CN207342861U - A kind of building waste processing equipment and system - Google Patents
A kind of building waste processing equipment and system Download PDFInfo
- Publication number
- CN207342861U CN207342861U CN201721167382.2U CN201721167382U CN207342861U CN 207342861 U CN207342861 U CN 207342861U CN 201721167382 U CN201721167382 U CN 201721167382U CN 207342861 U CN207342861 U CN 207342861U
- Authority
- CN
- China
- Prior art keywords
- building waste
- sieve
- screening
- processing equipment
- waste processing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Crushing And Pulverization Processes (AREA)
Abstract
The utility model provides a kind of building waste processing equipment and system, belongs to building waste processing technology field.A kind of building waste processing equipment, including:Charging gear, breaker, feeding belt and the screening plant installed successively.Charging gear includes feed bin, and the lower part of feed bin is provided with feed slideway, and feed slideway is connected with the discharge port of charging gear, and feed slideway is used to building waste being transported to breaker.Feeding belt is used for the building waste after breaker is handled and is delivered to screening plant.Screening plant includes screening main body and is arranged at least three-layer screen of screening body interior, sieve is set gradually along the short transverse of screening main body, vibrating device is installed at sieve, the position that screening main body corresponds to wherein two layers sieve is connected with feed mechanism, and feed mechanism is used to underproof building waste after screening being transported to breaker.It optionally can repeat building waste to crush, sieve, which crushes, screening effect is good.
Description
Technical field
Building waste processing technology field is the utility model is related to, in particular to a kind of building waste processing equipment
And system.
Background technology
Building waste is primarily referred to as the material such as reinforced concrete block, tile block caused by removal house etc..With urbanization
The continuous quickening of process, in city the generation of building waste also gradually accelerate.Building waste was considered as once urban development
Burden, many building wastes are not all reasonably utilized, and directly by air storage or landfill, take a large amount of soils, are formed
Rubbish encloses village, the phenomenon in besieged city, seriously affects town and country image.
But now, it is the city mineral reserve with potentiality to be exploited that building waste, which is realized,.Many discarded objects in building waste
It is sorted, reject or be broken after, regenerated resources can be used as to re-use mostly.Using discarded building concrete and discard
Masonry produces coarse-fine aggregate, available for the concrete of production respective strengths grade, mortar or prepares the building materials such as building block brick.Profit
Aggregate is produced with useless brick and tile, available for building materials such as regeneration brick, wallboard, floor tiles.Making good use of building waste can save naturally
Resource, the advantage such as preserve the ecological environment.But the broken of existing building waste processing equipment, screening effect are poor.
Utility model content
The purpose of this utility model is to provide a kind of building waste processing equipment, it can optionally weigh building waste
Multiple broken, screening, which crushes, screening effect is good.
The utility model is realized in this way:
A kind of building waste processing equipment, including:
Charging gear, breaker, feeding belt and the screening plant installed successively.
Charging gear includes feed bin, and the lower part of feed bin is provided with feed slideway, is fed the discharge port of slideway and charging gear
Connection, feed slideway are used to building waste being transported to breaker.
Feeding belt is used for the building waste after breaker is handled and is delivered to screening plant.
Screening plant includes screening main body and is arranged at least three-layer screen of screening body interior, sieve edge screening main body
Short transverse set gradually, vibrating device is installed, the position that screening main body corresponds to wherein two layers sieve is connected with sieve
Feed mechanism, feed mechanism are used to underproof building waste after screening being transported to breaker.
Further, in a kind of embodiment of the utility model, screening plant include along screening body height direction according to
The first sieve, the second sieve and the 3rd sieve of secondary setting, the aperture of the first sieve, the second sieve and the 3rd sieve subtracts successively
It is small.
Further, in a kind of embodiment of the utility model, screening main body corresponds to the first sieve and the second sieve
Position connects feed mechanism, and the position that screening main body corresponds to the 3rd sieve is connected with collecting mechanism.
Further, in a kind of embodiment of the utility model, feed mechanism includes the first feeding passage, the second feeding
Passage and belt conveyor, the first feeding passage is corresponding with the first sieve, and the second feeding passage is corresponding with the second sieve, and first
Feeding passage and the second feeding passage are used to building waste being delivered to belt conveyor, and belt conveyor is used for building waste
It is delivered to breaker.
