CN206457830U - A kind of construction prefabricated components assembling structure - Google Patents
A kind of construction prefabricated components assembling structure Download PDFInfo
- Publication number
- CN206457830U CN206457830U CN201720157630.9U CN201720157630U CN206457830U CN 206457830 U CN206457830 U CN 206457830U CN 201720157630 U CN201720157630 U CN 201720157630U CN 206457830 U CN206457830 U CN 206457830U
- Authority
- CN
- China
- Prior art keywords
- protective plate
- size
- fixing hole
- construction
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of construction prefabricated components assembling structure, including the first protective plate and the second protective plate, second protective plate is located at the bottom of the first protective plate, the bottom on the top of first protective plate and the second protective plate is provided with fixture block, and the inside on the first protective plate and the second protective plate top is provided with the first fixing hole.The utility model is by setting fixture block, neck, first fixing hole and the second fixing hole, the installation for facilitating the first protective plate and the second protective plate is reached, simultaneously, add the stability and fastness installed between the first protective plate and the second protective plate, and then reduce the advantage of difficulty of construction, by setting inserted link and slot, reach and facilitated the first protective plate and the second protective plate to be transversely mounted, simultaneously, the stability installed between adding, the advantage of fastness and accuracy, whole device is simple in construction, it is easy for installation, difficulty of construction is low, protection effect is good, the advantage of low engineering cost.
Description
Technical field
The utility model is related to Building Engineering Design technical field, specially a kind of construction prefabricated components assembling knot
Structure.
Background technology
With high stratification, the maximization of modern architecture, basic buried, prefabricated components assembling structure complexity etc. is therewith increasingly
It is many, therefore Large Precast Members are assembled and foundation pit construction often occurs and used in engineering construction, and for features as poor geologic condition
Deep basal pit operation generally existing soil property it is weak, stability is poor, the factor such as level of ground water is higher, is related to deep foundation pit earthwork digging
During excavation slope it is stable, underground water pump drainage, construction machinery safety work etc. produces many harmful effects.It must be taken for this
Effective technical scheme measure, to ensure the safety of construction quality and workmen and plant equipment.
At present, Large Construction prefabricated components assembling structure and foundation pit construction usually use armored concrete support pile and Nei Zhi
The form that support beam etc. is combined, simultaneously for place very it is open often excavated using slope by the way of constructed, but if
It is all big using armored concrete support pile meeting construction costs height, difficulty of construction.
Utility model content
The purpose of this utility model is to provide a kind of construction prefabricated components assembling structure possess convenient installation, apply
Work difficulty is low, and protection effect is good, the advantage of low engineering cost, solves at present, Large Construction prefabricated components assembling structure and base
The form that hole construction is usually combined using armored concrete support pile and inner support beam etc., it is very open past simultaneously for place
Constructed toward by the way of slope excavation, but if all using armored concrete support pile can construction costs be high, construct
The problem of difficulty is big.
To achieve the above object, the utility model provides following technical scheme:A kind of construction prefabricated components assembling knot
Structure, including the first protective plate and the second protective plate, the second protective plate be located at the first protective plate bottom, first protective plate and
The bottom on the top of the second protective plate is provided with fixture block, and the inside on the first protective plate and the second protective plate top is provided with
Neck is provided with the top of first fixing hole, first protective plate and the second protective plate bottom, the of the bottom of the neck
The inside of one protective plate and the second protective plate is provided with the second fixing hole, the side of first protective plate and the second protective plate
Header tank is provided with, the side of the header tank is provided with gully-hole, and the bottom of the header tank is provided with drainpipe, the collection
First protective plate of water tank both sides and the second protective plate side are provided with soil nailing, first protective plate and the second protective plate
Side is provided with inserted link, and the opposite side of the first protective plate and the second protective plate is provided with jack.
It is preferred that, first protective plate and the second protective plate are Z-shaped, are led between the first protective plate and the second protective plate
Cross bolt column to be fixedly connected, and the size of bolt column is adapted with the size of the first fixing hole, the position of second fixing hole with
The position of first fixing hole is respectively positioned on same vertical plane, and the size of the second fixing hole is adapted with the size of bolt column.
It is preferred that, the size of first protective plate and the second protective plate is consistent, the first protective plate and the second protective plate
The middle part on top opens up fluted, and the size of the groove is adapted with the size of drainpipe, and the first fixed hole position is in groove
First protective plate of both sides and the inside of the second protective plate.
It is preferred that, the size of the neck is adapted with the size of fixture block, and the size of the inserted link is mutually fitted with the size of jack
Match somebody with somebody, and inserted link is corresponding with the position of jack.
Compared with prior art, the beneficial effects of the utility model are as follows:
The utility model has reached by setting fixture block, neck, the first fixing hole and the second fixing hole and has facilitated the first protection
The installation of plate and the second protective plate, meanwhile, add the stability installed between the first protective plate and the second protective plate and firmly
Property, and then the advantage of difficulty of construction is reduced, by setting inserted link and slot, reach and facilitated the first protective plate and second to protect
Plate is transversely mounted, meanwhile, the advantage of stability, fastness and the accuracy installed between adding, by setting header tank, collection
Water hole and drainpipe, have reached the collection and discharge for facilitating current in excavation slope soil, and then add the first protective plate
With the advantage of the second protective plate mounting stability, by setting groove, the placement for facilitating drainpipe has been reached, meanwhile, reduce
The advantage of installation difficulty between first protective plate and the second protective plate, whole device is simple in construction, easy for installation, difficulty of construction
Low, protection effect is good, the advantage of low engineering cost.
Brief description of the drawings
Fig. 1 is the utility model structural representation;
Fig. 2 is the utility model backsight structural representation;
Fig. 3 is the utility model the first protective plate overlooking the structure diagram.
In figure:1 first protective plate, 2 second protective plates, 3 fixture blocks, 4 first fixing holes, 5 necks, 6 second fixing holes, 7 spiral shells
Hitching post, 8 header tanks, 9 gully-holes, 10 drainpipes, 11 inserted links, 12 jacks, 13 soil nailings, 14 grooves.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belongs to the scope of the utility model protection.
Refer to Fig. 1-3, a kind of construction prefabricated components assembling structure, including the first protective plate 1 and the second protective plate
2, the second protective plate 2 is located at the bottom of the first protective plate 1, and the bottom on the top of the first protective plate 1 and the second protective plate 2 is respectively provided with
There is fixture block 3, and the inside on the first protective plate 1 and the top of the second protective plate 2 is provided with the first fixing hole 4, the He of the first protective plate 1
Second protective plate 2 is provided with neck 5 at the top of bottom, the first protective plate 1 of the bottom of the neck 5 and the second protective plate 2
Inside is provided with the second fixing hole 6, and the first protective plate 1 and the second protective plate 2 are Z-shaped, the first protective plate 1 and the second protection
It is fixedly connected between plate 2 by bolt column 7, and the size of bolt column 7 is adapted with the size of the first fixing hole 4, this second is consolidated
Determine the position in hole 6 and be respectively positioned on same vertical plane, and the size and bolt column 7 of the second fixing hole 6 with the position of the first fixing hole 4
Size is adapted, and the side of the first protective plate 1 and the second protective plate 2 is provided with header tank 8, and the side of the header tank 8 is set
There is a gully-hole 9, the bottom of header tank 8 is provided with drainpipe 10, the size of the first protective plate 1 and the second protective plate 2 is consistent,
The middle part on one protective plate 1 and the top of the second protective plate 2 opens up fluted 14, the size of the groove 14 and the size of drainpipe 10
It is adapted, and the first fixing hole 4 is located at the first protective plate 1 of the both sides of groove 14 and the inside of the second protective plate 2,8 liang of header tank
First protective plate 1 of side and the side of the second protective plate 2 are provided with the side of soil nailing 13, the first protective plate 1 and the second protective plate 2
Inserted link 11 is provided with, and the opposite side of the first protective plate 1 and the second protective plate 2 is provided with jack 12, the size and card of neck 5
The size of block 3 is adapted, and the size of the inserted link 11 is adapted with the size of jack 12, and inserted link 11 is relative with the position of jack 12
Should, by setting fixture block 3, neck 5, the first fixing hole 4 and the second fixing hole 6, reach and facilitated the first protective plate 1 and second anti-
The installation of backplate 2, meanwhile, the stability and fastness installed between the first protective plate 1 and the second protective plate 2 are added, and then
The advantage of difficulty of construction is reduced, by setting inserted link 11 and jack 12, has reached and has facilitated the first protective plate 1 and the second protective plate
2 are transversely mounted, meanwhile, the advantage of stability, fastness and the accuracy installed between adding, by setting header tank 8, collection
Water hole 9 and drainpipe 10, have reached the collection and discharge for facilitating current in excavation slope soil, and then add the first protection
The advantage of the mounting stability of 1 and second protective plate of plate 2, by setting groove 14, has reached the placement for facilitating drainpipe 10, together
When, the advantage of installation difficulty between the first protective plate 1 and the second protective plate 2 is reduced, whole device is simple in construction, installation side
Just, difficulty of construction is low, and protection effect is good, the advantage of low engineering cost.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies
Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (4)
1. a kind of construction prefabricated components assembling structure, including the first protective plate (1) and the second protective plate (2), the second protection
Plate (2) is located at the bottom of the first protective plate (1), it is characterised in that:First protective plate (1) and the top of the second protective plate (2)
The bottom at end is provided with fixture block (3), and the inside on the first protective plate (1) and the second protective plate (2) top is provided with first
Neck (5) is provided with the top of fixing hole (4), first protective plate (1) and the second protective plate (2) bottom, the neck (5)
The first protective plate (1) of bottom and the inside of the second protective plate (2) be provided with the second fixing hole (6), first protection
The side of plate (1) and the second protective plate (2) is provided with header tank (8), and the side of the header tank (8) is provided with gully-hole (9),
The bottom of the header tank (8) is provided with drainpipe (10), and the first protective plate (1) of header tank (8) both sides and second prevent
Backplate (2) side is provided with soil nailing (13), and the side of first protective plate (1) and the second protective plate (2) is provided with slotting
Bar (11), and the opposite side of the first protective plate (1) and the second protective plate (2) is provided with jack (12).
2. a kind of construction prefabricated components assembling structure according to claim 1, it is characterised in that:First protection
Plate (1) and the second protective plate (2) are Z-shaped, fixed by bolt column (7) between the first protective plate (1) and the second protective plate (2)
Connect, and the size of bolt column (7) is adapted with the size of the first fixing hole (4), the position and first of second fixing hole (6)
The position of fixing hole (4) is respectively positioned on same vertical plane, and the size of the second fixing hole (6) is adapted with the size of bolt column (7).
3. a kind of construction prefabricated components assembling structure according to claim 1, it is characterised in that:First protection
The size of plate (1) and the second protective plate (2) is consistent, and the middle part on the first protective plate (1) and the second protective plate (2) top is opened up
Fluted (14), the size of the groove (14) is adapted with the size of drainpipe (10), and the first fixing hole (4) is located at groove
(14) inside of the first protective plate (1) of both sides and the second protective plate (2).
4. a kind of construction prefabricated components assembling structure according to claim 1, it is characterised in that:The neck (5)
Size be adapted with the size of fixture block (3), the size of the inserted link (11) is adapted with the size of jack (12), and inserted link (11)
Position with jack (12) is corresponding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720157630.9U CN206457830U (en) | 2017-02-16 | 2017-02-16 | A kind of construction prefabricated components assembling structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720157630.9U CN206457830U (en) | 2017-02-16 | 2017-02-16 | A kind of construction prefabricated components assembling structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206457830U true CN206457830U (en) | 2017-09-01 |
Family
ID=59691347
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720157630.9U Expired - Fee Related CN206457830U (en) | 2017-02-16 | 2017-02-16 | A kind of construction prefabricated components assembling structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206457830U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109371992A (en) * | 2018-11-12 | 2019-02-22 | 贵州大学 | A kind of mine slope protective frame of reuse easy to disassemble |
-
2017
- 2017-02-16 CN CN201720157630.9U patent/CN206457830U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109371992A (en) * | 2018-11-12 | 2019-02-22 | 贵州大学 | A kind of mine slope protective frame of reuse easy to disassemble |
CN109371992B (en) * | 2018-11-12 | 2021-04-13 | 贵州大学 | Mine side slope protection frame convenient to disassemble and reuse |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102251529A (en) | Self-balancing siphon drainage method by using side slope declining drill hole | |
CN106284296A (en) | Supporting structure of double-row steel sheet piles and construction method thereof | |
CN206540552U (en) | A kind of concealed observation pier | |
CN206457830U (en) | A kind of construction prefabricated components assembling structure | |
CN206328765U (en) | A kind of water drainage of deep foundation pit structure | |
CN210684727U (en) | Construction safety supporting construction | |
CN112502188B (en) | Power communication comprehensive pipe rack in easy-to-slide area and construction method thereof | |
CN206143801U (en) | Photovoltaic case contravariant basis that adapts to multiple ambient condition | |
CN206308700U (en) | A kind of Traffic Engineering Construction slope protection device | |
CN202247924U (en) | Assembled steel structure open caisson in pipe jacking construction | |
CN212612506U (en) | Quick strutting arrangement of foundation ditch | |
CN209083291U (en) | A kind of suspension device for Used in Shallow Mining Tunnel with Large Span | |
CN207277373U (en) | A kind of riding track being used in foundation pit construction | |
CN203603162U (en) | Construction elevator load basic system based on foundation pit edge | |
CN207143914U (en) | A kind of relief well assistance platform sets up structure | |
CN201605537U (en) | Jacking device of simply supported plate on retaining wall | |
CN206928262U (en) | Formula or river channel hydroelectric generation factory building sump structure behind dam | |
CN212427133U (en) | Convenient stack's gabion cage | |
CN219528643U (en) | Protective fence for urban underground water engineering construction | |
CN221523817U (en) | Protection device for hole subsidence | |
CN108412417B (en) | Safety cat ladder for high outcrop foundation of power transmission tower | |
CN211690294U (en) | Assembled underground continuous wall | |
CN215367364U (en) | Foundation structure of house building | |
CN208996550U (en) | Ground steel surge tower | |
CN204357346U (en) | A kind of crawler type cement-soil mixing pile machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170901 Termination date: 20180216 |
|
CF01 | Termination of patent right due to non-payment of annual fee |