CN207363006U - Assemblnig mobile building - Google Patents

Assemblnig mobile building Download PDF

Info

Publication number
CN207363006U
CN207363006U CN201721011972.6U CN201721011972U CN207363006U CN 207363006 U CN207363006 U CN 207363006U CN 201721011972 U CN201721011972 U CN 201721011972U CN 207363006 U CN207363006 U CN 207363006U
Authority
CN
China
Prior art keywords
column
shaped
ground
tie
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721011972.6U
Other languages
Chinese (zh)
Inventor
庞众
庞飘
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721011972.6U priority Critical patent/CN207363006U/en
Application granted granted Critical
Publication of CN207363006U publication Critical patent/CN207363006U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a kind of assemblnig mobile building, exterior wall, interior wall, roof and the ornament materials on ground of the mobile building are fixed on flase floor (5), and flase floor (5) is installed in the frame that column and tie-beam are formed, which is plugged on the foundation framework being spliced by crossbeam (1) and vertical beam (2).Component needed for the utility model is suitable with building height by the stem height of reinforced concrete casting complete, especially the utility model in factory, and is one-time cast-forming, its load-bearing, the frame strength of connection are high.The utility model has Assembling agility, good mobility, and security reliability, and short construction period, reduces engineering rubbish and build the pollution of dust, also help building removal, it is mobile after Reuse of materials.Built a building appearance is beautiful, its good warmth retention effect is very useful, meets the needs that people live the normal phase.

Description

Assemblnig mobile building
Technical field
Building field is the utility model is related to, specifically a kind of assemblnig mobile building.
Background technology
As China's expanding economy, the quickening of the Course of Urbanization, farm building building are more and more common.It is existing In technology, building is broadly divided into brick wall structure and reinforced concrete structure, and there are problems with for both building structures:1st, build Work progress is complicated, it is necessary to which the material category of auxiliary is more, and waste of materials is more, long construction period, engineering rubbish and building ash dustiness Dye is serious;2 and construction material cannot reuse;3rd, the fixation that finishes a house is irremovable.And existing modular architectural It is to be made more of folder thermal insulation material among color steel by the use of composite precast slab as wall, composite precast slab in steel construction, due to Steel construction is unable to load-bearing, is only used for the building such as green house of vegetables, prefabricated house or decoration prefabricated partition board of not load-bearing, less suitable Building for local-style dwelling houses building.
The content of the invention
The utility model aim is to provide that a kind of structure is safe and reliable, and energy conservation and environmental protection, cost are low, assembling is quick and bearing capacity Strong assemblnig mobile building, which is integrated precast reinforced concrete structure Assembled type movable building.
The technical solution of the utility model:Assemblnig mobile building includes exterior wall, interior wall, roof and ground, its feature It is:The mobile building further includes the tie-beam between column and column, and the exterior wall, interior wall are located between column, and roof It is located at ground on tie-beam.
One kind as the utility model is improved, and the mobile building further includes ground, its ground is by crossbeam and vertical beam It is spliced, the column is respectively provided at the periphery of ground and the inner portion of ground.
As the utility model one kind improve, the mobile building further include for exterior wall, interior wall, roof, ground dress The flase floor that plaque is fixed, the flase floor are located between each column, tie-beam.
One kind as the utility model is improved, and the column at four angles of ground periphery stands for square Column, the column of ground inner periphery is T-shaped column, and the column of ground inner portion is cross column.
One kind as the utility model is improved, and the square column includes several square transverse slats, in adjacent straight Plate is set up between the right-angle side of angular transverse slat, the card slot overlapped for tie-beam, flase floor and card convex are equipped with square transverse slat; The T-shaped column includes several T-shaped transverse slats, and T-shaped riser is set between adjacent T-shaped transverse slat, is equipped with T-shaped transverse slat for connection The card slot and card convex of beam, flase floor overlap joint;The cross column includes several cross transverse slats, in adjacent cross transverse slat Between set cross riser, on cross transverse slat be equipped with for tie-beam, flase floor overlap card slot and card convex.
One kind as the utility model is improved, and the cross rail inner of the ground is equipped with several for vertical beam connection U-shaped Kato, sets T-slot on the position connected in the middle part of the top surface of its crossbeam and with U-shaped Kato, and the top end of crossbeam and and U L-shaped groove is set on the position of shape Kato connection, the vertical beam both ends are perpendicular equipped with the fixture block being adapted with U-shaped Kato and with T-slot The bar-shaped trough that groove is adapted.
One kind as the utility model is improved, and the tie-beam is divided into exterior wall tie-beam and interior wall tie-beam, the exterior wall Tie-beam both ends are equipped with the card convex for column connection, its middle part is equipped with the card convex overlapped for roof Material and earth material, described The both ends of interior wall tie-beam are equipped with to be equipped with and ten for the bar-shaped trough with cross riser grafting, the end bottom surface of its interior wall tie-beam The overlap joint that the card slot and card convex of font transverse slat are adapted is raised.
The utility model beneficial effect is:The assemblnig mobile building of the utility model is a kind of integrated armored concrete The crossbeam of ground and vertical beam and column, tie-beam, are prefabricated into by prefabricated house with reinforced concrete in factory by size of being built a building Component, the transverse slat number of its column are consistent with the number of plies to be built a building, i.e., if plan five floor of lid, then column is in cast Time just makes the column containing five transverse slats, and the column component of the utility model is for integrated poured one-pass molding, its load-bearing, company The frame strength connect is high, and exterior wall, interior wall, roof and the material on ground and ornament materials can appoint easy selection, is used in combination, is covered Building appearance is beautiful, its good warmth retention effect is very useful, meets the needs that people live the normal phase.In factory by the prefabricated structure in lid building Part, which pours, to be poured in, and then transports to scene, the frame by the fixing piece of each component bolt, screw etc these Component compositions into building Frame, the utility model also set up flase floor, the fixed grating screen in frame, finally by Side fascia, lining and roof, ground Plate is fixed on flase floor, and so build a house simple and fast, and mobility is good., also can be at any time by the whole of assembling according to room needs The integrated armored concrete building dismounting of body formula, transports to new place, reconfigures and be installed together, build up new integrated reinforcing bar Concrete building.The mobile building 90% work can be completed in factory, have Assembling agility, good mobility, peace Full reliability.
The room of precast reinforced concrete structure assembling at present is connect using one layer one, column reinforcement welding, and the cast-in-place note in junction connects Connect, precast floor slab is also cast-in-site connection, and the utility model can realize that dry type assembles, and is not required to water power.Energy conservation and environmental protection, into This is low, assembling is fast, practicality is high.
Brief description of the drawings
Fig. 1 is the foundation framework structure diagram of the assemblnig mobile building of the utility model.
Fig. 2 is the structure diagram of vertical beam shown in Fig. 1.
Fig. 3 is the structure diagram of crossbeam shown in Fig. 1.
Fig. 4 is the square pillar construction schematic diagram of the assemblnig mobile building of the utility model.
Fig. 5 is the cross pillar construction schematic diagram of the assemblnig mobile building of the utility model.
Fig. 6 is the T-shaped pillar construction schematic diagram of the assemblnig mobile building of the utility model.
Fig. 7 is the outer tie-beam structure diagram of the assemblnig mobile building of the utility model.
Fig. 8 is the interior tie-beam structure diagram of the assemblnig mobile building of the utility model.
Fig. 9 is the grating board structure schematic diagram of the assemblnig mobile building of the utility model.
Embodiment
The assemblnig mobile building of the utility model includes exterior wall, interior wall, roof, ground, which further includes vertical Tie-beam between column and column, exterior wall, interior wall are located between column, and roof and ground are located on tie-beam, build building The hole slot of column grafting need to be reserved for when laying the foundations.
As shown in figure 4, can first build flase floor 5 between tie-beam, floor tile and wall can be also directly pasted on flase floor 5 Brick, flase floor 5 is latticed to pour into, and the big I of its lattice is with fitting up floor tile used, wall brick is adapted, the grid in periphery Thermal insulation board, sound panel and exterior wall tile are amplexiformed on plate 5, thus the exterior wall building, interior wall are carried out, then the connection in building Beam upper berth sets splash guard, sound panel and ground floor tile, can so form the ground in building and roof, so far, assemblnig work Dynamic building is built up.The utility model sets flase floor 5, first exterior wall, interior wall, roof and the material on ground can be fixed and pacified in factory On flase floor 5, such Assembling is quick, short construction period, reduces engineering rubbish and builds the pollution of dust.Secondly Also help building removal, it is mobile after Reuse of materials.
As shown in Figure 1, Figure 2, Figure 3 shows, the utility model further includes ground, and to be removable movable, ground includes the ground Crossbeam 1 and vertical beam 2, are equipped with several U-shaped Katos 11 on the medial surface of crossbeam 1, and crossbeam 1 top surface and with U-shaped Kato 11 corresponding positions are equipped with T-slot 12, and the groove of the top surface at 1 both ends of crossbeam is L-shaped groove 13, and the bottom surface at 2 both ends of vertical beam is distinguished If the fixture block 23 being adapted with U-shaped Kato 11, and the top surface in 2 end of vertical beam sets bar-shaped trough 22, the T-shaped of the groove 22 and crossbeam 1 The vertical slot of groove 12, which connects, to be formed larger T-slot 12 and is overlapped for T-shaped column 33, and cross bath is provided with the top surface at the middle part of vertical beam 2 21, which overlaps for cross column 32, and when crossbeam 1 and the overlap joint of vertical beam 2, the fixture block 23 of vertical beam 2 is overlapped on the U of crossbeam 1 On shape Kato 1, overlapped so as to complete crossbeam 1 with vertical beam 2, form foundation framework.
As shown in Fig. 1, Fig. 5, Fig. 6, Fig. 7, the grafting square in the trough with straight angle of the top surface formation at four angles of foundation framework Column 31, the grafting T-shaped column 33 in the T-slot of peripheral other position top surfaces formation of foundation framework, in foundation framework 21 grafting cross column 32 of cross bath on portion's vertical beam 2.Square column 31 includes several square transverse slats, that is, needs Several floors are covered, square column 31 just sets several square transverse slats, and plate is set up between the right angle side plate of adjacent square transverse slat, The card slot and card convex and card slot overlapped for tie-beam, flase floor 5 is equipped with square transverse slat;If T-shaped column 33 includes Dry T-shaped transverse slat, similarly, it is necessary to cover several floors, T-shaped column 33 just sets several T-shaped transverse slats, and T-shaped is set between adjacent T-shaped transverse slat Riser, T-shaped riser can be spliced by two pieces of risers, the card slot and card convex overlapped on T-shaped transverse slat for tie-beam, flase floor 5 And card slot;Cross column 32 includes several cross transverse slats, similarly needs to cover several floors, cross column 32 just sets several Cross transverse slat, sets cross riser between adjacent cross transverse slat, and cross riser can be spliced by two pieces of risers, or Four pieces of risers are spliced, and the card slot overlapped for tie-beam, flase floor 5 and card convex are equipped with cross transverse slat.This practicality is new The stem height of type is suitable with Suo Jian buildings height, and is integrated poured one-pass molding, its load-bearing, the frame strength of connection are high, exterior wall, Interior wall, roof and the material on ground and ornament materials can appoint easy selection, be used in combination, and appearance of building a building is beautiful, its warming effect Fruit is good, very useful, meets the needs that people live the normal phase.
Tie-beam is overlapped by these card slots and card convex between column as shown in Figure 8, Figure 9, tie-beam is divided into outer connection Beam 41 and interior tie-beam 42, outer tie-beam 41 is overlapped between square column 31 and T-shaped column 33, is therebetween phase interworking Zygote female thread structure, you can coordinate for card slot and card convex, between cross column 32, T-shaped column 33 and cross column 32 Between tie-beam 42 in overlap joint respectively, be also the primary and secondary buckle structure to cooperate, i.e. the two of tie-beam end between both If card slot and card convex, easy to the overlap joint of card convex and card slot with column,
The equal concrete prefabricated shapings of Yong Gang Zhu of all components of the utility model, the prefabricated card slot of lap-joint and card convex, overlap joint Place is reinforced using bolt, screw, and such building is suitable for people and lives, and has bearing capacity good, and practicality is high, securely and reliably, section Can be environmentally friendly, cost is low, assembling is quick the features such as.

Claims (5)

1. a kind of assemblnig mobile building, including exterior wall, interior wall, roof and ground, it is characterised in that:The mobile building also wraps Include the tie-beam between flase floor (5), column and the column fixed for the decorative panel on exterior wall, interior wall, roof, ground, the grid Plate (5) is located between each column, tie-beam, and the column at four angles of ground periphery is square column (31), the column of ground inner periphery is T-shaped column (33), and the column of ground inner portion is cross column (32).
2. assemblnig mobile building according to claim 1, it is characterised in that:The mobile building further includes ground, Its ground is spliced by crossbeam (1) and vertical beam (2), and the column is respectively provided at the periphery of ground and the inside portion of ground Position.
3. assemblnig mobile building according to claim 1 or 2, it is characterised in that:Square column (31) bag Several square transverse slats are included, plate is set up between the right-angle side of adjacent square transverse slat, are equipped with square transverse slat for connecting Connect beam, the card slot and card convex of flase floor (5) overlap joint;The T-shaped column (33) includes several T-shaped transverse slats, in adjacent T-shaped transverse slat Between set T-shaped riser, on T-shaped transverse slat be equipped with for tie-beam, flase floor (5) overlap card slot and card convex;The cross is stood Column (32)Including several cross transverse slats, cross riser is set between adjacent cross transverse slat, is set on cross transverse slat There are the card slot overlapped for tie-beam, flase floor (5) and card convex.
4. assemblnig mobile building according to claim 2, it is characterised in that:Set on the inside of the crossbeam (1) of the ground There are several to supply the U-shaped Kato (11) of the vertical beam (2) connection, connected in the middle part of the top surface of its crossbeam (1) and with U-shaped Kato (11) Position on set T-slot (12), and set L-shaped groove on the top end of crossbeam (1) and the position that is connected with U-shaped Kato (11) (13), vertical beam (2) both ends are equipped with the fixture block that is adapted with U-shaped Kato (11) and are adapted with the vertical slot of T-slot (12) Bar-shaped trough.
5. assemblnig mobile building according to claim 3, it is characterised in that:The tie-beam is divided into exterior wall tie-beam (41) and interior wall tie-beam (42), exterior wall tie-beam (41) both ends are equipped with the card convex for column connection, its middle part, which is equipped with, pays rent The card convex of topping material and floor decorative material overlap joint, the both ends of the interior wall tie-beam (42), which are equipped with, to be supplied and cross riser grafting Bar-shaped trough, it is raised that the end bottom surface of its interior wall tie-beam is equipped with the overlap joint being adapted with the card slot and card convex of cross transverse slat.
CN201721011972.6U 2017-08-14 2017-08-14 Assemblnig mobile building Expired - Fee Related CN207363006U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721011972.6U CN207363006U (en) 2017-08-14 2017-08-14 Assemblnig mobile building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721011972.6U CN207363006U (en) 2017-08-14 2017-08-14 Assemblnig mobile building

Publications (1)

Publication Number Publication Date
CN207363006U true CN207363006U (en) 2018-05-15

Family

ID=62422086

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721011972.6U Expired - Fee Related CN207363006U (en) 2017-08-14 2017-08-14 Assemblnig mobile building

Country Status (1)

Country Link
CN (1) CN207363006U (en)

Similar Documents

Publication Publication Date Title
CN105863067B (en) A kind of modularization low layer assembled Special-Shaped Column steel house system
CN103711238B (en) Assembled ring muscle fastens and is anchored concrete shear wall structure system
CN101368428B (en) Prefabricated component house and its construction method
US20100218446A1 (en) Structure system of concrete building for self-heat insulation
US20090056259A1 (en) Concrete load-bearing wall with compound heat-insulating layer
CN104563288A (en) Reinforced concrete frame gridding slab prefabricated energy-saving house
CN102561513A (en) Unit cabin type building system
CN104831812A (en) Whole assembly-type precast concrete frame structure, structural part production technology and mounting method
CN105464214B (en) Steel concrete integrated building manufacturing method
CN103352569A (en) Construction method of integrally-poured architecture building
CN205444984U (en) Pin -connected panel sanitation room
CN2931627Y (en) Framework and wall panel combination floor
CN103362235B (en) Integrally-poured building house with wallboards integrating thermal insulating and templates
CN107268778A (en) Assemblnig mobile building
CN205475877U (en) Compound outer thermal insulation walling system of assembled self preservation temperature wallboard
CN207363006U (en) Assemblnig mobile building
CN103074954A (en) Earthenware tile assembly, preparing die thereof, earthenware tile stone wall and heat insulation unit of earthenware tile assembly
CN205776780U (en) Integrated assembled type dwelling house system
CN203412312U (en) Thermal-insulating integrated template wallboard construction building
CN102767290A (en) Construction method for retention position of constructional column of self-insulation sand aerated concrete block exterior wall
CN106351466A (en) Housing assembled by light steel space framework structure composite plate module and construction method thereof
CN201649291U (en) Box house
CN107435375A (en) Civilian assembling, assembled building
CN203924420U (en) Assembling ring muscle fastens and is anchored concrete shear wall structure system
CN2911049Y (en) In-situ light-weight composite wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180515

Termination date: 20210814