CN112485489A - Intensive mounting bracket of many ammeter case - Google Patents

Intensive mounting bracket of many ammeter case Download PDF

Info

Publication number
CN112485489A
CN112485489A CN202011345551.3A CN202011345551A CN112485489A CN 112485489 A CN112485489 A CN 112485489A CN 202011345551 A CN202011345551 A CN 202011345551A CN 112485489 A CN112485489 A CN 112485489A
Authority
CN
China
Prior art keywords
concrete column
angle steel
steel
steel pipe
angle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011345551.3A
Other languages
Chinese (zh)
Inventor
杨士奇
朱孝天
冯军
邓佳
李媛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Beijing Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Beijing Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Beijing Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical State Grid Beijing Electric Power Co Ltd
Priority to CN202011345551.3A priority Critical patent/CN112485489A/en
Publication of CN112485489A publication Critical patent/CN112485489A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R11/00Electromechanical arrangements for measuring time integral of electric power or current, e.g. of consumption
    • G01R11/02Constructional details
    • G01R11/04Housings; Supporting racks; Arrangements of terminals

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

本发明公开了一种多电表箱集约型安装架,第一混凝土柱的下端及第二混凝土柱的下端均插入于地面下,第一钢管的下端沿轴向插入于第一混凝土柱内,第二钢管的下端沿轴向插入于第二混凝土柱内,第一角钢的一端通过第一抱箍固定于第一钢管上,第一角钢的另一端通过第二抱箍固定于第二角钢上,第二角钢的一端通过第三抱箍固定于第一钢管上,第二角钢的另一端通过第四抱箍固定于第二钢管上,各电表箱的壳体固定于第一角钢及第二角钢上,该安装架能够实现多个电表箱的集约安装,且能够避免过往行人磕碰到电表箱,保证行人安全。

Figure 202011345551

The invention discloses a multi-meter box intensive mounting frame. The lower end of the first concrete column and the lower end of the second concrete column are inserted under the ground, the lower end of the first steel pipe is inserted into the first concrete column along the axial direction, and the second concrete column is inserted into the first concrete column along the axial direction. The lower ends of the two steel pipes are axially inserted into the second concrete column, one end of the first angle steel is fixed on the first steel pipe through the first hoop, and the other end of the first angle steel is fixed on the second angle steel through the second hoop. One end of the second angle steel is fixed on the first steel pipe through a third hoop, the other end of the second angle steel is fixed on the second steel pipe through a fourth hoop, and the shell of each meter box is fixed on the first angle steel and the second angle steel On the other hand, the mounting frame can realize the intensive installation of multiple meter boxes, and can prevent pedestrians from bumping into the meter boxes and ensure the safety of pedestrians.

Figure 202011345551

Description

Intensive mounting bracket of many ammeter case
Technical Field
The invention belongs to the field of power equipment, relates to an installation rack, and particularly relates to an intensive installation rack for a multi-electric meter box.
Background
During the transformation period of the three-supply one-industry electric meter, the low-voltage resident one-storey house area of the original property unit has dense house arrangement structure, the space between two adjacent rows of one-storey houses is small, the channel is narrow, the installation height of the electric meter box of the original property unit is lower than the 1800mm standard value, the passing pedestrians easily collide to cause personnel injury, and each household electric meter box can not be transformed in the original place and can not be installed in a concentrated mode on the periphery.
An electric meter box: the material for manufacturing the low-voltage cable branch box body is a resin-based composite material. The main components of the box body are ABS engineering plastics, polycarbonate transparent PC materials, DMC and SMC which are injection molded and pressed.
Compound ammeter case: the material for manufacturing the low-voltage cable branch box body is a resin-based composite material. The composite material consists of two parts, a substrate, polyester resin; the reinforcing material is also referred to as a fiber-reinforced polyester material. In developed countries such as europe and the united states, such materials have been widely used in the electrical field for decades.
Wall hanging and fixing: and the support is connected with the box body to realize fixation.
Electric pole fixed mounting: the electric pole for installing the electric meter box is not available on the site, and the electric pole cannot be newly erected.
An electric meter box: the height of the original electric meter box in the single-storey house area is 200mm, and the height of the new electric meter box is 600 mm. If the device is changed in situ, the installation height of the electric meter box is lower than a 1800mm standard value, and pedestrians passing by are easy to collide and cause personnel injury.
Compound ammeter case: the former ammeter case height in bungalow area is 200mm, and the compound ammeter case height of many epitopes is more than 800mm, and ammeter case mounting height is less than 1800mm standard values, and the pedestrian easily collides with and causes personnel's injury past.
Wall hanging and fixing: the house arrangement structure in bungalow area is intensive, and two adjacent rows of bungalow intervals are little, and average channel width is only 1000mm, around the former ammeter case, can't adopt hanging fixed mounting opposite.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides an intensive mounting rack for multiple electric meter boxes, which can realize intensive mounting of the multiple electric meter boxes, can avoid the collision of pedestrians with the electric meter boxes and ensure the safety of the pedestrians.
In order to achieve the purpose, the intensive mounting frame for the multi-electric meter box comprises a first concrete column, a second concrete column, a first steel pipe, a second steel pipe, a first angle steel, a second angle steel, a first hoop, a second hoop, a third hoop and a fourth hoop;
the lower extreme of first concrete column and the lower extreme of second concrete column all insert in the underground, the lower extreme of first steel pipe inserts in first concrete column along the axial, the lower extreme of second steel pipe inserts in second concrete column along the axial, the one end of first angle steel is fixed in on the first steel pipe through first staple bolt, the other end of first angle steel is fixed in on the second angle steel through the second staple bolt, the one end of second angle steel is fixed in on the first steel pipe through the third staple bolt, the other end of second angle steel is fixed in on the second steel pipe through the fourth staple bolt, the casing of each ammeter case is fixed in on first angle steel and the second angle steel.
And zinc layers are plated on the surface of the first angle steel, the surface of the second angle steel, the surface of the first steel pipe and the surface of the second steel pipe.
The first concrete column, the second concrete column, the first steel pipe and the second steel pipe are vertically distributed.
All offer the through-hole that is used for connecting the ammeter case on first angle steel and the second angle steel, the ammeter case is connected through the through-hole on bolt and first angle steel and the second angle steel.
The top of first concrete column and the top of second concrete column all are located above ground, and the top of first concrete column and the top of second concrete column are hemispherical structure.
The top of first steel pipe and the top of second steel pipe are all sealed.
The first angle steel is positioned above the second angle steel, and the first angle steel and the second angle steel are distributed in parallel.
The distance between the second angle steel and the ground is 1800 mm.
The depth of the first concrete column and the second concrete column inserted into the ground is 1500 mm.
The outer diameter of the first concrete column and the outer diameter of the second concrete column are both 400mm, and the outer diameter of the first steel pipe and the outer diameter of the second steel pipe are 150 mm.
The invention has the following beneficial effects:
when the intensive mounting frame for the multiple electric meter boxes is operated, the lower end of a first steel pipe is inserted into a first concrete column, the lower end of a second steel pipe is inserted into a second concrete column, a first angle steel is fixed between the first steel pipe and the second steel pipe, a second angle steel is fixed between the first steel pipe and the second steel pipe, each electric meter box is fixed on the first angle steel and the second angle steel to realize intensive mounting of the electric meter boxes, it should be noted simultaneously that, on first angle steel was fixed in first steel pipe and second steel pipe through first staple bolt and second staple bolt, on the second angle steel was fixed in third steel pipe and fourth steel pipe through third staple bolt and fourth staple bolt, be convenient for adjust the height of first angle steel and second angle steel, adjust the height of ammeter case then, avoid the pedestrian of passing to collide with the ammeter case, guarantee pedestrian's safety, moreover, the steam generator is simple in structure, and convenient operation, the practicality is extremely strong.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural diagram of the first hoop 5 in the present invention.
Wherein, 1 is first concrete column, 2 is the second concrete column, 3 is first steel pipe, 4 is the second steel pipe, 5 is first staple bolt, 6 is the second staple bolt, 7 is the third staple bolt, 8 is the fourth staple bolt, 9 is first angle steel, 10 is the second angle steel, 11 is the ammeter case.
Detailed Description
The invention is described in further detail below with reference to the accompanying drawings:
referring to fig. 1 and 2, the intensive mounting bracket for the multi-electric meter box according to the present invention includes a first concrete column 1, a second concrete column 2, a first steel pipe 3, a second steel pipe 4, a first angle iron 9, a second angle iron 10, a first hoop 5, a second hoop 6, a third hoop 7, and a fourth hoop 8; the lower extreme of first concrete column 1 and the lower extreme of second concrete column 2 all insert in the underground, the lower extreme of first steel pipe 3 inserts in first concrete column 1 along the axial, the lower extreme of second steel pipe 4 inserts in second concrete column 2 along the axial, the one end of first angle steel 9 is fixed in on first steel pipe 3 through first staple bolt 5, the other end of first angle steel 9 is fixed in on second angle steel 10 through second staple bolt 6, the one end of second angle steel 10 is fixed in on first steel pipe 3 through third staple bolt 7, the other end of second angle steel 10 is fixed in on second steel pipe 4 through fourth staple bolt 8, the casing of each ammeter case 11 is fixed in on first angle steel 9 and the second angle steel 10.
Furthermore, the surface of the first angle steel 9, the surface of the second angle steel 10, the surface of the first steel pipe 3 and the surface of the second steel pipe 4 are plated with zinc layers, so that the first angle steel 9, the second angle steel 10, the first steel pipe 3 and the second steel pipe 4 are prevented from rusting, and the service life is long.
Further, the first concrete column 1, the second concrete column 2, the first steel pipe 3 and the second steel pipe 4 are vertically distributed.
Further, all offer the through-hole that is used for connecting ammeter case 11 on first angle steel 9 and the second angle steel 10, ammeter case 11 is connected through the through-hole on bolt and first angle steel 9 and the second angle steel 10, the installation of the ammeter case 11 of being convenient for.
Further, the top of first concrete column 1 and the top of second concrete column 2 all are located more than ground, and the top of first concrete column 1 and the top of second concrete column 2 are hemispherical structure, prevent that the long-term rainwater of depositing in the top of first concrete column 1 and the top of second concrete column 2.
Further, the top of first steel pipe 3 and the top of second steel pipe 4 are all sealed, prevent that the rainwater from pouring into first steel pipe 3 and second steel pipe 4, improve the life of first steel pipe 3 and second steel pipe 4.
Further, the first angle steel 9 is located above the second angle steel 10, and the first angle steel 9 and the second angle steel 10 are distributed in parallel.
Further, the distance between the second angle steel 10 and the ground is 1800 mm; the depth of the first concrete column 1 and the second concrete column 2 inserted into the ground is 1500 mm; the outer diameter of the first concrete column 1 and the outer diameter of the second concrete column 2 are both 400mm, and the outer diameter of the first steel pipe 3 and the outer diameter of the second steel pipe 4 are 150 mm.
The sizes of the first angle iron and the second angle iron are 50mm 50mm mm 5mm, the first hoop 5, the second hoop 6, the third hoop 7 and the fourth hoop 8 are all round steel flattening forging type 150mm hoops, and C20 type concrete is used as foundation pit casting.
The concrete construction process of the invention is as follows:
firstly, digging two foundation pits with a spacing of 2300mm, wherein the depth of each foundation pit is 1500mm, the diameter of each foundation pit is 400mm, steel pipes with the height of 4000mm and the diameter of 150mm are placed in the foundation pits, and then pouring C20 type concrete;
the first steel pipe 3 and the second steel pipe 4 are fixed with a first angle steel 9 and a second angle steel 10 through a first hoop 5, a second hoop 6, a third hoop 7 and a fourth hoop 8, wherein the first angle steel 9 and the second angle steel 10 are positioned 1800mm and 2250mm above the ground height.
And each electric meter box 11 is fixed in the through holes of the first angle steel 9 and the second angle steel 10 through bolts, wherein the distance between the adjacent electric meter boxes 11 is 5 mm.
The house arrangement structure in current plain area is intensive, and two adjacent row one-storey houses interval is little, the passageway is narrow, and traditional 11 wall-hanging or pole of ammeter case are installed and have all been unable to satisfy the technological standard. In addition, the eave is apart from ground height less than 2000mm under the bungalow, and apart from ground height only be 1200mm if 11 back of wall-hanging installation new ammeter casees, unsatisfied installation height 1800 mm's standard, simultaneously, the pedestrian collides with new ammeter case 11, easily causes personnel's injury.
In the single-story building area which does not meet the installation height, the invention is used for carrying out the centralized installation of a plurality of electric meter boxes 11 at the end of each row of single-story buildings, so that the new electric meter boxes 11 meet the installation height standard, are tidy, beautiful and save space, and simultaneously, the hidden danger of personnel injury caused by the pedestrian colliding with the new electric meter boxes 11 is eliminated.

Claims (10)

1. An intensive mounting frame for a multi-electric meter box is characterized by comprising a first concrete column (1), a second concrete column (2), a first steel pipe (3), a second steel pipe (4), a first angle steel (9), a second angle steel (10), a first hoop (5), a second hoop (6), a third hoop (7) and a fourth hoop (8);
the lower extreme of first concrete column (1) and the lower extreme of second concrete column (2) all insert in the underground, the lower extreme of first steel pipe (3) inserts in first concrete column (1) along the axial, the lower extreme of second steel pipe (4) inserts in second concrete column (2) along the axial, the one end of first angle steel (9) is fixed in on first steel pipe (3) through first staple bolt (5), the other end of first angle steel (9) is fixed in on second angle steel (10) through second staple bolt (6), the one end of second angle steel (10) is fixed in on first steel pipe (3) through third staple bolt (7), the other end of second angle steel (10) is fixed in on second steel pipe (4) through fourth staple bolt (8), the casing of each ammeter case (11) is fixed in on first angle steel (9) and second angle steel (10).
2. The intensive mounting rack of a multi-meter box according to claim 1, characterized in that the surface of the first angle steel (9), the surface of the second angle steel (10), the surface of the first steel pipe (3) and the surface of the second steel pipe (4) are plated with a zinc layer.
3. Intensive mounting of a multi-meter box according to claim 1, characterized in that the first column of concrete (1), the second column of concrete (2), the first steel tube (3) and the second steel tube (4) are all vertically distributed.
4. The intensive mounting rack of a multi-electric meter box according to claim 1, characterized in that the first angle steel (9) and the second angle steel (10) are both provided with through holes for connecting the electric meter box (11), and the electric meter box (11) is connected with the through holes on the first angle steel (9) and the second angle steel (10) through bolts.
5. The intensive mounting rack of a multi-meter box according to claim 1, characterized in that the top of the first concrete column (1) and the top of the second concrete column (2) are both located above the ground, and the top of the first concrete column (1) and the top of the second concrete column (2) are both of hemispherical structure.
6. The intensive mounting rack of a multi-meter box according to claim 1, characterized in that the top of the first steel pipe (3) and the top of the second steel pipe (4) are closed.
7. The intensive mounting of a multi-meter box according to claim 1, characterized in that the first angle (9) is located above the second angle (10) and the first angle (9) and the second angle (10) are distributed in parallel.
8. The intensive mounting of a multi-meter box according to claim 1, characterized in that the distance between the second angle (10) and the ground is 1800 mm.
9. The intensive mounting of a multi-meter box according to claim 1, characterized in that the first concrete column (1) and the second concrete column (2) are inserted with a depth of 1500mm under the ground.
10. The intensive mounting rack of a multi-meter box according to claim 1, characterized in that the outer diameter of the first concrete column (1) and the outer diameter of the second concrete column (2) are both 400mm, and the outer diameter of the first steel tube (3) and the outer diameter of the second steel tube (4) are 150 mm.
CN202011345551.3A 2020-11-25 2020-11-25 Intensive mounting bracket of many ammeter case Pending CN112485489A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011345551.3A CN112485489A (en) 2020-11-25 2020-11-25 Intensive mounting bracket of many ammeter case

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011345551.3A CN112485489A (en) 2020-11-25 2020-11-25 Intensive mounting bracket of many ammeter case

Publications (1)

Publication Number Publication Date
CN112485489A true CN112485489A (en) 2021-03-12

Family

ID=74934800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011345551.3A Pending CN112485489A (en) 2020-11-25 2020-11-25 Intensive mounting bracket of many ammeter case

Country Status (1)

Country Link
CN (1) CN112485489A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4254647A (en) * 1978-08-07 1981-03-10 Highfield Mfg. Company, A Division Of Clarkson Industries, Inc. Force-resistant locking devices
CN105866491A (en) * 2016-03-31 2016-08-17 国网山东省电力公司蓬莱市供电公司 A bracket for fixing the meter box
CN206657040U (en) * 2017-04-18 2017-11-21 国网山东省电力公司临沭县供电公司 A kind of ammeter box fixed mount
CN206684208U (en) * 2017-05-11 2017-11-28 郭建伟 A kind of ammeter box bracket
CN207406061U (en) * 2017-10-20 2018-05-25 安徽电信规划设计有限责任公司 A kind of aerial ready-package cabinet placement steel platform
CN110346620A (en) * 2019-08-12 2019-10-18 国家电网有限公司 A kind of open air pole type combination low pressure ammeter box
CN209927915U (en) * 2019-04-11 2020-01-10 赵金慰 Strut type meter box mounting mechanism

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4254647A (en) * 1978-08-07 1981-03-10 Highfield Mfg. Company, A Division Of Clarkson Industries, Inc. Force-resistant locking devices
CN105866491A (en) * 2016-03-31 2016-08-17 国网山东省电力公司蓬莱市供电公司 A bracket for fixing the meter box
CN206657040U (en) * 2017-04-18 2017-11-21 国网山东省电力公司临沭县供电公司 A kind of ammeter box fixed mount
CN206684208U (en) * 2017-05-11 2017-11-28 郭建伟 A kind of ammeter box bracket
CN207406061U (en) * 2017-10-20 2018-05-25 安徽电信规划设计有限责任公司 A kind of aerial ready-package cabinet placement steel platform
CN209927915U (en) * 2019-04-11 2020-01-10 赵金慰 Strut type meter box mounting mechanism
CN110346620A (en) * 2019-08-12 2019-10-18 国家电网有限公司 A kind of open air pole type combination low pressure ammeter box

Similar Documents

Publication Publication Date Title
JP5236459B2 (en) Prefabricated modular tower and manufacturing method thereof
CN102312790B (en) Novel ventilating pipeline wind power generation system
CN204782075U (en) Have enough to meet need bathroom that room constitutes by standard
JP2022507161A (en) Balcony system and method
CN106368358A (en) Modular integrated slabs and house
CN106320514A (en) Overall post-pouring type industrial building system and construction method thereof
CN204456428U (en) A kind of entirety being installed on composite wallboard is waftd window
CN204060064U (en) A kind of novel assembled switchbox protection canopy
CN112485489A (en) Intensive mounting bracket of many ammeter case
CN205954678U (en) Prefabricated utility tunnel hoisting point structure of assembled
CN109436228A (en) Floating type composite material circular tube floating body pallet system for photovoltaic power generation on water and manufacturing and installing process thereof
CN109372126A (en) A kind of precast concrete box Housing Structure System
CN211447361U (en) Interior wall of prefabricated building
CN203846839U (en) Extensible multi-loop incoming line door type pole and tower
CN102839770B (en) A kind of hollow heat insulation wall and preparation method thereof
CN211849569U (en) Reinforced concrete prefabricated assembled box becomes basis
CN204919989U (en) Collect steel - concrete combination special -shaped post of heat preservation bearing in an organic whole
KR100408926B1 (en) The contructing method of FRP box culvert and structure
CN215410523U (en) Municipal administration water supply and drainage pipeline connection structure
CN104131661A (en) Method and device for preventing mildewing of top indoor ceiling of building
CN203113514U (en) Combined split-mounting-type house device
CN210947958U (en) Integrated communication base station convenient to install
CN208168473U (en) A kind of double-deck integrated hexagon computer room
CN211572830U (en) Novel anti platform of anti ice of mountain area distribution network circuit is with door lever that acts as go-between
CN216588043U (en) Assembled fence

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210312

RJ01 Rejection of invention patent application after publication