CN207406061U - A kind of aerial ready-package cabinet placement steel platform - Google Patents

A kind of aerial ready-package cabinet placement steel platform Download PDF

Info

Publication number
CN207406061U
CN207406061U CN201721357296.8U CN201721357296U CN207406061U CN 207406061 U CN207406061 U CN 207406061U CN 201721357296 U CN201721357296 U CN 201721357296U CN 207406061 U CN207406061 U CN 207406061U
Authority
CN
China
Prior art keywords
platform
steel
steel pipe
guardrail
pipe post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721357296.8U
Other languages
Chinese (zh)
Inventor
杨建伟
张文斌
陈冲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Telecom Planning and Design Co Ltd
Original Assignee
Anhui Telecom Planning and Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Telecom Planning and Design Co Ltd filed Critical Anhui Telecom Planning and Design Co Ltd
Priority to CN201721357296.8U priority Critical patent/CN207406061U/en
Application granted granted Critical
Publication of CN207406061U publication Critical patent/CN207406061U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of aerial ready-package cabinet placement steel platform, including four reinforced concrete foundations, four steel pipe posts, steel platform pedestal, platform and guardrail;One end of steel pipe post is fixed with reinforced concrete foundation by built-in fitting, and the other end is fixed with steel platform pedestal, and steel pipe post side wall distribution is several to climb nail, and pre-buried pipeline is equipped in another steel pipe post;Platform is welded on steel platform pedestal, cabinet is installed on platform;Platform is equipped with the preformed hole being connected with pre-buried pipeline;The side of steel platform pedestal is connected by bolt with guardrail, is equipped on guardrail and is forbidden climbing mark and dodge gate.The utility model climbs nail and on guardrail equipped with dodge gate by being equipped on column, and personnel easy to repair carry out maintenance climbing, and play the role of security protection;Cable is protected by pre-buried pipeline, improves the service life of cable, suitable for more floods area, overcomes influence of the nature flood to base station equipment.

Description

A kind of aerial ready-package cabinet placement steel platform
Technical field
The utility model belongs to radio communication installation, is related to a kind of aerial ready-package cabinet placement steel platform.
Background technology
Communication base station cabinet is the pith of base station, and conventional cabinet setting is ground cast-in-situ steel reinforced concrete basis Fixed, conventional cabinet setting is difficult in adapt to flood and low laying areas, causes communication base station fragile;Cable is certainly in basis The shortcomings of easily being gnawed in right environment by snakeworm mouse ant so that the construction time of communication abnormality, in addition cast-in-situ steel reinforced concrete basis Length, curing time are long, at the construction field (site), since field building materials discarded object is more, pollute environment, with current environmentally protective requirement phase It runs counter to.For this reason, it is necessary to conventional cabinet setting is improved.
Utility model content
A kind of aerial ready-package cabinet placement steel platform provided by the utility model, passes through reinforced concrete foundation, steel pipe Column simultaneously combines built-in fitting, can improve the adaptability of platform, overcome influence of the nature flood to base station equipment;By in steel pipe Pre-buried pipeline is equipped in column, and the preformed hole on pre-buried pipeline and platform is penetrated through, protects feeder line, that improves feeder line uses the longevity Life.
The purpose of this utility model can be achieved through the following technical solutions:
A kind of aerial ready-package cabinet placement steel platform, including four reinforced concrete foundations, four steel pipe posts, steels Platform base, platform and guardrail;
One end of the reinforced concrete foundation and steel pipe post is fixedly connected by built-in fitting, steel pipe post it is another One end is fixed by bolt and steel platform pedestal, wherein a steel pipe post side wall array distribution is several to climb nail, a steel pipe post It is interior to be equipped with pre-buried pipeline;
The upper surface of the steel platform pedestal is welded with platform, and cabinet is equipped on platform;Platform is equipped with for machine The preformed hole of cabinet demand, preformed hole are connected with the pre-buried pipeline in steel pipe post;The side of steel platform pedestal passes through bolt It is connected with guardrail.
Further, described adjacent two spacing climbed between nail are 15-25cm.
Further, the cabinet is mounted on the center of platform so that four steel pipe post uniform forces.
Further, it is fixed on the guardrail and climbing is forbidden to identify.
Further, dodge gate is installed on the guardrail.
Further, the dodge gate is with being equipped with the steel pipe post for climbing nail in the same side.
The beneficial effects of the utility model:
The utility model improves steel pipe post in steel by reinforced concrete foundation, steel pipe post and with reference to built-in fitting Stability in reinforced concrete basis;Nail is climbed by being equipped on a steel pipe post, personnel are overhauled convenient for later period maintenance Climbing;By being equipped with guardrail and the installation activity door on the guardrail for climbing nail column one side is equipped on platform, people can be facilitated In member's disengaging guardrail, and the safety of service personnel is protected, improve the security of personnel;By can be right in pre-buried pipeline Cable is protected, and improves the service life of cable, which is suitable for more floods area, overcomes nature flood to base station The influence of equipment, reducing equipment water inlet causes the risk at disconnected station.
Description of the drawings
In order to illustrate more clearly of the technical solution of the utility model embodiment, make required for being described below to embodiment Attached drawing is briefly described, it should be apparent that, the accompanying drawings in the following description is only some embodiments of the utility model, For those of ordinary skill in the art, without creative efforts, can also be obtained according to these attached drawings Other attached drawings.
Fig. 1 is the structure diagram that a kind of aerial ready-package cabinet disposes steel platform in the utility model;
Fig. 2 is the top view that a kind of aerial ready-package cabinet disposes steel platform in the utility model;
In attached drawing, parts list represented by the reference numerals is as follows:
1- reinforced concrete foundations, 2- steel pipe posts, 3- steel platform pedestals, 4- platforms, 5- guardrails, the pre-buried pipelines of 6-, 7- climbs nail, and 8- forbids climbing to identify, 9- dodge gates, 10- built-in fittings.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without creative efforts The all other embodiment obtained, shall fall within the protection scope of the present invention.
It please refers to Fig.1 with shown in 2, a kind of aerial ready-package cabinet disposes steel platform, including four reinforced concrete foundations 1st, four steel pipe posts 2, steel platform pedestal 3, platform 4 and guardrail 5;
Steel reinforced concrete foundation 1 and one end of steel pipe post 2 are fixedly connected by built-in fitting 10, steel pipe post 2 The other end be bolted on the lower face of steel platform pedestal 3, steel pipe post 2 is cylinder or prism structure, wherein one 2 side wall array distribution of steel pipe post is several to climb nail 7, and adjacent two climb the spacing between nail 7 as 15-25cm, are equipped in a steel pipe post 2 Pre-buried pipeline 6, pre-buried pipeline 6 are used for away feeder line use;The upper surface of steel platform pedestal 3 is welded with platform 4, pacifies on platform 4 Equipped with cabinet, the cabinet is mounted on the center of platform 4 so that four 2 uniform forces of steel pipe post, platform 4 are equipped with For the preformed hole of cabinet demand, preformed hole is cabinet into walking line, and preformed hole connects with the pre-buried pipeline 6 in steel pipe post 2 It is logical, feeder line is made to be not exposed to natural environment, plays the role of protection circuit;The side of steel platform pedestal 3 passes through bolt and shield Column 5 connects, and is fixed on guardrail 5 and forbids climbing mark 8,5 other end of guardrail is provided with dodge gate 9, and the dodge gate 9 is mounted on There is the one side for the steel pipe post 2 for climbing nail 7, personnel is facilitated to climb up on platform 4.
The utility model improves steel pipe post in steel by reinforced concrete foundation, steel pipe post and with reference to built-in fitting Stability in reinforced concrete basis;Nail is climbed by being equipped on a steel pipe post, personnel are overhauled convenient for later period maintenance Climbing;By being equipped with guardrail and the installation activity door on the guardrail for climbing nail column one side is equipped on platform, people can be facilitated In member's disengaging guardrail, and the safety of service personnel is protected, improve the security of personnel;By can be right in pre-buried pipeline Cable is protected, and improves the service life of cable, which is suitable for more floods area, overcomes nature flood to base station The influence of equipment, reducing equipment water inlet causes the risk at disconnected station.
More than content is only to the utility model structure example and explanation, the technology people of affiliated the art Member does various modifications or additions to described specific embodiment or substitutes in a similar way, without departing from reality With new structure or surmount scope defined in the claims, all should belong to the protection range of the utility model.

Claims (6)

1. a kind of aerial ready-package cabinet placement steel platform, it is characterised in that:Including four reinforced concrete foundations (1), four Steel pipe post (2), steel platform pedestal (3), platform (4) and guardrail (5);
The reinforced concrete foundation (1) and one end of steel pipe post (2) are fixedly connected by built-in fitting (10), and steel pipe is stood The other end of column (2) is fixed by bolt and steel platform pedestal (3), wherein a steel pipe post (2) side wall array distribution is several Nail (7) is climbed, pre-buried pipeline (6) is equipped in a steel pipe post (2);
The upper surface of the steel platform pedestal (3) is welded with platform (4), and platform is equipped with cabinet on (4);Platform is set on (4) The preformed hole of cabinet demand is useful for, preformed hole is connected with the pre-buried pipeline (6) in steel pipe post (2);Steel platform pedestal (3) side is connected by bolt with guardrail (5).
2. a kind of aerial ready-package cabinet placement steel platform according to claim 1, it is characterised in that:Described adjacent two climb It is 15-25cm to follow closely the spacing between (7).
3. a kind of aerial ready-package cabinet placement steel platform according to claim 1, it is characterised in that:The cabinet installation In the center of platform (4) so that four steel pipe post (2) uniform forces.
4. a kind of aerial ready-package cabinet placement steel platform according to claim 1, it is characterised in that:The guardrail (5) On be fixed with forbid climbing mark (8).
5. a kind of aerial ready-package cabinet placement steel platform according to claim 1, it is characterised in that:The guardrail (5) On dodge gate (9) is installed.
6. a kind of aerial ready-package cabinet placement steel platform according to claim 5, it is characterised in that:The dodge gate (9) with being equipped with the steel pipe post (2) for climbing nail (7) in the same side.
CN201721357296.8U 2017-10-20 2017-10-20 A kind of aerial ready-package cabinet placement steel platform Active CN207406061U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721357296.8U CN207406061U (en) 2017-10-20 2017-10-20 A kind of aerial ready-package cabinet placement steel platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721357296.8U CN207406061U (en) 2017-10-20 2017-10-20 A kind of aerial ready-package cabinet placement steel platform

Publications (1)

Publication Number Publication Date
CN207406061U true CN207406061U (en) 2018-05-25

Family

ID=62320558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721357296.8U Active CN207406061U (en) 2017-10-20 2017-10-20 A kind of aerial ready-package cabinet placement steel platform

Country Status (1)

Country Link
CN (1) CN207406061U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112485489A (en) * 2020-11-25 2021-03-12 国网北京市电力公司 Intensive mounting bracket of many ammeter case

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112485489A (en) * 2020-11-25 2021-03-12 国网北京市电力公司 Intensive mounting bracket of many ammeter case

Similar Documents

Publication Publication Date Title
CN204960361U (en) Scalable used repeatedly prevents guardrail bar
CN207377264U (en) A kind of spliced foundation pit protective fence
CN207406061U (en) A kind of aerial ready-package cabinet placement steel platform
CN104993440B (en) Utilize the lightning protection artificial earthing system and construction method of the external downlead of structure reinforcing bars
CN112227809A (en) 5G communication network communication tower
CN204238622U (en) A kind of anti-climbing high voltage transmission line tower
CN204370827U (en) Face frontier defense guard fence
CN109616029B (en) Adjustable cable marker device
US20210002844A1 (en) Foundation system and method of construction
CN208479146U (en) A kind of open caisson of staggered floor cable laying
CN109281260A (en) A kind of recyclable sand stop wall and sand wall system
CN207583079U (en) A kind of flexible adjusting guardrail baffle system
CN212027397U (en) High protection device for civil engineering of security
CN209401276U (en) A kind of transformer substation communication optical cable markstone and its system
CN211523105U (en) Protection slope for strengthening water and soil conservation
CN209227406U (en) A kind of recyclable sand stop wall and sand wall system
KR20150033306A (en) Stair for mountain trail
CN206457830U (en) A kind of construction prefabricated components assembling structure
CN207348599U (en) A kind of novel protective fence with baffle
CN219352491U (en) Pavement tree pool structure capable of being constructed rapidly
CN113605412B (en) Integrated support carrier device for ecological regreening of mine side slope
CN215645799U (en) 220kV platform type half-indoor transformer substation structure
CN210660132U (en) Walkway plate support in subway tunnel
CN211257787U (en) Bearing stores pylon for civil engineering
CN204252417U (en) The lightning protection device of building roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant