CN109881826A - Sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method - Google Patents

Sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method Download PDF

Info

Publication number
CN109881826A
CN109881826A CN201910216253.5A CN201910216253A CN109881826A CN 109881826 A CN109881826 A CN 109881826A CN 201910216253 A CN201910216253 A CN 201910216253A CN 109881826 A CN109881826 A CN 109881826A
Authority
CN
China
Prior art keywords
cast
wall
connector
situ segment
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910216253.5A
Other languages
Chinese (zh)
Inventor
赵春梅
王雪峰
孙明福
解龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201910216253.5A priority Critical patent/CN109881826A/en
Publication of CN109881826A publication Critical patent/CN109881826A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention provides a kind of sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method: step 1: according to different installation sites when wall is prefabricated built-in connection one, connection two or reinforcing bar pull hook;Second step, exterior wall is in place, then installation wall, corner and aileron position carry out Cast-in-Situ Segment reinforcement construction;Third step, harness cord screw rod is welded in the end of connector one, connector two, when template is installed, screw rod passes through pattern hole, the welding section of connector one is outer on the inside of template, and two welding section of connector passes through pattern hole, corner and aileron position Cast-in-Situ Segment, before template installation, first embedded bar pull hook and template or reinforcing bar are tensed with No. 12 iron wires;4th step installs wall Cast-in-Situ Segment inner side template;5th step after form removable, directly cuts off harness cord screw rod, screw rod end brushing antirust paint along wall, remaining screw rod is cleaned out, continued to use to lower layer.The present invention reduces exterior wall holes blocking process, avoids infiltration hidden danger;Operating platform, less investment are not needed.

Description

Sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method
Technical field
The invention belongs to precast wall body technical field of construction, and in particular to a kind of sandwich thermal insulation board precast facade Cast-in-Situ Segment mould Plate reinforcement means.
Background technique
As country widelys popularize assembled architecture, assembly of shear wall structure system is used widely.For this knot The connecting portion of structure system, prefabricated components and Cast-in-Situ Segment becomes Construction control emphasis, prefabricated outer in particular by sandwich thermal insulation board Wall Cast-in-Situ Segment template construction, even more control stress point.It is the reserving hole on prefabricated panel, prefabricated panel by usual construction method It installs, after Cast-in-Situ Segment reinforcement construction is complete, carries on the back flitch on the outside of impeller outside dry wall, using side form in split bolt and wall Plate connection, the method one side wall outer side flitch and split bolt construction, need to set up operating platform;On the other hand it needs There is infiltration hidden danger in the reserving hole on sandwich thermal insulation board precast wall body, holes blocking.
It is typically employed in reserving hole on prefabricated outer wall panel, after prefabricated panel installation, using reserving hole, on the outside of wallboard Outrigger or tool-type protective frame are installed, operator constructs at station on outrigger.Reinforcement construction is complete, in prefabricated panel siphonal lobe The outer side back flitch of plate, wears prepared screw-bolt hole on prefabricated panel using split bolt, sockets with wallboard inner side template, carry out wallboard Template is fixed.The method needs the reserving hole on prefabricated outer wall panel, as the mounting hole of outrigger, after outrigger is removed, then to pre- Hole of boxing out block and water-proofing treatment, increases process and cost, while because exterior wall is sandwich thermal insulated precast wall body, hole envelope It is stifled to there is infiltration hidden danger.
Summary of the invention
It needs to cause construction later period wall to have infiltration hidden danger in exterior wall reserving hole to solve formwork reinforcement in the prior art The problem of.
Solution provided by the invention is:
A kind of sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method, construction procedure are as follows:
Step 1: when prefabricated sandwich heat preserving wall wall is prefabricated simultaneously pre-buried corresponding ruggedized construction:
The construction of precast facade Cast-in-Situ Segment formwork reinforcement built-in fitting:
1, a) prefabricated panel Cast-in-Situ Segment when, on the outer impeller at the cast-in-place position of wall, built-in connection one, connector one It is made of reinforcing bar, its one end is made into bent anchor, catches on siphonal lobe plate steel mesh, binds with steel mesh;The other end is on the inside of wall Side extends, and extension elongation is equal to cast-in-situ wall thickness, end brush antirust paint;B) when prefabricated panel, in interior impeller away from avris The position 100mm, built-in connection two, connector two are made of a reinforcing bar, and two one end of connector is protruded into precast wall body Leaf, end are converted into crotch;The other end stretches out precast wall body;
2, according to different Cast-in-Situ Segment joint forms, each connector is determined under the premise of guaranteeing that outer impeller piece is strict One horizontal space and away from siphonal lobe edges of boards distance, while determining that each connector one and connector two are vertically arranged rule along wall;
3, connector one and when pre-buried connector two, will avoid impeller reserved steel bar position in wall;
The construction of rotation angle position Cast-in-Situ Segment formwork reinforcement built-in fitting:
When rotation angle position exterior wall is prefabricated, in exterior wall corner away from the position impeller 100mm outside Cast-in-Situ Segment, embedded bar pull hook should Reinforcing bar pull hook one end is made into bent anchor, catches on siphonal lobe plate steel mesh, and the other end stretches out outer impeller, and end extends to cast-in-place segment limit It is interior and be converted into back bending hook;
The construction of aileron position Cast-in-Situ Segment formwork reinforcement built-in fitting:
When aileron position exterior wall is prefabricated, the position impeller 100mm outside away from exterior wall Cast-in-Situ Segment, the pre-buried reinforcing bar pull hook;
Second step, exterior wall is in place, then installation wall, corner and aileron position carry out Cast-in-Situ Segment reinforcement construction;
Third step, wall Cast-in-Situ Segment reinforcement construction is complete, and template installation is carried out on the basis of above-mentioned precast construction:
Specifically: harness cord screw rod a) is welded in connector one, two end of connector respectively using spot welding, connector one welds Section is located in Cast-in-Situ Segment wall, and screw rod wears pattern hole when template is installed;Two welding section of connector is located at outside Cast-in-Situ Segment wall, mould Welding section passes through pattern hole when plate is installed;B) corner and aileron position Cast-in-Situ Segment first will be pre- with No. 12 iron wires before template installation It buries reinforcing bar pull hook and template or reinforcing bar tenses;
4th step installs wall Cast-in-Situ Segment inner side template;
5th step after form removable, directly cuts off harness cord screw rod along wall, screw rod end brushing antirust paint, and remaining screw rod is clear Reason is clean, continues to use to lower layer.
Formwork reinforcement method provided by the invention reduces exterior wall holes blocking process, avoids infiltration hidden danger;Wall is saved again External side operating platform peace tears expense open;It using detachable split bolt, is used in turn, reduces cost;Outer porthole is eliminated simultaneously Hole blocks process, accelerates construction progress.
Preferably, the one bent anchor length of connector, which is greater than, waits 5d.
Preferably, it is from upper to upper by 200mm+500mm+600mm+600mm+ that embedded bar, which is vertically arranged spacing along wall, The progressive setting of 600mm.
Preferably, the vertical spacing of reinforcing bar pull hook presses the progressive setting of 200mm+500mm+1200mm+600mm.
Detailed description of the invention:
Fig. 1 Side fascia Cast-in-Situ Segment template mounting structure;
Fig. 2 Side fascia Cast-in-Situ Segment template mounting structure elevation;
