CN207452868U - For offshore pile positioning and guiding and the multifunctional platform of exploration - Google Patents
For offshore pile positioning and guiding and the multifunctional platform of exploration Download PDFInfo
- Publication number
- CN207452868U CN207452868U CN201721389363.4U CN201721389363U CN207452868U CN 207452868 U CN207452868 U CN 207452868U CN 201721389363 U CN201721389363 U CN 201721389363U CN 207452868 U CN207452868 U CN 207452868U
- Authority
- CN
- China
- Prior art keywords
- exploration
- main platform
- platform body
- guiding
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model discloses a kind of for offshore pile positioning and guiding and the multifunctional platform of exploration, including main platform body, set for square, exploration hole is provided in the middle part of the main platform body, boring rig is provided with above the exploration hole;The corner of the main platform body offers through hole;The upper surface setting on four sides of the main platform body is fluted, and horizon rule is placed in the groove;Column leg is arranged in a manner of the main platform body can be driven to lift in the through hole;Pile gripper is arranged at the edge of the main platform body;Driving mechanism, including controller and hydraulic pump, the hydraulic pump is controlled by the controller, and the hydraulic pump is connected to the column leg.It has the multifunctional platform that pile foundation is oriented to, piling and exploration operation are integrated simultaneously so that shallow sea job execution equipment is simplified, and effectively increases work efficiency, reduces the use cost of equipment.
Description
Technical field
The utility model is related to operation on the sea equipment technical field, it is more particularly to a kind of for offshore pile positioning and guiding and
The multifunctional platform of exploration.
Background technology
At present, the operations such as the country is engaged in shallow sea prospection, piling is oriented to are enterprising in different engineer operation ships or platform respectively
Row.Usual exploration operation builds formula in combination or self-elevating work platform is completed;Piling leads piling work to usually by pile driving barge
Or platform is responsible for, and wherein combine to build formula platform and exist and assemble cumbersome, narrow application range, the deficiencies of use cost is high;Shallow sea
Jack up exploration operation platform is single there are task, often in idle state, the deficiencies of economic performance is poor;Pile driving barge is deposited
In the deficiency that positioning process complexity and precision are difficult to ensure that in construction;Driving piles, platform device is various, and bulky, efficiency is not
Height, expense are also higher.Thus, it, can if a kind of platform that can be used for offshore pile positioning and guiding and exploration simultaneously of design
The drawbacks of overcoming above-mentioned various equipment significantly so as to significantly improve the utilization ratio of platform, and causes using more flexibly and square
Just.
Utility model content
One purpose of the utility model is to solve at least the above, and provides the advantages of at least will be described later.
The utility model is to provide a kind of for offshore pile positioning and guiding and the Multifunctional flat of exploration there are one purpose
Platform, while there is the multifunctional platform that pile foundation is oriented to, piling and exploration operation are integrated so that shallow sea job execution equipment obtains
Simplify, effectively increase work efficiency, reduce the use cost of equipment.
In order to realize these purposes and further advantage according to the present utility model, provide a kind of for offshore pile positioning
The multifunctional platform for being oriented to and exploring, including:
Main platform body is set for square, and exploration hole, the top in the exploration hole are provided in the middle part of the main platform body
It is provided with boring rig;The corner of the main platform body offers through hole;The upper surface on four sides of the main platform body is provided with recessed
Slot is placed with horizon rule in the groove;
Column leg is arranged in a manner of the main platform body can be driven to lift in the through hole;
Pile gripper is arranged at the edge of the main platform body;
Driving mechanism, including controller and hydraulic pump, the hydraulic pump is controlled by the controller, and the hydraulic pump connects
It is connected to the column leg.
Preferably, it is described in offshore pile positioning and guiding and the multifunctional platform of exploration, the table of the groove
Transparent cover body is provided on face.
Preferably, it is described in offshore pile positioning and guiding and the multifunctional platform of exploration, the main platform body
Side on be provided with the connection lock element that the main platform body can be connected.
Preferably, it is described in offshore pile positioning and guiding and the multifunctional platform of exploration, the main platform body
Surface be equipped with anti-skidding bed course.
Preferably, it is described in offshore pile positioning and guiding and the multifunctional platform of exploration, being set on the column leg
It is equipped with graduation mark.
Preferably, it is described in offshore pile positioning and guiding and the multifunctional platform of exploration, the horizon rule bag
Transparent hollow tube body is included, liquid and positioning ball are filled in the tube body, the surface of the tube body is provided with scale.
The utility model includes at least following advantageous effect:
The utility model at the middle part of main platform body by setting exploration hole with boring rig, connected in main platform body corner can
The column leg that it is driven to lift, and pile gripper is set in platform side so that main platform body passes through first after job location is reached
The decline of column leg causes platform to fix across the sea, and then is surveyed again, piling action, realizes collection exploration, piling and stake
The multifunctional platform that base positioning and guiding is integrated avoids the use one by one of the equipment such as single exploration operation equipment, pile driving barge, has
Imitate the process for simplifying platform construction so that work efficiency greatly improves, and platform integrates multi-functional, can significantly improve
The service efficiency of platform thereby reduces the use cost of platform.
Part is illustrated to embody by the further advantage, target and feature of the utility model by following, and part will also pass through
Research and practice to the utility model and be understood by the person skilled in the art.
Description of the drawings
Fig. 1 is the structural representation described in the utility model for offshore pile positioning and guiding and the multifunctional platform of exploration
Figure.
Specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings, to make those skilled in the art with reference to explanation
Book word can be implemented according to this.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein are not precluded from one or more
The presence or addition of a other elements or its combination.
As shown in Figure 1, the utility model provides a kind of multifunctional platform for being used for offshore pile positioning and guiding and exploration, bag
It includes:Main platform body 1 is set for square, and 1 middle part of main platform body is provided with exploration hole 2, the top in the exploration hole 2
It is provided with boring rig 3;The corner of the main platform body 1 offers through hole 4;The upper surface on four sides of the main platform body 1 is set
Fluted 5, horizon rule 6 is placed in the groove 5;Column leg 7 is worn in a manner of the main platform body 1 can be driven to lift
In in the through hole 4;Pile gripper 8 is arranged at the edge of the main platform body 1;Driving mechanism, including controller and hydraulic pressure
Pump 9, the hydraulic pump 9 is controlled by the controller, and the hydraulic pump 9 is connected to the column leg 7.
In said program, the specific side used for offshore pile positioning and guiding and the multifunctional platform of exploration
Method is:The multifunctional platform is transported to corresponding job location first, hydraulic pump is controlled by controller so that hydraulic pump band
Dynamic column leg declines, and column leg is made then to fix more work(by column leg after exact position is reached down toward mud face more than 50cm or so
Can platform position, then column leg deck roof is slowly risen into predetermined absolute altitude under the driving of hydraulic pump, and then according in groove
The instruction of horizon rule is finely adjusted the levelness of platform, then fixes, and subsequently can then be explored according to engineering construction
Or piling operation.And at the end of construction, platform is slowly transferred to the water surface first by hydraulic pump, is then proceeded to toward water
Platform babinet is pressed below bit line, to provide sufficiently large buoyancy, column leg below sea bed face is extracted, and then can be carried out
The construction in next place.By jacking multifunctional platform to more than the water surface so that the operation on platform is more convenient, avoids
Big by Lidar Equation using pile driving barge, pile foundation is oriented to complex procedures, and stability is bad, precision deficiency, and it is inefficient to drive piles
The drawbacks of.By setting horizon rule on four sides of platform, using the setting of simple horizon rule, can to the levelness of platform into
Accommodating adjusting so that platform it is more convenient to use, and the production cost of platform is lower.
In one preferred embodiment, transparent cover body is provided on the surface of the groove 5.
In said program, by setting transparent cover body on the surface of the recesses, neither influence to being marked on horizon rule
Observation, moreover it is possible to certain protection is carried out to horizon rule, and then improves the service life of horizon rule, while facilitates horizon rule more
Change and defend China.
In one preferred embodiment, the connection that the main platform body 1 can be connected is provided on the side of the main platform body 1
Latch fitting 10.
In said program, by setting connection lock element in the side of main platform body, but platform can be carried out at other platforms
Connection, and then the quantity of piling simultaneously is improved, while connection lock element can also be attached with other ships or equipment, and then
Carry out other associativity operations so that the use of the platform is more flexible, service efficiency higher.
In one preferred embodiment, the surface of the main platform body 1 is equipped with anti-skidding bed course.
In said program, by setting anti-skidding bed course in main platform body so that main platform body surface can effectively prevent
It is sliding, and then facilitate the work of staff, it avoids, because wet from sea water etc. cause to skid, influencing the normal work of staff,
So as to reduce work efficiency.
In one preferred embodiment, graduation mark is provided on the column leg 7.
In said program, because the soil property of seabed each several part is different so that the length of embedment of each column leg is different, receives
On pull out resistance and be also not quite similar, so column leg extracts operation certain processing arrangement is needed just to can guarantee that platform is smoothly stable extensive
Floating state is arrived again, and the column leg that otherwise will be had is extracted, and some column legs cannot extract or cause column leg to extract mud face
During flat surface over-tilting situation.And in order to ensure that platform is smoothly smoothly restored to floating state, usually according to
It according to the depth order below column leg insertion sea bed, is lifted successively from depth to shallow, but lifts dynamics difference and be not to be exceeded 30 centimetres, because
And by setting graduation mark on column leg, staff can be facilitated to understand the length of embedment of each column leg, while be also convenient for work
Control of the personnel to each column leg lifting dynamics.
In one preferred embodiment, the horizon rule 6 includes transparent hollow tube body, in the tube body filled with liquid and
Ball is positioned, the surface of the tube body is provided with scale.
In said program, by the liquid filling body in transparent hollow tube and positioning ball, the in vivo positioning of pipe can be made
Napiform root is tilted according to the angle of inclination of tube body to corresponding direction, and by setting scale on tube body, staff can be made directly perceived
The understanding horizon rule angle of inclination, and be adjusted, so that the platform is on horizontal plane, and then applied beneficial to items
The progress of work process.
Although the embodiment of the utility model is disclosed as above, it is not restricted in specification and embodiment
Listed utilization, it can be applied to the field of various suitable the utility model completely, for those skilled in the art,
Other modification is easily achieved, therefore without departing from the general concept defined in the claims and the equivalent scope, this reality
Specific details is not limited to new and shown here as the legend with description.
Claims (6)
- It is 1. a kind of for offshore pile positioning and guiding and the multifunctional platform of exploration, which is characterized in that including:Main platform body is set for square, and exploration hole is provided in the middle part of the main platform body, and the top in the exploration hole is set There is boring rig;The corner of the main platform body offers through hole;The upper surface on four sides of the main platform body sets fluted, institute It states and horizon rule is placed in groove;Column leg is arranged in a manner of the main platform body can be driven to lift in the through hole;Pile gripper is arranged at the edge of the main platform body;Driving mechanism, including controller and hydraulic pump, the hydraulic pump is controlled by the controller, and the hydraulic pump is connected to The column leg.
- 2. as described in claim 1 for offshore pile positioning and guiding and the multifunctional platform of exploration, which is characterized in that described Transparent cover body is provided on the surface of groove.
- 3. as described in claim 1 for offshore pile positioning and guiding and the multifunctional platform of exploration, which is characterized in that described The connection lock element that the main platform body can be connected is provided on the side of main platform body.
- 4. as claimed in claim 3 for offshore pile positioning and guiding and the multifunctional platform of exploration, which is characterized in that described The surface of main platform body is equipped with anti-skidding bed course.
- 5. as described in claim 1 for offshore pile positioning and guiding and the multifunctional platform of exploration, which is characterized in that described Graduation mark is provided on column leg.
- 6. as described in claim 1 for offshore pile positioning and guiding and the multifunctional platform of exploration, which is characterized in that described Horizon rule includes transparent hollow tube body, liquid and positioning ball is filled in the tube body, the surface of the tube body is provided with Scale.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721389363.4U CN207452868U (en) | 2017-10-25 | 2017-10-25 | For offshore pile positioning and guiding and the multifunctional platform of exploration |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721389363.4U CN207452868U (en) | 2017-10-25 | 2017-10-25 | For offshore pile positioning and guiding and the multifunctional platform of exploration |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207452868U true CN207452868U (en) | 2018-06-05 |
Family
ID=62281540
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721389363.4U Active CN207452868U (en) | 2017-10-25 | 2017-10-25 | For offshore pile positioning and guiding and the multifunctional platform of exploration |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207452868U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113802535A (en) * | 2021-08-27 | 2021-12-17 | 中经建研设计有限公司 | Multifunctional offshore exploration platform |
-
2017
- 2017-10-25 CN CN201721389363.4U patent/CN207452868U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113802535A (en) * | 2021-08-27 | 2021-12-17 | 中经建研设计有限公司 | Multifunctional offshore exploration platform |
WO2023024127A1 (en) * | 2021-08-27 | 2023-03-02 | 中经建研设计有限公司 | Multifunctional offshore exploration platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN200971492Y (en) | Pile submarine drilling basal disc with suction | |
CN110374131A (en) | A kind of cylinder composite truss formula offshore wind turbine foundation and its construction technology | |
CN103738481B (en) | Removable self-mounting type drilling processes oil storage platform | |
CN102644293B (en) | Pile foundation bucket foundation and construction method thereof | |
CN107542101A (en) | A kind of four floating drum buoyancy tank combined type foundation structures of sea and its construction method | |
CN107653895A (en) | Six floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea | |
CN107806108A (en) | Three floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea | |
CN104250968B (en) | From installation suction pile formula moveable platform structure | |
CN107740436A (en) | A kind of three floating drum buoyancy tank combined type foundation structures of sea and its construction method | |
CN107630461A (en) | Four floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea | |
CN105133558A (en) | Deep-water bare rock platform and construction method thereof | |
CN106320309A (en) | Suction anchor type overwater piling platform and overwater pile group foundation piling technology | |
CN107630462A (en) | A kind of six floating drum buoyancy tank combined type foundation structures of sea and its construction method | |
CN207452868U (en) | For offshore pile positioning and guiding and the multifunctional platform of exploration | |
CN203373716U (en) | Self-installation suction pile type movable platform structure | |
US2528089A (en) | Submersible floating structure | |
CN207403896U (en) | Marine drilling platform | |
CN206031709U (en) | Gasbag formula platform | |
CN202176267U (en) | Novel suction pile type seabed drilling base plate | |
CN107653858A (en) | The removable piling platform of the stake top of jack up waterborne and its construction method | |
CN208125234U (en) | Underground water level measuring device | |
CN104164886A (en) | Sinking leveling and reinforcing method for caisson | |
CN204589969U (en) | Be applicable to the small modular jack-up unit of greater coasting area operation | |
US3008691A (en) | Pile jacking apparatus | |
CN103556972A (en) | Self-installed ocean floor drilling template and installation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |