CN202361783U - Charging system of cupola furnace - Google Patents

Charging system of cupola furnace Download PDF

Info

Publication number
CN202361783U
CN202361783U CN2011204499364U CN201120449936U CN202361783U CN 202361783 U CN202361783 U CN 202361783U CN 2011204499364 U CN2011204499364 U CN 2011204499364U CN 201120449936 U CN201120449936 U CN 201120449936U CN 202361783 U CN202361783 U CN 202361783U
Authority
CN
China
Prior art keywords
slide carriage
vertical beam
charging basket
joist
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011204499364U
Other languages
Chinese (zh)
Inventor
姚立猛
陈姚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011204499364U priority Critical patent/CN202361783U/en
Application granted granted Critical
Publication of CN202361783U publication Critical patent/CN202361783U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a charging system of a cupola furnace. the charging system comprises a material-loading device and two material-guiding devices, wherein the two material-guiding devices are respectively arranged in front of the corresponding cupola furnace; according to the different left and right positions of the material-guiding devices, the material-guiding devices are divided into a left material-guiding device and a right material-guiding device; each of the material-guiding devices comprises a supporting structural part and a material-guiding structural part; the material-guiding devices are fundamentally symmetrical relative to a vertical plane which is in back and forth direction and is arranged between the material-guiding devices; the material-guiding structural part comprises a material-guiding chute; the opening of the material-guiding chute faces to upward rear direction; the front end part of the material-guiding chute is fixedly connected with a bracket; the material-guiding chute is wholly arranged in a front-high rear-low inclined form; and the guide rail of the material-loading device is arranged above the middle part in the front rear direction of the two material-guiding devices along the left and right horizontal direction, so that a hopper can blank above any of the two material-guiding devices so as to meet the use of two cupola furnaces.

Description

A kind of charging system of furnace cupola
Technical field
The utility model relates to the manufacturing field of furnace cupola, is specifically related to a kind of system reinforced in furnace cupola.
Background technology
Cast iron smelting is one of important step that obtains premium casting.The equipment of cast iron smelting has tilting cupola, three joint stoves, electric furnace (electric arc furnaces or electric induction furnace), furnace cupola etc.Wherein, it is the widest that furnace cupola is used, and the ironcasting total output is more than 90%, this be because the characteristics of cupola melting be that equipment is simple, easy to operate, production efficiency is high, can produce continuously, cost is low.Though the molten iron temperature of furnace cupola and Composition Control are easy not as electric furnace, it can satisfy the production requirement of general ironcasting basically, thereby present furnace cupola remains the capital equipment of cast iron smelting.Furnace cupola is a kind of cylindrical shape shaft furnace, removes to be mainly used in iron casting production, also can be in order to cooperate pneumatic steelmaking, being used for copper also sometimes, because of the furnace roof opening upwards, so be called furnace cupola.
The general structure of furnace cupola is: mainly comprise main stove, forehearth (also not establishing forehearth), supply air system and charging mechanism, often main stove is also referred to as furnace cupola in the prior art.Main stove mainly comprises support section and the body of heater that sets gradually from the bottom to top.Support section comprises basis, pillar (stove leg), drop-bottom and bottom door.Body of heater is the major part of furnace cupola; Be seated on the drop-bottom by corresponding pillar supporting; Body of heater is a cylindrical shape, and its shell is processed with steel plate, and the steel plate shell inwall is built into furnace lining (also being provided with refractory lining in the chimney part usually) with refractory material; Wherein, the part from drop-bottom to charge door (also claiming dog-house) lower edge forms burner hearth.Furnace charge is to the impact of burner hearth when feeding in raw material in order to alleviate; Be provided with the crashproof cover of steel (fixing and constitute) by cylindrical body and the ring flange welding that is positioned at the body top on the top of inboard wall of burner hearth; And the lower surface of the ring flange of crashproof cover contacts with the top of the inwall of burner hearth, and the lateral surface of the body of crashproof cover contacts with the top of the inwall of burner hearth.Body of heater comprises furnace bottom part, cupola well part, shaft part and chimney part successively according to order from the bottom to top.Before the blow-on, closed bottom door, and with the tamping of sand compound as furnace bottom, body of heater be positioned at part around the furnace bottom then as the furnace bottom part of body of heater.Cupola well is meant the part from furnace bottom top to a minimum exhaust outlet of body of heater, and shaft is meant the part from a minimum exhaust outlet to charge door lower edge of body of heater, and chimney then is meant the above part in lower edge of the charge door of body of heater.Is connected through passing a bridge between main stove and the forehearth, passes a bridge and be provided with the molten iron passage, the gap bridge mouth of main stove is arranged on the cupola well position of body of heater, has 2 to 4 on the air port of main stove is divided and arranges, and every exhaust outlet all evenly distributes along the shaft circumference.Shaft part region also is the combustion zone of furnace cupola, according to the different physical and chemical process that in section up and down, is carried out, is divided into the torrid zone, fusion zone and preheating zone successively according to from bottom to up order in the combustion zone.Around fusion zone, because furnace temperature is high, some occasion, this part be without refractory material furnace lining, and establish annular conduit in the furnace shell outside, lowers the temperature to furnace shell outer wall spraying cooling water.
The course of work of furnace cupola is: earlier through charging mechanism by charging basket (also bucket) with a part of bed coke by the charge door interior lower floor of cupola well part in the burner hearth of packing into as bed coke.After igniting above the bed coke lower floor; Again remaining bed coke is added in burner hearth and drop on the top of bed coke lower floor; And be positioned at the bottom of the shaft part of burner hearth, until adding to specified altitude (generally more than 1 meter), the bed coke that is arranged in the shaft part is the upper strata of bed coke.Still carry out the reinforced of furnace charge by charging basket then through charging mechanism; Earlier add the flux lime stone at the bed coke end face; Then in the order adding burner hearth of every barrel of furnace charge according to metal charge, coke charge and flux; Till furnace charge being added to the charge door lower edge, the weight proportion of metal charge, coke charge and flux draws according to the melting rate of stove always.In whole blow-on process; Through constantly replenishing of furnace charge add keep the furnace charge end face from the below lower edge near charge door; Combustion reaction takes place with the upper strata of bed coke in the air in the air port blasts stove; The high-temperature furnace gas that generates upwards flows, and to the furnace charge heating, and makes the layer of metal furnace charge fusing on the bed coke end face.Iron after the fusing drops under the gravity effect drippage downwards, pass through the molten iron passage of levels and gap bridge of bed coke successively after, flow in the furnace chamber of forehearth.When iron drips through the bed coke upper strata, further heated by high-temperature furnace gas and red-hot coke, it is overheated that this process is called.Along with the fusing of metal charge, the bed of material descends gradually, so at set intervals, adds one barrel of furnace charge, keeps the height of furnace charge constant basically, and makes whole fusion process carry out continuously.The adding of coke charge in every barrel of furnace charge, its main purpose is the consumption that replenishes bed coke, and bed coke height is remained unchanged basically.Becoming high-temperature flue gas after high-temperature furnace gas that produces because of the burning of upper strata bed coke and the metal charge effect moves upward outside the furnace roof opening flows out body of heater along the bore passages of body of heater; A kind of is directly to feed atmosphere, and another kind is through feeding atmosphere after the dust pelletizing system again.For melting rate is the furnace cupola more than 3 tons and 3 tons; The height of its charge door (length on the above-below direction) is all more than or equal to 2.5 meters; The width of charge door (length on the left and right directions) and chimney internal diameter are close, thus at high-temperature flue gas when flowing through charge door, because the length on the above-below direction of charge door is bigger; Part high-temperature flue gas flows into the indoor of workshop from charge door; This does not just win foundry and is in the boundless and indistinct atmosphere of ash throughout the year, and high-temperature flue gas also carries a large amount of pernicious gases such as carbon monoxide secretly because of the imperfect combustion of coke, and annual all have the personnel of many foundries to carry out first aid because of anthracemia; Even the generation of dead situation, this has become casting industry and will solve and unsolved hard nut to crack for a long time.
The charging mechanism of furnace cupola mainly contains two kinds of chargers, and a kind of is monorail charger, and another kind is guide tracked charger.
Monorail charger mainly is made up of single track (I-steel), walking mechanism, hoist engine and hopper.The suspension hook vertical-lift charging basket that is rotatably connected on the steel cable of the pulley on the shaped as frame roof beam structure of walking mechanism by passing of hoist engine during work and is connected by this steel cable is to the cupola charging desired height, drives charging basket with respect to the single track parallel motion by the shaped as frame roof beam structure of walking mechanism again and carries out horizontal movement and got into the body of heater lumen centers and carried out vertically reinforced by the charge door of cupola body sidepiece.So-called vertical reinforced; The flange circle that also is the inverted round platform shelly that is connected as a single entity by the ladle body main body of cylinder shelly with from top and ladle body main body of the ladle body of the charging basket that adopted constitutes; After charging basket gets into the body of heater inner chamber; The flange circle that vertically drops to earlier its ladle body is shelved on 2 channel-section steels that laterally arrange as bracing frame in the stove; Thereby make that be positioned at the mechanical controller structure charging basket outside, that lower end and charging basket twoly open that base plate links to each other, the upper end links to each other with suspension hook that the hoist engine steel cable is connected becomes relaxed state by tensioning state; Charging basket is two to be opened base plate and then in bucket, opens under the gravity effect of solid material, and the material in the charging basket just vertically falls into the combustion zone of shaft, and feeding intake finishes again opens base plate through the upper end of the mechanical controller structure of steel cable and suspension hook pulling charging basket with charging basket two by hoist engine and close and drive charging basket immediately vertically upward; Disengage with the stove inner support frame and the segment distance that rises after, again by walking mechanism along single track with the parallel body of heater that shifts out of charging basket.The process that above-mentioned prior art is fed in raw material to furnace cupola has tangible deficiency: at first the charging basket of this kind charger is in the charge door entering furnace cupola by sidepiece; Because the height dimension of charging basket is all bigger usually with the bucket footpath; Add shaped as frame roof beam structure and the height of steel cable and suspension hook of the walking mechanism of monorail charger; Not only cause the height of charge door of sidepiece of furnace cupola big, width is also big (for example melting rate for 10 to 12 tons the material mouth of furnace cupola per hour greatly about 4 to 5 meters high; 1.6 to 1.8 meters wide; Melting rate is that the height of charge door of 3 tons furnace cupola is a 2.5-2.6 rice; Width and body of heater internal diameter are basic identical), cause furnace cupola the time to have more extraneous air to be inhaled into the shaft inner chamber, because of the entering because of the outside air on charge door top of the suction that blower fan produced of thermal current and dust arrester is consumed from the upper space of charge door in operation.Therefore, what make the high-temperature flue gas that produced in the stove has quite a few to flow into the indoor of workshop from charge door, even if strengthen the power of the blower fan of dust arrester, also produces little effect.In order to ensure operating personnel's life security, the factory building of many foundries is highly higher mostly, and on roof and wall intensive installation ventilating fan, thereby wasted the energy greatly, nonetheless, the anthracemia accident also often takes place.In addition; Charging basket stopping during owing to feed intake to the shaft bore passages; Furnace cupola comprises toxic gas and dust such as a large amount of carbon monoxide, sulfur dioxide because of moving the high-temperature flue gas that is produced continuously; They pour out to the working environment in workshop from charge door, further cause the severe contamination to working environment, and are bigger to site operation personnel's injury.The hopper that Chinese patent document CN2120797U (number of patent application 92211335.1) disclosed " a kind of well formula loading hopper " promptly belongs to monorail charger to be adopted.
Guide tracked charger comprises inclined skip charger and two kinds of versions of tipping bucket type charger.Guide tracked charger mainly is made up of guide rail, truck, hopper and hoist engine.Guide tracked charger is in when work, drag truck by hoist engine and hopper pulled to the charge door of furnace cupola along guide rail, the tipping bucket type charger with hopper in the charge door upset and material is dropped in the furnace cupola.Inclined skip charger then drags truck by hoist engine and along guide rail hopper is pulled in the inner chamber of furnace cupola, opens base plate and to furnace charge.The latter since when reinforced hopper be arranged in the shaft inner chamber; So its shortcoming is basic identical with two shortcomings of monorail charger; And also exist because of pull rope is arranged in the erosion that the shaft inner chamber receives high-temperature flue gas always and damage; Thereby need often to change, there is great potential safety hazard in the careless slightly problem that promptly can rupture.For the former, when hopper upset was reinforced, evenly reinforced for making, hopper must have quite a few to stretch in the body of heater inner chamber, so also can form high-temperature flue gas stop, and have two shortcomings of monorail charger equally; Also, when reinforced, then directly receive the erosion of high-temperature flue gas and damage, thereby need often replacing, carelessly slightly also can rupture because nearer from charge door.Chinese patent document CN201385952Y (number of patent application 200920020118.5) disclosed " high inclination-angle charger " is a kind of of above-mentioned guide tracked charger.
In addition, also has a kind of charger that feeds in raw material from the chimney top of furnace cupola.This charger must cooperate the transformation to the body of heater chimney; Need on the top of body of heater chimney the air inducing equipment by the sidepiece smoke to be set, though when operation, can avoid the problem that flue gas gets into the workshop occurring, the furnace cupola of this structure is not only invested bigger; Energy consumption is higher during operation; And since the position of dog-house higher (can reduce the height of chimney, but higher) than the dog-house position of common furnace cupola cause easily when feeding intake the damage of burner hearth and the fragmentation of coke.
Adopt two furnace cupolas to be used for single shift system production in the general enterprise production process mostly, two furnace cupolas take turns blow-on, every blow-on one day, and another overhauls during a blow-on in two furnace cupolas.Two kinds of above-mentioned main chargers (monorail charger and guide tracked charger) all belong to the separate unit system, and promptly every furnace cupola must be equipped with a corresponding charger, thereby the utilization rate of charger lower (the half the time is in idle state).Secondly the floor space of charger is bigger, thereby the land resource of the preciousness of wasting greatly, and high in addition land price makes the input of enterprise also increase greatly.
The utility model content
The purpose of the utility model is: provide a kind of simple in structure, floor space is little, and utilization rate is high, and safe and reliable externally can import the material in the charging basket in the furnace cupola, can satisfy the charging system that two furnace cupolas use.
The basic technical scheme of realizing the utility model purpose is: a kind of charging system of furnace cupola comprises feeding device and material guide device.Feeding device comprises guide rail; Hopper and steel-wire rope type electric block; Steel-wire rope type electric block is rolled by its motor-driven carrier and is arranged on the guide rail, and can move along guide rail, and hopper hangs on the suspension hook of steel-wire rope type electric block; The suspended core of this suspension hook links to each other with steel wire rope, and said wire rope roll is on the reel of steel-wire rope type electric block.Material guide device has two, is separately positioned on the front side of corresponding furnace cupola, and two material guide devices are divided into left side material guide device and right side material guide device by the difference of its position, residing left and right sides.Two material guide devices include supporting structure and guide structural member, and two material guide devices are symmetrical basically with respect to a sagittal vertical guide between them.
The supporting structure of above-mentioned each material guide device is the support of steel, and the serve as reasons steel component of each straight type of said support is fixedly connected sequentially each other and constitutes, the steel component of described straight type be I-steel or/and channel-section steel or/and angle steel.Support is the structural member that is the cuboid framework, and said support comprises body frame body and charging basket bracing frame.The top of body frame body is open state.The charging basket bracing frame is positioned at the top of body frame body, and both are with the hold together support of formula of all shared mode of each root vertical beam.The top and the right side of the charging basket bracing frame of the support of said left side material guide device are open state.The top and the left side of the charging basket bracing frame of the support of said right side material guide device are open state.
Above-mentioned guide structural member comprises deflector chute; The opening of deflector chute is towards last rear; The front end position of deflector chute directly is fixedly connected on the support or through other rigid member and is fixedly connected on the support, and makes deflector chute integral body be provided with according to the low inclination mode in preceding high back.Deflector chute is a steel component, is made up of the left plate, slide carriage and the right plate that link to each other successively.Slide carriage is towards last rear, slide carriage towards be deflector chute towards, slide carriage be upper side towards posterosuperior side, the scope of the tilt angle alpha of slide carriage is that 28 degree are to 45 degree.The position, rear end of slide carriage is provided with accurate arc breach; The arc circular arc limit of this standard is the elliptic arc limit of an ellipse; So the position, rear end of slide carriage is an arcuate indentation portion, when the bottom at the left plate of this arcuate indentation portion and deflector chute and the position, rear end of right plate is to use and the interconnective position, position at the breach place that feeds intake of the crash protection circle of the body of heater of furnace cupola.The front portion of the upper side of slide carriage is unscreened position, top, also the i.e. position of this position furnace charge that can accept when using to fall from the top.
The guide rail of above-mentioned feeding device along about to the top of the front and back that are horizontally set on two material guide devices to the middle part, thereby make that hopper can be in two material guide devices any one above carry out blanking.
The further technical scheme that is the basis with above-mentioned basic technical scheme is: the guide structural member also comprises the slide carriage joist.The lower side edge of left plate and right plate is all towards the front lower place; Their the angle of inclination all tilt angle alpha with slide carriage is identical; Left plate by its lower side along from the top the airtight left side that is weldingly fixed on slide carriage along last; Right plate by its lower side along from the top the airtight right edge that is weldingly fixed on slide carriage along last, thereby make slide carriage, left plate and right plate form opening towards posterosuperior deflector chute.The scope of the tilt angle alpha of said slide carriage is preferably 33 degree to 40 degree.The slide carriage joist has 1 to 6.Each slide carriage joist directly is fixed on the support, perhaps is fixed on the support through rigid structural member.The side towards the front lower place of slide carriage is a downside, and slide carriage is weldingly fixed on the corresponding slide carriage joist from the top by its downside, thereby makes deflector chute be fixedly connected on the support through the slide carriage joist.
The technical scheme that is the basis with above-mentioned further basic technical scheme is: said slide carriage joist has 3.3 slide carriage joists are divided into left side slide carriage joist, middle part slide carriage joist and right side slide carriage joist according to the difference of position, the residing left and right sides.Each slide carriage joist is parallel each other, and each slide carriage joist all is obliquely installed on support along the mode that in the past goes up to the back, and the inclination angle beta of each slide carriage joist all the tilt angle alpha with slide carriage is identical.The downside front end of slide carriage is positioned on the front end position of each slide carriage joist, and the front end position of each slide carriage joist is fixed on the preceding upper lateral part of support, and makes the front end position of deflector chute be fixedly connected on the support through the slide carriage joist.The rear portion of each slide carriage joist is fixed on the back side lower part of support.
With the technique scheme is that basic technical scheme is: the vertical beam in the all-in-one-piece support of said each material guide device includes about branch along vertical 2 left vertical beams and 2 right vertical beams to setting; The latter half of described each vertical beam is as the vertical beam of body frame body, and the first half of each vertical beam is as the vertical beam of charging basket bracing frame.Described body frame body comprises that also branch upward connects crossbeam to horizontally disposed 2 tops about the lower edge and is connected crossbeam with 1 root bottom part, connects longeron along front and back to horizontally disposed 2 tops.Described charging basket bracing frame also comprises about the edge and connects crossbeam, connects longeron and horizontally disposed 2 charging basket brace summers along front and back to horizontally disposed 1 top to horizontally disposed 1 top.
Above-mentioned 2 left vertical beams are divided into left front vertical beam and left back vertical beam according to the difference of residing front and back position, and 2 right vertical beams are divided into right front vertical beam and right back vertical beam according to the difference of residing front and back position.2 connect connect before crossbeam is divided into according to the difference of residing front and back position crossbeam with after be connected crossbeam.It is to connect crossbeam after being positioned at the bottom at rear portion of support that 1 root bottom part connects crossbeam.2 top connects longeron and is divided into a left side, top according to the difference of position, the residing left and right sides and connects longeron and be connected longeron with the right side, top.
The right ends that connects crossbeam behind the above-mentioned bottom is welded respectively on the bottom, left side of the lower right side that is fixedly connected on left back vertical beam and right back vertical beam.Before connect crossbeam right ends weld respectively on the left side central portion of the right side central that is fixedly connected on left front vertical beam and right front vertical beam.The right ends that the back connects crossbeam is welded respectively on the left side central portion of the right side central that is fixedly connected on left back vertical beam and right back vertical beam.On the rear and front end that a top left side connects longeron is welded in the middle part of the front side of the rear side middle part that is fixedly connected on left front vertical beam and left back vertical beam respectively.On the right rear and front end that connects longeron, top is welded in the middle part of the front side of the rear side middle part that is fixedly connected on right front vertical beam and right back vertical beam respectively.
The right ends that connects crossbeam before the above-mentioned top is welded respectively on the left upper portion of the right upper portion that is fixedly connected on left front vertical beam and right front vertical beam.The right ends that connects crossbeam behind the top is welded respectively on the left upper portion of the right upper portion that is fixedly connected on left back vertical beam and right back vertical beam.
The back upper lateral part of the left front vertical beam of the support of material guide device and the preceding upper lateral part of left back vertical beam on the left of the rear and front end of the top connection longeron of the support of above-mentioned left side material guide device is welded respectively and is fixedly connected on.2 charging basket brace summers of the support of left side material guide device are divided into before the charging basket brace summer behind the brace summer and charging basket by the difference of its residing front and back position.Before the charging basket behind brace summer and the charging basket brace summer be the top that to the right " eight " font is symmetricly set on the charging basket bracing frame.Wherein, brace summer is contacted by the rear side right part that is connected crossbeam before its right-hand member and the top before the charging basket, and both are weldingly fixed on together at touching position.Brace summer is contacted by its left side is connected the position, right side of longeron with top front portion before the charging basket, and both are weldingly fixed on together at touching position.Brace summer is contacted by the front side right part that is connected crossbeam behind its right part end face and the top behind the charging basket, and both are weldingly fixed on together at touching position.Brace summer is contacted by its left side is connected longeron with top rear portion, right side behind the charging basket, and both are weldingly fixed on together at touching position.
The rear and front end that the top of the support of above-mentioned right side material guide device connects longeron is welded back upper lateral part and the preceding upper lateral part of right back vertical beam of the right front vertical beam of the support that is fixedly connected on the right side material guide device respectively.
2 charging basket brace summers of the support of above-mentioned right side material guide device are divided into before the charging basket brace summer behind the brace summer and charging basket by the difference of its residing front and back position.Before the charging basket behind brace summer and the charging basket brace summer be the top that left " eight " font is symmetricly set on the charging basket bracing frame.Wherein, brace summer is contacted by the rear side left part that is connected crossbeam before its left end and the top before the charging basket, and both are weldingly fixed on together at touching position.Brace summer is contacted by its right side is connected the left side of longeron with top front portion before the charging basket, and both are weldingly fixed on together at touching position.Brace summer is contacted by the front side left part that is connected crossbeam behind its left part end face and the top behind the charging basket, and both are weldingly fixed on together at touching position.Brace summer is contacted by its right side is connected the right side of longeron with top rear portion behind the charging basket, and both are weldingly fixed on together at touching position.
The front end of above-mentioned each slide carriage joist is weldingly fixed on preceding connection crossbeam, and the rear portion of each slide carriage joist connects crossbeam and is weldingly fixed on behind the bottom, thereby the mode under after making each slide carriage joist all go up extremely along the past is obliquely installed on support.
The left plate of above-mentioned deflector chute is fixed by the right flank of its left surface and the left front vertical beam of body frame body is connected longeron with a left side right flank welding, and the upper edge of left plate is and is horizontally disposed with.The right plate of deflector chute is fixed with the right left surface welding that is connected longeron by the left surface of its right flank and the right front vertical beam of body frame body, and the upper edge of right plate is and is horizontally disposed with.
With the technique scheme is that basic technical scheme is: the guide structural member also comprises about the edge to horizontally disposed 1 joist tie-beam and bracing frame.Each slide carriage joist is weldingly fixed on by the upper side of its rear end with the joist tie-beam.
Above-mentioned bracing frame is the shaped as frame that Open Side Down, and bracing frame comprises 2 the support vertical beams and 1 horizontally disposed crossbeam that is connected that vertically are provided with.2 are supported vertical beam and are divided into a left side by the difference of its position, residing left and right sides and support vertical beam and the right vertical beam that supports.Connect crossbeam and be opening upwards and along about be higher than the special-shaped channel-section steel of groove back side panel to horizontally disposed groove front side board, the sagittal middle part with corresponding 3 slide carriage joists of the perpendicular setting that is positioned at the top is weldingly fixed on from the below respectively for the left part at its notch position, middle part and right part.The upper surface that the right ends that connects crossbeam supports vertical beam with a left side respectively is weldingly fixed on the right upper surface of supporting vertical beam and constitutes bracing frame.The lower surface that vertical beam is supported on a left side is weldingly fixed on the sagittal middle part that bottom, left connects the longeron upper side, and the right lower surface of supporting vertical beam is weldingly fixed on the sagittal middle part that bottom, right connects the upper side of longeron.
The technical scheme that is the basis with above-mentioned each relevant art scheme is: also comprise buffer unit.Buffer unit comprises buffer board and gripper shoe.Buffer board is the elongated rectangular shape steel plate; Buffer board by its long side direction along about on the rear positions of the upper side that is horizontally set on slide carriage; The welding of the contacted part of its front side and slide carriage is fixing, and the arcuate indentation of the back side edge edge of buffer board and slide carriage foremost near.The width of buffer board short side direction is 70 millimeters to 150 millimeters.About the length of buffer board long side direction and slide carriage to length corresponding.Be provided with 2 to 8 blocks of right angled triangle steel plates about dividing between the downside of buffer board and the upper side of slide carriage as gripper shoe; Each gripper shoe is fixed by a side of its hypotenuse and the upper side welding of slide carriage, and a side of the horizontal right-angle side above each gripper shoe is positioned at by it and the downside welding of buffer board are fixing.
The utlity model has positive effect: (1) is in the furnace cupola field; The material guide device of the charging system of the furnace cupola of the utility model belongs to original utility model to be created; Be the upgraded product of this area, also can undergo technological transformation and meet requirement of safe production existing furnace cupola.
(2) material guide device of the charging system of the furnace cupola of the utility model belongs to ground-breaking utility model; It is simple in structure; Be arranged on the outside of the body of heater of furnace cupola master stove during use; And be positioned at the charge door place of main stove, the slide carriage of the deflector chute of material guide device with respect to the horizontal plane is obliquely installed according to low orientation, preceding high back.When reinforced; To the traditional direct feeding mode that furnace charge directly drops in the burner hearth being changed: by charging basket furnace charge is precipitated on the slide carriage of the deflector chute of the material guide device of the utility model earlier by charging basket; Under the gravity effect, import the indirect feeding mode in the burner hearth again by this deflector chute; This is a kind of brand-new feed way of this area; It provides possibility technically for the dwindling of area of charge door, and then helps solving flue gas from the excessive problem of charge door, thereby makes the material guide device of the utility model become a kind of ground-breaking utility model.
(3) supporting structure of the material guide device of the charging system of the furnace cupola of the utility model can adopt various ways; For example with cement and brick be built into wedge shape supporting base, be welded into bracing frame of frame structure etc. with I-steel or channel-section steel or angle steel, simple and reliable for structure.
(4) furnace cupola of charging system of using the furnace cupola of the utility model can be arranged to the height of the charge door that is positioned at sidepiece to be significantly smaller than the height of the side charging mouth of existing furnace cupola; Its numerical value is selected in 0.4 to 1.5 meter scope according to the size of melting rate (per hour 3 tons to 30 tons); Preferred 0.6 to 1 meter of this scope; The width of described charge door is corresponding with the body of heater internal diameter, even is slightly less than the body of heater internal diameter, and the width that also is charge door is 80% to 100% of a body of heater internal diameter; Thereby the negative pressure (being commonly called as the gas effect of pulling out) that the thermal current rising is produced can connect the whole chimney part of body of heater; Stack effect is not fully exerted, and this has solved people and will solve and an open question for a long time fundamentally having solved high-temperature furnace gas at the technical barrier that charge door leaks; Make that not only workshop condition takes on an entirely new look; And fundamentally eliminated the danger of operating personnel's anthracemias, also fundamentally solved the problem of the normal silicosis occupational diseases of suffering from of operating personnel, the energy of required consumption when greatly reducing follow-up smoke processing system air inducing simultaneously.
(5) consider that material guide device in the charging system of the furnace cupola of the utility model is when importing furnace charge; Reduce furnace charge along the downward landing of the slide carriage of deflector chute get into burner hearth because of inertial impaction in the crashproof impulsive force that puts; The steel plate that preferably on the position, posterior end of the upper side of the slide carriage of deflector chute, is horizontally disposed with a rectangle is as buffer board; Between the upper side of the downside of this buffer board and slide carriage, be welded with the gripper shoe that is used to support buffer board; Thereby make the downslide to furnace charge have certain deceleration buffer effect, furnace charge is greatly being alleviated along the impact to the crashproof cover of main stove in the process in slide carriage landing to the burner hearth.
(6) charging system of the furnace cupola of the utility model only is provided with a feeding system, has not only reduced the floor space of equipment greatly, and has improved usage ratio of equipment.
Description of drawings
Fig. 1 is the structural representation of the material guide device of the utility model;
Fig. 2 is the sketch map when observing from the rear of Fig. 1;
Fig. 3 is the schematic top plan view of the material guide device when top, the right side of Fig. 1 is observed;
Fig. 4 is the structural representation of furnace cupola;
Fig. 5 for the crash protection circle be arranged in the body of heater cross-sectional schematic and with the mounting structure sketch map of material guide device; Wherein the chimney of body of heater part is not drawn;
Sketch map when Fig. 6 is applied on two furnace cupolas for the charging system of the utility model;
Fig. 7 is the sketch map of crash protection circle of the body of heater of furnace cupola;
Fig. 8 is the sketch map of A when observing from Fig. 7;
Fig. 9 is the deflector chute of the utility model and the annexation sketch map of crash protection circle;
Figure 10 is the sketch map when the lower direction of Fig. 9 is observed.
Mark in the above-mentioned accompanying drawing is following:
Material guide device 1, support 11, body frame body 11a, charging basket bracing frame 11b,
Left vertical beam 11-1, left front vertical beam 11-1a, left back vertical beam 11-1b, right vertical beam 11-2, right front vertical beam 11-2a; Right back vertical beam 11-2b, the bottom connects crossbeam 11-3, connects crossbeam 11-3a before the bottom, connects crossbeam 11-3b behind the bottom, connects crossbeam 11-4; The preceding crossbeam 11-4a that connects, the back connects crossbeam 11-4b, and top connects crossbeam 11-5, connection crossbeam 11-5a before the top; Connect crossbeam 11-5b behind the top, the bottom connects longeron 11-6, and bottom, left connects longeron 11-6a, and bottom, right connects longeron 11-6b; Connect longeron 11-7, a left side connects longeron 11-7a, the right longeron 11-7b that connects, and top connects longeron 11-8; Brace summer 11-9a before the charging basket brace summer 11-9, charging basket, brace summer 11-9b behind the charging basket
Guide structural member 12, deflector chute 12-10, slide carriage 12-1, arcuate indentation position 12-1-1 left plate 12-2; Right plate 12-3, slide carriage joist 12-4, left side slide carriage joist 12-4a, middle part slide carriage joist 12-4b; Right side slide carriage joist 12-4c, joist tie-beam 12-5, bracing frame 12-6 supports vertical beam 12-6-1; Vertical beam 12-6-1a is supported on a left side, and the right vertical beam 12-6-1b that supports connects crossbeam 12-6-2
Buffer unit 13, buffer board 13-1, gripper shoe 13-2,
Body of heater 2, furnace bottom part 2a, cupola well part 2b, shaft part 2c, chimney part 2d,
Support section 20,
Shell 21, furnace lining 22, hearth body 22-1,
Crash protection circle 23, circle body 23-1, flanged plate 23-2, the breach 23-3 that feeds intake, feeding device 3, guide rail 31, hopper 32.
The specific embodiment
For the convenience of describing; The utility model will be called the front side towards a side of charge door; And the side that common forehearth is placed is called rear side, so the specific descriptions orientation of present embodiment describes according to concrete orientation shown in Figure 6, and the preceding above-below direction of Fig. 6 is the fore-and-aft direction (being also referred to as vertically) of description; Be the top towards the side of Fig. 6 promptly also, a side who deviates from Fig. 6 is the below; The left and right directions of Fig. 6 is the left and right directions (being also referred to as laterally) of description.Part with near the centre of two furnace cupolas is called the inboard.
(embodiment 1, the charging system of furnace cupola)
See Fig. 1 and Fig. 6, the charging system of the furnace cupola of the utility model comprises material guide device 1 and feeding device 3.
Material guide device 1 has two, the symmetrical configuration of two material guide devices 1, and two material guide devices (1) are symmetrical basically with respect to a sagittal vertical guide between them, are separately positioned on the front side of corresponding furnace cupola during use.Two material guide devices 1 are divided into left side material guide device 1a and right side material guide device 1b by the difference of its position, residing left and right sides.
Two material guide devices 1 include supporting structure, guide structural member 12 and buffer unit 13.Supporting structure is cement and the brick supporting base or the steel construction bracing frame framework that are built into wedge shape (the present embodiment bracing frame that the steel component of each straight type is fixedly connected sequentially each other and constitutes of serving as reasons, the steel component of described straight type are I-steel or/and channel-section steel or/and angle steel).The supporting structure of material guide device 1 comprises support 11, and support 11 is made up of body frame body 11a and two parts of charging basket bracing frame 11b.Charging basket bracing frame 11b is positioned at the top of body frame body 11a; And both are with the hold together support 11 of formula of all shared mode of each root vertical beam; The latter half of each vertical beam is as the vertical beam of body frame body 11a, and the first half of each vertical beam is as the vertical beam of charging basket bracing frame 11b.
The right upper portion and the top side of the support 11 of left side material guide device 1a are opening-wide state.The left upper portion and the top side of the support 11 of right side material guide device 1b are opening-wide state.Guide structural member 12 is fixed in the corresponding support 11 according to the low inclination mode in preceding high back.
Said each support 11 includes about branch along vertical 2 left vertical beam 11-1 and 2 right vertical beam 11-2 to setting; Connect crossbeam 11-3 to horizontally disposed 2 root bottom parts about the lower edge on the branch and be connected crossbeam 11-4 with 2; Divide about the edge, front and back and connect crossbeam 11-5, connect longeron 11-6 to horizontally disposed 2 root bottom parts before and after the lower edge on the branch and be connected longeron 11-7,1 top connection longeron 11-8 and 2 charging basket brace summer 11-9 with 2 to horizontally disposed 2 tops.
2 left vertical beam 11-1 are divided into left front vertical beam 11-1a and left back vertical beam 11-1b according to the difference of residing front and back position, and 2 right vertical beam 11-2 are divided into right front vertical beam 11-2a and right back vertical beam 11-2b according to the difference of residing front and back position.2 root bottom parts connect crossbeam 11-3 and are divided into according to the difference of residing front and back position and are connected crossbeam 11-3b after connecting crossbeam 11-3a and bottom before the bottom, 2 connect crossbeam 11-4 according to the difference of residing front and back position be divided into preceding connection crossbeam 11-4a with after be connected crossbeam 11-4b.2 top connects crossbeam 11-5 and is divided into according to the difference of residing front and back position and is connected crossbeam 11-5b after connecting crossbeam 11-5a and top before the top.2 root bottom parts connect longeron 11-6 and are divided into bottom, left according to the difference of position, the residing left and right sides and connect longeron 11-6a and is connected longeron 11-6b with bottom, right, and 2 connect that longeron 11-7 is divided into left side connection longeron 11-7a according to the difference of position, the residing left and right sides and the right side is connected longeron 11-7b.
2 left vertical beam 11-1 and 2 right vertical beam 11-2 are I-steel; Each root vertical beam is all with the state setting of opening towards fore-and-aft direction; The lower end of each root vertical beam is fixed on this operating platform through the foundation bolt in the operating platform that is embedded in reinforced concrete structure, and 4 vertical beams are arranged on four angles of a hypothetical rectangle.
2 root bottom parts connect crossbeam 11-3 and are I-steel, and 2 root bottom parts connect crossbeam 11-3 all with the state setting of opening towards fore-and-aft direction.The right ends that connects crossbeam 11-3a before the bottom is welded respectively on the bottom, left side of the lower right side that is fixedly connected on left front vertical beam 11-1a and right front vertical beam 11-2a; The right ends that bottom back connects crossbeam 11-3b is welded respectively on the bottom, left side of the lower right side that is fixedly connected on left back vertical beam 11-1b and right back vertical beam 11-2b.
2 connect crossbeam 11-4 and are channel-section steel.Before connect crossbeam 11-4a right ends weld respectively on the left side central portion of the right side central that is fixedly connected on left front vertical beam 11-1a and right front vertical beam 11-2a, and preceding connection crossbeam 11-4a is with opening state setting forward.The back connects crossbeam 11-4b right ends welds respectively on the left side central portion of the right side central that is fixedly connected on left back vertical beam 11-1b and right back vertical beam 11-2b, and the back connects crossbeam 11-4b with opening state setting forward.
It is channel-section steel that 2 tops connect crossbeam 11-5.The right ends that connects crossbeam 11-5a before the top is welded respectively on the left upper portion of the right upper portion that is fixedly connected on left front vertical beam 11-1a and right front vertical beam 11-2a, and on the top before connection crossbeam 11-5a with opening state setting forward.The right ends that connects crossbeam 11-5b behind the top is welded respectively on the left upper portion of the right upper portion that is fixedly connected on left back vertical beam 11-1b and right back vertical beam 11-2b, and connects crossbeam 11-5b behind the top with opening state setting backward.
2 root bottom parts connect longeron 11-6 and are channel-section steel.Weld respectively on the preceding side lower part of the back side lower part that is fixedly connected on left front vertical beam 11-1a and left back vertical beam 11-1b the rear and front end that bottom, left connects longeron 11-6a, and bottom, left connects longeron 11-6a with the state setting that Open Side Down.Weld respectively on the preceding side lower part of the back side lower part that is fixedly connected on right front vertical beam 11-2a and right back vertical beam 11-2b the rear and front end that bottom, right connects longeron 11-6b, and bottom, right connects longeron 11-6b with the state setting that Open Side Down.
2 connect longeron 11-7 and are channel-section steel.Weld respectively on the middle part, front side of the rear side middle part that is fixedly connected on left front vertical beam 11-1a and left back vertical beam 11-1b the rear and front end that a left side connects longeron 11-7a, and left side connection longeron 11-7a is with opening state setting to the right.Weld respectively on the middle part, front side of the rear side middle part that is fixedly connected on right front vertical beam 11-2a and right back vertical beam 11-2b the right rear and front end that connects longeron 11-7b, and right connection longeron 11-7b is with opening state setting left.
It is channel-section steel that top connects longeron 11-8.2 charging basket brace summer 11-9 are channel-section steel.2 charging basket brace summer 11-9 are divided into before the charging basket brace summer 11-9b behind the brace summer 11-9a and charging basket by the difference of its residing front and back position.
The back upper lateral part of the left front vertical beam 11-1a of the support 11 of material guide device 1a and the preceding upper lateral part of left back vertical beam 11-1b on the left of the rear and front end of the top connection longeron 11-8 of the support 11 of left side material guide device 1a is welded respectively and is fixedly connected on, and top connects longeron 11-8 with opening state setting left.
Before the charging basket of the support 11 of left side material guide device 1a behind brace summer 11-9a and the charging basket brace summer 11-9b be the top that to the right " eight " font is symmetricly set on the charging basket bracing frame 11b of support 11.Brace summer 11-9a is with the state setting of opening towards the left front before the charging basket, and brace summer 11-9b is with the state setting of opening towards the left back behind the charging basket.
Before the charging basket right side of the shaped as frame of brace summer 11-9a be processed to be positioned at along about on the vertical guide that is provided with, the left side of the shaped as frame of brace summer 11-9a is processed to be positioned at along front and back on the vertical guide that is provided with before the charging basket.Brace summer 11-9a is contacted by the rear side right part that is connected crossbeam 11-5a before its right side and the top before the charging basket, and both are weldingly fixed on together at touching position.Brace summer 11-9a is contacted by its left side is connected longeron 11-8 with top front portion, right side before the charging basket, and both are weldingly fixed on together at touching position.
Behind the charging basket right side of the shaped as frame of brace summer 11-9b be processed to be positioned at along about on the vertical guide that is provided with, the left side of the shaped as frame of brace summer 11-9b is processed to be positioned at along front and back on the vertical guide that is provided with behind the charging basket.Brace summer 11-9b is contacted by the front side right part that is connected crossbeam 11-5b behind its right side and the top behind the charging basket, and both are weldingly fixed on together at touching position.Brace summer 11-9b is contacted by its left side is connected longeron 11-8 with top rear portion, right side behind the charging basket, and both are weldingly fixed on together at touching position.
The rear and front end that the top of the support 11 of right side material guide device 1b connects longeron 11-8 is welded back upper lateral part and the preceding upper lateral part of right back vertical beam 11-2b of the right front vertical beam 11-2a of the support 11 that is fixedly connected on right side material guide device 1b respectively, and top connects longeron 11-8 with opening state setting to the right.
Before the charging basket of the support 11 of right side material guide device 1b behind brace summer 11-9a and the charging basket brace summer 11-9b be the top that left " eight " font is symmetricly set on support 11.Brace summer 11-9a is with the state setting of opening towards the right front before the charging basket, and brace summer 11-9b is with the state setting of opening towards the right back behind the charging basket.
Before the charging basket left side of the shaped as frame of brace summer 11-9a be processed to be positioned at along about on the vertical guide that is provided with, the right side of the shaped as frame of brace summer 11-9a is processed to be positioned at along front and back on the vertical guide that is provided with before the charging basket.Brace summer 11-9a is contacted by the rear side left part that is connected crossbeam 11-5a before its left side and the top before the charging basket, and both are weldingly fixed on together at touching position.Brace summer 11-9a is contacted by its right side is connected longeron 11-8 with top front portion, left side before the charging basket, and both are weldingly fixed on together at touching position.
Behind the charging basket left side of the shaped as frame of brace summer 11-9b be processed to be positioned at along about on the vertical guide that is provided with, the right side of the shaped as frame of brace summer 11-9b is processed to be positioned at along front and back on the vertical guide that is provided with behind the charging basket.Brace summer 11-9b is contacted by the front side left part that is connected crossbeam 11-5b behind its left side and the top behind the charging basket, and both are weldingly fixed on together at touching position.Brace summer 11-9b is contacted by its right side is connected longeron 11-8 with top rear portion, left side behind the charging basket, and both are weldingly fixed on together at touching position.
Guide structural member 12 comprises slide carriage 12-1, left plate 12-2, right plate 12-3 and slide carriage joist 12-4.Left plate 12-2 and right plate 12-3 are steel plate, and slide carriage 12-1 is steel plate or preferably is welded with one deck wearing layer in the upper side of the general steel plate mode through built-up welding.Slide carriage 12-1 is obliquely installed according to the low mode in preceding high back; Slide carriage 12-1 is towards last rear; Slide carriage 12-1 towards be deflector chute 12-10 towards; Slide carriage 12-1's is upper side towards posterosuperior side, and the side towards the front lower place of slide carriage 12-1 is a downside, and the tilt angle alpha of slide carriage 12-1 (also being slide carriage 12-1 and horizontal plane angle) is 28 degree to 45 degree (present embodiment is 35 degree); The position, rear end of slide carriage 12-1 is provided with accurate arc breach; The arc circular arc limit of this standard is the elliptic arc limit of an ellipse, so the position, rear end of slide carriage 12-1 is the 12-1-1 of arcuate indentation portion, and when the 12-1-1 of this arcuate indentation portion is to use and the 12-1-1 of this arcuate indentation portion of the interconnective position of crash protection circle of body of heater and interconnective position of crash protection circle of body of heater when being to use.
Slide carriage joist 12-4 has 1 to 6 (originally being embodied as 3), and 3 slide carriage joist 12-4 are divided into left side slide carriage joist 12-4a, middle part slide carriage joist 12-4b and right side slide carriage joist 12-4c according to the difference of position, the residing left and right sides.
3 slide carriage joist 12-4 are channel-section steel.Each slide carriage joist 12-4 all is obliquely installed with the mode under opening is after the state of front lower place is gone up extremely along the past; 3 slide carriage joist 12-4 are parallel each other; And the inclination angle beta of each the slide carriage joist 12-4 all tilt angle alpha with slide carriage 12-1 is identical; The side towards the back upper place that also is each slide carriage joist 12-4 trough floor separately is positioned on the same plane, and this plane and horizontal plane angle are the inclination angle beta of each slide carriage joist 12-4.The front end face of the shaped as frame of each slide carriage joist 12-4 all is processed to towards the end face on the vertical guide that is provided with about the same edge of being positioned at of the place ahead, and the rear portion end face of the shaped as frame of each slide carriage joist 12-4 all is processed into the end face on the same horizontal plane of being positioned at of below.Left side slide carriage joist 12-4a is contacted by the last left part position of the trailing flank of the trough floor that is connected crossbeam 11-4a before its front end face and the top; And both are weldingly fixed on together at touching position; The rear portion of left side slide carriage joist 12-4a is seated in the back, bottom and connects on the relevant position of crossbeam 11-3b from the top; And both are weldingly fixed on together at touching position, and the follower head of left side slide carriage joist 12-4a stretches out the back, bottom backward and connects crossbeam 11-3b; Middle part slide carriage joist 12-4b is contacted by middle position on the trailing flank of the trough floor that is connected crossbeam 11-4a before its front end face and the top; And both are weldingly fixed on together at touching position; The rear portion of middle part slide carriage joist 12-4b is seated in the back, bottom and connects on the relevant position of crossbeam 11-3b from the top; And both are weldingly fixed on together at touching position, and the follower head of middle part slide carriage joist 12-4b stretches out the back, bottom backward and connects crossbeam 11-3b.Right side slide carriage joist 12-4c is contacted by the last right part position of the trailing flank of the trough floor that is connected crossbeam 11-4a before its front end face and the top; And both are weldingly fixed on together at touching position; The rear portion of right side slide carriage joist 12-4c is seated in the back, bottom and connects on the relevant position of crossbeam 11-3b from the top; And both are weldingly fixed on together at touching position, and the follower head of right side slide carriage joist 12-4c stretches out the back, bottom backward and connects crossbeam 11-3b.
Guide structural member 12 also comprises about the edge to horizontally disposed 1 joist tie-beam 12-5.Joist tie-beam 12-5 is a channel-section steel; Joist tie-beam 12-5 is horizontally disposed with and Open Side Down along left and right directions; Each slide carriage joist 12-4 is contacted with the upper side of the trough floor of joist tie-beam 12-5 by end surface thereafter, and each comfortable touching position is weldingly fixed on together.
Guide structural member 12 also comprises bracing frame 12-6.Bracing frame 12-6 is the shaped as frame that Open Side Down, and bracing frame 12-6 comprises 2 the support vertical beam 12-6-1 and 1 horizontally disposed crossbeam 12-6-2 that is connected that vertically are provided with.2 are supported vertical beam 12-6-1 and are divided into a left side by the difference of its position, residing left and right sides and support vertical beam 12-6-1a and the right vertical beam 12-6-1b that supports.Connect crossbeam 12-6-2 is higher than the groove back side panel for the groove front side board special-shaped channel-section steel.Connect state that crossbeam 12-6-2 makes progress with opening along about to being horizontally disposed with; The left part at its notch position, middle part and right part contact with the middle part that the front and back at notch position of corresponding 3 slide carriage joist 12-4 of the perpendicular setting that is positioned at the top make progress respectively, and are weldingly fixed on together in the part that is in contact with one another separately.The left lower surface of supporting the shaped as frame of vertical beam 12-6-1a is connected longeron 11-6a upper side with bottom, left sagittal middle part contacts and is fixing in the touching position welding; The upper surface that the shaped as frame of vertical beam 12-6-1a is supported on a left side contacts with the left part of the downside that is connected crossbeam 12-6-2, and fixing in the touching position welding.The right lower surface of supporting the shaped as frame of vertical beam 12-6-1b is connected the upper side of longeron 11-6b with bottom, right sagittal middle part contacts and is fixing in the touching position welding; The right upper surface of supporting the shaped as frame of vertical beam 12-6-1b contacts with the right part of the downside that is connected crossbeam 12-6-2, and fixing in the touching position welding.Thereby left side support vertical beam 12-6-1a, connection crossbeam 12-6-2 and right support vertical beam 12-6-1b form and are weldingly fixed on the downward shaped as frame bracing frame 12-6 of integral finish on the body frame body 11a.
Slide carriage 12-1 is weldingly fixed on from the top on corresponding left side slide carriage joist 12-4a, middle part slide carriage joist 12-4b and the right side slide carriage joist 12-4c by its downside towards the front lower place.The lower side edge of left plate 12-2 and right plate 12-3 is all towards the front lower place; Their the angle of inclination all tilt angle alpha with slide carriage 12-1 is identical; Left plate 12-2 by its lower side along from the top the airtight left side that is weldingly fixed on slide carriage 12-1 along last; Left plate 12-1 is contacted with the right flank that a left side is connected longeron 11-7a by the right flank of its left surface and the left front vertical beam 11-1a of body frame body 11a, and fixes being in contact with one another the position welding, and the upper edge of left plate 12-2 is and is horizontally disposed with.Right plate 12-3 by its lower side along from the top the airtight right edge that is weldingly fixed on slide carriage 12-1 along last; Right plate 12-3 is contacted with the right left surface that is connected longeron 11-7b with the left surface of the right front vertical beam 11-2a of body frame body 11a by its right flank; And in that to be in contact with one another position welding fixing, the upper edge of right plate 12-3 is and is horizontally disposed with.Thereby make slide carriage 12-1, left plate 12-2 and right plate 12-3 form opening towards posterosuperior deflector chute 12-10.
Buffer unit 13 comprises buffer board 13-1 and gripper shoe 13-2.Buffer board 13-1 is the elongated rectangular shape steel plate; Buffer board 13-1 by its long side direction along about on the rear end that is horizontally set on slide carriage 12-1; The welding of the contacted part of its front side and slide carriage 12-1 is fixing, and the arcuate indentation of the back side edge edge of buffer board 13-1 and slide carriage 12-1 foremost near.The width of buffer board 13-1 short side direction is 70 millimeters to 150 millimeters (present embodiment is 100 millimeters).About the length of buffer board 13-1 long side direction and slide carriage 12-1 to length corresponding.Be provided with equally spaced 2 to 8 blocks of right angled triangle steel plates about dividing between the upper side of the downside of buffer board 13-1 and slide carriage 12-1 as gripper shoe 13-2 (present embodiment is 3); Each gripper shoe 13-2 is fixed by a side of its hypotenuse and the upper side welding of slide carriage 12-1, and a side of the horizontal right-angle side above each gripper shoe 13-2 is positioned at by it and the downside welding of buffer board 13-1 are fixing.
Feeding device 3 comprises guide rail 31, hopper 32 and steel-wire rope type electric block.Guide rail 31 along about to the top at the sagittal middle part that is horizontally set on two material guide devices 1; And be positioned at before the charging basket behind the brace summer 11-9a and charging basket on the plane of symmetry of brace summer 11-9b, thus make that hopper 32 can be in two material guide devices 1 any one above carry out blanking.Steel-wire rope type electric block is rolled by its motor-driven carrier and is arranged on the guide rail 31, and can be along guide rail about 31 to moving horizontally.Hopper 32 adopts Chinese patent document CN2120797U (number of patent application 92211335.1) disclosed " a kind of well formula loading hopper ".Hopper 32 hangs on the suspension hook of steel-wire rope type electric block, and the suspended core of this suspension hook links to each other with steel wire rope, and said wire rope roll is on the reel of steel-wire rope type electric block.
(the corresponding charging system of 1, two furnace cupola of application examples)
See Fig. 4 to Fig. 6, furnace cupola 2 that should use-case has two.Two furnace cupolas 2 include the support section 20 and body of heater 2 that sets gradually from the bottom to top.The body of heater of furnace cupola that should use-case is a side charging formula body of heater 2, comprises furnace bottom part 2a, cupola well part 2b, shaft part 2c and chimney part 2d successively according to from the bottom to top order.The support section 20 of furnace cupola comprises basis, pillar, drop-bottom and bottom door.Body of heater 2 is the annulus cylindricality basically; It is the part on the drop-bottom that is seated in furnace cupola support section 20 of furnace cupola; Body of heater 2 comprises that mainly columnar shell of being processed by steel plate 21 and the material that is fixed on shell 21 inwalls are the furnace lining 22 of refractory material; Wherein, the part to the charge door lower edge from drop-bottom of furnace lining 22 is hearth body 22-1.
See Fig. 5 to Fig. 8, body of heater 2 also comprises crash protection circle 23.Crash protection circle 23 is welded to each other fixing by the circle body 23-1 of cylinder hull shape and the tabular flanged plate 23-2 of horizontal circular ring that is positioned at the circle body top and constitutes.Crash protection circle 23 is on the top end face of the inwall that is pressed in hearth body 22-1 under the gravity effect by the lower surface of its flanged plate 23-2; And the circumferential lateral surface by its circle body 23-1 contacts with the top of the inwall of hearth body 22-1, thereby makes crash protection circle 23 be fixed on the hearth body 22-1.Crash protection circle 23 is provided with the breach 23-3 that feeds intake, and this breach 23-3 that feeds intake is positioned at the front side, top of crash protection circle 23, and the rear shape of the deflector chute 12-10 of the material guide device 1 of the shape of this breach 23-3 that feeds intake when using is corresponding.After being cut away by the front side, top to collision guard circle 23, the breach 23-3 that feeds intake of crash protection circle 23 obtains; Comprising high back before imaginary by 1 low with inclination angle horizontal plane be the intersecting foremost of top of tapered plane and the circle body 23-1 of crash protection circle 23 of α, the described imaginary tapered plane in edge is to the back lower place cutting that the circle body 23-1 that hits guard circle 23 and flanged plate 23-2 carried out that crashes again; The scope of described inclined angle alpha be 28 degree to 45 degree, preferred 33 degree are to 40 degree (present embodiment be 35 degree).
To being cut into of being carried out of front side, top of collision guard circle 23 by intersecting with the corresponding site of the first half at the top of crash protection circle 23 from top to bottom to the vertical guide that is provided with about 1 imaginary edge; Again along described imaginary vertical guide downwards to circle body 23-1 and the flanged plate 23-2 of collision guard circle 23 carry out up to intersecting with described imaginary tapered plane by cutting, and about this to vertical guide and the joining of the left and right sides of the top of crash protection circle 23 and circle body 23-1 between distance be said circle body 23-1 internal diameter 80% to 100%.
Before the blow-on, closed bottom door, and with the tamping of sand compound as furnace bottom.The charge door 24 of body of heater 2 is positioned at the bottom of chimney part 2d.The height of charge door 24 is 400 millimeters to 1500 millimeters (present embodiment is 800 millimeters); The width of described charge door is corresponding with the body of heater internal diameter of furnace cupola; Even be slightly less than the cupola body internal diameter, also be that charge door 24 width are 80% to 100% (present embodiment is 80%) of internal diameter of the hearth body 22-1 of body of heater 2.
See Fig. 5 and Fig. 6, Fig. 9 and Figure 10; When this material guide device 1 is installed; The arcuate indentation position 12-1-1 of the slide carriage 12-1 of the deflector chute 12-10 of material guide device 1 is weldingly fixed on together along the contacted edge of breach 23-3 that feeds intake of the crash protection circle 23 of the upper furnace of the body of heater that is arranged on furnace cupola 2; And slide carriage 12-1 fills sealing by refractory brick and fire clay between the upper surface at the position, lower edge of the charge door 24 of the position of the charge door that stretches into body of heater 24 of the downside of front lower place and body of heater; Preferred outer surface at the sealing position again is provided with the curved plate as the extension of body of heater shell of a respective shapes; And it is the lower edge welding of the charge door 24 of the lower end of this steel plate and body of heater shell is fixing; End about this steel plate is fixing along welding with the right sides of the charge door 24 of body of heater shell respectively, the upper end and the corresponding site welding of the downside of slide carriage 12-1 of this steel plate are fixed.The rear end lower of the left side plate of deflector chute 12-10 contacts with the corresponding site of the breach 23-3 that feeds intake of the crash protection circle 23 of body of heater respectively, and welding is fixing each other; The left side of the left plate 12-2 of deflector chute 12-10 contacts with the body of heater shell, and welding is fixedly connected each other; The right side of the right plate 12-3 of deflector chute 12-10 contacts with the body of heater shell, and welding is fixedly connected each other; Thereby make and between left side, downside and right side, form hermetically-sealed construction between the charge door 24 of deflector chute 12-10 and body of heater 2 of material guide device 1.
When reinforced; With filling material in the hopper 32; Work the middle upper part that winches to two material guide devices 1 by steel-wire rope type electric block, the bottom bottom position of hopper 32 is higher than the upper surface of connection longeron 11-7 of the support 11 of material guide device 1, and the lower surface on the upper edge edge of hopper 32 is higher than the upper surface of support 11; Then with hopper 32 from left to right (or from right to left) send in the corresponding material guide device 1; When the left and right sides of hopper 32 simultaneously with corresponding charging basket before when brace summer 11-9b is tangent behind brace summer 11-9a and the charging basket, slowly put down hopper 32, be seated on the support 11 by its upper edge edge until hopper 32; Continue to transfer the steel wire rope of steel-wire rope type electric block; Utilize the gravity effect of material that the movable bottom of the blanking mechanism of the moving end of hopper 32 is opened then, material then along the slide carriage 12-1 of the guide structural member 12 of material guide device 1 to back lower place landing, when material landing during to buffer board 13-1; Speed slows down and is the flat burner hearth that shape falls into the furnace cupola of a corresponding job of throwing, thereby accomplishes feeding in raw material to furnace cupola.
Furnace cupola produces a large amount of flue gases when carrying out cast iron smelting, contain toxic gas and dust such as a large amount of carbon monoxide, sulfur dioxide in the flue gas, therefore produces flue gas and need handle accordingly usually, just can be disposed in the atmosphere.Usually adopt deduster to carry out dust removal process at present for the travel fatigue in the flue gas.And electric bag compound type dust remover and sack cleaner are use in the present industry many.When stating electric bag compound type dust remover and sack cleaner in the use the dust of furnace cupola being handled; Need flue gas be caused in the deduster through air-introduced machine; Therefore with said method the flue gas of the furnace cupola of quoting the utility model is carried out dust removal process; Can reduce the power of air-introduced machine greatly, make energy consumption reduce by 30% to 50%.
More than all embodiment only supply to explain the usefulness of the utility model; But not to the restriction of the utility model; The technical staff in relevant technologies field is under the situation of spirit that does not break away from the utility model and scope; Can also make various conversion and variation, can also carry out corresponding transformation according to the inspiration of the foregoing description and application examples in the concrete application process, so all technical schemes that are equal to should be included within the scope of patent protection of the utility model all.

Claims (6)

1. the charging system of a furnace cupola comprises feeding device (3), and feeding device (3) comprises guide rail (31); Hopper (32) and steel-wire rope type electric block; Steel-wire rope type electric block is rolled by its motor-driven carrier and is arranged on the guide rail (31), and can move along guide rail, and hopper (32) hangs on the suspension hook of steel-wire rope type electric block; The suspended core of this suspension hook links to each other with steel wire rope, and said wire rope roll is on the reel of steel-wire rope type electric block;
It is characterized in that: also comprise material guide device (1); Material guide device (1) has two; Be separately positioned on the front side of corresponding furnace cupola, two material guide devices (1) are divided into left side material guide device (1a) and right side material guide device (1b) by the difference of its position, residing left and right sides; Two material guide devices (1) include supporting structure and guide structural member (12), and two material guide devices (1) are symmetrical basically with respect to a sagittal vertical guide between them;
The supporting structure of each material guide device (1) is the support (11) of steel, and the serve as reasons steel component of each straight type of said support (11) is fixedly connected sequentially each other and constitutes, the steel component of described straight type be I-steel or/and channel-section steel or/and angle steel; Support (11) is for being the structural member of cuboid framework, and said support (11) comprises body frame body (11a) and charging basket bracing frame (11b); The top of body frame body (11a) is open state; Charging basket bracing frame (11b) is positioned at the top of body frame body (11a), and both are with the hold together support (11) of formula of all shared mode of each root vertical beam; The top and the right side of the charging basket bracing frame (11b) of the support (11) of said left side material guide device (1a) are open state; The top and the left side of the charging basket bracing frame (11b) of the support (11) of said right side material guide device (1b) are open state;
Guide structural member (12) comprises deflector chute (12-10); The opening of deflector chute (12-10) is towards last rear; The front end position of deflector chute (12-10) directly is fixedly connected on support (11) and goes up or be fixedly connected on the support (11) through other rigid member, and makes deflector chute (12-10) integral body be provided with according to the low inclination mode in preceding high back; Deflector chute (12-10) is a steel component, is made up of the left plate (12-2) that links to each other successively, slide carriage (12-1) and right plate (12-3); Slide carriage (12-1) is towards last rear, slide carriage (12-1) towards be deflector chute (12-10) towards, slide carriage (12-1) be upper side towards posterosuperior side, the scope of the tilt angle alpha of slide carriage (12-1) is that 28 degree are to 45 degree; The position, rear end of slide carriage (12-1) is provided with accurate arc breach; The arc circular arc limit of this standard is the elliptic arc limit of an ellipse; So the position, rear end of slide carriage (12-1) is arcuate indentation portion (12-1-1), when the bottom at the left plate (12-2) of this arcuate indentation portion (12-1-1) and deflector chute (12-10) and the position, rear end of right plate (12-3) is to use and the interconnective position, position at the breach that feeds intake (23-3) of the crash protection circle (23) of the body of heater (2) of furnace cupola place; The front portion of the upper side of slide carriage (12-1) is unscreened position, top, also the i.e. position of this position furnace charge that can accept when using to fall from the top;
The guide rail (31) of feeding device (3) along about to the front and back that are horizontally set on two material guide devices (1) to the top at middle part, thereby make hopper (32) to carry out blanking in any one top in two material guide devices (1).
2. the charging system of furnace cupola according to claim 1, it is characterized in that: guide structural member (12) also comprises slide carriage joist (12-4); The lower side edge of left plate (12-2) and right plate (12-3) is all towards the front lower place; Their the angle of inclination all tilt angle alpha with slide carriage (12-1) is identical; Left plate (12-2) by its lower side along from the top the airtight left side that is weldingly fixed on slide carriage (12-1) along last; Right plate (12-3) by its lower side along from the top the airtight right edge that is weldingly fixed on slide carriage (12-1) along last, thereby make slide carriage (12-1), left plate (12-2) and right plate (12-3) formation opening towards posterosuperior deflector chute (12-10); The scope of the tilt angle alpha of said slide carriage (12-1) is preferably 33 degree to 40 degree; Slide carriage joist (12-4) has 1 to 6; Each slide carriage joist (12-4) directly is fixed on the support (11), perhaps is fixed on the support (11) through rigid structural member; The side towards the front lower place of slide carriage (12-1) is a downside; Slide carriage (12-1) is weldingly fixed on the corresponding slide carriage joist (12-4) from the top by its downside, thereby makes deflector chute (12-10) be fixedly connected on the support (11) through slide carriage joist (12-4).
3. the charging system of furnace cupola according to claim 2, it is characterized in that: said slide carriage joist (12-4) has 3; 3 slide carriage joists (12-4) are divided into left side slide carriage joist (12-4a), middle part slide carriage joist (12-4b) and right side slide carriage joist (12-4c) according to the difference of position, the residing left and right sides; Each slide carriage joist (12-4) is parallel each other, and each slide carriage joist (12-4) all is obliquely installed on support (11) along the mode that in the past goes up to the back, and the inclination angle beta of each slide carriage joist (12-4) all the tilt angle alpha with slide carriage (12-1) is identical; The downside front end of slide carriage (12-1) is positioned on the front end position of each slide carriage joist (12-4); The front end position of each slide carriage joist (12-4) is fixed on the preceding upper lateral part of support (11), and makes the front end position of deflector chute (12-10) be fixedly connected on the support (11) through slide carriage joist (12-4); The rear portion of each slide carriage joist (12-4) is fixed on the back side lower part of support (11).
4. the charging system of furnace cupola according to claim 3; It is characterized in that: the vertical beam in the all-in-one-piece support (11) of said each material guide device (1) includes about branch along 2 piece left vertical beams (11-1) and the 2 piece right vertical beams (11-2) of vertical to setting; The latter half of described each vertical beam is as the vertical beam of body frame body (11a), and the first half of each vertical beam is as the vertical beam of charging basket bracing frame (11b); Described body frame body (11a) comprises that also branch upward connects crossbeams (11-4) to horizontally disposed 2 tops about the lower edge and is connected crossbeam (11-3) with 1 root bottom part, connects longeron (11-7) along front and back to horizontally disposed 2 tops; Described charging basket bracing frame (11b) also comprises about the edge and connects crossbeam (11-5), connects longeron (11-8) and horizontally disposed 2 charging basket brace summers (11-9) along front and back to horizontally disposed 1 top to horizontally disposed 1 top;
2 left vertical beams (11-1) are divided into left front vertical beam (11-1a) and left back vertical beam (11-1b) according to the difference of residing front and back position, and 2 right vertical beams (11-2) are divided into right front vertical beam (11-2a) and right back vertical beam (11-2b) according to the difference of residing front and back position; 2 connect connect before crossbeams (11-4) are divided into according to the difference of residing front and back position crossbeam (11-4a) with after be connected crossbeam (11-4b); It is to connect crossbeam (11-3b) after being positioned at the bottom at rear portion of support (11) that 1 root bottom part connects crossbeam (11-3); 2 top connection longerons (11-7) are divided into the right longeron (11-7b) that is connected of top left side connection longeron (11-7a) and top according to the difference of position, the residing left and right sides;
The right ends that bottom back connects crossbeam (11-3b) is welded respectively on the bottom, left side of the lower right side that is fixedly connected on left back vertical beam (11-1b) and right back vertical beam (11-2b); Before connect crossbeam (11-4a) right ends weld respectively on the left side central portion of the right side central that is fixedly connected on left front vertical beam (11-1a) and right front vertical beam (11-2a); The right ends that the back connects crossbeam (11-4b) is welded respectively on the left side central portion of the right side central that is fixedly connected on left back vertical beam (11-1b) and right back vertical beam (11-2b); On the rear and front end that a top left side connects longeron (11-7a) is welded in the middle part of the front side of the rear side middle part that is fixedly connected on left front vertical beam (11-1a) and left back vertical beam (11-1b) respectively; On the right rear and front end that connects longeron (11-7b), top is welded in the middle part of the front side of the rear side middle part that is fixedly connected on right front vertical beam (11-2a) and right back vertical beam (11-2b) respectively;
The right ends that connects crossbeam (11-5a) before the top is welded respectively on the left upper portion of the right upper portion that is fixedly connected on left front vertical beam (11-1a) and right front vertical beam (11-2a); The right ends that connects crossbeam (11-5b) behind the top is welded respectively on the left upper portion of the right upper portion that is fixedly connected on left back vertical beam (11-1b) and right back vertical beam (11-2b);
The back upper lateral part of the left front vertical beam (11-1a) of the support (11) of material guide device (1a) and the preceding upper lateral part of left back vertical beam (11-1b) on the left of the rear and front end of the top connection longeron (11-8) of the support (11) of left side material guide device (1a) is welded respectively and is fixedly connected on; 2 charging basket brace summers (11-9) of the support (11) of left side material guide device (1a) are divided into before the charging basket brace summer (11-9b) behind the brace summer (11-9a) and charging basket by the difference of its residing front and back position; Before the charging basket behind brace summer (11-9a) and the charging basket brace summer (11-9b) be the top that to the right " eight " font is symmetricly set on charging basket bracing frame (11b); Wherein, brace summer (11-9a) is contacted by the rear side right part that is connected crossbeam (11-5a) before its right-hand member and the top before the charging basket, and both are weldingly fixed on together at touching position; Brace summer (11-9a) is contacted by its left side is connected the position, right side of longeron (11-8) with top front portion before the charging basket, and both are weldingly fixed on together at touching position; Brace summer behind the charging basket (11-9b) is contacted by the front side right part that is connected crossbeam (11-5b) behind its right part end face and the top, and both are weldingly fixed on together at touching position; Brace summer behind the charging basket (11-9b) is contacted by its left side is connected longeron (11-8) with top rear portion, right side, and both are weldingly fixed on together at touching position;
The rear and front end that the top of the support (11) of right side material guide device (1b) connects longeron (11-8) is welded back upper lateral part and the preceding upper lateral part of right back vertical beam (11-2b) of the right front vertical beam (11-2a) of the support (11) that is fixedly connected on right side material guide device (1b) respectively;
2 charging basket brace summers (11-9) of the support (11) of right side material guide device (1b) are divided into before the charging basket brace summer (11-9b) behind the brace summer (11-9a) and charging basket by the difference of its residing front and back position; Before the charging basket behind brace summer (11-9a) and the charging basket brace summer (11-9b) be the top that left " eight " font is symmetricly set on charging basket bracing frame (11b); Wherein, brace summer (11-9a) is contacted by the rear side left part that is connected crossbeam (11-5a) before its left end and the top before the charging basket, and both are weldingly fixed on together at touching position; Brace summer (11-9a) is contacted by its right side is connected the left side of longeron (11-8) with top front portion before the charging basket, and both are weldingly fixed on together at touching position; Brace summer behind the charging basket (11-9b) is contacted by the front side left part that is connected crossbeam (11-5b) behind its left part end face and the top, and both are weldingly fixed on together at touching position; Brace summer behind the charging basket (11-9b) is contacted by its right side is connected the right side of longeron (11-8) with top rear portion, and both are weldingly fixed on together at touching position;
The front end of each slide carriage joist (12-4) is weldingly fixed on preceding connection crossbeam (11-4a); The rear portion of each slide carriage joist (12-4) connects crossbeam (11-3b) and is weldingly fixed on behind the bottom, thereby the mode under after making each slide carriage joist (12-4) all go up extremely along the past is obliquely installed on support (11);
The left plate (12-1) of deflector chute (12-10) is fixed by the right flank of its left surface and the left front vertical beam (11-1a) of body frame body (11a) is connected longeron (11-7a) with a left side right flank welding, and the upper edge of left plate (12-2) is and is horizontally disposed with; The right plate (12-3) of deflector chute (12-10) is fixed with the right left surface welding that is connected longeron (11-7b) by the left surface of its right flank and the right front vertical beam (11-2a) of body frame body (11a), and the upper edge of right plate (12-3) is and is horizontally disposed with.
5. the charging system of furnace cupola according to claim 4 is characterized in that: guide structural member (12) also comprise along about to horizontally disposed 1 joist tie-beam (12-5) and bracing frame (12-6); Each slide carriage joist (12-4) is weldingly fixed on by the upper side of its rear end with joist tie-beam (12-5);
Bracing frame (12-6) is the shaped as frame that Open Side Down, and bracing frame (12-6) comprises 2 the support vertical beams (12-6-1) and 1 horizontally disposed crossbeam (12-6-2) that is connected that vertically are provided with; 2 support vertical beams (12-6-1) are divided into left side support vertical beam (12-6-1a) and the right vertical beam (12-6-1b) that supports by the difference of its position, residing left and right sides; Connect crossbeam (12-6-2) for opening upwards and along about be higher than the special-shaped channel-section steel of groove back side panel to horizontally disposed groove front side board, the sagittal middle part with corresponding 3 slide carriage joists (12-4) of the perpendicular setting above being positioned at is weldingly fixed on from the below respectively for the left part at its notch position, middle part and right part; The upper surface that the right ends that connects crossbeam (12-6-2) supports vertical beam (12-6-1a) with a left side respectively is weldingly fixed on the right upper surface of supporting vertical beam (12-6-1b) and constitutes bracing frame (12-6); The lower surface that vertical beam (12-6-1a) is supported on a left side is weldingly fixed on the sagittal middle part that bottom, left connects longeron (11-6a) upper side, and the right lower surface of supporting vertical beam (12-6-1b) is weldingly fixed on the sagittal middle part that bottom, right connects the upper side of longeron (11-6b).
6. according to the charging system of the described furnace cupola of one of claim 1 to 5, it is characterized in that: also comprise buffer unit (13); Buffer unit (13) comprises buffer board (13-1) and gripper shoe (13-2); Buffer board (13-1) is the elongated rectangular shape steel plate; Buffer board (13-1) by its long side direction along about on the rear positions of the upper side that is horizontally set on slide carriage (12-1); The welding of the contacted part of its front side and slide carriage (12-1) is fixing, and the arcuate indentation of the back side edge edge of buffer board (13-1) and slide carriage (12-1) foremost near; The width of buffer board (13-1) short side direction is 70 millimeters to 150 millimeters; About the length of buffer board (13-1) long side direction and slide carriage (12-1) to length corresponding; Be provided with 2 to 8 blocks of right angled triangle steel plates about dividing between the upper side of the downside of buffer board (13-1) and slide carriage (12-1) as gripper shoe (13-2); Each gripper shoe (13-2) is fixed by a side of its hypotenuse and the upper side welding of slide carriage (12-1), and a side of the horizontal right-angle side above each gripper shoe (13-2) is positioned at by it and the downside welding of buffer board (13-1) are fixing.
CN2011204499364U 2011-11-14 2011-11-14 Charging system of cupola furnace Expired - Lifetime CN202361783U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011204499364U CN202361783U (en) 2011-11-14 2011-11-14 Charging system of cupola furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011204499364U CN202361783U (en) 2011-11-14 2011-11-14 Charging system of cupola furnace

Publications (1)

Publication Number Publication Date
CN202361783U true CN202361783U (en) 2012-08-01

Family

ID=46572964

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011204499364U Expired - Lifetime CN202361783U (en) 2011-11-14 2011-11-14 Charging system of cupola furnace

Country Status (1)

Country Link
CN (1) CN202361783U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102519243A (en) * 2011-11-14 2012-06-27 姚立猛 Charging system for cupola furnaces
CN106225473A (en) * 2016-09-08 2016-12-14 泰石岩棉有限公司 A kind of cupola furnace device produced for rock wool and distributing method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102519243A (en) * 2011-11-14 2012-06-27 姚立猛 Charging system for cupola furnaces
CN102519243B (en) * 2011-11-14 2013-11-27 姚立猛 Charging system for cupola furnaces
CN106225473A (en) * 2016-09-08 2016-12-14 泰石岩棉有限公司 A kind of cupola furnace device produced for rock wool and distributing method thereof

Similar Documents

Publication Publication Date Title
EP3370024B1 (en) Steel scrap preheating-type electric arc furnace
CN2906510Y (en) Horizontal continuous-charging scrap preheating device for electric arc steel smelting furnace
CN201764828U (en) short-flow conveying apparatus for preheating scrap steel
CN108866270A (en) A kind of steelmaking equipment
CN101825396A (en) Device for preheating and conveying scrap steel
CN103776270A (en) Calcium carbide sensible heat recovery equipment and method for calcium carbide furnace
CN110388830A (en) Scrap preheater, arc-melting equipment and pre-heating mean
CN102410725B (en) Material guiding device, cupola furnace body, and cupola furnace body provided with material guiding device
CN202361783U (en) Charging system of cupola furnace
CN208472142U (en) A kind of steelmaking equipment
CN202361780U (en) Furnace body of cupola furnace
CN209069003U (en) A kind of continuous charging pre-heating device
CN103170612A (en) Melting method of bonded iron on hot-metal ladle
CN102519243B (en) Charging system for cupola furnaces
CN202361781U (en) Cupola body with material guide device
CN103292594B (en) Furnace body of cupola furnace
CN209745007U (en) Continuous aluminum alloy centralized melting furnace
CN202361782U (en) Material guide device
CN103776271A (en) Calcium carbide sensible heat recovery equipment for calcium carbide furnace
CN203798180U (en) Calcium carbide furnace calcium carbide sensible heat recovery device
CN206772027U (en) A kind of improved grid section
CN201785438U (en) Compact dipping cover type molten steel refining device
CN208472141U (en) A kind of steelmaking equipment
CN210029830U (en) Special lifting appliance for replacing bell-less furnace top airtight box
CN103388978B (en) Material guiding device for electric-arc furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20120801

Effective date of abandoning: 20131127

RGAV Abandon patent right to avoid regrant