, described sharp portion is arranged on the front end of cylindrical portion, and rear end and the backing plate of cylindrical portion fix, and described twoThe reinforcement of end penetrates respectively body of wall, and the length of reinforcement is less than the width of body of wall.
The method in reinforcing wall crack, comprises the following steps:
(1) adopt mud jacking to repair wall body slit: to inject and split by low viscosity, high-intensity crack repairing glueIn seam chamber;
(2) many bars bolt is anchored into body of wall: first holed respectively in wall body slit two ends, by the long spiral shell of many bars boltHitching post and lag bolt post are along the hole getting out on body of wall, and vertical direction penetrates body of wall, by the many bars bolt through body of wallStay bolt post on be inserted in backing plate, then cover is had on the stay bolt post of backing plate and is inserted in clamp nut, tighten fastening screwFemale time, the reinforcement of backing plate front side stretches into body of wall, and fracture has applied certain pressure, simultaneously many bars spiral shellBolt also fracture adds certain power in advance, and then many bars bolt is anchored into body of wall with anchoring adhesive.
Compared to the prior art the pre-applied force equipment in reinforcing wall of the present invention crack and method, have followingOutstanding beneficial effect: by augmentor by fastening the clamp nut on the stay bolt post passing outside body of wall, canTo add arbitrarily accurate power on many bars bolt, allow many bars bolt bear a certain amount of pulling force of wall section, by addingThe size of power, controls the size of crack occurrence; When the stay bolt post fracture pre-applied force of many bars bolt and damageBody of wall, when fracture pre-applied force is inoperative, lag bolt post can play fracture pre-applied force, anti-crack arrest equallySeam splits again; In the time that body of wall is stressed, many bars bolt and body of wall are worked jointly, simultaneously stressed; On backing plate, arrangeHave reinforcement, can make reinforcement stressed work simultaneously, fracture pre-applied force, reduces crack, prevents that crack againInferior splitting; Adopt the method in reinforcing wall of the present invention crack, compared with total cross-section bar-mat reinforcement reinforcing thermal cracking,Greatly save amount of reinforcement, bury compared with muscle method with traditional seam that picks, can effectively control the size in crack, comprehensiveEconomic benefit high.
Brief description of the drawings
Accompanying drawing 1 is the main TV structure schematic diagram of the pre-applied force equipment in reinforcing wall crack;
Accompanying drawing 2 is the A-A cutaway views shown in Fig. 1;
Accompanying drawing 3 is backsight structural representations of the pre-applied force equipment in reinforcing wall crack;
Accompanying drawing 4 is main TV structure schematic diagrames that the pre-applied force equipment in reinforcing wall crack is positioned at body of wall;
Description of reference numerals:
1, many bars bolt, 11, connector, 12, stay bolt post, 13, lag bolt post;
2, backing plate, 21, reinforcement, 210, cylindrical portion, 211, sharp portion;
3, clamp nut;
4, body of wall;
5, crack.
Detailed description of the invention
With reference to Figure of description 1 to pre-applied force equipment and the side of accompanying drawing 4 to reinforcing wall of the present invention crackMethod is described in detail below.
The pre-applied force equipment in reinforcing wall of the present invention crack, its structure comprises many bars bolt 1, backing plate 2With clamp nut 3;
Described many bars bolt 1 comprises a connector 11 and multiple bolt column, and described multiple bolt columns respectivelyBe arranged on the homonymy of connector 11, described multiple bolt columns comprise that to be arranged on two of connector 11 middle parts longBolt column 12 and the multiple lag bolt posts 13 that are arranged on connector 11 both ends, left and right, connector 11 left partsBe symmetrical arranged the length of two described stay bolt posts 12 along connector 11 middle parts with the lag bolt post 13 of right partDegree is greater than the width of body of wall 4, and the length of lag bolt post 13 is less than the width of body of wall 4, described connector 11Made by reinforcing bar respectively with multiple bolt columns;
Described many bars bolt 1 comprises multiple, respectively centered by crack 5 between the upper and lower every setting, each many barsMultiple bolt columns of bolt 1 penetrate respectively body of wall 4, and wherein two stay bolt posts 12 at middle part pass respectively body of wall4, its end is provided with screw thread, and fastening by clamp nut 3, between described clamp nut 3 and body of wall 4Stay bolt post 12 on be also provided with backing plate 2.
Described lag bolt post 13 comprises two, is symmetricly set on respectively the two ends, left and right of connector 11.
On the excircle of two described lag bolt posts 13, be respectively arranged with screw thread, can make lag bolt post to body of wallHave good grasping force, prevent from body of wall, its front end is respectively pointed design. Before two lag bolt posts 13End, for pointed, easily imports body of wall, can insert easily body of wall 4.
The two ends, front side of described backing plate 2 are respectively arranged with reinforcement 21, and described reinforcement 21 comprises cylinderPortion 210 and sharp portion 211, described sharp portion 211 is arranged on the front end of cylindrical portion 210, cylindrical portion 210Rear end and backing plate 2 fix, the reinforcement 21 at described two ends penetrates respectively body of wall 4, reinforcement 21Length is less than the width of body of wall 4. Reinforcement 21 can fracture 5 pre-applied forces, reduce crack 5, prevent crack5 split again.
The method in reinforcing wall crack, comprises the following steps:
(1) adopt mud jacking to repair wall body slit 5: to inject by low viscosity, high-intensity crack repairing glueIn chamber, crack;
(2) many bars bolt 1 is anchored into body of wall 4: first holed respectively in wall body slit two ends, by many bars bolt 1Stay bolt post and lag bolt post along the hole getting out on body of wall, vertical direction penetrates body of wall 4, will be through body of wall 4The stay bolt post 12 of many bars bolt 1 on be inserted in backing plate 2, then cover is had on the stay bolt post 12 of backing plate and is inserted inClamp nut 3, when tightening clamp nut 3, the reinforcement 21 of backing plate 2 front sides stretches into body of wall 4, counterincisionSeam 5 has applied certain pressure, and while many bars bolt 1 also fracture 5 adds certain power in advance, and then with plantingMany bars bolt 1 is anchored into body of wall 4 by muscle glue. Use the method in above-mentioned reinforcing wall crack for going to live in the household of one's in-laws on getting married into method.
By the fastening stay bolt post of clamp nut 3 12 time, can on many bars bolt 1, add arbitrarily accurate power,Allow many bars bolt 1 bear a certain amount of pulling force of wall section, by afterburning size, control crack 5 and ftractureSize; In the time that body of wall is stressed, many bars bolt 1 and body of wall are worked jointly; On backing plate 2, be provided with reinforcement 21,Can make reinforcement 21 stressed work simultaneously; Employing is gone to live in the household of one's in-laws on getting married into method, reinforces thermal cracking with total cross-section bar-mat reinforcementCompare, greatly save amount of reinforcement, bury compared with muscle method with traditional seam that picks, can effectively control the size in crack,Overall economic efficiency is high.
Except the technical characterictic described in description, be the known technology of those skilled in the art.

Claims (5)

1. the pre-applied force equipment in reinforcing wall crack, is characterized in that: comprise many bars bolt, backing plate and fasteningNut;
Described many bars bolt comprises a connector and multiple bolt column, and described multiple bolt columns arrange respectivelyAt the homonymy of connector, described multiple bolt columns comprise and are arranged on two stay bolt posts at connector middle part and establishPut the multiple lag bolt posts at both ends, connector left and right, the lag bolt post edge of connector left part and right partConnector middle part is symmetrical arranged, and the length of two described stay bolt posts is greater than the width of body of wall, lag bolt postLength is less than the width of body of wall, and described connector and multiple bolt column are made up of reinforcing bar respectively;
Described many bars bolt comprises multiple, respectively centered by crack between the upper and lower every setting, each many bars boltMultiple bolt columns penetrate respectively body of wall, wherein middle part two stay bolt posts pass respectively body of wall, establish its endBe equipped with screw thread, and fastening by clamp nut, on the stay bolt post between described clamp nut and body of wall, also establishBe equipped with backing plate.
2. the pre-applied force equipment in reinforcing wall according to claim 1 crack, is characterized in that: described inLag bolt post comprise two, be symmetricly set on respectively the two ends, left and right of connector.
3. the pre-applied force equipment in reinforcing wall according to claim 2 crack, is characterized in that: described inThe excircle of two lag bolt posts on be respectively arranged with screw thread, its front end is respectively pointed design.
4. the pre-applied force equipment in reinforcing wall according to claim 1 crack, is characterized in that: described inThe two ends, front side of backing plate be respectively arranged with reinforcement, described reinforcement comprises cylindrical portion and sharp portion, described inSharp portion be arranged on the front end of cylindrical portion, rear end and the backing plate of cylindrical portion fix, the reinforcement at described two endsMuscle penetrates respectively body of wall, and the length of reinforcement is less than the width of body of wall.
5. the method in reinforcing wall crack, is characterized in that: comprise the following steps:
(1) adopt mud jacking to repair wall body slit: to inject and split by low viscosity, high-intensity crack repairing glueIn seam chamber;
(2) many bars bolt is anchored into body of wall: first holed respectively in wall body slit two ends, by the long spiral shell of many bars boltHitching post and lag bolt post are along the hole getting out on body of wall, and vertical direction penetrates body of wall, by the many bars bolt through body of wallStay bolt post on be inserted in backing plate, then cover is had on the stay bolt post of backing plate and is inserted in clamp nut, tighten fastening screwFemale time, the reinforcement of backing plate front side stretches into body of wall, and fracture has applied certain pressure, simultaneously many bars spiral shellBolt also fracture adds certain power in advance, and then many bars bolt is anchored into body of wall with anchoring adhesive.
CN201410715193.9A 2014-11-29 2014-11-29 Pre-applied force equipment and the method in reinforcing wall crack Expired - Fee Related CN104358422B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410715193.9A CN104358422B (en) 2014-11-29 2014-11-29 Pre-applied force equipment and the method in reinforcing wall crack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410715193.9A CN104358422B (en) 2014-11-29 2014-11-29 Pre-applied force equipment and the method in reinforcing wall crack

Publications (2)

Publication Number Publication Date
CN104358422A CN104358422A (en) 2015-02-18
CN104358422B true CN104358422B (en) 2016-06-15

Family

ID=52525719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410715193.9A Expired - Fee Related CN104358422B (en) 2014-11-29 2014-11-29 Pre-applied force equipment and the method in reinforcing wall crack

Country Status (1)

Country Link
CN (1) CN104358422B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2592554B1 (en) * 2016-10-14 2017-11-08 Universitat De Les Illes Balears METHOD OF ACTIVE REINFORCEMENT AGAINST CUTTING EFFORT OR PUNCHING IN STRUCTURAL SUPPORTING ELEMENTS, AND ACTIVE REINFORCEMENT SYSTEM
CN107044211A (en) * 2017-03-28 2017-08-15 宝业西伟德混凝土预制件(合肥)有限公司 A kind of repairing and reinforcing process of sandwich insulation exterior wall glass sheet fiber tension member damage
CN108060791A (en) * 2017-12-21 2018-05-22 安徽银兔装饰材料有限公司 Novel wall crack resistence component
CN108049649A (en) * 2017-12-21 2018-05-18 安徽银兔装饰材料有限公司 Intelligent wall anti-cracking component
CN108060792A (en) * 2017-12-21 2018-05-22 安徽银兔装饰材料有限公司 Wall strength crack resistence component
CN108104303A (en) * 2017-12-21 2018-06-01 安徽银兔装饰材料有限公司 Wall anti-cracking component
CN111501578B (en) * 2020-04-14 2021-07-30 中铁二十四局集团江苏工程有限公司 Reinforcing method of reinforcing structure for bridge pier cracks
CN113294008B (en) * 2021-05-29 2022-07-29 重庆海发工程项目管理咨询有限公司 Building crack repairing method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202215004U (en) * 2011-08-24 2012-05-09 贵阳铝镁设计研究院有限公司 Reinforcing structure for cracked brick wall
JP5939542B2 (en) * 2012-11-02 2016-06-22 トヨタ車体株式会社 Crack growth prevention structure
CN103255843A (en) * 2013-05-29 2013-08-21 东莞市利鹏建材有限公司 Expansion joint structure used for wall body and capable of releasing prestress
CN103452332A (en) * 2013-09-11 2013-12-18 中建中东有限责任公司 Method for repairing construction engineering floor slab crack
CN204299205U (en) * 2014-11-29 2015-04-29 山东省建筑科学研究院 The pre-applied force equipment in reinforcing wall crack

