CN207403896U CN201721396267.2U CN201721396267U CN207403896U CN 207403896 U CN207403896 U CN 207403896U CN 201721396267 U CN201721396267 U CN 201721396267U CN 207403896 U CN207403896 U CN 207403896U
Authority
CN
China
Prior art keywords
platform
babinet
pillar
marine drilling
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721396267.2U
Other languages
Chinese (zh)
Inventor
何俊彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Harbour Engineering Co Ltd
Original Assignee
China Harbour Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Harbour Engineering Co Ltd filed Critical China Harbour Engineering Co Ltd
Priority to CN201721396267.2U priority Critical patent/CN207403896U/en
Application granted granted Critical
Publication of CN207403896U publication Critical patent/CN207403896U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a kind of marine drilling platforms, and including babinet, first through hole is offered on four sides;Platform is more than the square setting of babinet upper surface area, and platform and the longitudinally coaxial top for being arranged at babinet of babinet for area, and the corner of platform offers well bore;Telescopic mast is arranged to 4, and 4 telescopic masts are arranged on four sides of the babinet between babinet and platform in telescopic manner respectively;Pillar is arranged to 4, and pillar is arranged in a manner of it can move up and down in first through hole in first through hole;Derrick is arranged on the top of well bore;Driving mechanism, including controller and hydraulic pump, hydraulic pump is controlled by controller, and hydraulic pump is connected to telescopic mast and pillar.It between platform and babinet by setting telescopic mast so that platform and babinet separation, the levelness of platform is more easy to adjust, while platform is not easy to be infected with seawater, reduces platform by the risk of seawater corrosion, effectively extends the service life of drilling platform.

Description

Marine drilling platform
Technical field
The utility model is related to operation on the sea equipment technical field, more particularly to a kind of marine drilling platform.
Background technology
Marine drilling platform is in sea by supports such as drilling equipment (including auxiliary device), tubing, instrument and other materials Device on face, is the important drilling equipment such as oil and natural gas, and marine drilling platform must possess following conditions:There is foot Enough intensity is able to take wind, wave, gushes, flows and the effect of ice;Adapt to certain depth of water;A full set of drilling equipment, pipe can be accommodated Material, instrument and other materials, and a work-yard and required living condition are provided;With certain stability and holding position The ability put, under the action of wind, wave and trend, kinematic parameter is no more than defined scope, to keep probing work just Often carry out.
Marine drilling platform can be divided into fixed drilling platform, submersible drilling platform, jack up rigs (or footing Formula drilling platform), semisubmersible drilling platform and drilling ship it is several.Wherein jack up rig floor platform is mainly connected by babinet, babinet The compositions such as latch fitting, pillar, power station and hydraulic system, control system.Hydraulic pump is driven by dynamical system during work, by with putting down The pillar hydraulic cylinder of platform connection carrys out the lifting of control platform, and pillar is then provided the reaction force of platform upgrading phase by sea bed and realized Sink, most platform is fixed across the sea at last, then starts drillng operation.
But existing this drilling platform is mostly that babinet upper surface is directly connected to platform, is easily made in raising and lowering Seawater is punched on platform, is had a certain impact to the equipment on platform, while platform is caused to be easier to be damaged by seawater corrosion, so as to Affect the service life of entire platform.
Utility model content
One purpose of the utility model is to solve at least the above, and provides the advantages of at least will be described later.
The utility model is to provide a kind of marine drilling platform there are one purpose, is stretched by being set between platform and babinet Contracting column so that platform and babinet separation, the levelness of platform is more easy to adjust, while platform is not easy to be infected with seawater, reduces platform By the risk of seawater corrosion, the service life of drilling platform is effectively extended.
In order to realize these purposes and further advantage according to the present utility model, a kind of marine drilling platform is provided, is wrapped It includes:
Babinet is square setting, first through hole is offered on four sides of the babinet;
Platform is more than the square setting of the babinet upper surface area for area, and the platform is indulged with the babinet To coaxial arrangement in the top of the babinet, the corner of the platform offers well bore;The platform leads to described first The corresponding position in hole offers the second through hole;
Telescopic mast is arranged to 4, and 4 telescopic masts are arranged at the babinet peace in telescopic manner respectively On four sides of the babinet between platform;
Pillar is arranged to 4, and the pillar is arranged in described in a manner of it can move up and down in the first through hole In first through hole;
Derrick is arranged on the top of the well bore;
Driving mechanism, including controller and hydraulic pump, the hydraulic pump is controlled by the controller, the hydraulic pump point The telescopic mast and pillar are not connected to.
Preferably, in the marine drilling platform, being provided between the pillar and babinet can be by the pillar and case The connection lock element that body is locked.
Preferably, in the marine drilling platform, the upper surface of the platform is equipped with anti-skidding bed course.
Preferably, in the marine drilling platform, graduation mark is provided on the pillar.
Preferably, in the marine drilling platform, the bottom of the pillar is arranged to tip.
Preferably, in the marine drilling platform, one end of the telescopic mast is connected to four sides of the babinet Center, the other end of the telescopic mast vertically upward, and are fixedly connected with the bottom surface of the platform.
Preferably, in the marine drilling platform, the size of the upper surface of the babinet is removed with the platform and bored The size of wellhole is engaged.
The utility model includes at least following advantageous effect:
The utility model between babinet and platform by setting telescopic mast so that platform and babinet separation reach sea After upper corresponding drilling sites, fixed first by the decline platform of pillar across the sea, then by adjusting telescopic mast Length adjust the levelness of height and platform of the platform apart from sea, and then carry out drillng operation again, pass through telescopic mast Setting, one so that platform is farther apart from sea, and seawater is not easy to be infected with platform surface so that the various equipment placed on platform It is preferably protected with instrument, extends the service life of platform.Second, being separately provided by telescopic mast, avoids existing Some adjusts the trouble of the levelness of platform surface using pillar so that the adjustment of platform is more convenient, so as to effectively improve Work efficiency.
Part is illustrated to embody by the further advantage, target and feature of the utility model by following, and part will also pass through Research and practice to the utility model and be understood by the person skilled in the art.
Description of the drawings
Fig. 1 is the structure diagram of marine drilling platform described in the utility model.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to explanation Book word can be implemented according to this.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein are not precluded from one or more The presence or addition of a other elements or its combination.
As shown in Figure 1, the utility model provides a kind of marine drilling platform, including:Babinet 1 is square setting, described First through hole 2 is offered on four sides of babinet 1;Platform 3 is more than the square setting of 1 upper surface area of babinet for area, And the platform 3 and the longitudinally coaxial top for being arranged at the babinet 1 of the babinet 1, the corner of the platform 3 offers drilling well Hole 4;The platform 3 is offering the second through hole 11 with the 2 corresponding position of first through hole;Telescopic mast 5 is arranged to 4, 4 telescopic masts 5 are arranged at four sides of the babinet 1 between the babinet 1 and platform 3 in telescopic manner respectively On;Pillar 6, is arranged to 4, and the pillar 6 be arranged in described the in a manner of it can move up and down in the first through hole 2 In one through hole 2;Derrick 7 is arranged on the top of the well bore 4;Driving mechanism, including controller 8 and hydraulic pump 9, institute It states hydraulic pump 9 and is controlled by the controller 8, the hydraulic pump 9 is connected to the telescopic mast 5 and pillar 6.
In said program, the specific method used of the marine drilling platform is:The offshore drilling is put down first Platform is transported to corresponding drilling sites, and hydraulic pump is controlled by controller so that hydraulic pump drive pillar decline, and make pillar down toward Then mud face more than 50cm or so fixes the position of rig floor platform after exact position is reached by pillar, then pillar is in liquid Slowly babinet is jacked to predetermined absolute altitude under the driving of press pump, so by adjusting telescopic mast height to the levelness of platform into Row fine tuning, is then fixed, and subsequently can then be needed to carry out drilling operation according to engineering construction.And at the end of construction, pass through first Hydraulic pump slowly transfers babinet to the water surface, then proceedes to press babinet toward below water level line, to provide sufficiently large floating Power extracts pillar below sea bed face, and then can carry out the construction in next place.By by babinet jacking to the water surface with On so that it is farther apart from sea on the platform on babinet, operating personnel carry out operation when as land it is the same, ensure that personnel And equipment safety, work efficiency is also improved, more important is for main platform body from the influence of current, wave, drilling tool will not Disturbance is generated to the soil layer of bottom hole, has ensured the quality for taking soil sample, has ensured that in-situ test such as vane shear test, mark are passed through The performance data accuracy of experiment etc. can also carry out the in-situ test such as static sounding that can not be carried out on ship cultivation drilling platform Experiment etc..Derrick is respectively provided with by the corner in platform so that platform can be carried out at the same time four drilling well work, improve work Efficiency, in addition also can be when a derrick damages, and derrick in addition can work on, and so as to avoid construction delay, improve The utilization ratio of the marine drilling platform.
In one preferred embodiment, it is provided with what the pillar 6 and babinet 1 can be locked between the pillar 6 and babinet 1 Connection lock element 10.
In said program, by setting connection lock element between pillar and babinet so that pillar is dropping to stable depth, And by after babinet jacking to predetermined altitude, babinet is fixed on pillar by connection lock element, so that babinet is across the sea It is more firm, easily facilitate the progress of operation on platform.
In one preferred embodiment, the upper surface of the platform 3 is equipped with anti-skidding bed course.
In said program, by setting anti-skidding bed course on platform so that platform surface can be effectively anti-skidding, Jin Erfang Just the work of staff avoids, because wet from sea water etc. cause to skid, the normal work of staff being influenced, so as to reduce Work efficiency.
In one preferred embodiment, graduation mark is provided on the pillar 6.
In said program, because the soil property of seabed each several part is different so that the length of embedment of each pillar is different, receives On pull out resistance and be also not quite similar, so pillar extracts operation certain processing arrangement is needed just to can guarantee that platform is smoothly stable extensive Floating state is arrived again, and the pillar that otherwise will be had is extracted, and some pillars cannot extract or cause pillar to extract mud face During flat surface over-tilting situation.And in order to ensure that platform is smoothly smoothly restored to floating state, usually according to It according to the depth order below pillar insertion sea bed, is lifted successively from depth to shallow, but lifts dynamics difference and be not to be exceeded 30 centimetres, because And by setting graduation mark on pillar, staff can be facilitated to understand the length of embedment of each pillar, while be also convenient for work Control of the personnel to each pillar lifting dynamics.
In one preferred embodiment, the bottom of the pillar 6 is arranged to tip.
In said program, by the way that the bottom of pillar is arranged to tip so that pillar is more easy to stretch into the soil in seabed, So as to improve the speed for platform stable of knowing clearly, be conducive to improve work efficiency.
In one preferred embodiment, one end of the telescopic mast 5 is connected to the center on four sides of the babinet 1, described flexible The other end of column 5 vertically upward, and is fixedly connected with the bottom surface of the platform 3.
In said program, by the center with four sides of babinet being set to be attached telescopic mast so that 4 telescopic masts It is symmetrical thus more steady for the support of the platform above babinet in tank surface, while because telescopic mast is arranged symmetrically, Also it is more easy to the levelness of adjustment platform.
In one preferred embodiment, the size of the upper surface of the babinet 1 removes the size phase of well bore 4 with the platform 3 Cooperation.
In said program, it is engaged by limiting the size of upper surface of babinet with the size of platform removing well bore, So that babinet will not be touched by being arranged at the work of the derrick of platform corner, hereby it is ensured that being smoothed out of probing work.
Although the embodiment of the utility model is disclosed as above, it is not restricted in specification and embodiment Listed utilization, it can be applied to the field of various suitable the utility model completely, for those skilled in the art, Other modification is easily achieved, therefore without departing from the general concept defined in the claims and the equivalent scope, this reality Specific details is not limited to new and shown here as the legend with description.

Claims (7)

1. a kind of marine drilling platform, which is characterized in that including:
Babinet is square setting, first through hole is offered on four sides of the babinet;
Platform is more than the square setting of the babinet upper surface area for area, and the platform and the babinet are longitudinally same Axis is arranged at the top of the babinet, and the corner of the platform offers well bore;The platform with the first through hole phase The position answered offers the second through hole;
Telescopic mast, is arranged to 4,4 telescopic masts be arranged in telescopic manner respectively the babinet and platform it Between the babinet four sides on;
Pillar is arranged to 4, and the pillar is arranged in described first in a manner of it can move up and down in the first through hole In through hole;
Derrick is arranged on the top of the well bore;
Driving mechanism, including controller and hydraulic pump, the hydraulic pump is controlled by the controller, and the hydraulic pump connects respectively It is connected to the telescopic mast and pillar.
2. marine drilling platform as described in claim 1, which is characterized in that being provided between the pillar and babinet can be by described in The connection lock element that pillar and babinet are locked.
3. marine drilling platform as described in claim 1, which is characterized in that the upper surface of the platform is equipped with non-slip mat Layer.
4. marine drilling platform as described in claim 1, which is characterized in that be provided with graduation mark on the pillar.
5. marine drilling platform as described in claim 1, which is characterized in that the bottom of the pillar is arranged to tip.
6. marine drilling platform as described in claim 1, which is characterized in that one end of the telescopic mast is connected to the babinet Four sides center, the other end of the telescopic mast vertically upward, and is fixedly connected with the bottom surface of the platform.
7. marine drilling platform as described in claim 1, which is characterized in that the size of the upper surface of the babinet is put down with described The size that platform removes well bore is engaged.
CN201721396267.2U 2017-10-25 2017-10-25 Marine drilling platform Active CN207403896U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721396267.2U CN207403896U (en) 2017-10-25 2017-10-25 Marine drilling platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721396267.2U CN207403896U (en) 2017-10-25 2017-10-25 Marine drilling platform

Publications (1)

Publication Number Publication Date
CN207403896U true CN207403896U (en) 2018-05-25

Family

ID=62407801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721396267.2U Active CN207403896U (en) 2017-10-25 2017-10-25 Marine drilling platform

Country Status (1)

Country Link
CN (1) CN207403896U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024524A (en) * 2018-08-02 2018-12-18 黄建青 A kind of marine engineering platform
CN111752321A (en) * 2020-06-29 2020-10-09 山东科技大学 Multi-power-driven movable sea-air comprehensive observation platform
CN113508772A (en) * 2020-03-18 2021-10-19 吴常文 Bottom-sitting type marine ranch management platform with sinking and floating functions

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109024524A (en) * 2018-08-02 2018-12-18 黄建青 A kind of marine engineering platform
CN113508772A (en) * 2020-03-18 2021-10-19 吴常文 Bottom-sitting type marine ranch management platform with sinking and floating functions
CN111752321A (en) * 2020-06-29 2020-10-09 山东科技大学 Multi-power-driven movable sea-air comprehensive observation platform

Similar Documents

Publication Publication Date Title
US2210408A (en) Marine working platform substructure
US3138932A (en) Locating an offshore drilling platform
CN207403896U (en) Marine drilling platform
CN103738481B (en) Removable self-mounting type drilling processes oil storage platform
MX2009010275A (en) Elevating support vessel and methods thereof.
WO2008122898A3 (en) Methods of positioning an elevating support vessel
US2603068A (en) Offshore working platform and method of erecting same
RU2732755C2 (en) Lateral saddle sub-base
US4372707A (en) Pile installation and removal mechanisms in off-shore rigs and method of using same
CN108674105A (en) Amphibious geotechnical engineering investigation platform and application method
US5051036A (en) Method of installing lean-to well protector
CN104250968A (en) Self-installation suction pile type movable platform structure
RU2579162C2 (en) Mobile drilling rig
WO2012004556A1 (en) Surface-breaking re-usable submergeable template for installing one or more submerged columns/piles
US3983828A (en) Vertically moored platform installation
NO20151749A1 (en) Method and a system for performing several well activities.
KR20150140792A (en) Arctic telescoping mobile offshore drilling unit
CN105648996B (en) A kind of lifting ballast suitable for simple wellhead stage+module is refuted and its installation method
CN207331657U (en) Hydraulic drilling platform
USRE35912E (en) Method of installing lean-to well protector
US20170002534A1 (en) System and Method for Improving A Jack Up Platform with Asymmetric Cleats
CN207452868U (en) For offshore pile positioning and guiding and the multifunctional platform of exploration
KR20140122794A (en) Heave compensation device, and drilling ship having the same
KR20110094895A (en) Derrick lifting structure and oil prospecting ship including the same
US3104531A (en) Mobile marine drilling foundation