CN207392239U - A kind of prefabricated piping lane of two-piece unit formula - Google Patents
A kind of prefabricated piping lane of two-piece unit formula Download PDFInfo
- Publication number
- CN207392239U CN207392239U CN201721333061.5U CN201721333061U CN207392239U CN 207392239 U CN207392239 U CN 207392239U CN 201721333061 U CN201721333061 U CN 201721333061U CN 207392239 U CN207392239 U CN 207392239U
- Authority
- CN
- China
- Prior art keywords
- piping lane
- anchor slab
- hole
- lower side
- rod irons
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The utility model discloses a kind of prefabricated piping lane of two-piece unit formula, including upper piping lane and lower piping lane;Upper piping lane sets pre-buried slot, and lower piping lane sets pre-buried slot;PC rod irons run through upper and lower piping lane, and both ends respectively upper pre-buried slot and under pre-buried slot connected by anchor slab and bolt-nut, coordinated between upper and lower piping lane by shearing concave and convex platform, PC rod irons are through shearing concave and convex platform.The utility model uses two-piece unit formula structure, and piping lane is connected by whole PC rod iron up and down, and easy for installation, bonding strength is strong, and toward through hole up slip casting, bubble should not be generated in through hole for pre-buried slot under lower piping lane.
Description
Technical field
Technical field more particularly to one kind the present invention relates to the pipe gallery for Urban Buried Pipeline Network Systems are divided up and down
The prefabricated piping lane of body formula.
Background technology
Pipe gallery refers to that a municipal administration is built below urban road shares tunnel, by electric power, communication, water supply, combustion gas
One is concentrated on etc. a variety of municipal pipelines, " unified planning, unified construction, unified management " is carried out, to accomplish the comprehensive of the underground space
It closes using shared with resource.
Traditional pipe gallery construction generally uses cast in situs, it is necessary to carry out steel bar meter binding, branch at the construction field (site)
The processes such as mould, concrete cast, maintenance, form removal, not only working procedure is complicated for the method, long construction period, while also presence needs
The problems such as larger raw material is wanted to store and process factory site.
In order to solve the constructional deficiency of cast in situs formula piping lane, there is integrated precast piping lane, but integrated precast
Often volume and weight is larger for piping lane, and the transport and on-site hoisting from factory to construction site are extremely inconvenient, so as to occur
Fabricated construction piping lane.
And existing fabricated construction piping lane is also to belong to integrated precast piping lane scope in fact, simply opposite monoblock type is pre-
Tubulation corridor length reduction;Its casting craft generally uses vertical one-piece casting or horizontal one-piece casting;
Horizontal one-piece casting, often all there are several technological deficiencies:
1) since the height of prefabricated piping lane is high, weight is big, show so as to often swollen mould occur in the lower part of mold when pouring
As so as to cause burn failure;
2) since mold is monoblock type, so as to cause from top to bottom into mold during concrete perfusion, in mold bottom
Air and bubble can not be completely exhausted out, there is cellular defect so as to cause molding piping lane bottom plate or even local dew occur
Muscle phenomenon seriously affects structural strength, service life and leakproofness;
3) poured, the demoulding is difficult, and grinding tool easy to wear, reduces die life.
And vertical one-piece casting, there are technological deficiencies:
1) mating surface poured when top surface is piping lane assembling of mold, using vertical one-piece casting, mold can not ensure
The flatness in the face poured, so as to which the piping lane after influencing is assembled and sealed.
At present, also occur the prefabricated piping lane of two-piece unit formula, such as Patent No. in the industry of prefabricated piping lane
The 201621083138.3 prefabricated assembled more cabin pipe galleries of one kind, the reinforcement member connection mode of disclosed pipe gallery
Using the pre-buried rod iron of lower member, upper member penetrates rod iron and is connected by rebar sleeve, but it was verified that in prefabricated lower structure
, it is necessary to which fixed pre-buried rod iron, comparatively laborious during part;In addition after the completion of upper member and lower member assembling, steel is penetrated to upper member
In the upper preformed hole of stick during slip casting, it may appear that bubbling phenomenon causes slip casting insufficient, and rod iron does not fasten.
The content of the invention
For above-mentioned technological difficulties, it is an object of the present invention to provide a kind of prefabricated piping lane of two-piece unit formula, prefabricated sides
Just, it is and easy for installation, it is solid.
Its technical solution is as follows:
A kind of prefabricated piping lane of two-piece unit formula, including upper piping lane and lower piping lane;The upper piping lane includes top plate and two upsides
Plate;Lower piping lane includes bottom plate and two lower side panels;Two epipleurals and two lower side panels are connected, and inside is hole capital after selling all securities;
The lower side panel of the epipleural of upper piping lane and lower piping lane sets multigroup through hole, and is set above the through hole of epipleural on top plate
Pre-buried slot, the through hole lower section lower side panel inner wall of lower side panel set pre-buried slot;PC rod irons are through the logical of epipleural and lower side panel
Hole, and both ends respectively upper pre-buried slot and under pre-buried slot connected by anchor slab and bolt-nut, it is easy for installation, and under
The up slip casting of the through hole of side plate should not generate bubble in through hole.
Shearing boss is set in the mating surface of the lower side panel, shearing groove is set in the mating surface of epipleural, and is worked in coordination;
On the one hand cooperation is facilitated to align, on the other hand increases the shearing between piping lane up and down, prevents piping lane dislocation up and down;The PC rod irons
Through shearing boss and shearing groove, the intensity of enhancing shearing concave and convex platform;
Anchor slab in the upper pre-buried slot is upper anchor slab, under anchor slab in pre-buried slot be lower anchor slab, the upper anchor slab
It is compound seal anchor slab with lower anchor slab;
Upper anchor slab includes the upper platen that centre sets the perforation of PC rod irons, and the upper periphery of upper platen sets " mouth " grommet type seal,
Centre sets the gas vent connected with the perforation of PC rod irons;
Lower anchor slab includes the lower fastening plates that centre sets the perforation of PC rod irons, and the upper periphery of lower fastening plates sets " mouth " grommet type seal,
Centre sets the injected hole connected with the perforation of PC rod irons.
It is fastened when upper and lower piping lane is connected by PC rod irons, anchor slab and anchorage nut, under under the pre-buried downward anchor slab of slot
The injected hole concrete perfusion of fastening plates is starched, and the air in through hole is discharged from the gas vent of upper platen;Along through hole from lower past
Upper slip casting, slip casting is complete, and the concrete grout being perfused in through hole can be avoided bubble phenomenon occur, so as to influence PC rod irons to upper and lower
The bonding strength of piping lane;Meanwhile into through hole during slip casting, shearing concave and convex platform can be filled along PC rod irons, so as to increase up and down
The bonding strength and shear strength of side plate.
One fabricated construction piping lane is split as two-piece unit formula structure, on the one hand can mitigate single-piece pours weight
Amount, is readily transported, on the other hand, split type upper piping lane and lower piping lane can be used it is horizontal pour, pouring quality is good, respectively matches somebody with somebody
The fit precision in conjunction face is high, is installed convenient for assembling;Piping lane is connected by a PC rod iron up and down simultaneously, and bonding strength is good, is led to
It crosses to through hole slip casting from the bottom up, slip casting effect is good, and structural strength is good.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is epipleural and the enlarged drawing at lower side panel cooperation in the present invention;
Fig. 3 is the anchor connection enlarged drawing at upper pre-buried slot in the present invention;
Fig. 4 is the structure diagram of upper anchor slab in the present invention;
Fig. 5 be in the present invention under anchor connection enlarged drawing at pre-buried slot;
Fig. 6 is the structure diagram of lower anchor slab in the present invention;
Specific embodiment
The present invention is illustrated further below in conjunction with the accompanying drawings.
As shown in Figures 1 and 2, a kind of prefabricated piping lane of two-piece unit formula, including upper piping lane 1 and lower piping lane 2;The upper piping lane
1 includes 11 and two epipleural 12 of top plate;Lower piping lane 2 includes 21 and two lower side panel 22 of bottom plate;Two epipleurals 12 and two lower side panels 22
It is connected, inside is hole capital after selling all securities;
The epipleural 12 of upper piping lane 1 and the lower side panel 21 of lower piping lane 2 set multigroup through hole 4, and top above the through hole of epipleural
Pre-buried slot 13 is set on plate, lower side panel inner wall sets pre-buried slot 23 below the through hole of lower side panel 22;PC rod irons 3 run through upside
The through hole 4 of plate 11 and lower side panel 22, and both ends respectively upper pre-buried slot 13 and under pre-buried slot 23 pass through anchor slab and anchoring spiral shell
Mother's connection.
Shearing boss 24 is set in the mating surface of the lower side panel 22, shearing groove 14 is set in the mating surface of epipleural 12, and
It works in coordination;Prevent that piping lane is wrong up and down through two PC rod irons 3, the intensity of enhancing shearing concave and convex platform in every group of shearing concave and convex platform
Position facilitates cooperation to align.
Anchor slab in the upper pre-buried slot 13 is upper anchor slab 5, under anchor slab in pre-buried slot 23 be lower anchor slab 6, it is described
Upper anchor slab 5 and lower anchor slab 6 are compound seal anchor slab;
Upper anchor slab 5 includes the upper platen 52 that centre sets two PC rod irons perforation 54, and the upper periphery of upper platen 52 is set " mouth "
Grommet type seal 51, centre set the gas vent 53 connected with PC rod irons perforation 54;
Lower anchor slab 6 includes the lower fastening plates 61 that centre sets PC rod irons perforation 54, and the upper periphery of lower fastening plates 61 sets " mouth " type
Gasket 51, centre set the injected hole 62 connected with PC rod irons perforation 54.
It is fastened when upper and lower piping lane is connected by PC rod irons 3, anchor slab and anchorage nut, the pre-buried 23 downward anchor slab 6 of slot under
Lower fastening plates 61 62 concrete perfusion of injected hole slurry, the air in through hole 4 discharges from the gas vent 53 of upper platen 52;Edge
The slip casting from the bottom up of through hole 4, slip casting is complete, and the concrete grout being perfused in through hole can be avoided bubble phenomenon occur, so as to shadow
Ring bonding strength of the PC rod irons 3 to upper and lower piping lane;Meanwhile into 4 through holes during slip casting, concave and convex platform can will be sheared along PC rod irons 3
It fills, so as to increase the bonding strength of upper and lower side plate and shear strength.
The foregoing is merely the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, without departing from the principle of the present invention, several improvement can also be made, these improvement also should be regarded as the present invention's
Protection domain.
Claims (3)
1. a kind of prefabricated piping lane of two-piece unit formula, including upper piping lane and lower piping lane;The upper piping lane includes top plate and two epipleurals;
Lower piping lane includes bottom plate and two lower side panels;Two epipleurals and two lower side panels are connected, and inside is hole capital after selling all securities;It is characterized in that:
The lower side panel of the epipleural of upper piping lane and lower piping lane sets multigroup through hole, and is set on the through hole top top plate of epipleural pre-buried
Slot, the through hole lower section lower side panel inner wall of lower side panel set pre-buried slot;PC rod irons run through the through hole of epipleural and lower side panel, and
Both ends respectively upper pre-buried slot and under pre-buried slot pass through anchor slab and bolt-nut and connect.
A kind of 2. prefabricated piping lane of two-piece unit formula according to claim 1, which is characterized in that the mating surface of the lower side panel
On set shearing boss, shearing groove is set in the mating surface of epipleural, and is worked in coordination;The PC rod irons are through shearing boss and cut
Power groove.
3. a kind of prefabricated piping lane of two-piece unit formula according to claim 1, which is characterized in that in the upper pre-buried slot
Anchor slab is upper anchor slab, under anchor slab in pre-buried slot be lower anchor slab, the upper anchor slab and lower anchor slab are compound seal anchor slab;
Upper anchor slab includes the upper platen that centre sets the perforation of PC rod irons, and the upper periphery of upper platen sets " mouth " grommet type seal, intermediate
If the gas vent connected with the perforation of PC rod irons;
Lower anchor slab includes the lower fastening plates that centre sets the perforation of PC rod irons, and the upper periphery of lower fastening plates sets " mouth " grommet type seal, intermediate
If the injected hole connected with the perforation of PC rod irons.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721333061.5U CN207392239U (en) | 2017-10-16 | 2017-10-16 | A kind of prefabricated piping lane of two-piece unit formula |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721333061.5U CN207392239U (en) | 2017-10-16 | 2017-10-16 | A kind of prefabricated piping lane of two-piece unit formula |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207392239U true CN207392239U (en) | 2018-05-22 |
Family
ID=62332334
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721333061.5U Active CN207392239U (en) | 2017-10-16 | 2017-10-16 | A kind of prefabricated piping lane of two-piece unit formula |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207392239U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109024677A (en) * | 2018-08-10 | 2018-12-18 | 上海公路桥梁(集团)有限公司 | Assembling method |
-
2017
- 2017-10-16 CN CN201721333061.5U patent/CN207392239U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109024677A (en) * | 2018-08-10 | 2018-12-18 | 上海公路桥梁(集团)有限公司 | Assembling method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104947719B (en) | The rear pouring tape construction method of formwork erecting structure is hung in basement roof post-cast strip | |
CN105862916A (en) | Superimposed assembled type underground pipe gallery system and construction and manufacturing process | |
CN209053120U (en) | Bolt Bolted angle connection assembled counterfort retaining wall | |
CN110359601A (en) | A kind of one-time formed energy saving form walls of one-piece casting and construction method | |
CN106808578B (en) | A kind of prefabricated piping lane of two-piece unit formula and method for prefabricating | |
CN207619856U (en) | A kind of replaceable combination girder segment for bridge construction | |
CN108360712A (en) | A kind of assembled steel reinforced concrete shear force wall and its construction method | |
CN209555978U (en) | A kind of cast-in-situ steel reinforced concrete manhole shaft shaping combined steel shuttering | |
CN108005401A (en) | A kind of support and change method of the column of existing frame structure base isolation reinforcement | |
CN103866885A (en) | Energy-saving insulation structure of lighting window and construction method thereof | |
CN110284587A (en) | A kind of prefabricated window and connection joints of steel structure and the construction method of floaing of staggered floor | |
CN109914644A (en) | A kind of assembled heat insulation masonry wall and preparation method thereof | |
CN208072706U (en) | A kind of connection structure of the prefabricated steel shear wall horizontal joint of slip installation | |
CN106759485B (en) | A kind of prefabricated piping lane of two-piece unit formula and installation method | |
CN106088578A (en) | Non-dismantling formwork, foam concrete self-heat conserving composite wall body structure and construction method | |
CN103883022B (en) | The construction method of space enclosing structure inner-outer wall antidetonation and sound insulation cracking resistance integrated structure | |
CN209040349U (en) | A kind of ring muscle fastening shear wall structure being easily installed | |
CN207392239U (en) | A kind of prefabricated piping lane of two-piece unit formula | |
CN208168479U (en) | A kind of prefabricated rod structure in inspection hole | |
CN207633546U (en) | Toilet concrete sealing prefabricated components | |
CN110450278A (en) | A kind of production technology of sandwich heat preservation overlapped shear wall | |
CN212866938U (en) | Leveling structure of prefabricated wall body | |
CN203856100U (en) | Environment-friendly energy-saving cast-in-place heat-insulating composite exterior wall system | |
CN103741944B (en) | Fixation kit, template system containing this fixation kit and body of wall casting method | |
CN108798715A (en) | A kind of tunnel type pipe gallery sectional type component assembly method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |