CN207368612U - Concealed distribution box body branch stake tool for building - Google Patents
Concealed distribution box body branch stake tool for building Download PDFInfo
- Publication number
- CN207368612U CN207368612U CN201721167767.9U CN201721167767U CN207368612U CN 207368612 U CN207368612 U CN 207368612U CN 201721167767 U CN201721167767 U CN 201721167767U CN 207368612 U CN207368612 U CN 207368612U
- Authority
- CN
- China
- Prior art keywords
- distribution box
- angle steel
- harness cord
- cord bar
- cleat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
The utility model patent discloses a kind of concealed distribution box body branch stake tool for building, it is suitable for the inside support of concealed distribution box in construction wall, distribution box can be prevented because of casting concrete crimp.The instrument includes upper and lower support angle steel, angle cleat, harness cord bar and adjusting nut, the angle cleat opens two holes in middle point symmetry, the support angle steel up and down is directly played a supporting role with upper following contact of distributing box, lower support angle steel is welded to connect with angle cleat harness cord bar, for fixing end, upper support angle steel is welded to connect with harness cord bar, and the harness cord bar other end is connected with nut by hole with angle cleat and is fixed as adjustable end, realizes the adjustable function of bearing height.The utility model avoids concealed distribution box body extrusion within the walls so that the pre-buried one-pass molding of distributing box, improves installation quality, and branch stake tool can be used with turnaround cycle, and cost is low.
Description
Technical field
A kind of branch stake tool of building field is the utility model is related to, it is suitable for the inside of concealed distribution box in construction wall
Support, prevents distribution box because of casting concrete crimp.
Background technology
During the electric installation of architectural engineering, indoor distribution box is typically designed to be embedded in concrete structure wall
Installation, after frequently appearing in distribution box installation is complete, can be extruded, mainly distribution when walls concrete pours by external pressure
Upper box part can directly bear concrete gravity pushing, and the upper of concealed distribution box is usually long side below, it is easier to by pressure
Change shape.The situation once distribution box deforms, can cause switch, component in later stage case not install, chamber door can not be installed
The problems such as replaced, it is necessary to pick chisel on reinforced concrete structure and take out first wife electronic box, and after the completion of distribution box is replaced, babinet
It is if bad with the processing of the gap of wall, in fact it could happen that the consequence of wall body slit, produce larger cost of labor and there may be
Risk.This support tool needle is to this phenomenon, using common materials such as angle steel, harness cords, using simple processing technology, composition support
Instrument, carries out secure support to distributing box inside, avoids the generation of deformation.
The content of the invention
The utility model instrument is process using angle steel, harness cord bar, nut.First according in the processing of the specification of distribution box
The length of lower support angle steel and angle cleat, angle cleat are connected with lower support angle steel with the mode that harness cord bar is welded, upper support
Angle steel welds harness cord bar, and the harness cord bar other end is connected by the perforate of angle cleat using nut, angle cleat and support up and down
Bolted angle connection finishes, and the utility model completes.
Specifically, the utility model provide it is a kind of it is for building secretly bury branch stake tool inside distributing box, it includes
Lower support angle steel, angle cleat, harness cord bar and adjusting nut, two perforates of the angle cleat symmetrically divide with angle steel midpoint
Cloth, the support angle steel up and down are directly played a supporting role with upper following contact of distributing box, lower support angle steel and joint angle
Steel harness cord bar is welded to connect, and is fixing end, and upper support angle steel is welded to connect with harness cord bar, and the harness cord bar other end leads to angle cleat
The connection of via nut is fixed as adjustable end, realizes the adjustable function of bearing height.
The beneficial effects of the utility model are:The height of branch stake tool is adjusted by nut, withstands upper and lower support angle steel
It is following on distribution box, prevent pressure distortion of the distribution box due to concrete.Material is all gathered materials on the spot, and is not required to special processing process.
Through field test, this branch stake tool avoids the deformation that concealed distribution box body is produced by concreting extruding within the walls so that matches somebody with somebody
The pre-buried one-pass molding of electronic box body, improves installation quality, and branch stake tool can be used with turnaround cycle, and cost is low.
Brief description of the drawings
Fig. 1 is the combination diagram of the utility model.
Fig. 2 is the using state structure diagram of the utility model.
Description of reference numerals
1st, support angle steel;2nd, angle cleat;3rd, screw is adjusted;4th, fixed screw;5th, stop nut;6th, distributing box.
Embodiment
1st, two holes are opened on angle cleat 2, holes is symmetrical with the distribution of 2 midpoint of angle cleat
2nd, angle cleat 2 is welded to connect fixation with the fixed screw 4 of lower support angle steel 1.
3rd, the one end for adjusting screw 4 is welded to connect with upper support angle steel 1.
4th, 3 other end end of screw will be adjusted to screw on first stop nut 5 and be inserted into the hole of angle cleat 2, then screwed on
Another stop nut 5.
5th, stop nut is adjusted, supports upper and lower support angle steel 1 and upper following be in close contact of distribution box body 6.
6th, after treating that concrete pours, this mould is taken out, completes hole to be provided work.
The utility model has the characteristics that labor and material saving, processing are simple, easily operated, can greatly improve construction quality, be
A kind of preferably construction industry utility.
Claims (1)
1. a kind of concealed distribution box body branch stake tool for building, it is characterised in that including lower support angle steel, angle cleat, harness cord
Bar and adjusting nut, two perforates of the angle cleat are symmetrical with the distribution of angle cleat midpoint, and upper support angle steel welds harness cord
After bar, the harness cord bar other end is adjusted and is fixed by stop nut through angle cleat perforate, and lower support angle steel is with being connected
Angle steel is welded and fixed by harness cord bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721167767.9U CN207368612U (en) | 2017-09-13 | 2017-09-13 | Concealed distribution box body branch stake tool for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721167767.9U CN207368612U (en) | 2017-09-13 | 2017-09-13 | Concealed distribution box body branch stake tool for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207368612U true CN207368612U (en) | 2018-05-15 |
Family
ID=62348360
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721167767.9U Active CN207368612U (en) | 2017-09-13 | 2017-09-13 | Concealed distribution box body branch stake tool for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207368612U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111749462A (en) * | 2020-07-06 | 2020-10-09 | 中核华辰建筑工程有限公司 | Circulating support device for wall-embedded concealed-assembly electric box and preparation process |
CN113131365A (en) * | 2021-03-22 | 2021-07-16 | 中国五冶集团有限公司 | Method for strengthening internal support of indoor finished product electric box |
-
2017
- 2017-09-13 CN CN201721167767.9U patent/CN207368612U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111749462A (en) * | 2020-07-06 | 2020-10-09 | 中核华辰建筑工程有限公司 | Circulating support device for wall-embedded concealed-assembly electric box and preparation process |
CN113131365A (en) * | 2021-03-22 | 2021-07-16 | 中国五冶集团有限公司 | Method for strengthening internal support of indoor finished product electric box |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207368612U (en) | Concealed distribution box body branch stake tool for building | |
CN105625621B (en) | Waffle beam formwork is fixed and electromechanical pipeline fixes Versatile apparatus and method | |
CN107338871A (en) | Precast concrete box connection component | |
CN110241955A (en) | Assembling structure sandwich thermal insulation board precast facade Cast-in-Situ Segment single side formwork construction method | |
CN206859713U (en) | The supporting construction of superposed type side wall | |
CN204174911U (en) | A kind of scaffold connecting device | |
DE102011102825A1 (en) | Connecting arrangement and method for producing a puncture protection or a reinforcement connection | |
CN206091264U (en) | Outer wall scaffold frame is wall spare even | |
CN107700841A (en) | Prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method | |
CN105735487A (en) | Wall tied reinforcement component | |
CN107740497B (en) | Construction method for embedding foundation bolts on overflow surface of hydraulic building | |
CN107800070A (en) | The pre-embedded construction method of electric concealed junction box | |
CN207469596U (en) | A kind of beam column outer rim is exempted to tear concrete mold open | |
CN101922242B (en) | Construction process of exterior wall cladding | |
CN204876554U (en) | Outer wall middle part constructional column mould shell mounting structure | |
CN205444484U (en) | Wall lacing wire subassembly | |
EP2312088A2 (en) | Method and device for producing a point of connection in a concrete or reinforced concrete ceiling | |
CN206512893U (en) | A kind of prefabricated assembled board wall I-steel bolt joint construction | |
CN207348492U (en) | A kind of opening protective device | |
CN205857789U (en) | A kind of pre-stretch-draw carbon fiber board reinforced concrete beam panel assembly | |
CN206448519U (en) | Constructional column side form bracing means | |
CN204326435U (en) | A kind of board pendant device | |
CN206267351U (en) | A kind of inclined hole grouting shear wall of in-line | |
JP5251074B2 (en) | Repair method for reinforcing bars for concrete utility poles | |
CN110173113A (en) | A kind of Lin Qiang hangs hole constructing structure and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: BEIJING URBAN CONSTRUCTION NORTH EQUIPMENT INSTALLATION CO., LTD. Document name: Notification to Pay the Fees |
|
DD01 | Delivery of document by public notice | ||
DD01 | Delivery of document by public notice |
Addressee: BEIJING URBAN CONSTRUCTION NORTH EQUIPMENT INSTALLATION Co.,Ltd. Document name: Notification of Termination of Patent Right |