CN207435909U - A kind of highway engineering bridge construction bridge deck concrete health preserving equipment - Google Patents

A kind of highway engineering bridge construction bridge deck concrete health preserving equipment Download PDF

Info

Publication number
CN207435909U
CN207435909U CN201721365294.3U CN201721365294U CN207435909U CN 207435909 U CN207435909 U CN 207435909U CN 201721365294 U CN201721365294 U CN 201721365294U CN 207435909 U CN207435909 U CN 207435909U
Authority
CN
China
Prior art keywords
bridge
water pipe
electric flat
flat carriage
deck concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721365294.3U
Other languages
Chinese (zh)
Inventor
王久江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Wuzhou Highway Engineering Co Ltd
Original Assignee
Dalian Wuzhou Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Wuzhou Highway Engineering Co Ltd filed Critical Dalian Wuzhou Highway Engineering Co Ltd
Priority to CN201721365294.3U priority Critical patent/CN207435909U/en
Application granted granted Critical
Publication of CN207435909U publication Critical patent/CN207435909U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to highway engineering field of bridge construction, and in particular to a kind of highway engineering bridge construction bridge deck concrete health preserving equipment.Technical solution is as follows:A kind of highway engineering bridge construction bridge deck concrete health preserving equipment, treat on health bridge deck concrete by vertical bridge to be laid with walk track, electric flat carriage is located on the walking track, electric flat carriage is equipped with column, the column is equipped with H-type stent, butterfly rain shape nozzle is uniformly provided with by direction across bridge on H-type stent, butterfly rain shape nozzle is connected by water pipe with water pump;The walking track both ends are equipped with position sensor, and the position sensor is connected by conducting wire with control cabinet, and the control cabinet is connected by conducting wire with distribution box, and the distribution box is connected by cable with the water pump and electric flat carriage;Electric flat carriage is equipped with water pipe reel and cable drum, and the water pipe is wrapped on water pipe reel, and the cable for connecting distribution box and electric flat carriage is wrapped on cable drum.

Description

A kind of highway engineering bridge construction bridge deck concrete health preserving equipment
Technical field
The utility model is related to highway engineering field of bridge construction, and in particular to a kind of highway engineering bridge construction bridge floor mixes Solidifying soil health preserving equipment.
Background technology
In highway engineering bridge construction, the importance of bridge deck concrete quality is indubitable.Bridge floor coagulation The quality of soil directly determines the durability of the bitumen layer in face attached thereto, comfortable so as to influence traffic safety and driving.And When correct bridge deck concrete health can ensure that cement gel body, to the demand of water, while prevents drying shrinkage and split in hardening process The generation of seam, the quality influence on bridge deck concrete is vital.
Bridge deck concrete health is to be carried out after bridge deck concrete casting complete before 8-12h, concrete final set.Generally apply Work building site is covered using geotextiles, is relied on manually setting water tank with water pump broad irrigation or eminence with bucket or human hand held water pipe The form of gravity stream keeps the moistening of geotextiles, achievees the purpose that health.These concrete curing forms are strong there is work Degree is big, lacks a sense of responsibility and causes health not comprehensive not in time and the problem of serious waste water resource, while bridge deck concrete health It is also possible to being related to high-rise working and facing side operation, there is very big security risks.
Utility model content
The utility model provides a kind of highway engineering bridge construction bridge deck concrete health preserving equipment, solves highway engineering bridge floor Existing labor intensity is big during concrete curing, health not in time, serious waste water resource be unfavorable for asking for environmental protection Topic.
The technical solution of the utility model is as follows:A kind of highway engineering bridge construction bridge deck concrete health preserving equipment, waits to support By vertical bridge to track of walking is laid on raw bridge deck concrete, electric flat carriage is located on the walking track, on electric flat carriage Equipped with column, the column is equipped with H type stents, is uniformly provided with butterfly rain shape nozzle, butterfly rain by direction across bridge on H-type stent Shape nozzle is connected by water pipe with water pump;The walking track both ends are equipped with position sensor, and the position sensor is by leading Line is connected with control cabinet, and the control cabinet is connected by conducting wire with distribution box, the distribution box by cable and the water pump and Electric flat carriage is connected;Electric flat carriage is equipped with water pipe reel and cable drum, and the water pipe is wrapped on water pipe reel, and connection is matched somebody with somebody The cable of electronic box and electric flat carriage is wrapped on cable drum, and cable and water pipe are realized by cable drum and water pipe spool turns It is flexible.
Butterfly rain shape nozzle is arranged in by direction across bridge on stent with a determining deviation, it is made to spray covering surface satisfaction and treats health bridge The requirement of surface concrete transverse width.
Signal distribution control box of the control cabinet according to position sensor to start water pump and electric flat carriage, realizes butterfly rain Shape nozzle sprays, and electric flat carriage moves back and forth.
The beneficial effects of the utility model are:
1st, the utility model controls the work of entire health preserving equipment using intelligent control box, greatly reduces labor intensity, Manpower is saved, the punctual, accurate of bridge deck concrete health after cast, exhaustive is ensure that, ensure that bridge deck concrete The construction quality of construction.
2nd, the utility model realizes the flexible of cable and water pipe using magnetic force coupling type reel, prevents caused by due to towing Cable and water pipe damage, avoid the generation of economic loss and security incident.
3rd, the utility model uses butterfly rain shape nozzle, while health quality is ensured, water resource is greatly saved, has Beneficial to environmental protection.
4th, the utility model maintenance is simple, and component is durable, and failure rate is low.
Description of the drawings
Fig. 1 is a kind of highway engineering bridge construction bridge deck concrete health preserving equipment main structure chart;
Fig. 2 is a kind of annexation figure of highway engineering bridge construction bridge deck concrete health preserving equipment.
Specific embodiment
As shown in Figure 1, 2, a kind of highway engineering bridge construction bridge deck concrete health preserving equipment, is treated on health bridge deck concrete It being located in by vertical bridge to track 5 of walking, electric flat carriage 4 is laid on the walking track 5, electric flat carriage 4 is equipped with column 1, The column 1 is equipped with H types stent 6, is uniformly provided with butterfly rain shape nozzle 2, butterfly rain shape nozzle by direction across bridge on H-type stent 6 2 are connected by water pipe with water pump 8, and water pump 8 is fetched water from cistern 9;5 both ends of the walking track are equipped with position sensor 12, The position sensor 12 is connected by conducting wire with control cabinet 11, and the control cabinet 11 is connected by conducting wire with distribution box 10, institute Distribution box 10 is stated by cable with the water pump 8 and electric flat carriage 4 to be connected;Electric flat carriage 4 is equipped with water pipe reel 7 and coil of cable Cylinder 3, the water pipe is wrapped on water pipe reel 7, and connection distribution box 10 and the cable of electric flat carriage 4 are wrapped on cable drum 3, Cable and water pipe rotate realization by cable drum 3 and water pipe reel 7 and stretch.
Its course of work is as follows:After checking that each several part connection is intact, device power-up, according to temperature at that time, wind-force and air Humidity etc. influences the various factors regulating device start-stop time of health water evaporation and continues device automatic running after spray time.Control 11 distribution control box 10 of case processed starts water pump 8 and electric flat carriage 4, butterfly rain shape nozzle 2 start to spray, and electric flat carriage 4 starts edge Walking track 5 moves, and realizes the action moved in spray.Cable drum 3 and water pipe reel 4 start simultaneously at work, make cable It can stretch with water pipe under natural overhang with the movement of electric flat carriage 4.When electric flat carriage 4 runs to terminal by initial point When, position sensor 12 works, and signal is fed back to control cabinet 11, control cabinet 11 controls electric flat carriage 4 anti-by distribution box 10 To traveling, after reaching initial point, backward going, and advancing to terminal in the same way achievees the effect that spray repeatedly, Zhi Daoshe Fixed lasting spray time terminates, and device is stopped.Until what is set is again started up the time, device automatic start is run, Start to spray, so repeatedly, be completed until health works, the intelligent health of bridge deck concrete is achieved.

Claims (1)

1. a kind of highway engineering bridge construction bridge deck concrete health preserving equipment, which is characterized in that treat on health bridge deck concrete by Vertical bridge is located in track of walking, electric flat carriage is laid on the walking track, and electric flat carriage is equipped with column, the column Equipped with H-type stent, butterfly rain shape nozzle is uniformly provided with by direction across bridge on H-type stent, butterfly rain shape nozzle passes through water pipe and water Pump is connected;The walking track both ends are equipped with position sensor, and the position sensor is connected by conducting wire with control cabinet, described Control cabinet is connected by conducting wire with distribution box, and the distribution box is connected by cable with the water pump and electric flat carriage;It is electronic flat Vehicle is equipped with water pipe reel and cable drum, and the water pipe is wrapped on water pipe reel, connects the electricity of distribution box and electric flat carriage Cable is wrapped on cable drum.
CN201721365294.3U 2017-10-23 2017-10-23 A kind of highway engineering bridge construction bridge deck concrete health preserving equipment Active CN207435909U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721365294.3U CN207435909U (en) 2017-10-23 2017-10-23 A kind of highway engineering bridge construction bridge deck concrete health preserving equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721365294.3U CN207435909U (en) 2017-10-23 2017-10-23 A kind of highway engineering bridge construction bridge deck concrete health preserving equipment

Publications (1)

Publication Number Publication Date
CN207435909U true CN207435909U (en) 2018-06-01

Family

ID=62293583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721365294.3U Active CN207435909U (en) 2017-10-23 2017-10-23 A kind of highway engineering bridge construction bridge deck concrete health preserving equipment

Country Status (1)

Country Link
CN (1) CN207435909U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108714961A (en) * 2018-06-13 2018-10-30 王国爱 Box beam beam curing device
CN108724442A (en) * 2018-06-13 2018-11-02 王国爱 Box beam beam curing device
CN109826099A (en) * 2019-03-08 2019-05-31 中国一冶集团有限公司 A kind of deck paving Self-watering curing means
CN110541342A (en) * 2019-07-09 2019-12-06 周丽博 side-swinging type anti-cracking spraying device for asphalt pavement

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108714961A (en) * 2018-06-13 2018-10-30 王国爱 Box beam beam curing device
CN108724442A (en) * 2018-06-13 2018-11-02 王国爱 Box beam beam curing device
CN109826099A (en) * 2019-03-08 2019-05-31 中国一冶集团有限公司 A kind of deck paving Self-watering curing means
CN110541342A (en) * 2019-07-09 2019-12-06 周丽博 side-swinging type anti-cracking spraying device for asphalt pavement

Similar Documents

Publication Publication Date Title
CN207435909U (en) A kind of highway engineering bridge construction bridge deck concrete health preserving equipment
CN202241559U (en) Automatic concrete spraying and curing system
CN203919328U (en) The circulating automatic spray curing system in bridge prefabrication field
CN102729325B (en) Full-automatic monitoring, early warning, temperature control, moisturizing and curing system and method for prefabricated immersed tube sections
CN203994187U (en) A kind of precast beam automatic spray health preserving equipment
CN104772816B (en) Concrete curing automatic control spraying and sprinkling system and method
CN104264995A (en) Automatic spraying conservation system for high-rise building shear wall structure
CN103161176B (en) Tower crane foundation construction method in main building disjunctor garage
CN202658899U (en) Outer wall spray curing device
CN205009378U (en) A intelligence sprays health preserving system for roof beam, board precasting yard
CN108276024A (en) A kind of climbing form system adhesion type intelligence spray maintenance device and its maintenance process
CN201800119U (en) Water-saving type automatic spray curing device for precast yard
CN210969332U (en) Bridge construction is with spraying maintenance system
CN202689563U (en) Intelligent cement and concrete spraying and maintaining measurement and control system
CN205043936U (en) High -speed railway ballastless track opens production line of track board with two -way elder generation
JP6080889B2 (en) Watering system and watering method
CN104805864B (en) The cementing Waterproof Construction Technique that closes of basement top-down method exterior wall tongue and groove and sealing
CN107553716B (en) A kind of construction method controlling prestressing force Simple T-Girders beam-ends crackle
CN207549073U (en) New pouring structure concrete automatic maintenance device
CN208619117U (en) A kind of constructing device of cable duct
CN204238264U (en) A kind of sole plate post-poured strip structure
CN206154492U (en) Bury shower nozzle intelligence maintenance system
CN105906374A (en) Automatic spraying maintenance device and method for railroad bridge large pier
CN204252021U (en) A kind of precast beam automatic maintenance system
CN106626031A (en) Automatic spraying maintenance system and spraying method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant