CN107700841A - Prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method - Google Patents

Prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method Download PDF

Info

Publication number
CN107700841A
CN107700841A CN201710922977.2A CN201710922977A CN107700841A CN 107700841 A CN107700841 A CN 107700841A CN 201710922977 A CN201710922977 A CN 201710922977A CN 107700841 A CN107700841 A CN 107700841A
Authority
CN
China
Prior art keywords
lobe
internal lobe
sleeve
internal
siphonal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710922977.2A
Other languages
Chinese (zh)
Inventor
张晓峰
迟毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201710922977.2A priority Critical patent/CN107700841A/en
Publication of CN107700841A publication Critical patent/CN107700841A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts

Abstract

The present invention provides a kind of prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method, 1) installation sleeve on prefabricated fixed structure inner surface, sleeve set internal thread again;2) bolt hole is opened up in internal lobe template;3) bolt hole of internal lobe template is passed through with a threaded rod, inner termination is fixedly connected on sleeve, and external end head sets nut, and tightening nut locking internal lobe template, when the width that siphonal lobe is more than internal lobe is less than 150, sleeve is fixed in the pre-buried steel ledges inner surface of internal lobe;When the width that siphonal lobe is more than internal lobe is more than 150, the termination screw thread of internal lobe scope is extended in the pre-buried heat-insulation layer connector of siphonal lobe, sleeve is fixedly mounted on heat-insulation layer connector termination;When siphonal lobe be more than internal lobe width be more than 250 when, sleeve and threaded rod longitudinal direction be provided with two row, this method to internal lobe model sheetinstallat need not on siphonal lobe prepared screw-bolt hole, also will not be punched on siphonal lobe, siphonal lobe wall is not destroyed, ensures the entirety of siphonal lobe, ensures water proofing property performance.

Description

Prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method
Technical field:
This patent is related to the construction method of architectural engineering precast wall body Cast-in-Situ Segment.
Background technology:
In precast wall body cast-in-place section construction, split bolt hole is reserved generally in wall, then Cast-in-Situ Segment is tied up muscle, Formwork, and reinforced with split bolt by hole to be provided, wait to beat ash, pour and reach the removable removing template in intensity rear.
On the basis of traditional cast-in-place concrete construction, precast facade cast-in-place section construction, with the form of construction work of cast-in-place engineering It is similar, all it is utilized on wall and reserves split bolt hole, and Cast-in-Situ Segment is contained with template, finally use split bolt Template is reinforced through reserving hole.
For prefabricated exterior wall, it is necessary to reserve split bolt hole on wall when making, reduce live peace Secondary perforate during dress causes the destruction to wall, but needs to seal split bolt hole after wall installs Stifled, because reserving hole is through siphonal lobe in wall, this, which results in wall, can not ensure the complete of its water proofing property.
The content of the invention
The present invention needs to reserve split bolt hole, shadow on wall siphonal lobe to solve the installation method of template in the prior art The problem of ringing the water proofing property of siphonal lobe, this problem carries out bolt hole repairing in the later stage even if siphonal lobe can not also remedy.The present invention is guarantor Demonstrate,prove the water proofing property of assembled wall siphonal lobe, there is provided a kind of Formwork Installation Method, its concrete technical scheme are:
A kind of prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method, 1) again on prefabricated fixed structure inner surface Installation sleeve, sleeve set internal thread;2) bolt hole is opened up in internal lobe template;3) bolt of internal lobe template is passed through with a threaded rod Hole, inner termination are fixedly connected on sleeve, and external end head sets nut, tightening nut locking internal lobe template.
This method to internal lobe model sheetinstallat need not on siphonal lobe prepared screw-bolt hole, will not also be punched on siphonal lobe, no Siphonal lobe wall is destroyed, ensures the entirety of siphonal lobe, ensures water proofing property performance.
When the width that siphonal lobe is more than internal lobe is less than 150, sleeve is fixed in the pre-buried steel ledges inner surface of internal lobe.Most bottom The sleeve in portion is located at the position away from base 200mm;Sleeve vertical direction 500mm mono- is arranged.
When the width that siphonal lobe is more than internal lobe is more than 150, internal lobe scope is extended in the pre-buried heat-insulation layer connector of siphonal lobe Termination screw thread, sleeve are fixedly mounted on heat-insulation layer connector termination.
When siphonal lobe be more than internal lobe width be more than 250 when, for the improvement under the second operating mode, sleeve and threaded rod longitudinal direction Provided with two row.Every two row sleeve spacing 100mm.
The arrangement of sleeve is still that the sleeve of bottommost is located at the position away from base 200mm.Sleeve vertical direction 500mm mono- It is individual to be arranged.
Brief description of the drawings
Fig. 1 is the first working condition chart;
Fig. 2 is n-n line sectional views in Fig. 1;
Fig. 3 is A point enlarged drawings in Fig. 2;
Fig. 4 is the first operating mode angle of depression figure;
Fig. 5 is the second working condition chart;
Fig. 6 is L-L line sectional views in Fig. 5;
Fig. 7 is the second operating mode angle of depression figure;
Fig. 8 is the 3rd working condition chart;
Fig. 9 is the 3rd operating mode angle of depression figure.
In figure:Internal lobe 1, siphonal lobe 2, internal lobe template 3, heat-insulation layer 4, pre-buried steel ledges 5, heat-insulation layer connector 6, sleeve 11, Threaded rod 12, nut 13.
Embodiment
Internal lobe template 3 should be first installed before being poured to internal lobe 1 and carry out supporting.Before model sheetinstallat is carried out, first Mounted is prefabricated wall siphonal lobe 2, and heat-insulation layer 4 is fixed on the inner side of siphonal lobe 2 with heat-insulation layer connector 6.Heat-insulation layer connector 6 Pedestal is just embedded in siphonal lobe 2 in prefabricated siphonal lobe 2, and the termination of heat-insulation layer connector 6 extends to the scope of internal lobe 1 through heat-insulation layer 4, Before internal lobe 1 pours, prefabricated pre-buried steel ledges 5 in internal lobe 1.
The installation method purport of the present invention is the not drilling on siphonal lobe 2, protects the complete of siphonal lobe 2, ensures its water proofing property Energy.Then the installing component of internal lobe template 3 is arranged in the more existing structure fixed, the table on the inside of existing structure Face fixes sleeve 11, then bolt hole is opened up in internal lobe template 3, it is connected with a threaded rod 12 through internal lobe template 3 with sleeve 11, Screwed again with nut 13 from outside and fix internal lobe template 3.
Siphonal lobe, which can be designed when prefabricated, goes out greatly internal lobe one fixed width, the assembling for different walls, it is wide go out length not phase Together, this installation method is illustrated with siphonal lobe operating mode different from internal lobe below.
First, when siphonal lobe extends beyond the part of internal lobe and is less than 150mm:Welded in the pre-buried steel ledges 5 of precast wall body internal lobe 1 Sleeve 11, other fixed connection modes can also be used.Sleeve 11 sets internal thread, and bolt hole is opened up in internal lobe template 3, with a screw thread Bar 12 is fixedly connected on sleeve 11 through internal lobe template 3, and other end installation nut 13, tightening nut 13 fixes internal lobe template 3. The position of first sleeve 11 is located at the height away from base 200mm, and then mono- progress sleeve of the upward 500mm of vertical direction is consolidated It is fixed.
What the 2nd, siphonal lobe extended beyond internal lobe is partially larger than 150mm when being less than 250mm:Go out internal lobe in the width of precast wall body siphonal lobe 2 During 1 part, pre-buried heat-insulation layer connector 6.The termination of heat-insulation layer connector 6 extends to the surface screw thread of the scope of internal lobe 1;Set Cylinder 11 is arranged on the termination of heat-insulation layer connector 6.Bolt hole is opened up in internal lobe template 3, internal lobe mould is passed through with a threaded rod 12 Plate 3 is fixedly connected on sleeve 11, and other end installation nut 13, be tightened internal lobe template 3.The setting of heat-insulation layer connector 6 Position is the set location of subsequent sleeve 11, then sets first heat-insulation layer connector 6 in the height away from base 200mm, then The upward 500mm of vertical direction mono- is arranged.
3rd, siphonal lobe extends beyond when being partially larger than 250mm of internal lobe:Precast wall body siphonal lobe 2 it is wide go out internal lobe 1 part it is pre- Heat-insulation layer connector 6 is buried, heat-insulation layer connector 6 extends to the termination screw thread of the scope of internal lobe 1, and sleeve 11 is fixedly mounted on insulation Layer connector 6 termination, opens up bolt hole in internal lobe template 3, sleeve is fixedly connected on through internal lobe template 3 with a threaded rod 12 On 11, other end installation nut 13, be tightened internal lobe template 3.Such a operating mode is excessive because outer leaf width goes out internal lobe part, can cloth Put multiple row sleeve 11 to be used to fix internal lobe template, each column is between left and right away from for 100mm.
The installation method of internal lobe template provided by the invention to internal lobe model sheetinstallat need not on siphonal lobe prepared screw-bolt hole, Also it will not be punched on siphonal lobe, not destroy siphonal lobe wall, ensure the entirety of siphonal lobe, ensure water proofing property performance.

Claims (7)

1. a kind of prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method, 1) pacify again on prefabricated fixed structure inner surface Sleeved, sleeve sets internal thread;2) bolt hole is opened up in internal lobe template;3) bolt of internal lobe template is passed through with a threaded rod Hole, inner termination are fixedly connected on sleeve, and external end head sets nut, tightening nut locking internal lobe template.
2. prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method as claimed in claim 1, it is characterized in that:When siphonal lobe is more than When the width of internal lobe is less than 150, sleeve is fixed in the pre-buried steel ledges inner surface of internal lobe.
3. prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method as claimed in claim 1, it is characterized in that:When siphonal lobe is more than When the width of internal lobe is more than 150, the termination screw thread of internal lobe scope is extended in the pre-buried heat-insulation layer connector of siphonal lobe, sleeve is fixed On heat-insulation layer connector termination.
4. prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method as claimed in claim 3, it is characterized in that:When siphonal lobe is more than The width of internal lobe be more than 250 when, sleeve and threaded rod longitudinal direction be provided with two row.
5. prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method as claimed in claim 4, it is characterized in that:Every two row sleeve Spacing 100mm.
6. prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method, its feature as any one of claim 1 to 5 It is:The sleeve of bottommost is located at the position away from base 200mm.
7. prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method, its feature as any one of claim 1 to 5 It is:Sleeve vertical direction 500mm mono- is arranged.
CN201710922977.2A 2017-09-30 2017-09-30 Prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method Pending CN107700841A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710922977.2A CN107700841A (en) 2017-09-30 2017-09-30 Prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710922977.2A CN107700841A (en) 2017-09-30 2017-09-30 Prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method

Publications (1)

Publication Number Publication Date
CN107700841A true CN107700841A (en) 2018-02-16

Family

ID=61184456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710922977.2A Pending CN107700841A (en) 2017-09-30 2017-09-30 Prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method

Country Status (1)

Country Link
CN (1) CN107700841A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643403A (en) * 2018-05-18 2018-10-12 中国二十二冶集团有限公司 Precast concrete shear wall siphonal lobe reinforcement means
CN109881826A (en) * 2019-03-21 2019-06-14 中国二十二冶集团有限公司 Sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method
CN114000615A (en) * 2021-11-12 2022-02-01 筑友智造科技投资有限公司 External wall panel connecting piece, connecting assembly and prefabricated part connecting joint

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203487776U (en) * 2013-09-03 2014-03-19 二十二冶集团第一建设有限公司 Connecting structure for cast-in-place heat preservation protection layer of prefabricated concrete structure and module
CN205206324U (en) * 2015-11-26 2016-05-04 广东合迪科技股份有限公司 Precast concrete wallboard and wall form setting node
CN205894668U (en) * 2016-08-05 2017-01-18 成都市第四建筑工程公司 Superimposed sheet is pour and is used mould

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203487776U (en) * 2013-09-03 2014-03-19 二十二冶集团第一建设有限公司 Connecting structure for cast-in-place heat preservation protection layer of prefabricated concrete structure and module
CN205206324U (en) * 2015-11-26 2016-05-04 广东合迪科技股份有限公司 Precast concrete wallboard and wall form setting node
CN205894668U (en) * 2016-08-05 2017-01-18 成都市第四建筑工程公司 Superimposed sheet is pour and is used mould

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108643403A (en) * 2018-05-18 2018-10-12 中国二十二冶集团有限公司 Precast concrete shear wall siphonal lobe reinforcement means
CN109881826A (en) * 2019-03-21 2019-06-14 中国二十二冶集团有限公司 Sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method
CN114000615A (en) * 2021-11-12 2022-02-01 筑友智造科技投资有限公司 External wall panel connecting piece, connecting assembly and prefabricated part connecting joint

Similar Documents

Publication Publication Date Title
CN105220874A (en) The construction method of basement superelevation exterior wall self-supporting single side formwork system
CN107700841A (en) Prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method
CN106284655A (en) Precast concrete beam stud connects node and method of attachment in succession
CN106592824B (en) Thin wall concrete shear wall in a kind of prefabricated hollow formula
CN107119901A (en) The cast-in-place system of formwork structure and shear wall and construction method of shear wall angle node
CN107700667A (en) A kind of precast floor slab and girder steel lower flange connecting node
CN108060789B (en) wall underpinning method for seismic isolation and reinforcement of existing masonry structure
CN101356318B (en) Precast concrete segment having connecting structure using steel duct, and connecting structure thereof
KR101513066B1 (en) Method for reinforcing masonry wall
CN203834934U (en) Constructional column template erecting structure
CN207553314U (en) A kind of concrete postposition beam anchor bar constructing structure
JP7027265B2 (en) Formwork structure, method of forming formwork structure
KR20120048134A (en) Retaining wall using corrugated steel plate and construction method thereof
CN111809792B (en) Assembled precast concrete wallboard
CN215107978U (en) Fully prefabricated wall or retaining wall
CN109057328A (en) With the wall split bolt structure of cable bearer linkage function in pipe gallery
CN205134364U (en) Basement uprises poor section slant bottom plate formwork system that links up
CN204827500U (en) Pinniform wedge body stock
CN107023078A (en) Assemble cast-in-place combined type superposed box mesh-beam floor system and construction method
CN205954641U (en) Pin -connected panel sump pit of circulated use supports protector
CN104963457B (en) A kind of construction method of tubular spiral space network reinforcing bar connector
JP2009299333A (en) Structure of electrically connecting reinforcements, and method of electrically connecting reinforcements
CN206279522U (en) Ground-connecting-wall steel reinforcement cage
CN108914781A (en) A kind of connection construction technique for welding nail connector combination beam with assembled
CN209228050U (en) With the wall split bolt structure of cable bearer linkage function in pipe gallery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180216

RJ01 Rejection of invention patent application after publication