CN207296221U - Waterproof special form brick - Google Patents
Waterproof special form brick Download PDFInfo
- Publication number
- CN207296221U CN207296221U CN201720753591.9U CN201720753591U CN207296221U CN 207296221 U CN207296221 U CN 207296221U CN 201720753591 U CN201720753591 U CN 201720753591U CN 207296221 U CN207296221 U CN 207296221U
- Authority
- CN
- China
- Prior art keywords
- brick
- horizontal part
- vertical portion
- special form
- splicing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
Waterproof special form brick provided by the utility model, is related to building material technical field, and the purpose of this utility model is to provide a kind of waterproof special form brick for reducing floor tile splicing gap, effectively avoiding infiltration.Waterproof special form brick includes right angle brick and includes vertical portion and horizontal part to angle brick, right angle brick, and the vertical portion and the horizontal part intersect vertically, and the two is integrally formed.Angle brick is included:Horizontal part, the first vertical portion and the second vertical portion;Both are perpendicular to one another intersecting for any in the horizontal part, first vertical component effect and the second vertical component effect three, and are integrally formed.Right angle brick is applied to metope and ground intersection, itself is without splicing gap;Corner is applied to angle brick, itself applies without splicing gap, right angle brick and to angle brick expansion body shaping and do not splice gap at inner corner trim, solve the problems, such as that routine with easily seeping water at brick inner corner trim, improves integral waterproofing performance, extends building structure service life.
Description
Technical field
It the utility model is related to building material technical field, and in particular to waterproof special form brick.
Background technology
The reason for basic reason of most seepage in toilet water is that waterproof layer is ineffective, but most direct is undoubtedly defended
Domestic water between life is directly entered decorative layer lower part from surface seep, then leaks into lower floor's floor, and the approach leaked the
One step is exactly the gap that floor tile paving process produces, if can thoroughly solve to ooze under toilet floor tile gap, can not only prevent to defend
Leak between life, and greatly reduce the dependence to waterproof material function.
The content of the invention
Splice gap to solve the above problems, the purpose of this utility model is to provide a kind of floor tile that reduces, effectively avoid oozing
The waterproof special form brick of water.
In a first aspect, waterproof special form brick provided by the utility model, including:Vertical portion and horizontal part, the vertical portion
Intersect vertically with the horizontal part, and the two is integrally formed.
Further, the back side of the horizontal part is set fluted, and the both ends of the groove end in the water respectively
The side in flat portion.
Further, the horizontal part is used to the position of other floor tiles splicing be provided with splicing notch.
Further, the section of the splicing notch is vertical broken line.
Further, the splicing notch is used to the plane of other floor tiles splicing be provided with groove.
Second aspect, waterproof special form brick provided by the utility model, including:Horizontal part, the first vertical portion and second are perpendicular
Straight portion;Both are perpendicular to one another intersecting for any in the horizontal part, first vertical component effect and the second vertical component effect three, and
It is integrally formed.
Further, the back side of the horizontal part is set fluted, and the both ends of the groove end in the water respectively
The side in flat portion.
Waterproof special form brick provided by the utility model, including right angle brick and to angle brick two types, are integrally processed into
Type, directly applies at inner corner trim, and right angle brick is applied to metope and ground intersection, including vertical portion and horizontal part, in vertical portion
With horizontal part intersection also without splicing gap;It is applied to corner, including the first vertical portion, the second vertical portion and level to angle brick
Gap is not spliced on portion, the side that three is intersected two-by-two, and overall shaping, applies and do not splice gap at inner corner trim, solves conventional use
The problem of easily seeping water at brick inner corner trim, improves integral waterproofing performance, extends building structure service life.
Brief description of the drawings
, below will be right in order to illustrate more clearly of the utility model embodiment or technical solution of the prior art
Embodiment or attached drawing needed to be used in the description of the prior art are briefly described.In all of the figs, it is similar
Element or part are generally identified by similar reference numeral.In attached drawing, each element or part might not be according to actual ratios
Draw.
Fig. 1 is the schematic diagram for the right angle brick that one embodiment of the utility model provides;
Fig. 2 is the schematic diagram to angle brick that one embodiment of the utility model provides;
Fig. 3 is the waterproof special form brick horizontal part schematic rear view that one embodiment of the utility model provides;
Reference numeral:
1- right angles brick
11- vertical portions
12- horizontal parts
13- splices notch
2- is to angle brick
The first vertical portions of 21-
The second vertical portions of 22-
23- horizontal parts
3- grooves
Embodiment
The embodiment of technical solutions of the utility model is described in detail below in conjunction with attached drawing.Following embodiments are only
For clearly illustrating the technical solution of the utility model, therefore example is only used as, and this practicality cannot be limited with this
New protection domain.
In a first aspect, waterproof special form brick provided by the utility model, including:Vertical portion 11 and horizontal part 12, vertical portion
11 and horizontal part 12 intersect vertically, and the two is integrally formed.As shown in Figure 1, it is the right angle brick 1 in waterproof special form brick, one
Machine-shaping, right angle brick 1 are applied to metope and ground intersection, also do not have splicing seams in vertical portion 11 and 12 intersection of horizontal part
Gap, overall shaping, solves the problems, such as that routine with easily seeping water at brick inner corner trim, improves integral waterproofing performance, extends building structure and use
The time limit.
Although right angle brick 1 avoids splicing gap in vertical portion 11 and 12 intersection of horizontal part, spelled when with other floor tiles
Scoop out for toilet when long-time contacted with water space when, still have the possibility of immersion with the stitching portion of other floor tiles, be
Influence of the immersion to floor tile paste section position is reduced, sets fluted 3 at the back side of horizontal part, and the both ends of groove 3 are ended respectively
In the side of horizontal part 12.As shown in Figure 3, groove is curvilinear shaped recesses 3, can make water when there is slight infiltration situation to occur
Circulated in 3 inner curve of groove, be unlikely to spread, the stickup position without flowing into floor tile, effectively prevents infiltration scope from expanding, not shadow
The cohesive force of floor tile is rung, improves integral waterproofing performance, extends building structure service life.For further improve waterproof special form brick with
The splicing compactness of other floor tiles, is used to the position of other floor tiles splicing be provided with splicing notch 13 in horizontal part 12.Splicing
The height of notch 13 is less than horizontal part 12, specific floor tile can be selected to be used cooperatively with waterproof special form brick, pressed and overlapped overlays on splicing
At notch 13, splicing is compact to be not easy to seep water.
The section for splicing notch 13 is vertical broken line, and the cross section of splicing notch 13 is rectangle, so easy to selection
The floor tile coordinated with waterproof special form brick, to reach the effect of sealing.
In an embodiment provided by the utility model, splicing notch 13 is used to be provided with the plane of other floor tiles splicing
Groove, corresponding, the position of the floor tile splicing being used cooperatively with special form brick is equipped with flange, during splicing, the flange and waterproof of floor tile
The groove matching of special form brick, splicing closely avoid seeping water, while if producing infiltration, water flows into groove first, avoid influencing ground
The stickup position of brick.
In other embodiment provided by the utility model, when splicing notch 13 splices with other floor tiles, caulking agent can be used
Or the processing of white cement wiping seam, improve sealing performance.
Second aspect, waterproof special form brick provided by the utility model, including:Horizontal part 23, the first vertical portion 21 and
Two vertical portions 22;Both are perpendicular to one another intersecting for any in 22 three of horizontal part 23, the first vertical component effect 21 and the second vertical component effect, and
It is integrally formed.As shown in Figure 2, it is that is applied to by corner to angle brick 2, is integrally machined into for angle brick 2 in waterproof special form brick
Type, applies and does not splice gap at inner corner trim, solves the problems, such as that routine with easily seeping water at brick inner corner trim, improves integral waterproofing performance,
Extend building structure service life.
In horizontal part 23, the first vertical portion 21 and 22 intersection of the second vertical portion although splicing gap is avoided to angle brick,
But when being applied to toilet when the space that long-time is contacted with water with the splicing of other floor tiles, with the stitching portions of other floor tiles still
There is the possibility of immersion, to reduce influence of the immersion to floor tile paste section position, the back side of horizontal part 23 sets fluted 3, and groove 3
Both ends end in the side of horizontal part 23 respectively.As shown in Figure 3, groove is curvilinear shaped recesses 3, may be configured as it is arc-shaped,
Even if there is micro- ooze also to circulate herein, it is unlikely to spread, when there is the generation of infiltration situation water can be made to be followed in 3 inner curve of groove
Ring, the stickup position without flowing into floor tile, effectively prevents infiltration scope from expanding, does not influence the cohesive force of floor tile, improves overall anti-
Water-based energy, extends building structure service life.
The application method and technique of waterproof special form brick provided by the utility model include the following steps:
Cleaning arrangement basic ground → cement mortar screeding → calibration height, snap the line → installation standard brick → sorting → infiltration →
Mat formation → the cementation of fissures → cleaning → maintenance.
