CN207436481U - A kind of Novel high-rise construction external scaffolding - Google Patents

A kind of Novel high-rise construction external scaffolding Download PDF

Info

Publication number
CN207436481U
CN207436481U CN201721411646.4U CN201721411646U CN207436481U CN 207436481 U CN207436481 U CN 207436481U CN 201721411646 U CN201721411646 U CN 201721411646U CN 207436481 U CN207436481 U CN 207436481U
Authority
CN
China
Prior art keywords
installation
external scaffolding
novel high
installing pipe
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721411646.4U
Other languages
Chinese (zh)
Inventor
陈旭
常红彬
樊瑞瑶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721411646.4U priority Critical patent/CN207436481U/en
Application granted granted Critical
Publication of CN207436481U publication Critical patent/CN207436481U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of Novel high-rise construction external scaffolding, structure includes No.1 installation component, casing, No. two installation components, fastening mounting head;In order to realize that work efficiency can be stablized and be provided to setting up for Novel high-rise construction external scaffolding, it is connected using the fastening mounting head under No.1 installation component with the sleeve rotating on No. two installation components, contacting between steel pipe and steel pipe is made more to consolidate, and without recycling fastener connection, saves cost and material that external scaffolding is set up, accelerate installation speed and dismounting speed, work efficiency is provided, energy conservation and environmental protection, this is reasonable in design, and cost is low, suitable for promoting the use of.

Description

A kind of Novel high-rise construction external scaffolding
Technical field
The utility model is a kind of Novel high-rise construction external scaffolding, belongs to construction scaffold field.
Background technology
External scaffolding system refers to the scaffold set up in architecture enclosing, and external scaffolding is used extensively, outside various console modes Scaffold, suspended scaffold choose formula scaffold, working platform etc., are generally set up in architecture enclosing, external scaffolding is mostly used In outer-wall building, alien invasion finishing and reinforced concrete works.
Prior art external scaffolding is generally connected using steel pipe with fastener, but external scaffolding is walked about for a long time by construction personnel When, the nut on fastener can be loosened, and cause the connection between steel pipe and steel pipe unstable, whole external scaffolding is caused all It is affected.
Utility model content
In view of the deficienciess of the prior art, the utility model aim is to provide a kind of Novel high-rise construction out-mould scaffold Frame is generally connected with solving external scaffolding using steel pipe with fastener, but when external scaffolding is walked about for a long time by construction personnel, fastener On nut can be loosened, cause the connection between steel pipe and steel pipe unstable, cause whole external scaffolding that can all be subject to shadow The problem of ringing.
To achieve these goals, the utility model is to realize by the following technical solutions:A kind of Novel high-rise is built Construction external scaffolding is built, structure includes No.1 installation component, casing, No. two installation components, fastening mounting head;
No. two installation component upper ends are equipped with casing, and described No. two installation components are fixedly connected with casing, described No. two installation component bottoms be equipped with fastening mounting head, described No. two installation components and fasten mounting head mutually weld, it is described No. two installation components are equipped with No.1 installation component, and described No. two installation components and No.1 installation component are matched by casing It closes;
The casing is made of tube body, inner tube, extrapolation pin hole, supporting block, swivelling chute, and the tube body has support Block, the tube body are mutually welded with supporting block, and the inner tube is inserted on the supporting block center vertically, the inner tube and Supporting block is fixedly connected, and the tube surfaces are equipped with extrapolation pin hole, and the swivelling chute is arranged on tube surfaces;
The fastening mounting head is made of link block, limited post, installing pipe, interior pin hole, and the link block is divided into There is installing pipe, the link block is mutually welded with installing pipe, and the installation pipe surface is equipped with interior pin hole, the installation Pipe left and right ends are equipped with limited post, and the installing pipe is fixedly connected with limited post.
Further, the No.1 installation component and No. two installation components are identical structure.
Further, it is equipped with swivelling chute at left and right sides of the tube body.
Further, the installing pipe is cylindrical structural.
Further, the extrapolation pin hole is equal with the diameter of interior pin hole.
Further, the interior pipe surface is equipped with screw thread.
Further, the No.1 installation component is made of stainless steel, prevents from getting rusty.
Advantageous effect
A kind of Novel high-rise construction external scaffolding of the utility model, when user is want using the utility model No.1 installation component is connected with No. two installation components by casing, because No.1 installation component is with No. two installation components Identical structure, so the casing in fastening mounting head and No. two installation components under No.1 installation component is engaged, by installing pipe On limited post be rotatably mounted on by swivelling chute on tube body, and inner tube is then inserted inside the installing pipe, makes No.1 installation component Do not have to again fastener between No. two installation components to be connected, be directly inserted through with bolt on the extrapolation pin hole on tube body and installing pipe On interior pin hole, No.1 installation component is avoided to be loosened with No. two installation components.
In order to realize that work efficiency can be stablized and be provided to setting up for Novel high-rise construction external scaffolding, No.1 is utilized Fastening mounting head under installation component is connected with the sleeve rotating on No. two installation components, makes contacting more between steel pipe and steel pipe Add it is firm, and without recycle fastener connection, save cost and material that external scaffolding is set up, accelerate installation speed with Speed is dismantled, provides work efficiency, energy conservation and environmental protection, this is reasonable in design, and cost is low, suitable for promoting the use of.
Description of the drawings
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other spies of the utility model Sign, objects and advantages will become more apparent upon:
Fig. 1 is a kind of structure diagram of Novel high-rise construction external scaffolding of the utility model.
Fig. 2 is a kind of structural representation of the Novel high-rise construction external scaffolding casing of the utility model with fastening mounting head Figure.
In figure:No.1 installation component -1, casing -2, No. two installation components -3, fastening mounting head -4, tube body -201, inner tube - 202nd, extrapolation pin hole -203, supporting block -204, swivelling chute -205, link block -401, limited post -402, installing pipe -403, interpolation Pin hole -404.
Specific embodiment
Technical means, creative features, achievable purpose and effectiveness to realize the utility model are easy to understand, below With reference to specific embodiment, the utility model is expanded on further.
- Fig. 2 is please referred to Fig.1, the utility model provides a kind of Novel high-rise construction external scaffolding, and structure includes one Number installation component 1,2, No. two installation components 3 of casing, fastening mounting head 4;
No. two 3 upper ends of installation component are equipped with casing 2, and described No. two installation components 3 are fixedly connected with casing 2, No. two 3 bottoms of installation component are equipped with fastening mounting head 4, and described No. two installation components 3 are mutually welded with fastening mounting head 4 It connects, described No. two installation components 3 are equipped with No.1 installation component 1, described No. two installation components 3 and No.1 installation component 1 It is engaged by casing 2;
The casing 2 is made of tube body 201, inner tube 202, extrapolation pin hole 203, supporting block 204, swivelling chute 205, described Tube body 201 have supporting block 204, the tube body 201 is mutually welded with supporting block 204, the inner tube 202 vertically insert it is embedding On 204 center of supporting block, the inner tube 202 is fixedly connected with supporting block 204, is set on 201 surface of tube body There is extrapolation pin hole 203, the swivelling chute 205 is arranged on 201 surface of tube body;
The fastening mounting head 4 is made of link block 401, limited post 402, installing pipe 403, interior pin hole 404, described Link block 401 have installing pipe 403, the link block 401 is mutually welded with installing pipe 403,403 table of installing pipe Face is equipped with interior pin hole 404, and 403 left and right ends of installing pipe are equipped with limited post 402,403 He of installing pipe Limited post 402 is fixedly connected;
The No.1 installation component 1 and No. two installation components 3 are identical structure, 201 left and right sides of tube body Swivelling chute 205 is equipped with, the installing pipe 403 is cylindrical structural, the extrapolation pin hole 203 and interior pin hole 404 Diameter is equivalent, and 202 surface of inner tube is equipped with screw thread, and the No.1 installation component 1 is made of stainless steel, It prevents from getting rusty.
No.1 installation component 1 and No. two installation components 3 are passed through into casing 2 when user is want using the utility model It is connected, because No.1 installation component 1 and No. two installation components 3 are identical structure, the fastening under No.1 installation component 1 Casing 2 in mounting head 4 and No. two installation components 3 is engaged, and the limited post 402 in installing pipe 403 is revolved by swivelling chute 205 Turn to be mounted on tube body 201, and inner tube 202 is then inserted inside installing pipe 403, makes No.1 installation component 1 and No. two installation structures Between part 3 without fastener again connect, directly with bolt be inserted through on the extrapolation pin hole 203 on tube body 201 and installing pipe 403 on Interior pin hole 404, No.1 installation component 1 is avoided to be loosened with No. two installation components 3.
Limited post 402 described in the utility model is that one kind continues to glide and position for limiting main body.
The utility model solves the problems, such as it is that external scaffolding is generally connected using steel pipe with fastener, but external scaffolding is applied When worker person walks about for a long time, the nut on fastener can be loosened, and caused the connection between steel pipe and steel pipe unstable, caused whole External scaffold can all be affected, and the utility model is combined with each other by above-mentioned component, in order to realize that Novel high-rise is built Work efficiency can be stablized and be provided to setting up for external scaffolding of construction, utilize the fastening mounting head 4 and two under No.1 installation component 1 Casing 2 on number installation component 3 is rotatably connected, make between steel pipe and steel pipe contacting it is more firm, and without recycling button Part connects, and saves cost and material that external scaffolding is set up, accelerates installation speed and dismounting speed, provides work efficiency, Energy conservation and environmental protection, this is reasonable in design, and cost is low, suitable for promoting the use of.
The basic principle of the utility model and main feature and the advantages of the utility model has been shown and described above, for For those skilled in the art, it is clear that the utility model is not limited to the details of above-mentioned exemplary embodiment, and without departing substantially from this In the case of the spirit or essential attributes of utility model, the utility model can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the utility model is by institute Attached claim rather than above description limit, it is intended that will fall within the meaning and scope of the equivalent requirements of the claims All changes are embraced therein.Any reference numeral in claim should not be considered as to the involved right of limitation It is required that.
Moreover, it will be appreciated that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should Using specification as an entirety, the technical solutions in each embodiment can also be properly combined, forms those skilled in the art It is appreciated that other embodiment.

Claims (5)

1. a kind of Novel high-rise construction external scaffolding, structure includes No.1 installation component(1), casing(2), No. two installations Component(3), fastening mounting head(4), it is characterised in that:
No. two installation components(3)Upper end is equipped with casing(2), No. two installation components(3)With casing(2)It is fixed to connect It connects, described No. two installation components(3)Bottom is equipped with fastening mounting head(4), No. two installation components(3)It is installed with fastening Head(4)It mutually welds, described No. two installation components(3)It is equipped with No.1 installation component(1), No. two installation components(3) With No.1 installation component(1)Pass through casing(2)It is engaged;
The casing(2)By tube body(201), inner tube(202), extrapolation pin hole(203), supporting block(204), swivelling chute(205) Composition, the tube body(201)Have supporting block(204), the tube body(201)And supporting block(204)Mutually weld, it is described Inner tube(202)It is vertical to insert embedded in supporting block(204)On center, the inner tube(202)And supporting block(204)It is fixed to connect It connects, the tube body(201)Surface is equipped with extrapolation pin hole(203), the swivelling chute(205)Arranged on tube body(201)Surface On;
The fastening mounting head(4)By link block(401), limited post(402), installing pipe(403), interior pin hole(404)Group Into the link block(401)Have installing pipe(403), the link block(401)And installing pipe(403)It mutually welds, institute The installing pipe stated(403)Surface is equipped with interior pin hole(404), the installing pipe(403)Left and right ends are equipped with limited post (402), the installing pipe(403)And limited post(402)It is fixedly connected.
2. a kind of Novel high-rise construction external scaffolding according to claim 1, it is characterised in that:The No.1 peace Fill component(1)With No. two installation components(3)It is identical structure.
3. a kind of Novel high-rise construction external scaffolding according to claim 1, it is characterised in that:The tube body (201)The left and right sides is equipped with swivelling chute(205).
4. a kind of Novel high-rise construction external scaffolding according to claim 1, it is characterised in that:The installing pipe (403)For cylindrical structural.
5. a kind of Novel high-rise construction external scaffolding according to claim 1, it is characterised in that:The outer plug Hole(203)With interior pin hole(404)Diameter it is equivalent.
CN201721411646.4U 2017-10-28 2017-10-28 A kind of Novel high-rise construction external scaffolding Expired - Fee Related CN207436481U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721411646.4U CN207436481U (en) 2017-10-28 2017-10-28 A kind of Novel high-rise construction external scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721411646.4U CN207436481U (en) 2017-10-28 2017-10-28 A kind of Novel high-rise construction external scaffolding

Publications (1)

Publication Number Publication Date
CN207436481U true CN207436481U (en) 2018-06-01

Family

ID=62290359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721411646.4U Expired - Fee Related CN207436481U (en) 2017-10-28 2017-10-28 A kind of Novel high-rise construction external scaffolding

Country Status (1)

Country Link
CN (1) CN207436481U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057313A (en) * 2018-08-03 2018-12-21 安徽卓良新材料有限公司 A kind of easy disassembly scaffold support component and installation method
CN113006458A (en) * 2021-01-27 2021-06-22 山东金力金属制品有限公司 Anti-slip steel pipe for scaffold

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057313A (en) * 2018-08-03 2018-12-21 安徽卓良新材料有限公司 A kind of easy disassembly scaffold support component and installation method
CN113006458A (en) * 2021-01-27 2021-06-22 山东金力金属制品有限公司 Anti-slip steel pipe for scaffold

Similar Documents

Publication Publication Date Title
CN101736893B (en) Overhanging type scaffold supporting system
CN204940556U (en) A kind of steel structure girder of building in the style of the ancients and the syndeton of pin
CN207436481U (en) A kind of Novel high-rise construction external scaffolding
CN206128597U (en) Assembly type structure work platform
CN204919828U (en) Archaize building's wooden frame and steel structure column's connection structure
CN104372923B (en) Scaffolding
CN206345617U (en) Building tower crane attachment device is received in a kind of
CN206376507U (en) Prefabrication outrigger
CN205713034U (en) A kind of speed inserts formula girder steel construction operation platform
CN107338965A (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
CN204238537U (en) A kind of elevated hoistway operation platform
CN207211705U (en) Means for fastening scaffolding
CN107476564B (en) Special fastener for support frame
CN202081633U (en) Detachable scaffold locking plate
CN204174915U (en) Scaffold
CN208981753U (en) Key slot type scaffold is fixedly connected device
CN206352399U (en) One kind lengthens L-type back cord
CN206917061U (en) A kind of steel construction assembled wallboard
CN207110500U (en) The discharging of modularization ready-package and outer protection integrated system for assembled architecture
CN206693590U (en) A kind of Quick-mounting aluminium alloy scaffold
CN104372922A (en) Scaffold
CN204174903U (en) Scaffold
CN204163359U (en) Scaffold
CN208023791U (en) A kind of aluminum alloy wallboard installation joint structure
CN204627012U (en) A protection canopy that encorbelments of instrument formula for having outer scaffold frame building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180601

Termination date: 20181028

CF01 Termination of patent right due to non-payment of annual fee