Fig. 3 rotation angle position Cast-in-Situ Segment template installation diagram;
Fig. 4 rotation angle position Cast-in-Situ Segment template mounting structure elevation;
Fig. 5 is aileron Cast-in-Situ Segment template installation diagram.
Specific embodiment
Below by example the present invention is described in detail scheme: in conjunction with attached drawing 1-5, wherein precast facade basic structure includes outer Impeller 1, insulation board 2, interior impeller 3, template 4, Cast-in-Situ Segment 5 for Cast-in-Situ Segment supporting, the invention also includes connector 1, even Fitting 27, screw rod 8, reinforcing bar pull hook 9.
The sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method that the present invention uses, certain detailed construction procedure It is:
Step 1: the pre-buried corresponding ruggedized construction first on prefabricated sandwich heat preserving wall: being pressed in this explanation when wall is prefabricated Different structure classification respectively illustrates the pre-buried structure on different structure:
1, specifically: 1) in prefabricated panel Cast-in-Situ Segment, on the outer impeller 1 at the cast-in-place position of wall, built-in connection one 6, connector 1 uses diameter 12mm round bar, and reinforcing bar one end is made into bent anchor, and length is not less than 5d, catches on outer 1 reinforcing bar of impeller Net is bound with steel mesh, and the other end extends to wall inner side edge, and extension elongation is equal to 5 thickness of wall body of Cast-in-Situ Segment, in this example, Connector 1 stretches out the outer 200mm of siphonal lobe insulation board 2, end brush antirust paint.Connector 1 is also capable as wall top die roller. 2) according to different 5 joint forms of Cast-in-Situ Segment, determine that each connector 1 is horizontal under the premise of guaranteeing that outer 1 piece of impeller is strict Spacing and away from siphonal lobe edges of boards distance, there are also each connector 1 and is vertically arranged rule along wall.In this practical example, connector one 6 to be vertically arranged spacing along wall be from upper to upper by the progressive setting of 200mm, 500mm, 600mm, 600mm, 600mm, i.e., under the Layer connector 1 is arranged on away from wall bottom edge 200mm height, and the second layer compares the second layer away from first layer 500mm high, third layer High 600mm again, the 4th layer, the 5th 600mm higher than preceding layer.3) it is reserved that impeller in wall is avoided when connector one is pre-buried Reinforcement location.As shown in Figs. 1-2.
2, when Side fascia is prefabricated, in interior impeller 3 away from the position avris 100mm, built-in connection 27, connector 27 is also It is made of a 12mm round bar.Precast wall body internal lobe is protruded into 27 one end of connector, and the other end stretches out precast wall body.Connector 27 entire lengths are not less than 200mm, and it is 50mm that it, which stretches out wall part Design of length, it is embedded in the part in interior impeller 3 Length is not less than 150mm, and pre-buried portions end is made into 50mm hook.The setting of the vertical spacing of connector 27 and connector one 6 identical rules.Referring to Fig. 1-2.
3, when rotation angle position exterior wall is prefabricated, in exterior wall corner away from the position impeller 100mm outside Cast-in-Situ Segment, pre-buried diameter 10mm Reinforcing bar pull hook 9 made of reinforcing bar, bending is made into bent anchor at 9 one end 50mm length of reinforcing bar pull hook, catches on outer 1 reinforcing bar of impeller Net, the other end stretch out outer impeller 50mm, extend in 5 range of Cast-in-Situ Segment and are converted into back bending.The vertical spacing of reinforcing bar pull hook 9 is pressed The progressive setting of 200mm+500mm+1200mm+600mm, i.e. lowest level reinforcing bar pull hook are arranged away from wall bottom edge 200mm height On, the second layer is 500mm higher than first layer, and third layer is higher than the second layer by 1200, and the 4th layer is higher by 600mm than third layer again.With reference to Shown in Fig. 3-4.
4, when aileron position exterior wall is prefabricated, the position impeller 100mm embedded bar pull hook 9, the steel outside away from exterior wall Cast-in-Situ Segment Muscle pull hook 9 is also to be made of the reinforcing bar of diameter 10mm, and shape and setting position are identical as on rotation angle position exterior wall, is erected It is arranged to spacing also identical with rotation angle position exterior wall embedded bar pull hook.Such as Fig. 5.
Second step, exterior wall is in place, then installation wall, corner and aileron position carry out Cast-in-Situ Segment reinforcement construction.
Third step, wall Cast-in-Situ Segment reinforcement construction is complete, and template installation is carried out on the basis of above-mentioned precast construction:
Specifically: screw rod 8 a) is welded in connector 1,27 end of connector respectively using spot welding, screw rod 8 is using straight The harness cord screw rod of diameter 14mm, the 50mm Chong Die with connector one or connector two of screw rod 8 when welding, this 50mm overlap length weld Connect section.Screw rod 8 wears pattern hole when template 4 is installed, and one 6 welding section of connector is in 4 inside Cast-in-Situ Segment 5 of template;Template installation When 27 welding section of connector pass through pattern hole, other than external 5 wall range of Cast-in-Situ Segment.B) corner and aileron position Cast-in-Situ Segment mould Before plate installation, first embedded bar pull hook and template 4 or reinforcing bar are tensed with No. 12 iron wires.
4th step installs wall Cast-in-Situ Segment inner side template.
5th step after form removable, directly cuts off harness cord screw rod along wall, 4 end brushing antirust paint of screw rod, and remaining screw rod is clear Reason is clean, continues to use to lower layer.
This construction method is easy to operate, and it is fast that peace tears speed open, reduces exterior wall plugging construction process, avoids external wall seepage hidden danger, Cancel external scaffolding construction;It is used in turn using hinged bolt, i.e. guarantee concrete metope presentation quality, and reduces construction cost. Beneficial effects of the present invention: 1. exterior walls are not boxed out hole, and external wall seepage hidden danger is avoided.2. it is flat not need to set up wall outer side operation Platform reduces outrigger expense.3. reducing exterior wall closure and water-proofing treatment process, shortens the construction period, reduce cost.4. template connecting piece Pre-buried with component in precast plant, site operation is convenient, environmentally protective.5. built-in connection uses reinforcing bar clout, cost is reduced.

Claims (4)

1. a kind of sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method, construction procedure are as follows:
Step 1: when prefabricated sandwich heat preserving wall wall is prefabricated simultaneously pre-buried corresponding ruggedized construction:
The construction of precast facade Cast-in-Situ Segment formwork reinforcement built-in fitting:
1, a) prefabricated panel Cast-in-Situ Segment when, on the outer impeller at the cast-in-place position of wall, built-in connection one, connector one use steel Muscle is made, its one end is made into bent anchor, catches on siphonal lobe plate steel mesh, binds with steel mesh;The other end extends to wall inner side edge, Extension elongation is equal to cast-in-situ wall thickness, end brush antirust paint;B) when prefabricated panel, in interior impeller away from the position avris 100mm, in advance Connector two is buried, connector two is made of a reinforcing bar, and precast wall body internal lobe is protruded into two one end of connector, and end is converted into curved Hook;The other end stretches out precast wall body;
2, according to different Cast-in-Situ Segment joint forms, determine that each connector one is horizontal under the premise of guaranteeing that outer impeller piece is strict Spacing and away from siphonal lobe edges of boards distance, while determining that each connector one and connector two are vertically arranged rule along wall;
3, connector one and when pre-buried connector two, will avoid impeller reserved steel bar position in wall;
The construction of rotation angle position Cast-in-Situ Segment formwork reinforcement built-in fitting:
When rotation angle position exterior wall is prefabricated, in exterior wall corner away from the position impeller 100mm outside Cast-in-Situ Segment, embedded bar pull hook, the reinforcing bar Pull hook one end is made into bent anchor, catches on siphonal lobe plate steel mesh, and the other end stretches out outer impeller, and end extends in cast-in-place segment limit and rolls over At back bending hook;
The construction of aileron position Cast-in-Situ Segment formwork reinforcement built-in fitting:
When aileron position exterior wall is prefabricated, the position impeller 100mm outside away from exterior wall Cast-in-Situ Segment, the pre-buried reinforcing bar pull hook;
Second step, exterior wall is in place, then installation wall, corner and aileron position carry out Cast-in-Situ Segment reinforcement construction;
Third step, wall Cast-in-Situ Segment reinforcement construction is complete, and template installation is carried out on the basis of above-mentioned precast construction:
Specifically: harness cord screw rod a) is welded in connector one, two end of connector respectively using spot welding, one welding section of connector is set In Cast-in-Situ Segment wall, screw rod wears pattern hole when template is installed;Two welding section of connector is located at outside Cast-in-Situ Segment wall, template installation When welding section pass through pattern hole;B) corner and aileron position Cast-in-Situ Segment are first drawn embedded bar with No. 12 iron wires before template installation It hooks and is tensed with template or reinforcing bar;
4th step installs wall Cast-in-Situ Segment inner side template;
5th step after form removable, directly cuts off harness cord screw rod, screw rod end brushing antirust paint along wall, remaining screw rod cleaning is done Only, it is continued to use to lower layer.
2. sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method according to claim 1, it is characterized in that: the connection One bent anchor length of part, which is greater than, waits 5d.
3. sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method according to claim 1, it is characterized in that: embedded bar Being vertically arranged spacing along wall is from upper to upper by the progressive setting of 200mm+500mm+600mm+600mm+600mm.
4. sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method according to claim 1, it is characterized in that: reinforcing bar pull hook Vertical spacing presses the progressive setting of 200mm+500mm+1200mm+600mm.
CN201910216253.5A 2019-03-21 2019-03-21 Sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method Pending CN109881826A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910216253.5A CN109881826A (en) 2019-03-21 2019-03-21 Sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910216253.5A CN109881826A (en) 2019-03-21 2019-03-21 Sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method

Publications (1)

Publication Number Publication Date
CN109881826A true CN109881826A (en) 2019-06-14

Family

ID=66933376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910216253.5A Pending CN109881826A (en) 2019-03-21 2019-03-21 Sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method

Country Status (1)

Country Link
CN (1) CN109881826A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241955A (en) * 2019-06-19 2019-09-17 中国二十二冶集团有限公司 Assembling structure sandwich thermal insulation board precast facade Cast-in-Situ Segment single side formwork construction method
CN111997221A (en) * 2020-08-12 2020-11-27 北京崇建工程有限公司 Construction method for L-shaped node joint of assembled outer wall
CN113530230A (en) * 2021-08-16 2021-10-22 王鹏 Disposable concrete formwork connecting system based on split screw
CN113733309A (en) * 2021-07-27 2021-12-03 新城控股集团实业发展有限公司 Laminated slab reinforcing steel bar hole plugging structure and construction method thereof
CN113944318A (en) * 2021-11-03 2022-01-18 上海建工五建集团有限公司 Steel template reinforcing device, arc-shaped combined shaping steel template and using method thereof
CN115182482A (en) * 2022-08-25 2022-10-14 中国建筑第七工程局有限公司 Construction method of cavity prefabricated wall body matched with external frame free

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101285326A (en) * 2008-06-02 2008-10-15 南通华新建工集团有限公司 Handling method for external wall root node in process cast-in-situ integral construction
CN202787576U (en) * 2012-07-27 2013-03-13 中国建筑一局(集团)有限公司 Cast-in-situ and precast combined structural wall
CN107700841A (en) * 2017-09-30 2018-02-16 中国二十二冶集团有限公司 Prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method
CN109138413A (en) * 2018-08-31 2019-01-04 上海二十冶建设有限公司 A kind of formwork erection method at precast shear wall and cast-in-place corner wall node

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101285326A (en) * 2008-06-02 2008-10-15 南通华新建工集团有限公司 Handling method for external wall root node in process cast-in-situ integral construction
CN202787576U (en) * 2012-07-27 2013-03-13 中国建筑一局(集团)有限公司 Cast-in-situ and precast combined structural wall
CN107700841A (en) * 2017-09-30 2018-02-16 中国二十二冶集团有限公司 Prefabricated exterior wall Cast-in-Situ Segment internal lobe Formwork Installation Method
CN109138413A (en) * 2018-08-31 2019-01-04 上海二十冶建设有限公司 A kind of formwork erection method at precast shear wall and cast-in-place corner wall node

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241955A (en) * 2019-06-19 2019-09-17 中国二十二冶集团有限公司 Assembling structure sandwich thermal insulation board precast facade Cast-in-Situ Segment single side formwork construction method
CN111997221A (en) * 2020-08-12 2020-11-27 北京崇建工程有限公司 Construction method for L-shaped node joint of assembled outer wall
CN113733309A (en) * 2021-07-27 2021-12-03 新城控股集团实业发展有限公司 Laminated slab reinforcing steel bar hole plugging structure and construction method thereof
CN113530230A (en) * 2021-08-16 2021-10-22 王鹏 Disposable concrete formwork connecting system based on split screw
CN113944318A (en) * 2021-11-03 2022-01-18 上海建工五建集团有限公司 Steel template reinforcing device, arc-shaped combined shaping steel template and using method thereof
CN115182482A (en) * 2022-08-25 2022-10-14 中国建筑第七工程局有限公司 Construction method of cavity prefabricated wall body matched with external frame free

Similar Documents

Publication Publication Date Title
CN109881826A (en) Sandwich thermal insulation board precast facade Cast-in-Situ Segment formwork reinforcement method
CN107326940B (en) basement advanced water stop post-cast strip structure and construction method thereof
CN109024697A (en) Buried rubber watertight strip and its installation method in tunneling boring enclosed type
CN207582956U (en) A kind of one-time formed constructing device of concrete window tongue and groove
CN207959612U (en) A kind of frame, shear wall cast-in-place structural fill wall with assembled light
CN208267118U (en) A kind of embedded part system and the curtain wall for cladding concrete segment curtain wall
CN110241955A (en) Assembling structure sandwich thermal insulation board precast facade Cast-in-Situ Segment single side formwork construction method
CN103422677A (en) Construction method for binding steel reinforced concrete composite structure reinforcing steel bars
CN107893529A (en) Suitable for deep basal pit outer wall of basement PC template systems and its construction method
CN107130720A (en) PK prestressed concrete overlapped slab construction methods
CN103758045B (en) Box girder wet joint formwork construction method under space limitation condition
CN105256995B (en) A kind of shear wall structure movement joint inner side template bracing means and construction method
CN207079635U (en) Structure is fixedly mounted in a kind of steel plate for sealing water
CN211421838U (en) Beam plate post-cast strip pouring system
CN108708489A (en) A kind of concrete segment curtain wall and its manufacture and installation method
CN105442833B (en) Assemble the cast-in-situ template bracing means of exterior wall and the T-shaped connecting portion of cast-in-place interior wall
CN105442736A (en) Anti-floating construction method for cast-in-place concrete hollow floor sectional type combined device
CN106284372A (en) The method for supporting of roof plate template during a kind of electric power ditch is integrated poured
CN211622120U (en) Improve constructional column structure of top quality of pouring
CN208039839U (en) Steel construction main building construction bracket
CN106193578B (en) It is a kind of that modular system and construction technology are matched somebody with somebody based on groove type quarter bend
CN112411627A (en) Construction method for eliminating construction joint stubbles on inner side of outer wall of underground structure
CN205857379U (en) A kind of precast wall panel and post attachment means
CN208088357U (en) A kind of basement roof closes late poured band structure in advance
CN216517181U (en) Double-deck concrete shear force wall construction structures in fire pond

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190614

RJ01 Rejection of invention patent application after publication