Also Published As

Publication number Publication date
CN104358422A (en) 2015-02-18

Similar Documents

Publication Publication Date Title
CN104358422B (en) Pre-applied force equipment and the method in reinforcing wall crack
CN103132656B (en) Connecting structure for vertical reinforcement bars of prefabricated wall parts
CN103790247A (en) Cast-in-situ heat preservation beam or column or shear wall and construction method
CN110528950B (en) Assembled hidden bracket type beam-column joint connecting device
CN104328881B (en) Vacuum insulation panel heat-preservation decoration dry hanging system and construction method thereof
CN113323149A (en) Laminated wood prestressed casing bolt joint and construction method thereof
CN101768967A (en) Soil anchor quick construction method and anchor thereof
CN204225278U (en) A kind of prefabricated strap-on insulation wallboard and with beam-to-column joint structure
CN103711232B (en) L-shaped frame component and lightweight concrete wall prefabricated type shear wall and connection construction method
CN211447484U (en) Concrete pouring prefabricated plate with function is assembled to dovetail type
CN103015735A (en) Construction method for planting wall lacing bars after pre-burying of sleeve assemblies
CN204299205U (en) The pre-applied force equipment in reinforcing wall crack
WO2014127680A1 (en) Scissor-type expansion bolt and use thereof
CN203546991U (en) Fixing anchor bolt structure for outer wall stone curtain wall
CN105862871B (en) Pre-applied force anchoring body assembly type frame hoop slope protection device and construction method
CN101498148B (en) Composite heat insulating walling fastening bolt and construction method thereof
CN206368439U (en) Integrated prefabricated heat-insulation wall plate construction and wallboard connecting component
CN207484742U (en) A kind of prestressed building blocks wall between windows
CN105735517B (en) Assembled steel reinforced concrete wall structure based on heat bridge separating technology
CN208701955U (en) A kind of insulation board and the knockdown outer wall template of steel frame
CN210067088U (en) Internal and external combined wall heat insulation system
CN104060831B (en) A kind of construction method of architecture interlayer combined wall
CN105952001B (en) A kind of prefabricated sandwich heat preservation Side fascia and sunshade board connecting structure and its construction method
CN214461239U (en) Embedded part
CN108149944A (en) A kind of existing building exterior-wall heat insulation integral structure and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Song Shuangyang

Inventor after: Cui Shiqi

Inventor after: Sun Jiandong

Inventor after: Lou Cuan

Inventor after: Shi Lei

Inventor after: Li Haiwen

Inventor after: Cheng Bo

Inventor before: Song Shuangyang

Inventor before: Lou Cuan

Inventor before: Sun Jiandong

Inventor before: Shi Lei

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160510

Address after: 250031 Shandong Province Flyover District of Ji'nan City Road 29.

Applicant after: Building Science Inst., Shandong Prov.

Address before: 250031 Shandong Province Flyover District of Ji'nan City No. 29 Wuyingshan road Shandong Academy of Building Research

Applicant before: Song Shuangyang

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160615

Termination date: 20161129