Further, in a kind of embodiment of the utility model, feed bin includes upper warehouse, lower warehouse and elevating mechanism,
Lower warehouse is movably set in the bottom of warehouse, and elevating mechanism twists ring, installing plate including rack, gear, installing plate, shaft and hand
It is fixedly connected with the outer wall of lower warehouse, gear and hand twist the opposite sides that ring is located at installing plate respectively, and shaft passes through installing plate simultaneously
Be rotatablely connected with installing plate, the both ends of shaft twist ring with gear and hand respectively and be connecteds, and rack is vertically set, the top of rack and
Upper warehouse connection, the bottom of rack extend to the side towards gear of installing plate, rack and pinion engagement.
Further, in a kind of embodiment of the utility model, elevating mechanism further includes resetting spring, and resetting spring is set
Hand is placed in twist between ring and installing plate, the side wall of installing plate towards gear is provided with multiple positioning protrusion, gear be provided with it is more
A matched multiple positioning grooves of positioning protrusion shape size.
Further, in a kind of embodiment of the utility model, multiple positioning protrusion are set around shaft.
Further, in a kind of embodiment of the utility model, positioning protrusion is jagged protrusion.
Further, in a kind of embodiment of the utility model, the position that feed bin corresponds to discharge port is provided with adjustable plate.
A kind of building waste processing system, building waste processing system include above-mentioned building waste processing equipment.
The beneficial effects of the utility model are:The building waste processing equipment that the utility model is obtained by above-mentioned design,
In use, transporting building waste to charging gear, the feed bin of charging gear is used to accommodate building waste, and the lower part of feed bin is set
Feeder channel, the building waste in feed bin are transported to breaker through feeder channel.It is transported to the building waste of breaker
It is broken after processing, being transported to screening plant through feeding belt carries out screening process.Since screening plant has at least three layer screen
Net, and the position for sieving main body wherein two layers sieve of correspondence is connected with feed mechanism.When sieve to it is broken after building waste into
After row screening, meet that the building waste of particle diameter is collected, the corresponding two layer screen for being connected with feed mechanism is trapped down on the net
The building waste come is fed mechanism and is delivered to breaker progress break process again, is then sieved again, so circulation.
The corresponding installation of feed mechanism, can make choice installation according to specific demand (required building waste particle diameter).In selectivity
In the case that ground repeats broken, screening, not waste of resource, and crushing and screening effect is more preferable.
Brief description of the drawings
, below will be to required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment
The attached drawing used is briefly described, it will be appreciated that and the following drawings illustrate only some embodiments of the utility model, therefore not
The restriction to scope is should be considered as, for those of ordinary skill in the art, without creative efforts,
Other relevant attached drawings can also be obtained according to these attached drawings.
Fig. 1 is the structure diagram for the building waste processing equipment that the utility model example provides;
Fig. 2 is the structure diagram for the screening plant that the utility model embodiment provides;
Fig. 3 is the structure diagram for the feed bin that the utility model embodiment provides;
Fig. 4 is the structural scheme of mechanism for the elevating mechanism that the utility model embodiment provides;
Fig. 5 is the enlarged drawing of V part in Fig. 4.
Icon:10- building waste processing equipments;100- charging gears;110- feed bins;The upper warehouses of 111-;Warehouse under 112-;
113- elevating mechanisms;1131- racks;1132- gears;1133- installing plates;1134- shafts;1135- hands twist ring;1136- resets
Spring;1137- positioning protrusion;1138- positioning grooves;130- is fed slideway;140- adjustable plates;200- breakers;300- is sent
Material strip;400- screening plants;410- sieves main body;The first sieves of 421-;The second sieves of 422-;The 3rd sieves of 423-;430- is sent
Expect mechanism;The first feeding passages of 431-;The second feeding passages of 432-;433- belt conveyors;440- collecting mechanisms;450- vibrates
Device.
Embodiment
To make the purpose, technical scheme and advantage of the utility model embodiment clearer, below in conjunction with this practicality
Attached drawing in new embodiment, is clearly and completely described the technical solution in the utility model embodiment, shows
So, described embodiment is a part of embodiment of the utility model, rather than whole embodiments.Based on this practicality
Embodiment in new, those of ordinary skill in the art are obtained every other without creative efforts
Embodiment, shall fall within the protection scope of the present invention.
Therefore, the detailed description of the embodiment of the utility model provided in the accompanying drawings is not intended to limit below will
The scope of the utility model of protection is sought, but is merely representative of the selected embodiment of the utility model.Based on the utility model
In embodiment, the every other implementation that those of ordinary skill in the art are obtained without creative efforts
Mode, shall fall within the protection scope of the present invention.
It should be noted that:Similar label and letter represents similar terms in following attached drawing, therefore, once a certain Xiang Yi
It is defined, then it further need not be defined and explained in subsequent attached drawing in a attached drawing.
In the description of the utility model, it is to be understood that term " on ", " under ", " top ", " bottom ", " interior ", " outer " etc.
The orientation or position relationship of instruction are based on orientation shown in the drawings or position relationship, are for only for ease of description the utility model
Described with simplifying, rather than the equipment or element of instruction or hint meaning there must be specific orientation, with specific orientation structure
Make and operate, therefore it is not intended that limitation to the utility model.
In addition, term " first ", " second ", " the 3rd " are only used for description purpose, and it is not intended that instruction or implying phase
To importance or the implicit quantity for indicating indicated technical characteristic.Thus, " first ", " second ", " the 3rd " are defined
One or more this feature can be expressed or be implicitly included to feature.In the description of the utility model, " multiples' "
It is meant that two or more, unless otherwise specifically defined.
In the utility model, unless otherwise clearly defined and limited, term " installation ", " setting ", " connection ", " Gu
It is fixed " etc. term should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;Can be
It is connected directly, can also be indirectly connected by intermediary, can is the mutual of connection inside two elements or two elements
Interactively.For the ordinary skill in the art, it can understand that above-mentioned term is new in this practicality as the case may be
Concrete meaning in type.
Embodiment
The present embodiment provides a kind of building waste processing equipment 10, refers to Fig. 1 and Fig. 2, building waste processing equipment 10
Including charging gear 100, breaker 200, feeding belt 300 and the screening plant 400 installed successively.
Charging gear 100 includes feed bin 110, and the lower part of feed bin 110 is provided with feed slideway 130, and feed slideway 130 is with giving
Expect the discharge port connection of device 100, feed slideway 130 is used to building waste being transported to breaker 200.
Feeding belt 300 is used for the building waste after breaker 200 is handled and is delivered to screening plant 400.
Building waste is transported to charging gear 100, the feed bin 110 of charging gear 100 and is used to accommodate building waste, feed bin
110 lower part, which is set, is fed slideway 130, and the building waste in feed bin 110 is transported to breaker 200 through being fed slideway 130.
The building waste for being transported to breaker 200 is broken after processing, and being transported to screening plant 400 through feeding belt 300 is sieved
Manage office.
At least three-layer screen that screening plant 400 includes screening main body 410 and is arranged on inside screening main body 410, sieve
Set gradually along the short transverse of screening main body 410, vibrating device 450 is installed at sieve, screening main body 410 corresponds to wherein two
The position of layer sieve is connected with feed mechanism 430, and feed mechanism 430 is used to underproof building waste after screening being transported to brokenly
Crushing device 200.
Since screening plant 400 has at least three-layer screen, and sieve the position company that main body 410 corresponds to wherein two layers sieve
It is connected to feed mechanism 430.After building waste after sieve is to crushing sieves, meet that the building waste of particle diameter has been collected
Come, the building waste that the corresponding two layer screen for being connected with feed mechanism 430 is retained down on the net is fed mechanism 430 and is delivered to brokenly
Crushing device 200 carries out break process again, is then sieved again, so circulation, and vibrating device 450 is provided with beneficial to screening
The progress of process, and be conducive to building waste and enter feed mechanism 430.It should be noted that the corresponding peace of feed mechanism 430
Dress, can make choice installation according to specific demand (required building waste particle diameter).Optionally repeating to crush, sieving
In the case of, not waste of resource, and crushing and screening effect is more preferable.
Specifically, in the present embodiment, screening plant 400 includes the set gradually along screening 410 short transverse of main body
One sieve 421, the second sieve 422 and the 3rd sieve 423, the aperture of the first sieve 421, the second sieve 422 and the 3rd sieve 423
It is sequentially reduced, refer to Fig. 2.In the present embodiment, sieve is inclined to set.
Screening main body 410 corresponds to the first sieve 421 and feed mechanism 430 is connected with the position of the second sieve 422, sieves main body
The position of 410 the 3rd sieves 423 of correspondence is connected with collecting mechanism 440.
It is contemplated that in the present embodiment, the building waste that the first sieve 421 and the second sieve 422 are retained down
Particle diameter is undesirable, and the building waste of 423 the upper and lower of the 3rd sieve meets Particle size requirements.3rd sieve, 423 lower floor
Building waste be sized main body 410 and collect, the building waste on 423 upper strata of the 3rd sieve is collected by collecting mechanism 440.Two
The building waste of kind different-grain diameter can be used for different products.
Specifically, feed mechanism 430 includes the first feeding passage 431, the second feeding passage 432 and belt conveyor
433, the first feeding passage 431 is corresponding with the first sieve 421, and the second feeding passage 432 is corresponding with the second sieve 4220, and first send
431 and second feeding passage 432 of material passage is used to building waste being delivered to belt conveyor 433, and belt conveyor 433 is used for
Building waste is delivered to breaker 200.
In addition, refer to Fig. 3-5, in the present embodiment, feed bin 110 includes upper warehouse 111, lower warehouse 112 and elevator
Structure 113, lower warehouse 112 are movably set in the bottom of warehouse 111, and elevating mechanism 113 includes rack 1131, gear 1132, peace
Loading board 1133, shaft 1134 and hand twist ring 1135, and installing plate 1133 is fixedly connected with the outer wall of lower warehouse 112,1132 He of gear
Hand twists the opposite sides that ring 1135 is located at installing plate 1133 respectively, shaft 1134 through installing plate 1133 and with 1133 turns of installing plate
Dynamic connection, the both ends of shaft 1134 are twisted ring 1135 with gear 1132 and hand respectively and are connected, and rack 1131 is vertically set, rack
1131 top is connected with upper warehouse 111, and the bottom of rack 1131 extends to the side towards gear 1132 of installing plate 1133,
Rack 1131 is engaged with gear 1132.
Elevating mechanism 113 further includes resetting spring 1136, and resetting spring 1136 is arranged at hand and twists ring 1135 and installing plate
Between 1133, the side wall of installing plate 1133 towards gear 1132 is provided with multiple positioning protrusion 1137, gear 1132 be provided with
Multiple matched multiple positioning grooves 1138 of 1137 shape size of positioning protrusion.Multiple positioning protrusion 1137 are set around shaft 1134
Put.
Feed bin 110 is arranged to upper warehouse 111 and lower warehouse 112, lower warehouse 112 is movably set in the bottom of warehouse 111
End.Lower warehouse 112 and upper warehouse 111 can be by lifting the height to adjust feed bin 110.Feed bin 110 is provided with elevating mechanism
113, elevating mechanism 113 includes rack 1131, gear 1132, installing plate 1133, shaft 1134, hand and twists ring 1135 and resetting spring
1136.Installing plate 1133 is fixedly connected with the outer wall of lower warehouse 112, can play the role of fixed mounting plate 1133.Gear
1132 and hand twist ring 1135 respectively be located at installing plate 1133 opposite sides, shaft 1134 through installing plate 1133 and and installing plate
1133 rotation connections.The both ends of shaft 1134 are twisted ring 1135 with gear 1132 and hand respectively and are connected, and ring 1135 is twisted by rotating hand
The rotation of gear 1132 can be achieved.Rack 1131 is vertically set, and the top of rack 1131 is connected with upper warehouse 111, rack
1131 bottom extends to installing plate 1133 and can be engaged with gear 1132 towards the side of gear 1132, rack 1131.Pass through
Gear 1132 rotate can the operating with carry-over bar 1131, so as to drive the lifting of warehouse 111.
Resetting spring 1136 is arranged on hand and twists between ring 1135 and installing plate 1133, and installing plate 1133 is towards gear 1,132 1
The side wall of side is provided with multiple positioning protrusion 1137, and positioning protrusion 1137 is set around shaft 1134.As long as rotate the angle of very little
Degree, positioning protrusion 1137 and positioning groove 1138 can coordinate.Press resetting spring 1136, the positioning protrusion on installing plate 1133
1137 and gear 1132 on positioning groove 1138 matching overlap.Gear 1132 shuts down at this time, and rack 1131 also stops turning
It is dynamic, so that upper warehouse 111 stops lifting, it is fixed on a position.The height and capacity of feed bin 110 be configured on demand and
Selection.
In the present embodiment, positioning protrusion 1137 is raised for zigzag, and in other embodiments, positioning protrusion 1137 can be
Rectangular preiection, trapezoidal protrusion, as long as positioning protrusion 1137 disclosure satisfy that the effect of positioning.
In addition, in the present embodiment, the position that feed bin 110 corresponds to discharge port is provided with adjustable plate 140.Pass through adjustable plate
140 can adjust the speed that building waste enters breaker 200 from feed bin 110.To avoid the load capacity mistake of breaker 200
Machine breakdown caused by greatly.
The operation principle and effect of the building waste processing equipment 10 of the present embodiment:
Building waste is transported to charging gear 100, the feed bin 110 of charging gear 100 and is used to accommodate building waste, feed bin
110 lower part, which is set, is fed slideway 130, and the building waste in feed bin 110 is transported to breaker 200 through being fed slideway 130.
The building waste for being transported to breaker 200 is broken after processing, and being transported to screening plant 400 through feeding belt 300 is sieved
Manage office.Since screening plant 400 has at least three-layer screen, and sieve the position company that main body 410 corresponds to wherein two layers sieve
It is connected to feed mechanism 430.After building waste after sieve is to crushing sieves, meet that the building waste of particle diameter has been collected
Come, the building waste that the corresponding two layer screen for being connected with feed mechanism 430 is retained down on the net is fed mechanism 430 and is delivered to brokenly
Crushing device 200 carries out break process again, is then sieved again, so circulation.The corresponding installation of feed mechanism 430, can be with
Installation is made choice according to specific demand (required building waste particle diameter).In the case where optionally repeating to crush, sieving,
Not waste of resource, and crushing and screening effect is more preferable.
The present embodiment also provides a kind of building waste processing system (not shown), including building waste processing equipment 10
And concentration equipment (not shown).Building waste after the screened processing of device 400 is transported to concentration equipment and is handled,
The magnetisable material in building waste can be removed.
Above description is merely a prefered embodiment of the utility model, is not intended to limit the present invention, for
For those skilled in the art, various modifications and changes may be made to the present invention.It is all in the spiritual and former of the utility model
Within then, any modification, equivalent replacement, improvement and so on, should be included within the scope of protection of this utility model.
Claims (10)
- A kind of 1. building waste processing equipment, it is characterised in that including:Charging gear, breaker, feeding belt and the screening plant installed successively;The charging gear includes feed bin, and the lower part of the feed bin is provided with feed slideway, the feed slideway and the feed The discharge port connection of device, the feed slideway are used to building waste being transported to the breaker;The feeding belt is used to the building waste after breaker processing being delivered to screening plant;The screening plant includes screening main body and is arranged at least three-layer screen of the screening body interior, the sieve edge The short transverse of the screening main body is set gradually, and vibrating device is provided with the sieve, and the screening main body corresponds to wherein The position of two layers of sieve is connected with feed mechanism, and the feed mechanism is used for underproof building waste conveying after sieving To the breaker.
- 2. building waste processing equipment according to claim 1, it is characterised in that the screening plant is included along screening master The first sieve, the second sieve and the 3rd sieve that body short transverse is set gradually, first sieve, second sieve and institute The aperture for stating the 3rd sieve is sequentially reduced.
- 3. building waste processing equipment according to claim 2, it is characterised in that the screening main body corresponds to described first Sieve connects the feed mechanism with the position of second sieve, and the position that the screening main body corresponds to the 3rd sieve connects It is connected to collecting mechanism.
- 4. the building waste processing equipment according to Claims 2 or 3, it is characterised in that the feed mechanism includes first Feeding passage, the second feeding passage and belt conveyor, first feeding passage is corresponding with first sieve, and described Two feeding passages are corresponding with second sieve, and first feeding passage and second feeding passage are used for building waste The belt conveyor is delivered to, the belt conveyor is used to building waste being delivered to the breaker.
- 5. building waste processing equipment according to claim 1, it is characterised in that the feed bin includes upper warehouse, lower storehouse Body and elevating mechanism, the lower warehouse are movably set in the bottom of the upper warehouse, the elevating mechanism include rack, gear, Installing plate, shaft and hand twist ring, and the installing plate is fixedly connected with the outer wall of the lower warehouse, and the gear and the hand twist ring It is located at the opposite sides of the installing plate respectively, the shaft is rotatablely connected through the installing plate and with the installing plate, institute The both ends for stating shaft are twisted ring with the gear and the hand respectively and are connected, and the rack is vertically set, the top of the rack It is connected with the upper warehouse, the bottom of the rack extends to the side of the direction gear of the installing plate, the rack Engaged with the gear.
- 6. building waste processing equipment according to claim 5, it is characterised in that the elevating mechanism further includes reset bullet Spring, the resetting spring are arranged at the hand and twist between ring and the installing plate, side wall of the installing plate towards the gear Multiple positioning protrusion are provided with, the gear is provided with recessed with the matched multiple positioning of the multiple positioning protrusion shape size Groove.
- 7. building waste processing equipment according to claim 6, it is characterised in that multiple positioning protrusion surround the shaft Set.
- 8. building waste processing equipment according to claim 6, it is characterised in that the positioning protrusion is jagged convex Rise.
- 9. building waste processing equipment according to claim 1, it is characterised in that the feed bin corresponds to the discharge port Position is provided with adjustable plate.
- 10. a kind of building waste processing system, it is characterised in that the building waste processing system includes claim 1-9 and appoints Building waste processing equipment described in one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721167382.2U CN207342861U (en) | 2017-09-12 | 2017-09-12 | A kind of building waste processing equipment and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721167382.2U CN207342861U (en) | 2017-09-12 | 2017-09-12 | A kind of building waste processing equipment and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207342861U true CN207342861U (en) | 2018-05-11 |
Family
ID=62409752
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721167382.2U Active CN207342861U (en) | 2017-09-12 | 2017-09-12 | A kind of building waste processing equipment and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207342861U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108620159A (en) * | 2018-07-16 | 2018-10-09 | 四川省科源工程技术测试中心 | Soil screening crusher |
CN112474273A (en) * | 2020-11-09 | 2021-03-12 | 东阳市启创建设有限公司 | Garbage disposal device for construction |
-
2017
- 2017-09-12 CN CN201721167382.2U patent/CN207342861U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108620159A (en) * | 2018-07-16 | 2018-10-09 | 四川省科源工程技术测试中心 | Soil screening crusher |
CN112474273A (en) * | 2020-11-09 | 2021-03-12 | 东阳市启创建设有限公司 | Garbage disposal device for construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105107571B (en) | A kind of energy-efficient concrete aggregate production line and its production method | |
CN101736099B (en) | Secondary treatment system for steel slag and method thereof | |
CN107309256A (en) | A kind of heavy metal polluted soil processing system and technique | |
CN103611721B (en) | Hydraulic separator and building waste material resource utilization system | |
CN105750205A (en) | Construction waste throwing and heavy separation crushing device and method | |
CN104860561A (en) | Construction waste recycling brick manufacturing system | |
CN207342861U (en) | A kind of building waste processing equipment and system | |
CN104722494A (en) | Comprehensive rubbish sorting technology and comprehensive rubbish sorting machine | |
CN103586257A (en) | Construction waste treatment system | |
CN101596402A (en) | A kind of method for arranging of flue gas desulfur device | |
CN201231528Y (en) | Building rubbish combined forming equipment | |
CN203487049U (en) | Tower type powder-selecting sand-making equipment | |
CN206526918U (en) | Building rubbish treatment device | |
CN109772506B (en) | Civil engineering construction waste material treatment facility of environmental protection | |
CN202022530U (en) | Fly ash disposal conveyor belt device | |
CN206824381U (en) | A kind of closed construction refuse regenerated processing system | |
CN202638758U (en) | Sand-selection production device by using drying method | |
CN210171639U (en) | Dry powder machine system sand apparatus for producing | |
CN102836825B (en) | Multi-stage quick energy-saving garbage sorting system | |
CN210146647U (en) | Solid waste screening system | |
CN107309249A (en) | A kind of stacked construction refuse resource processing equipment | |
CN203664202U (en) | Comprehensive sorting machine for garbage disposal | |
CN115228541B (en) | Rock material processing device for machine-made sand | |
CN203778190U (en) | Lead powder recovery equipment | |
CN203526190U (en) | Construction waste treatment system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 518172 workshop b1302, No. 1, Longgang Tian'an digital entrepreneurship Park, Longcheng street, Longgang District, Shenzhen City, Guangdong Province Patentee after: Zhongxinhang (Shenzhen) Industrial Environment Group Co.,Ltd. Address before: 518000 workshop b1302, No. 1, Longgang Tian'an digital entrepreneurship Park, Longcheng street, Longgang District, Shenzhen City, Guangdong Province Patentee before: SHENZHEN LONGJISHUN INDUSTRY DEVELOPMENT Co.,Ltd. |
|
CP03 | Change of name, title or address |