CN207483847U - A kind of compression drying air pressure monitoring device of chemical vapor deposition machine station - Google Patents

A kind of compression drying air pressure monitoring device of chemical vapor deposition machine station Download PDF

Info

Publication number
CN207483847U
CN207483847U CN201721516339.2U CN201721516339U CN207483847U CN 207483847 U CN207483847 U CN 207483847U CN 201721516339 U CN201721516339 U CN 201721516339U CN 207483847 U CN207483847 U CN 207483847U
Authority
CN
China
Prior art keywords
baroceptor
drying air
vapor deposition
compression drying
chemical vapor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721516339.2U
Other languages
Chinese (zh)
Inventor
张欣
刘玮
祝家伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Huali Microelectronics Corp
Original Assignee
Shanghai Huali Microelectronics Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Huali Microelectronics Corp filed Critical Shanghai Huali Microelectronics Corp
Priority to CN201721516339.2U priority Critical patent/CN207483847U/en
Application granted granted Critical
Publication of CN207483847U publication Critical patent/CN207483847U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drying Of Solid Materials (AREA)

Abstract

The utility model provides a kind of compression drying air pressure monitoring device of chemical vapor deposition machine station, including on chemical vapor deposition machine station, chemical vapor deposition machine station baroceptor one, the compression drying air supply mouth that is connect with one gas pipeline of baroceptor, further include the three-way connection on baroceptor two and the gas pipeline;The three-way connection connection compression drying air supply mouth, baroceptor one, baroceptor two.The utility model is transformed board and installs compression drying air pressure upper limit monitoring device additional in itself, can predict simultaneously clamping compression drying air supply pressure monitor range in advance.

Description

A kind of compression drying air pressure monitoring device of chemical vapor deposition machine station
Technical field
The utility model is related to a kind of a kind of compression drying of semiconductor equipment more particularly to chemical vapor deposition machine station skies Atmospheric pressure monitoring device.
Background technology
Chemical vapor deposition (CVD, Chemical Vapor Deposition) is most widely used in semi-conductor industry The technology for depositing multiple materials, including large-scale insulating materials, most metals material and metal alloy compositions.Two Kind or two or more gaseous starting materials are imported into a reative cell, and then they chemically react between each other, are formed A kind of new material, deposits in wafer surface.The chemical vapor depsotition equipment of existing Vector boards model often occurs Supply pressure is excessive after pressure regulator valve damage on compression drying air (CDA, Compressed dry air) supply line leads to machine The compression drying air of upper valve on platform gas piping is leaked so as to influence carcass switch event, due to valve member when serious Not opening completely causes products thickness abnormal.It is primarily due to have no board import compression drying sky during the manufacture design of Vector boards Atmospheric pressure upper limit monitoring device, can not effective monitoring work as the excessive situation of compression drying air pressure.And compression drying air simultaneously It will cause equipment, pneumatic valve member excess load under no monitor state operates in itself when pressure is excessive.
Utility model content
Technical problem to be solved in the utility model is in view of the drawbacks of the prior art, to provide a kind of assembling simply, energy Directly it is adapted to the compression drying air pressure monitoring device of existing chemical vapor deposition machine station.
The utility model uses following technical scheme to solve above-mentioned technical problem:
A kind of compression drying air pressure monitoring device of chemical vapor deposition machine station, including chemical vapor deposition machine station, Baroceptor one on chemical vapor deposition machine station, the compression drying air being connect with one gas pipeline of baroceptor Supply opening further includes the three-way connection on baroceptor two and the gas pipeline;The three-way connection connects compression drying Air supply mouth, baroceptor one, baroceptor two.
In order to advanced optimize above-mentioned technical proposal, the technical measures that the utility model is taken are:
Preferably, the connector of baroceptor two is connect with 24V power supplys.
Preferably, the equipment interface of the connector of baroceptor two and chemical vapor deposition machine station connects.
Preferably, the connector of the baroceptor two is 5 needle signal wire joints.
Preferably, the equipment interface is 15 needle interfaces.
Preferably, the connector of the baroceptor is 15 adapters.
Preferably, the equipment interface is interlocking connecting pin.
The utility model uses above technical scheme, compared with prior art, has the following technical effect that:
The utility model is transformed board and installs compression drying air pressure upper limit monitoring device additional in itself, can carry Preceding precognition and clamping compression drying air supply pressure monitor range, to reach technique effect:
By the way that the soft-off of not enabled on board is interlocked (Soft shutdown Interlock) application of function in compression Interlocking (Interlock) during dry air pressure exception alarms and installs the baroceptor (Pressure of SMC models Switch) on this circuit to reach effective monitoring equipment compression drying air supply pressure, when compression drying air supply pressure Board quotes soft-off (Soft Shutdown) alarm when power is exceeded.When soft-off (Soft shutdown) alarm occurs, machine Platform, which can be given tacit consent to currently to fulfil assignment in the product of board cavity, to be returned to wafer transfer box (FOUP) and stops follow-up product afterwards Operation.
The pneumatic valve member of board is avoided, which to be used for a long time under high compression dry air pressure, to be caused itself to damage.
It avoids influencing when the supply of board compression drying air pressure is abnormal or certain compression drying air supply unit has leakage Other especially mainly reflect process gas pipeline correlation carcass switch.
Description of the drawings
Fig. 1 is that a kind of compression drying air monitoring device of preferred embodiment of the utility model reequips module diagram;
Fig. 2 is a kind of circuit connection diagram of the baroceptor two of preferred embodiment of the utility model;
Reference numeral therein is:
1 baroceptor one;2 compression drying air supply mouths;3 baroceptors two;4 three-way connections;5 equipment interfaces.
Specific embodiment
The technical solution of the utility model is described in further detail below in conjunction with the accompanying drawings.
The utility model is suitable for the chemical vapor depsotition equipment of Vector models.
Fig. 1 is that a kind of compression drying air monitoring device of preferred embodiment of the utility model reequips module diagram; Fig. 2 is a kind of circuit connection diagram of the baroceptor two of preferred embodiment of the utility model.
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the utility model can To be combined with each other.
As illustrated in fig. 1 and 2, the compression drying air pressure monitoring device of the chemical vapor deposition machine station of the present embodiment, packet Include chemical vapor deposition machine station, the baroceptor 1 on chemical vapor deposition machine station and one 1 gas of baroceptor The compression drying air supply mouth 2 of pipeline connection, further includes the three-way connection 4 on baroceptor 23 and the gas pipeline; The three-way connection 4 connects compression drying air supply mouth 2, baroceptor 1, baroceptor 23.
Further, in a kind of preferred embodiment, the baroceptor 23 is connect with 24V power supplys.
Further, in a kind of preferred embodiment, the connector and chemical vapor deposition machine station of baroceptor 23 Equipment interface 5 connect.
Further, in a kind of preferred embodiment, the connector of the baroceptor 23 connects for 5 needle signal wires Head.
Further, in a kind of preferred embodiment, the equipment interface 5 is 15 needle interfaces.
Further, in a kind of preferred embodiment, the connector of the baroceptor 23 is 15 adapters.
Further, in a kind of preferred embodiment, the equipment interface 5 is interlocks connecting pin, i.e. interlock Connecting pin is alarm linkage functional connector.
The concrete operations flow of above-described embodiment is:
By the soft-off of 5 needles of baroceptor 23 or 15 needles interlocking (Soft shutdown Interlock) connector with The device junction 5 of (interlock) connecting pin is interlocked, then opens 24V power supplys, baroceptor 23 is made to start to work, it is original Baroceptor 1 is provided with the warning device of air pressure lower limit, and baroceptor 23 is provided with the warning device of the air pressure upper limit, It is now connected by the connector of the interlocking connecting pin of alarm linkage function, to realize that detecting board simultaneously atmospherically limits and lower limit Function, it is preferred that baroceptor 1 and baroceptor 23 access IOC modules, to realize function;By air pressure sensing The compression drying air supply mouth 2 of device 23 and baroceptor 1 and Vector chemical vapor deposition machine stations (complete machine is not shown) By in the connection of three-way connection 4.After board is started to work, baroceptor 1 and baroceptor 23 monitor compression drying The atmospheric pressure value of air, when atmospheric pressure value is too low, the warning device of baroceptor 1 starts to alarm, to show that air pressure is too low;Work as gas When pressure value is excessively high, the warning device of baroceptor 23 starts to alarm, to show that air pressure is excessively high.In baroceptor 1 or air pressure After the warning device alarm of sensor 23, board, which can be given tacit consent to currently to fulfil assignment in the product of board cavity, is returned to crystalline substance Stop follow-up product operation after circle feeder, can adjust the air pressure of the entire instrument of detection at this time.If the normal alarm free of air pressure, board After the completion of working properly, compression drying air supply mouth and its baroceptor 1 and baroceptor 23 are closed, is completed whole A operation.
In conclusion the utility model is transformed board in itself installs compression drying air pressure upper limit monitoring dress additional It puts, simultaneously clamping compression drying air supply pressure monitor range can be predicted in advance.Install the monitoring of compression drying air pressure additional After device, the pneumatic valve member service life can be increased to 5 years from 1 year, then be calculated with each 300 U.S. dollar of valve member, and independent valve member can save 25 Overhead valve quantity * 4*300*6.3=25*2*4*300*6.3=378000 RMB (RMB) on platform equipment * boards; The each valve member compression drying air leakage of Vector model devices can also result in 4 sheet articles and scrap, with every sheet articles 1000RMB It calculates, 4000RMB can be caused to lose;Therefore by installing compression drying air pressure monitoring device additional after, can avoid making as far as possible Product are scrapped, and are improved 4 years and calculated with the valve member service life, then product loss from spoilage is 25 equipment *, 4 systems caused by valve member damages 4 * of product * are per the sheet articles expense * exchange rate=25*4*4*1000=400000RMB;A set of compression drying air pressure monitoring device The pressure sensor (Pressure Switch) that expense is electric wire+connector+gas piping=50RMB, a SMC, which is offered, is 417RMB. is with total quotation for 25 equipment * circuits quotation+pressure sensor quotation=25* (50+417)=11675;So mesh It is preceding to save product failure costs+valve member failure costs * completed percentages-installation cost=378000+400000-11675=altogether 766325RMB。
Specific embodiment of the utility model is described in detail above, but it is only used as example, the utility model It is not restricted to particular embodiments described above.To those skilled in the art, it is any that the practicality is equal Modifications and substitutions are also all among the scope of the utility model.Therefore, the institute under the spirit and scope for not departing from the utility model The impartial conversion of work and modification should all be covered in the scope of the utility model.

Claims (7)

1. a kind of compression drying air pressure monitoring device of chemical vapor deposition machine station including chemical vapor deposition machine station, is changed The compression drying for learn the baroceptor one (1) on vapor deposition board, connecting with described one (1) gas pipeline of baroceptor Air supply mouth (2), it is characterised in that:Further include the three-way connection (4) on baroceptor two (3) and the gas pipeline; Three-way connection (4) the connection compression drying air supply mouth (2), baroceptor one (1), baroceptor two (3).
2. the compression drying air pressure monitoring device of chemical vapor deposition machine station according to claim 1, feature exist In:The connector of baroceptor two (3) is connect with 24V power supplys.
3. the compression drying air pressure monitoring device of chemical vapor deposition machine station according to claim 1, feature exist In:The connector of baroceptor two (3) and the equipment interface (5) of chemical vapor deposition machine station connect.
4. the compression drying air pressure monitoring device of chemical vapor deposition machine station according to claim 3, feature exist In:The connector of the baroceptor two (3) is 5 needle signal wire joints.
5. the compression drying air pressure monitoring device of chemical vapor deposition machine station according to claim 3, feature exist In:The equipment interface (5) is 15 needle interfaces.
6. the compression drying air pressure monitoring device of chemical vapor deposition machine station according to claim 5, feature exist In:The connector of the baroceptor two (3) is 15 adapters.
7. the compression drying air pressure monitoring device of chemical vapor deposition machine station according to claim 5, feature exist In:The equipment interface (5) is interlocking connecting pin.
CN201721516339.2U 2017-11-14 2017-11-14 A kind of compression drying air pressure monitoring device of chemical vapor deposition machine station Active CN207483847U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721516339.2U CN207483847U (en) 2017-11-14 2017-11-14 A kind of compression drying air pressure monitoring device of chemical vapor deposition machine station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721516339.2U CN207483847U (en) 2017-11-14 2017-11-14 A kind of compression drying air pressure monitoring device of chemical vapor deposition machine station

Publications (1)

Publication Number Publication Date
CN207483847U true CN207483847U (en) 2018-06-12

Family

ID=62477110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721516339.2U Active CN207483847U (en) 2017-11-14 2017-11-14 A kind of compression drying air pressure monitoring device of chemical vapor deposition machine station

Country Status (1)

Country Link
CN (1) CN207483847U (en)

Similar Documents

Publication Publication Date Title
CN214010686U (en) New energy automobile battery package leakproofness test equipment
CN207483847U (en) A kind of compression drying air pressure monitoring device of chemical vapor deposition machine station
CN212513507U (en) Pressure sensor leakage testing device
CN210664940U (en) Air tightness detection device
CN217360550U (en) Monitoring tool of glue spreading and developing chemical liquid inlet equipment
CN109612025B (en) Air conditioning device and control method thereof
CN110957234A (en) Exhaust monitoring system and exhaust monitoring method for semiconductor manufacturing equipment
CN210400757U (en) Full-automatic sealing test and nitrogen filling integrated machine
CN109186154A (en) Four-way valve, which is collaborated, protects method for diagnosing faults, device, storage medium and air-conditioning
CN114823428A (en) Semiconductor heat treatment apparatus and control method thereof
CN201973452U (en) Medium pressure regulating box for compressed natural gas supply station
CN212432449U (en) Automatic leakage detection device for fuel cell stack
CN207586371U (en) High-performance Intelligent TV remote controller chip test system
CN211263094U (en) Device for detecting semiconductor equipment
CN209111114U (en) A kind of manipulator basket structure against pressure
CN207830992U (en) A kind of test compressed air recycling system
CN113075509A (en) Online monitoring device and monitoring method for insulation of water and electricity connector of bar of internal water cooling generator
CN207336721U (en) A kind of energy saving battery detection device
CN114076661A (en) Automatic leakage detection device and method for fuel cell stack
CN113390576A (en) Pressure sensor leakage testing device and operation method
CN216922454U (en) Pressure simulation manual regulating device for parallel operation of multiple air compressors
CN116753465B (en) System and method for sharing instrument gas of multiple sets of nitrogen production devices
CN218762704U (en) Purging replacement panel
CN110579324A (en) Full-automatic sealing test and nitrogen filling integrated machine and control method thereof
KR100372881B1 (en) Method for auto socket off of Test handler

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant