CN2074320U - 桥梁施工用自动连续顶推装置 - Google Patents

桥梁施工用自动连续顶推装置 Download PDF

Info

Publication number
CN2074320U
CN2074320U CN 90220583 CN90220583U CN2074320U CN 2074320 U CN2074320 U CN 2074320U CN 90220583 CN90220583 CN 90220583 CN 90220583 U CN90220583 U CN 90220583U CN 2074320 U CN2074320 U CN 2074320U
Authority
CN
China
Prior art keywords
jack
electromagnetic change
hydraulic electromagnetic
controller
bridge construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN 90220583
Other languages
English (en)
Inventor
江文明
上官兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIUZHOU BUILDING MACHINERY GENERAL FACTORY
Original Assignee
LIUZHOU BUILDING MACHINERY GENERAL FACTORY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LIUZHOU BUILDING MACHINERY GENERAL FACTORY filed Critical LIUZHOU BUILDING MACHINERY GENERAL FACTORY
Priority to CN 90220583 priority Critical patent/CN2074320U/zh
Publication of CN2074320U publication Critical patent/CN2074320U/zh
Withdrawn legal-status Critical Current

Links

Images

Abstract

一种桥梁施工用自动连续顶推装置,由拉锚器。 前、后端盖,前、后千斤顶,前、后液压电磁换向阀,前、 后工具锚,螺杆,平衡对中孔板,钢丝工具束,控制器 等组成,前、后千斤顶通过中间撑脚串联,并用四根长 螺杆将其紧固成一体,通过控制器控制前、后液压电 磁换向阀来控制前、后千斤顶交替动作从而实现自动 连续顶推。该装置将连续梁的施工由断续顶推变为 自动连续顶推,提高工效5倍左右,且轻便灵活,施工 方便。

Description

本实用新型属于一种桥梁施工用机具。
在桥梁施工过程中,用顶推法架设连续梁,一般均采用预制一段,顶推一段的方法。目前,连续梁的施工是采用长行程水平千斤顶装置断续顶推的方法。该装置是将拉杆或钢丝索的一端与拉锚器相连接(该拉锚器与梁连接),一端穿过长行程水平千斤顶的穿心孔与千斤顶活塞杆伸出端用螺母或(锚夹具)紧固。当油泵供压力油时,千斤顶活塞伸出。通过拉杆或钢丝索牵引梁向前推动。当千斤顶活塞伸出到最大行程时,顶推必须停止,让千斤顶回程,回程到位后再重复上述工序,这样不连续的断续顶推,耗时间长,施工进度慢,多次重复起动易损坏滑动用四氟板,而且千斤顶行程太长,较笨重、不便施工。
本实用新型的目的在于提供一种由两个千斤顶构成,并由控制器自动控制两个千斤顶交替动作以实现自动连续顶推的桥梁施工用自动连续顶推装置。
为达上述目的,本实用新型之桥梁施工用自动连续顶推装置采用两个短行程千斤顶依靠中间撑脚串联、并用四根长螺杆将其紧固成一体来代替原单个长行程水平千斤顶,采用由六个时间继电器和两个中间继电器组成的控制器,控制两个电磁液压换向阀来控制两个千斤顶的交替动作从而实现自动连续顶推。
本实用新型之桥梁施工用自动连续顶推装置具有以下优点:将断续顶推变为自动连续顶推,减少了桥梁从静态重复起动的次数,不仅大大加快了施工进度,提高工效5倍左右,而且还减轻了对滑移器四氟板的损坏,且轻便灵活,施工方便,并可一机多用,卸下一个千斤顶,还可作预应力张拉用。
以下,结合附图及实施例对本实用新型之桥梁施工用自动连续顶推装置的结构特征作进一步描述。
图1:桥梁施工用自动连续顶推装置之结构示意图。
图2:控制器电路图。
本实用新型之桥梁施工用自动连续顶推装置之结构如图1所示。该装置由拉锚器1,前、后端盖2,11,前、后置千斤顶4、9,前、后工具锚6、12,前、后液压电磁换向阀8、10,螺杆13,平衡对中孔板14,钢丝工具束15,控制器16等部份构成,前置千斤顶4和后置千斤顶9通过中间撑脚7串联,并用四根长螺杆5将其紧固成一体,前置千斤顶4顶端与前端盖2相连,后置千斤顶9的尾部与后端盖11相连。前、后工具锚6、12用卡件分别与前、后千斤顶4、9的活塞伸出端紧固,四螺杆13将平衡对中孔板14紧固在后端盖11上,钢丝工具束15的一端与拉锚器连接,另一端穿过垫环3,前、后置千斤顶4、9的穿心孔,前、后置工具锚6、12,平衡对中孔板14,并与后置工具锚12紧固相连。控制器16由时间继电器JS1、JS2、JS3、JS4、JS5、JS6,以及两中间继电器JZ1、JZ2组成,并按图2所示的电控原理图与前、后液压电磁换向阀电路连接。控制器面板上有电源开关指示H1,表示千斤顶工作状态的信号灯L1、L2,H1、H2,以及手动按钮LA1~LA8
本实用新型之桥梁施工用自动连接顶推装置动作过程及电控原理如下:使用前,先将本装置的拉锚器1与被顶推桥梁的梁相连紧固,将油泵高压油管经前、后液压电磁换向阀8、10与前、后置千斤顶的主油缸和副油缸油嘴相连,合上电源开关k1,信号灯H1亮,开动油泵,使用手动按钮LA1~LA8调节好前、后千斤顶活塞的起始位置(将前置千斤顶4置于刚顶推时位置,而后置千斤顶置于回程位置),再合上开关K2
(1)电源通过中间继电器JZ2常闭接点JZ2-3及LA1,LA2的常闭接点给前置液压电磁换向阀8的第一线圈D11及时间继电器JS1,JS2供电,压力油经前置液压电磁换向阀8向前置千斤顶4供油,前置千斤顶4活塞伸出,顶推开始,表示前置千斤顶实施例推工作的绿色指示灯L1亮,JS1和JS2开始延时;同时,时间继电器JS6线圈经中间继电器JZ1的常闭接点JZ1-3接通电源,JS6开始延时2秒钟左右,JS6常开接点闭合。后置电磁液压换向阀10的第二线圈D22通电,后置千斤顶9活塞回程,表示后千斤顶回程的红色信号灯H3亮。
(2)当时间继电器JS1延时到前置千斤顶4活塞伸出到预定长度的时间时,JS1常开接点闭合,JS4常闭接点给中间继电器JZ1线圈供电,JZ1常开接点JZ1-1 JZ1-2闭合,常闭接点JZ1-3断开,JS6断电,后液压电磁换向阀第一线圈D21接通电源,后置千斤顶9活塞停止回程,并将活塞伸出接替前置千斤顶实施顶推。表示后置千斤顶实施顶推的绿色指示灯L2亮。
(3)当后置千斤顶9活塞伸出到设定长度,接替到充分的顶推力后,JS2停止延时,JS2常开接点闭合,给中间继电器JZ2线圈供电,JZ2常闭接点JZ2-3断开,常开接点JZ2-1,JZ2-2闭合,前液压电磁换向阀第一线圈D11断电,前置千斤顶4停止顶推,而延时继电器JS5线圈接通电源,延时2秒钟左右,JS5常开接点闭合,前置液压电磁换向阀8的第二线圈D12通电,控制前置千斤顶4回程,表示前置千斤顶回程的红色信号灯H亮。
(4)当后置千斤顶9活塞伸出到预定长度时,时间继电器JS3延时停止,JS3常闭接点断开,中间继电器JZ2线圈断电,常开接点JZ2-1,JZ2-2断开,而JZ常闭接点JZ2-3闭合,前置液压电磁换向阀8的第二线圈D12断电,第一线圈D11通电,前置千斤顶4停止回程,并将活塞伸出接替后置千斤顶实施顶推。
(5)当前置千斤顶4将顶推充分接替后,时间继电器JS4延时停止,JS4常闭接点断开,中间继电器JZ1线圈断电,JZ1常开接点JZ1-1,JZ1-2断开,而常闭接点JZ1-3闭合,后置液压电磁换向阀第一线圈D21断电,后千斤顶9停止顶推,表示后千斤顶工作的信号灯L2熄灭,同时时间继电器JS6通JZ1常闭接点JZ1-3接通电源,延时2秒左右,JS6常开接点闭合,D22通电,后千斤顶9回程。由此往复动作,将桥梁的梁顶推到位为止。断开电源开关K1,关断油泵油路及控制电源。

Claims (2)

1、一种桥梁施工用自动连续顶推装置,由拉锚器1,前、后端盖2、11,千斤顶,前、后工具锚6、12,螺杆13,平衡对中孔板14,钢丝工具束15组成,四螺杆13把平衡对中孔板14串联紧固在后端盖11上,其特征在于:该装置还有一个控制器16和前后液压电磁换向阀8、10,所述的千斤顶有前、后两个,前置千斤顶4和后置千斤顶9通过中间撑脚7串联,再用四根长螺杆5将其紧固成一体,前、后工具锚6、12用卡件分别与前后千斤顶4、9的活塞伸出端紧固,控制器16与前、后液压电磁换向阀8、10电路连接。
2、如权利要求1所述的桥梁施工用自动连续顶推装置,其特征在于:所述的控制器16是由六个时间继电器JS1、JS2、JS3、JS4、JS5、JS6和两个中间继电器JZ1、JZ2组成。
CN 90220583 1990-09-15 1990-09-15 桥梁施工用自动连续顶推装置 Withdrawn CN2074320U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 90220583 CN2074320U (zh) 1990-09-15 1990-09-15 桥梁施工用自动连续顶推装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 90220583 CN2074320U (zh) 1990-09-15 1990-09-15 桥梁施工用自动连续顶推装置

Publications (1)

Publication Number Publication Date
CN2074320U true CN2074320U (zh) 1991-04-03

Family

ID=4898986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 90220583 Withdrawn CN2074320U (zh) 1990-09-15 1990-09-15 桥梁施工用自动连续顶推装置

Country Status (1)

Country Link
CN (1) CN2074320U (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967800A (zh) * 2010-11-17 2011-02-09 中铁二十四局集团有限公司 钢箱梁的架设顶推滑移方法
CN102002914A (zh) * 2010-11-17 2011-04-06 中铁二十四局集团有限公司 钢箱梁的架设顶推装置
CN102199915A (zh) * 2010-03-23 2011-09-28 柳州欧维姆机械股份有限公司 步履式顶推装置及其用于桥梁顶推施工的方法
CN103911953A (zh) * 2014-04-14 2014-07-09 上海市机械施工集团有限公司 用于高架、桥梁安装的组合顶推装置及其不间歇顶推方法
CN104973545A (zh) * 2015-07-15 2015-10-14 中铁二十五局第四集团工程有限公司 一种张拉设备结构
CN107988921A (zh) * 2017-10-30 2018-05-04 四川公路桥梁建设集团有限公司 一种上跨铁路、高速公路的跨线桥梁单点连续顶推施工方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102199915A (zh) * 2010-03-23 2011-09-28 柳州欧维姆机械股份有限公司 步履式顶推装置及其用于桥梁顶推施工的方法
CN102199915B (zh) * 2010-03-23 2012-07-11 柳州欧维姆机械股份有限公司 步履式顶推装置及其用于桥梁顶推施工的方法
CN101967800A (zh) * 2010-11-17 2011-02-09 中铁二十四局集团有限公司 钢箱梁的架设顶推滑移方法
CN102002914A (zh) * 2010-11-17 2011-04-06 中铁二十四局集团有限公司 钢箱梁的架设顶推装置
CN101967800B (zh) * 2010-11-17 2011-11-30 中铁二十四局集团有限公司 钢箱梁的架设顶推滑移方法
CN103911953A (zh) * 2014-04-14 2014-07-09 上海市机械施工集团有限公司 用于高架、桥梁安装的组合顶推装置及其不间歇顶推方法
CN103911953B (zh) * 2014-04-14 2015-10-28 上海市机械施工集团有限公司 用于高架、桥梁安装的组合顶推装置及其不间歇顶推方法
CN104973545A (zh) * 2015-07-15 2015-10-14 中铁二十五局第四集团工程有限公司 一种张拉设备结构
CN107988921A (zh) * 2017-10-30 2018-05-04 四川公路桥梁建设集团有限公司 一种上跨铁路、高速公路的跨线桥梁单点连续顶推施工方法
CN107988921B (zh) * 2017-10-30 2019-11-05 四川公路桥梁建设集团有限公司 一种上跨铁路、高速公路的跨线桥梁单点连续顶推施工方法

Similar Documents

Publication Publication Date Title
CN2074320U (zh) 桥梁施工用自动连续顶推装置
CN2087616U (zh) 液压滑升机多缸同步控制装置
CN2447319Y (zh) 重复张拉千斤顶
CN2272497Y (zh) 双速液压油泵
CN2285322Y (zh) 顶压式接头管起拔机
CN106088209A (zh) 工程机械自动怠速控制系统
CN1040314A (zh) 扣件连接装置
CN2232938Y (zh) 一种夯管拔除转换机构
CN2181566Y (zh) 可缩性防倒链
CN220550552U (zh) 电控式柴油打桩机
CN2637114Y (zh) 自动换向连续拆锁的液压扭矩扳手
CN2331939Y (zh) 一种清理铅鼓风炉炉瘤装置
CN2331648Y (zh) 卧式油压千斤顶空行程一泵举升到顶装置
CN213944726U (zh) 钢丝绳三角圈环眼夹制器
CN2119520U (zh) 混凝土输送泵电气控制装置
CN213088893U (zh) 新型高压闸板阀驱动器
CN218532144U (zh) 一种艾萨炉喷枪结渣清理装置
CN2249819Y (zh) 修井作业井架立放液控锁紧装置
CN2187162Y (zh) 快速爬行千斤顶
CN2232098Y (zh) 可控电力液压推动器
CN201169944Y (zh) 遥控升降车位锁
CN201228977Y (zh) 锅炉炉排风室自动清灰器
CN1390659A (zh) 电液锤打击控制系统
CN2185832Y (zh) 消水锤自动阀门
CN116791608A (zh) 电控式柴油打桩机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee