CN207377115U - A kind of heat insulation integrated non-dismantling formworks of STP - Google Patents

A kind of heat insulation integrated non-dismantling formworks of STP Download PDF

Info

Publication number
CN207377115U
CN207377115U CN201721117991.7U CN201721117991U CN207377115U CN 207377115 U CN207377115 U CN 207377115U CN 201721117991 U CN201721117991 U CN 201721117991U CN 207377115 U CN207377115 U CN 207377115U
Authority
CN
China
Prior art keywords
stp
dismantling
plate
heat insulation
insulation integrated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721117991.7U
Other languages
Chinese (zh)
Inventor
翟传伟
张希廷
李壮贤
沈建军
刘静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Kerui New Environmental Protection Materials Group Co Ltd
Original Assignee
Qingdao Kerui New Environmental Protection Materials Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Kerui New Environmental Protection Materials Group Co Ltd filed Critical Qingdao Kerui New Environmental Protection Materials Group Co Ltd
Priority to CN201721117991.7U priority Critical patent/CN207377115U/en
Application granted granted Critical
Publication of CN207377115U publication Critical patent/CN207377115U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model is related to a kind of heat insulation integrated non-dismantling formworks of STP; including outer layer, middle level, internal layer; the outer layer is protective layer; the middle level is insulating layer; the internal layer is casing play; the middle level uses vacuum heat-insulating plate, and the internal layer is using plate and non-dismantling formwork built-in fitting is provided in plate.The heat insulation integrated non-dismantling formworks of STP of the utility model are applied to the cast-in-place bonding pad of assembled integral concrete shear wall structure, for replacing outer wall template, exempt insulating layer of external wall, the situ wet operation of finish coat, it is highly resistant to lateral pressure, construction and the equipment load of young concrete generation, the load that vibrated concrete generates and topples over load that concrete generates etc., all constructing operations can be completed on the inside of wall, exterior wall scaffold can be exempted, save construction-time, fee of material and labour cost.

Description

A kind of heat insulation integrated non-dismantling formworks of STP
Technical field
The utility model is related to assembled architecture technical fields, and in particular to a kind of heat insulation integrated non-dismantling formworks of STP.
Background technology
Assembled architecture refers to the building formed with prefabricated component in assemble in site.The advantages of this building is to build speed Degree is fast, and climate conditionality is small, and construction quality can simultaneously be improved by saving labour.Assembled architecture begins to draw in early 20th century The interest of people is played, is realized finally to the sixties.The states such as English, method, the Soviet Union attempt first.Due to building for assembled architecture It is fast to make speed, and production cost is relatively low, promotes come all over the world rapidly.Assembled architecture has the characteristics that following 5:1) Substantial amounts of building subassembly is machined by Workshop Production, and component species mainly has:Side fascia, lining, superimposed sheet, balcony are empty Tuned plate, stair, precast beam, prefabricated post etc.;2)The substantial amounts of assembling work in scene, greatly reduces than original cast-in-place operation;3)Using Building, finishing integrated design, construction, perfect condition are that finishing can synchronously be carried out with main body construction;4)The standardization of design and The informationization of management, component get over standard, and production efficiency is higher, and corresponding component cost will decline, and coordinate the digitlization of factory Management, the cost performance of entire assembled architecture can higher and higher 5)Meet the requirement of green building.
The Chinese utility model patent of Publication No. CN105714961A discloses a kind of prefabricated outer with heat insulation function Wall form structural system and its construction method propose precast concrete outer wall template, i.e., including precast concrete outer wall template, in advance Insulating layer is fixed on the inside of concrete outer wall template processed, cast-in-place shear wall has been poured on the inside of insulating layer, treats that concrete reaches Inner template is removed after required intensity, forms cast-in-place shear wall, forms outer wall template containing precast concrete, insulating layer, cast-in-place shearing The external wall system of wall.But the intensity that precast concrete outer wall template and insulating layer are depended merely on when implementing can not bear to pour at all The dead weight of concrete and when vibrating to the lateral pressure of template, it is inadequate to rely solely on split bolt, it is easy to cause swollen mould The problems such as;In addition after timely pouring molding, from the point of view of durability, fastness experiment, insulating layer bears dead weight and is mixed with prefabricated at all The weight of solidifying soil outer wall template, in turn results in and comes off;Itself main reason is that insulating layer and the direct pouring molding of walls concrete, The insulating layer mutability first under larger tension force effect causes hollowing occur with walls concrete bonding place;Two kinds of material heat preservations Layer is not bonded with the bonding of concrete, and cohesive force is also relatively poor, and expected purpose is not achieved at all, and then implements the skill Art can not practice and extension, equally, there is also the problems with insulating layer junction for precast concrete outer wall template.
The content of the invention
The purpose of this utility model is to provide a kind of heat insulation integrated non-dismantling formworks of new STP, solve existing dress Outboard template needs dismounting, outside scaffolding construction to there are problems that risk and exterior sheathing can not bear to pour in being built with formula The dead weight of concrete and when vibrating to the lateral pressure of template the problem of.
To achieve the above object, the technical solution adopted in the utility model is:A kind of heat insulation integrated non-dismantling formworks of STP, Including outer layer, middle level, internal layer, the outer layer is protective layer, and the middle level is insulating layer, and the internal layer is casing play, in described For layer using vacuum heat-insulating plate, the internal layer is using plate and non-dismantling formwork built-in fitting is provided in plate;
Further, the outer layer is dalle or protection mortar or polymer mortar;The dalle is thin type Stone material, the cement fibre pressure plate of coating, the calcium silicate board of coating, the aluminium sheet of coating, the aluminium of coating The steel plate of alloy sheets or coating, glass magnesium board, Cement fibre mat are covered with outside above-mentioned dalle or are not covered with protection Film;
Further, when the outer layer is dalle, outer layer passes through structure glue bonding connection with middle level;
Further, protect and anti-cracking net is provided in mortar, the protection mortar thickness is 10-20mm, and anti-cracking net is set At in protection mortar away from the outer layer 5mm;Anti-cracking net is galvanized steel wire netting or glass fiber mesh;
Further, the middle level passes through structure glue or two-component polyurethane adhesive bonding connection with internal layer;
Further, the internal layer is calcium silicate board, high-density fiber cement plate, high-strength cement composite plate, UHPC superelevation Performance concrete plate, steel plate or slabstone, STP heat preservation dismounting-free formworks;
Further, the STP heat preservation dismounting-free formworks are steam pressure without asbestos fibre cellulose fiber cement board, thickness 10- 30mm;
Further, the non-dismantling formwork built-in fitting is non-dismantling formwork embedded nut;
Further, the non-dismantling formwork embedded nut is welded in the circular steel plate surface of 2mm thickness, the steel plate for nut Outer edge be provided with corner cut;
Further, the non-dismantling formwork embedded nut is nut-welding in steel wire or rebar surface;
Further, the corner cut is the bevel edge for the isosceles right triangle that right-angle side is 0.5mm;The nut is away from steel plate Edge is 20mm.
The utility model method has the following advantages that:
1)Cancel outer page board, effectively reduce wall dead weight, eliminate connector, prevent security risk;
2)Thickness of wall body can be reduced, solve the problems, such as heat bridge, effectively improve building usable floor area;
3)Cancel external scaffolding, exterior sheathing need not be removed after cast-in-place concrete, only needs to remove inner side template.
The heat insulation integrated non-dismantling formworks of STP of the utility model are applied to showing for assembled integral concrete shear wall structure Bonding pad is poured, for replacing outer wall template, exempts insulating layer of external wall, the situ wet operation of finish coat, is highly resistant to and newly pours Lateral pressure, construction and equipment load, the load of vibrated concrete generation and the lotus for toppling over concrete generation that concrete generates Carry etc., all constructing operations can be completed on the inside of wall, can exempt exterior wall scaffold, save construction-time, fee of material and Labour cost.
Description of the drawings
Fig. 1 is that the heat insulation integrated non-dismantling formworks of STP of the utility model show applied to the structure of the T-shaped connecting node of shear wall It is intended to.
Fig. 2 is that the heat insulation integrated non-dismantling formworks of STP of the utility model are applied to the knot of non-edge component area connecting node Structure schematic diagram.
Fig. 3 is the structure diagram of the non-dismantling formwork embedded nut of the heat insulation integrated non-dismantling formworks of STP of the utility model.
Fig. 4 is that the corner cut structure of the non-dismantling formwork embedded nut of the heat insulation integrated non-dismantling formworks of STP of the utility model is shown It is intended to.
Description of the drawings:1- precast concrete wall panels, 2- template fixing bolts, 3- embedded nuts, 4- bolts, the common spiral shells of 5- Mother, 6- insides detachable template, 7-STP heat preservation dismounting-free formworks, 8- non-dismantling formwork embedded nuts, 9- vacuum heat-insulating plates, 10- are cast-in-place Area's steel bar stress, 11- protection mortars, 12- glass fiber mesh, 13- weather proofing sealants, 14- structure glues, 15- polyurethane foams block up Seam, 16- cast-in-place concretes, 17- rough surfaces.
Specific embodiment
The following examples illustrate the utility model, but is not intended to limit the scope of the present invention.
A kind of heat insulation integrated non-dismantling formworks of STP, including outer layer, middle level, internal layer, the outer layer is protective layer, in described Layer is insulating layer, and the internal layer is casing play, and the middle level uses vacuum heat-insulating plate, and the internal layer is using plate and in plate It is provided with non-dismantling formwork built-in fitting;
Preferably, the outer layer is dalle or protection mortar;
Preferably, dalle is thin type stone material, the cement fibre pressure plate of coating, the calcium silicates of coating Plate, the aluminium sheet of coating, steel plate, glass magnesium board, the Cement fibre mat of the aluminium alloy plate of coating or coating, it is above-mentioned It is covered with outside dalle or is not covered with protective film;
Preferably, when the outer layer is dalle, outer layer passes through structure glue bonding connection with middle level;
Preferably, it is provided with anti-cracking net in protection mortar;
Preferably, the protection mortar thickness is 10-20mm, anti-cracking net is arranged in protection mortar away from the outer layer At 5mm;
Preferably, anti-cracking net is galvanized steel wire netting or glass fiber mesh;
Preferably, anti-cracking net is alkali-resistant glass fibre net;
Preferably, alkali-resistant glass fibre net is middle alkali or alkali-free glass fibre grid cloth is base material, coated modification third It is dried after olefin(e) acid ester copolymer mixed liquor;
Preferably, the protection mortar is cement mortar or crack resist at mortar;
Preferably, the crack resist at mortar is made of following component:Modified zeolite, portland cement, tetrapropylene benzene Sodium sulfonate, coconut oil diethanol amine, chlorination aluminium powder, latex powder, quick lime, methacrylate, water;
Preferably, the modified zeolite is through acetum impregnates, drying is made after oleic acid infiltration;
Preferably, the middle level passes through structure glue bonding connection with internal layer;
Preferably, the internal layer is calcium silicate board, high-density fiber cement plate, high-strength cement composite plate, UHPC superelevation Performance concrete plate, steel plate or slabstone, STP heat preservation dismounting-free formworks;
Preferably, the internal layer is STP heat preservation dismounting-free formworks;
Preferably, the STP heat preservation dismounting-free formworks for steam pressure without asbestos fibre cellulose fiber cement board;
Preferably, the internal layer thickness is 10-30mm.
Preferably, the non-dismantling formwork built-in fitting is non-dismantling formwork embedded nut;
Preferably, non-dismantling formwork embedded nut is defaulted in for the internal layer in production in internal layer or internal layer production It is fixed on after finishing in internal layer punching, by non-dismantling formwork nut with cement base adhesive material in the internal layer;
Preferably, the non-dismantling formwork embedded nut is welded in the circular steel plate surface of 2mm thickness, the steel plate for nut Outer edge be provided with corner cut, as shown in Figure 3-4;
Preferably, the bevel edge for the isosceles right triangle that it is 0.5mm that the corner cut, which is right-angle side, sets corner cut can be effective Avoid damage of the steel plate being likely to occur to vacuum heat-insulating plate;
Preferably, the nut is 20mm away from steel plate edge.
As shown in Figs. 1-2, the construction technology of the heat insulation integrated non-dismantling formworks of STP, is as follows:
1)Lifting, fixed precast concrete wall panel;
2)Reinforcing bar binding is carried out in the space of cast-in-place part;
3)Lift the heat insulation integrated non-dismantling formworks of STP, described heat insulation integrated two sections of connection concretes of non-dismantling formwork of STP Cob wall plate;
4)In the step 2 surrounded by precast concrete wall panel, the heat insulation integrated non-dismantling formworks of STP)Cast-in-place part sky Between inside installation inside construction formwork;
5)Screw rod one end is connected with the non-dismantling formwork built-in fitting in the heat insulation integrated non-dismantling formworks of STP, and the other end is in Side construction formwork, it is fixed;
6)Form joint and corner location closure are with mortar leakage prevention;
7)In cast-in-place part casting concrete;
8)Maintenance;
9)Inner side template is removed, remove bolt or cuts off the part that bolt protrudes from cast-in-place part casting concrete;
Preferably, the bolt can be split bolt, the spacing of split bolt according to floor height, heat insulation integrated exempt to tear open The lateral pressure that thickness and intensity, the heat insulation integrated non-dismantling formwork of template are born determines;The diameter of split bolt is born according to it Pulling force determine;The length of split bolt is determined according to thickness of wall body, internal model plate thickness;
Preferably, prefabricated panel is stitched with non-dismantling formwork using mismatch(Constructional waterproofing measure), plate stitch inside uses structure Glue or polyurethane foam closure, outside use weather proofing sealant filleting;
Preferably, there is the non-dismantling formwork built-in fitting with the heat insulation integrated non-dismantling formworks of STP on the inside construction formwork The preformed hole of position consistency, bolt are inserted into through preformed hole in non-dismantling formwork built-in fitting;
Preferably, the non-dismantling formwork built-in fitting is non-dismantling formwork embedded nut;
Preferably, step 5)It is middle to be fixed screw rod and inside construction formwork using nut;
Preferably, step 9)The middle hole for removing bolt is blocked using grouting material.
Embodiment 1
The crack resist at mortar is made of following components of following parts by weight meter:30 parts of modified zeolite, portland cement 60 Part, 5 parts of tetrapropylene benzene sodium sulfonate, 5 parts of coconut oil diethanol amine, 10 parts of chlorination aluminium powder, 5 parts of latex powder, 5 parts of quick lime, 1 part of methacrylate, 100 parts of water, the modified zeolite are to grind zeolite to 80-120 mesh, then with 30% concentration Acetum impregnate 1h after again after oleic acid infiltrates dry be made.By modified zeolite, portland cement, chlorination aluminium powder, latex Powder, calcium lime powder, methacrylate, water add in reaction kettle be stirred together, when being heated to 50 DEG C and keeping 1-2 small, Up to crack resist at mortar.
It is the mechanical property test and its result on this crack resist at mortar that utility model people provides below:
(1)Test cube is made using the standard test mode of 70mm × 70mm × 70mm, 60 are conserved by standard curing method My god, carry out cubic compressive strength experiment.Result of the test shows:Mortar specimen compression strength average value is 67MPa, and test block reaches It is unloaded after peak load and carries out second of loading again, Residual Compressive Strength can reach the 82% of peak load, test block destructive process With apparent resistance to compression toughness.
(2)It is made of the die trial of 50mm × 15mm × 350mm and stretches test block, conserved 60 days by standard curing method, Carry out direct tensile test.The result shows that:Mortar specimen uniaxial tensile strength average value is 3.9MPa, and ultimate tensile strength can reach 1.4%, bearing capacity is held essentially constant test specimen cracking later, has good tensile toughness, occurs in destructive process less than 10 Crack.
It is required according to the standard of the mortar of JC/T1024-2007, outdoor test is carried out 6 months to above-mentioned crack resist at mortar, nothing Thus it is clear that the accumulation of salt in the surface soil, without picking, it can be seen that, the addition of modified zeolite and methacrylate, which has alkali burnout resistance and adhesion strength, to be changed It is kind.
Reference examples are set up, preparation method is removed with specific embodiment described in embodiment 1 and do not add in tetrapropylene benzene sulphur Outside sour sodium and coconut oil diethanol amine, remaining step and reagent all same, according to JC/T1024-2007 wall facing mortars Standard requirement is tested, and the water absorption situation obtained by 1 gained mortar of embodiment and reference examples in mortar 30min is respectively 0.4g And the water absorption situation of 1.9g, 240min are respectively 0.6g, 2.5g, are met the technical requirements;According to GB/T 13891- 2008《Test methods of specular gloss for decorative building materials》Standard requirement tested, 1 gained mortar of embodiment and control 60 o glossiness of example gained mortar are respectively 14.5,7.2.
Toughness is preferable when crack resist at mortar compression, tension knowable to above-mentioned experiment, is not susceptible to brittle break, intensity Well, effect of prestressed is good, ductility is good, alkalescence is weak, can effectively protect vacuum heat-insulating plate and mitigate the corrosion journey to glass fiber mesh Degree.Pass through the addition of dispersant, surfactant tetrapropylene benzene sodium sulfonate and coconut oil diethanol amine so that be infiltrated on boiling Oleic acid inside stone gap is dispersed in during agitating and heating in mortar, is effectively improved the surface gloss of mortar, The aesthetic measure and decoration function of mortar are improved, and due to employing tetrapropylene benzene sulfonic acid in the mortar of the utility model Sodium and coconut oil diethanol amine can effectively uniformly disperse a small amount of oleic acid that zeolite pores adsorb for oil droplet little particle so that nothing Oleic acid or oleate need to be added in, and only needs to reach in a manner that oleic acid infiltrates and adds in what a large amount of oleic acid can be only achieved Brightness, glossiness and water resistance reduce the dosage of oleic acid or oleate, reduce cost;Acetic acid inside zeolite pores It is released in whipping process in mortar, effectively improves the basicity of mortar.
Embodiment 2
According to《Building construction formwork act of technique for security》JGJ162-2014, the lateral pressure standard value of exterior sheathing are:
F1=0.22γct0β1β2V1/2
F2cH
γcFor the unit weight of newly-laid concrete, by 24KN/m3It calculates;
t0For newly-laid concrete presetting period, t0=200/(T+15)=200/(25+15)=5;
β1Without considering addition retarder, 1.2 are taken;
β2Slump influences correction factor, takes 0.8;
V is concreting speed, and 3 meters of floor height takes V=3;
F1=0.22×24×5×1.2×0.85×31/2=46.6 KN/m2
F2=24×3=72 KN/m2
The two gets the small value:F=46.6 KN/m2(Dead load);
Vibrate characteristic value of load:Take 4KN/m2(Mobile load);
Topple over characteristic value of load:Take 2KN/m2(Mobile load);
Dead load controls, combined value=1.35 × 46.6+1.4 × 0.7+(4+2)=68.79 KN/m2
From the above results, the compressive property of the heat insulation integrated non-dismantling formworks of the STP of the utility model far surpasses in the market Existing product is highly resistant to lateral pressure, construction and the equipment load of young concrete generation, the lotus that vibrated concrete generates Load that concrete generates etc. is carried and topples over, all constructing operations can be completed on the inside of wall, can exempt outer foundation hand Frame saves construction-time, fee of material and labour cost.
Embodiment 3
Non-dismantling formwork embedded nut crush test:
Mold and detection model:Circular steel plate thickness 2mm, nut is away from steel plate edge 20mm, fiber cement board density: 1.52g/cm2, the punching of plate centre, size is consistent with nut size, and plate surface leaves the circular trough of 2mm;
Experimentation:The fiber cement board that would be embedded with non-dismantling formwork embedded nut is put into tensile test equipment, and startup is set It is standby, test speed 5mm/min;
Experimental result:It can bear maximal destruction power and be up to 7910N.
From above-mentioned experimental result, the non-dismantling formwork embedded nut that the utility model uses passes through rational circular steel plate The pulling force that the distance of thickness, nut away from steel plate edge causes it and can bear is up to 7910N, remote exceeded alignment request.
Although above having made detailed description to the utility model with generality explanation and specific embodiment, On the basis of the utility model, it can be made some modifications or improvements, this is apparent to those skilled in the art 's.Therefore, the these modifications or improvements on the basis of without departing from the utility model spirit, belonging to the utility model will Seek the scope of protection.

Claims (10)

1. a kind of heat insulation integrated non-dismantling formworks of STP, including outer layer, middle level, internal layer, the outer layer is protective layer, the middle level For insulating layer, the internal layer is casing play, which is characterized in that the middle level uses vacuum heat-insulating plate, and the internal layer uses plate And non-dismantling formwork built-in fitting is provided in plate.
2. a kind of heat insulation integrated non-dismantling formworks of STP as described in claim 1, which is characterized in that the outer layer is decorative panel Material or protection mortar or polymer mortar;
The dalle for thin type stone material, the cement fibre pressure plate of coating, the calcium silicate board of coating, with painting Aluminium sheet, the aluminium alloy plate of coating or steel plate, glass magnesium board, the Cement fibre mat of coating of layer, above-mentioned dalle Outside is covered with or is not covered with protective film.
3. a kind of heat insulation integrated non-dismantling formworks of STP as claimed in claim 2, which is characterized in that the outer layer is decorative panel During material, outer layer passes through structure glue or two-component polyurethane adhesive bonding connection with middle level.
4. a kind of heat insulation integrated non-dismantling formworks of STP as claimed in claim 3, which is characterized in that be provided in protection mortar Anti-cracking net, the protection mortar thickness are 10-20mm, and anti-cracking net is arranged in protection mortar at away from the outer layer 5mm;
Anti-cracking net is galvanized steel wire netting or glass fiber mesh.
5. a kind of heat insulation integrated non-dismantling formworks of STP as described in claim 1, which is characterized in that the middle level leads to internal layer Cross structure glue or two-component polyurethane adhesive bonding connection.
6. a kind of heat insulation integrated non-dismantling formworks of STP as described in claim 1, which is characterized in that the internal layer is calcium silicates Plate, high-density fiber cement plate, high-strength cement composite plate, UHPC ultra-high performance concretes plate, steel plate or slabstone, STP heat preservations are exempted from Form removal.
7. a kind of heat insulation integrated non-dismantling formworks of STP as claimed in claim 6, which is characterized in that form removal is exempted from the STP heat preservations Plate is steam pressure without asbestos fibre cellulose fiber cement board, thickness 10-30mm.
8. a kind of heat insulation integrated non-dismantling formworks of STP as described in claim 1, which is characterized in that the non-dismantling formwork is pre-buried Part is non-dismantling formwork embedded nut.
9. a kind of heat insulation integrated non-dismantling formworks of STP as claimed in claim 8, which is characterized in that the non-dismantling formwork is pre-buried Nut is welded in the circular steel plate surface of 2mm thickness for nut, and the outer edge of the steel plate is provided with corner cut;
Or the non-dismantling formwork embedded nut for nut-welding in steel wire or rebar surface.
10. a kind of heat insulation integrated non-dismantling formworks of STP as claimed in claim 9, which is characterized in that the corner cut is right-angle side For the bevel edge of the isosceles right triangle of 0.5mm;
The nut is 20mm away from steel plate edge.
CN201721117991.7U 2017-09-02 2017-09-02 A kind of heat insulation integrated non-dismantling formworks of STP Active CN207377115U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721117991.7U CN207377115U (en) 2017-09-02 2017-09-02 A kind of heat insulation integrated non-dismantling formworks of STP

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721117991.7U CN207377115U (en) 2017-09-02 2017-09-02 A kind of heat insulation integrated non-dismantling formworks of STP

Publications (1)

Publication Number Publication Date
CN207377115U true CN207377115U (en) 2018-05-18

Family

ID=62343368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721117991.7U Active CN207377115U (en) 2017-09-02 2017-09-02 A kind of heat insulation integrated non-dismantling formworks of STP

Country Status (1)

Country Link
CN (1) CN207377115U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107327137A (en) * 2017-09-02 2017-11-07 青岛科瑞新型环保材料集团有限公司 A kind of heat insulation integrated non-dismantling formworks of STP and its construction technology

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107327137A (en) * 2017-09-02 2017-11-07 青岛科瑞新型环保材料集团有限公司 A kind of heat insulation integrated non-dismantling formworks of STP and its construction technology

Similar Documents

Publication Publication Date Title
CN107327137A (en) A kind of heat insulation integrated non-dismantling formworks of STP and its construction technology
CN107313531A (en) A kind of assembled integral shear wall connecting node and its system and its construction technology
CN200968053Y (en) Reinforced concrete detaching-free formwork
CN102071797A (en) Fiber-reinforced plaster-free dismantle-free integrated heat-preservation template and exterior wall heat-preservation construction process
CN105780976B (en) Compound concrete shear wall structure and its concreting method
CN203429831U (en) Split-free composite heat insulation template for pouring concrete
CN106801517A (en) A kind of schoolhouse surface consolidation of Prefabricated porous plate brick mixed structure strengthens method
CN105298015B (en) The architectural surface light-weight aseismatic partition plate integrated with wall and preparation method
CN107476491A (en) Fill concrete wallboard and its manufacture method in a kind of prefabricated thermal insulation
CN103437439A (en) Prefabricated steel wire net rack thermal insulation plate, manufacturing method of prefabricated steel wire net rack thermal insulation plate and construction method of prefabricated steel wire net rack thermal insulation plate
CN108951966A (en) The decoration integrated assembling type outer wall plate of basalt fibre grid concrete heat-insulating
CN203430021U (en) Split-free polyurethane composite heat insulation template for pouring concrete
CN205134717U (en) Take frame mould integration light antidetonation partition plate of architectural surface
CN108149819B (en) Integrated superposed outer wall of building bottom reinforcing area and production and construction method thereof
CN210288790U (en) Firstly assembled steel mesh frame perlite concrete heat-insulating sound-insulating fireproof partition plate
CN108343173A (en) High-strength foam concrete self-heat conserving shear wall and high-strength foam concrete self-heat conserving shear wall structure system
CN108035485A (en) Assembled CF steam pressures porcelain powder air entrained concrete shear wall Side fascia and production method
CN205502373U (en) Evaporate and press whole wallboard that keeps warm of aerated concrete
CN207194226U (en) A kind of assembled integral shear wall connecting node
CN207959692U (en) A kind of assembled CF steam pressures porcelain powder air entrained concrete shear wall Side fascia
CN207377115U (en) A kind of heat insulation integrated non-dismantling formworks of STP
CN108395184A (en) Combined wall
CN201459966U (en) Self-insulation wall structure for building
CN209011386U (en) The decoration integrated assembling type outer wall plate of basalt fibre grid concrete heat-insulating
CN204238264U (en) A kind of sole plate post-poured strip structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A kind of STP thermal insulation integrated non demolition formwork

Effective date of registration: 20201012

Granted publication date: 20180518

Pledgee: Qingdao Huiquan Private Capital Management Co., Ltd

Pledgor: QINGDAO KERUI NEW ENVIRONMENTAL MATERIALS GROUP Co.,Ltd.

Registration number: Y2020370010043

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20210330

Granted publication date: 20180518