CN207312918U - Maintenance construction hanging scaffold in a kind of coke dry quenching furnace - Google Patents

Maintenance construction hanging scaffold in a kind of coke dry quenching furnace Download PDF

Info

Publication number
CN207312918U
CN207312918U CN201721399084.6U CN201721399084U CN207312918U CN 207312918 U CN207312918 U CN 207312918U CN 201721399084 U CN201721399084 U CN 201721399084U CN 207312918 U CN207312918 U CN 207312918U
Authority
CN
China
Prior art keywords
support frame
hanging scaffold
hanging
dry quenching
quenching furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721399084.6U
Other languages
Chinese (zh)
Inventor
王福兴
旷军
胡知春
张卫强
张俊杰
张珺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Handan Iron and Steel Group Co Ltd
Hangang Group Hanbao Iron and Steel Co Ltd
Original Assignee
Handan Iron and Steel Group Co Ltd
Hangang Group Hanbao Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Handan Iron and Steel Group Co Ltd, Hangang Group Hanbao Iron and Steel Co Ltd filed Critical Handan Iron and Steel Group Co Ltd
Priority to CN201721399084.6U priority Critical patent/CN207312918U/en
Application granted granted Critical
Publication of CN207312918U publication Critical patent/CN207312918U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Coke Industry (AREA)

Abstract

Maintenance construction hanging scaffold in a kind of coke dry quenching furnace is the utility model is related to, belongs to metallurgy industry coke dry quenching furnace maintenance technical field of construction equipment.Technical solution is:Include hanging scaffold inspection platform and pipe-hanging hook;The hanging scaffold inspection platform includes support frame and cover board(14), support frame and cover board(14)It is rounded, cover board(14)It is fixed on support frame, cover board(14)It is equipped with square hole(15), support frame is equipped with multiple lifting lugs one being evenly arranged(9);The pipe-hanging hook is by two longerons(12)With two crossbeams(13)It is in groined type to be fixedly connected, longeron(12)And crossbeam(13)It is equipped with multiple lifting lugs two(16);The hanging scaffold inspection platform is fixedly connected with pipe-hanging hook by more steel wire ropes.The beneficial effects of the utility model are:The maintenance duration of coke dry quenching furnace can shorten more than 50%, improve overhaul efficiency, while can also ensure that repair quality.

Description

Maintenance construction hanging scaffold in a kind of coke dry quenching furnace
Technical field
Maintenance construction hanging scaffold in a kind of coke dry quenching furnace is the utility model is related to, belongs to metallurgy industry coke dry quenching furnace maintenance construction equipment Technical field.
Background technology
The popularization of Dry Quenching Technology is currently in the mature stage in China, and the maintenance of coke dry quenching furnace all refers to refractory material Replacement build the projects such as the adjustment with air supply device by laying bricks or stones.At present, the maintenance mode that coke dry quenching furnace generally uses for scaffolding shape Formula, overhauling project are itemized progress from bottom to top, and maintenance duration needs entirety more than 45 days, in particular for wind apparatus and resistance to material During replacement, maintenance duration needs 55 days.Repair time is grown, and overhaul efficiency is low, influences the organization of production and material balance of dry coke quenching, Easily lead to lower procedure production and quality produces fluctuation.
Utility model content
The utility model aim is to provide maintenance construction hanging scaffold in a kind of coke dry quenching furnace, can shorten the check man of coke dry quenching furnace Phase, while can ensure repair quality, solve the problems, such as present in background technology.
The technical solution of the utility model is:
Maintenance construction hanging scaffold, includes hanging scaffold inspection platform and pipe-hanging hook in a kind of coke dry quenching furnace;
The hanging scaffold inspection platform includes support frame and cover board, and support frame and cover board are rounded, and cover board is fixed on On support frame, cover board is equipped with square hole, and support frame is equipped with multiple lifting lugs one being evenly arranged;
The pipe-hanging hook is fixedly connected by two longerons and two crossbeams to be equipped with multiple in groined type, longitudinal and cross beam Lifting lug two;
The hanging scaffold inspection platform is fixedly connected with pipe-hanging hook by more steel wire ropes.
Lifting lug one in the hanging scaffold inspection platform on support frame and the lifting lug on the longitudinal and cross beam in pipe-hanging hook Two is corresponding.
Lifting lug one in the hanging scaffold inspection platform on support frame and the lifting lug on the longitudinal and cross beam in pipe-hanging hook Two be corresponding eight.
Support frame in the hanging scaffold inspection platform is welded by more girders and Duo Gen auxiliary girders, and overall is in netted circle Shape structure.
Using the utility model, when coke dry quenching furnace is overhauled, pipe-hanging hook is fixed on the track of coke dry quenching furnace fire door both sides, hung Disk inspection platform on pipe-hanging hook, using hanging scaffold inspection platform, can make chute, the ring in coke dry quenching furnace by wire rope suspensioning Shape flue replaces refractory material and the cooling section of its underpart and intersects progress at the same time with the maintenance of air feed system, shortens maintenance duration.
The beneficial effects of the utility model are:The maintenance duration of coke dry quenching furnace can shorten more than 50%, improve maintenance effect Rate, while can also ensure that repair quality.
Brief description of the drawings
Fig. 1 is the utility model hanging scaffold inspection platform schematic diagram;
Fig. 2 is the utility model pipe-hanging hook schematic diagram;
Fig. 3 is the utility model coke dry quenching furnace front view;
Fig. 4 is the utility model coke dry quenching furnace side view;
In figure:The section that prestores 1, cooling section 2, air supply device 3, chute 4, ring-shaped flue 5, coke dry quenching furnace 6, girder 7, auxiliary girder 8, Lifting lug 1, track 10, fire door 11, longeron 12, crossbeam 13, cover board 14, square hole 15, lifting lug 2 16.
Embodiment
Below in conjunction with attached drawing, by example, the utility model is described in further detail.
Referring to the drawings 1,2, a kind of coke dry quenching furnace is interior to overhaul construction hanging scaffold, it is characterised in that includes hanging scaffold inspection platform and suspention Stent;
The hanging scaffold inspection platform includes support frame and cover board 14, and support frame and cover board 14 are rounded, cover board 14 It is fixed on support frame, cover board 14 is equipped with square hole 15, and support frame is equipped with multiple lifting lugs 1 being evenly arranged;
The pipe-hanging hook is fixedly connected by two longerons 12 with two crossbeams 13 in groined type, on longeron 12 and crossbeam 13 Equipped with multiple lifting lugs 2 16;
The hanging scaffold inspection platform is fixedly connected with pipe-hanging hook by more steel wire ropes.
In the present embodiment, referring to the drawings 1, the support frame in hanging scaffold inspection platform is by 21 10m long channel steels as master Beam 7 and 8 butt welding of auxiliary girder form, and in netted circular configuration, a diameter of 9m, is engaged with coke dry quenching furnace cooling section diameter, and weld bond uses Whole circle heap welding form, eight lifting lugs 1 of uniform welding on support frame, after the completion of support frame welding, spread above it 8mm steel plates reserve the square hole 15 of wide 3m as cover board 14, centre.
Referring to the drawings 2, longeron 12 and crossbeam 13 in pipe-hanging hook use 20A I-steel, two longerons 12 and two The welding of crossbeam 13 be in groined type, welds eight lifting lugs 2 16 on longeron 12 and crossbeam 13 altogether, on lifting lug 2 16 and support frame Lifting lug 1 is corresponding.
Referring to the drawings 3,4, coke dry quenching furnace overhaul when, pipe-hanging hook is fixed on the track 10 of 11 both sides of coke dry quenching furnace fire door, Hanging scaffold inspection platform on pipe-hanging hook, using hanging scaffold inspection platform, can make dry put out by the wire rope suspensioning of diameter 11mm Chute 4 in stove, ring-shaped flue 5 replace refractory material and the cooling section 2 of its underpart and the maintenance of air feed system intersect at the same time into OK, it can complete within 25 days to overhaul, shorten maintenance duration more than 50%.

Claims (4)

1. maintenance construction hanging scaffold in a kind of coke dry quenching furnace, it is characterised in that include hanging scaffold inspection platform and pipe-hanging hook;
The hanging scaffold inspection platform includes support frame and cover board(14), support frame and cover board(14)It is rounded, cover board (14)It is fixed on support frame, cover board(14)It is equipped with square hole(15), support frame be equipped with it is multiple be evenly arranged hang Ear one(9);
The pipe-hanging hook is by two longerons(12)With two crossbeams(13)It is in groined type to be fixedly connected, longeron(12)And crossbeam (13)It is equipped with multiple lifting lugs two(16);
The hanging scaffold inspection platform is fixedly connected with pipe-hanging hook by more steel wire ropes.
2. maintenance construction hanging scaffold in a kind of coke dry quenching furnace according to claim 1, it is characterised in that the hanging scaffold inspection platform Lifting lug one on middle support frame(9)With the longeron in pipe-hanging hook(12)And crossbeam(13)On lifting lug two(16)It is corresponding.
3. maintenance construction hanging scaffold in a kind of coke dry quenching furnace according to claim 2, it is characterised in that the hanging scaffold inspection platform Lifting lug one on middle support frame(9)With the longeron in pipe-hanging hook(12)And crossbeam(13)On lifting lug two(16)It is opposite Eight answered.
4. maintenance construction hanging scaffold in a kind of coke dry quenching furnace according to claim 1 or 2, it is characterised in that the hanging scaffold maintenance is flat Support frame in platform is by more girders(7)With more auxiliary girders(8)It is welded, overall is in netted circular configuration.
CN201721399084.6U 2017-10-26 2017-10-26 Maintenance construction hanging scaffold in a kind of coke dry quenching furnace Expired - Fee Related CN207312918U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721399084.6U CN207312918U (en) 2017-10-26 2017-10-26 Maintenance construction hanging scaffold in a kind of coke dry quenching furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721399084.6U CN207312918U (en) 2017-10-26 2017-10-26 Maintenance construction hanging scaffold in a kind of coke dry quenching furnace

Publications (1)

Publication Number Publication Date
CN207312918U true CN207312918U (en) 2018-05-04

Family

ID=62378722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721399084.6U Expired - Fee Related CN207312918U (en) 2017-10-26 2017-10-26 Maintenance construction hanging scaffold in a kind of coke dry quenching furnace

Country Status (1)

Country Link
CN (1) CN207312918U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110373214A (en) * 2019-06-24 2019-10-25 五冶集团上海有限公司 A kind of coke oven stay top cross-brace replacing options
CN110953482A (en) * 2019-12-16 2020-04-03 云南云铝海鑫铝业有限公司 Air pipe system for maintenance of aluminum electrolysis workshop without stopping air
CN113684042A (en) * 2021-08-26 2021-11-23 攀钢集团工程技术有限公司 Method for replacing cross air duct of coke dry quenching furnace

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110373214A (en) * 2019-06-24 2019-10-25 五冶集团上海有限公司 A kind of coke oven stay top cross-brace replacing options
CN110373214B (en) * 2019-06-24 2021-08-13 五冶集团上海有限公司 Method for replacing cross brace at upper part of coke oven column
CN110953482A (en) * 2019-12-16 2020-04-03 云南云铝海鑫铝业有限公司 Air pipe system for maintenance of aluminum electrolysis workshop without stopping air
CN113684042A (en) * 2021-08-26 2021-11-23 攀钢集团工程技术有限公司 Method for replacing cross air duct of coke dry quenching furnace

Similar Documents

Publication Publication Date Title
CN207312918U (en) Maintenance construction hanging scaffold in a kind of coke dry quenching furnace
CN205932941U (en) A device for handling of precast box girder template
CN203359745U (en) Hot blast stove refractory vertical transport device
CN110241285A (en) Converter mouth petticoat pipe more changing device, replacement structure and replacing options
CN101109028A (en) Method of upside-down mounting hydraulic pressure lifting of converter shell
CN109055637A (en) The hydraulic pressure lift technique of furnace shell installation in a kind of blast furnace overhaul
CN105834626B (en) A kind of vertical butt weld gasket support bracket and welding method
CN106834589B (en) Converter Maintenance method
CN207812983U (en) A kind of encircling operating deck
CN104878139B (en) Blast furnace Y-type three way type installation method of formula down-comer integral hoisting
CN206088741U (en) Hoist of safe handling converter sublance
CN103884184A (en) Vertical continuous annealing furnace refractory material and lining installing method and movable installing platform
CN205187695U (en) Steel construction has hoisted gallows
CN202657825U (en) Device for lifting guyed tower in integrally assembled mode
CN208586320U (en) A kind of tap holes of electric furnace rapid tool change
CN217102742U (en) Hoisting equipment for flat plate type aluminum alloy
CN202508844U (en) Foldable platform
CN206857970U (en) A kind of gantry hook
CN207296350U (en) Detachable operating platform for steel pipe column
CN202361783U (en) Charging system of cupola furnace
CN205296804U (en) Protection cage structure in elevartor shaft
CN205953322U (en) Large -scale rotating member turns over a frock
CN206645746U (en) A kind of quick pulling off device of sintering pallet
CN204848915U (en) Blast furnace stave overhauls conveyer
CN212076944U (en) H-shaped protection plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180504

Termination date: 20201026