【Before paving】:
1st, base treatment is clean, and the place of being uneven wants first chipping and repairing, before bottom cement mortar screeding is smeared, ground
Should be sprinkled water moistening, to improve the cementitiousness with basic unit.Waterproof special form brick and the matched floor tile used must soak moistening,
The back side is cleaned after drying in the shade.
2nd, construction needs all to block floor drain and all collector nozzles before starting, and prevents cement residue from blocking sewer pipe.
3rd, metope is ensured vertically and horizontally, ground is upright, and otherwise the right angle of waterproof special form brick easily plays platform.
【In paving】:
1st, basic demand:Waterproof special form brick is mated formation must firmly, and pavement surfaces are smooth, and color and luster is coordinated, and without obvious aberration, connects
Stitch that straight, width is uniform, stone material is without losing fangle phenomenon;Non-standard specification plate is mated formation, and position is correct, flowing water slope is in the right direction,
Bracing wire checks that error is less than 2mm, checks that flatness error is less than 1mm, clean surface with 2 meters of guiding rulers.
2nd, the mixed proportion of cement sand is not more than 1:3, can be because the coefficient of expansion of cement be high if cement content is overweight
And cause the cracking of ceramic tile, reduce the service life of ceramic tile.
Standard brick must be placed when the 3rd, mating formation, standard brick should be placed in venter of relicle, diagonal installation, and mating formation will when operating
Often capable hanging wire successively.During paving, from doorway inwards, regress and mat formation from centre to four sides, side paving frontier inspection look into brick size and
Aberration, can so ensure that some have the brick of aberration and flatness to have error for full sized brick, good brick at ground centre and close doorway
Brick can be attached at the inside and corner.
Place waterproof special form brick and during matched floor tile must corner fall at the same time, and with rubber hammer or wooden mallet percussion
Consolidation is smooth.
4th, the main reason for causing floor tile hollowing has:Tack coat mortar is dilute, when mating formation lean concrete grout do, the plate back of the body, face
Pollutant is un-cleared, curing period crosses people's walking in morning or weight etc., therefore it is required that answering stringent selection in construction, it is tight to reject warpage
Weight defective work, gage distortion, can backboard smear mortar adjustment it is levelling, do not fill flat plate, refitting should be removed.
【After paving】
1st, jointing needs again to be advisable after ceramic tile is solid, is generally advisable at 24 hours later.
2nd, water power transformation conduit line map is finished during patch block and carries out mark, punching is not got to above pipeline.
3rd, the maintenance after waterproof special form brick ground pavement is particularly significant, when installation 24 is small after must sprinkle water maintenance, two days it
Inside forbid upper people, not influence sundry item construction, solid wood board can be laid with the ground for walking.
It should be noted that unless otherwise indicated, technical term or scientific terminology used in this application should be this Shen
Please the ordinary meaning that is understood of one of ordinary skill in the art.
In the description of the present application, it is to be understood that term " " center ", " longitudinal direction ", " transverse direction ", " length ", " width ",
" thickness ", " on ", " under ", "front", "rear", "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outer ", " up time
The orientation or position relationship of the instruction such as pin ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " be based on orientation shown in the drawings or
Position relationship, is for only for ease of description the application and simplifies description, rather than indicates or imply that signified device or element must
There must be specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " etc. are only used for description purpose, and it is not intended that indicating or implying relatively important
Property or the implicit quantity for indicating indicated technical characteristic.In the description of the utility model, " multiple " are meant that two
More than, unless otherwise specifically defined.
In this application, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection ", " fixation " etc.
Term should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integrally;Can be that machinery connects
Connect or be electrically connected;It can be directly connected, can also be indirectly connected by intermediary, can be in two elements
The connection in portion or the interaction relationship of two elements.For the ordinary skill in the art, can be according to specific feelings
Condition understands the concrete meaning of above-mentioned term in the present invention.
In this application, unless otherwise clearly defined and limited, fisrt feature can be with "above" or "below" second feature
It is that the first and second features directly contact, or the first and second features pass through intermediary mediate contact.Moreover, fisrt feature exists
Second feature " on ", " top " and " above " but fisrt feature are directly over second feature or oblique upper, or be merely representative of
Fisrt feature level height is higher than second feature.Fisrt feature second feature " under ", " lower section " and " below " can be
One feature is immediately below second feature or obliquely downward, or is merely representative of fisrt feature level height and is less than second feature.
In the specification of the utility model, numerous specific details are set forth.It is to be appreciated, however, that the reality of the utility model
Applying example can put into practice in the case of these no details.In some instances, known method, knot is not been shown in detail
Structure and technology, so as not to obscure the understanding of this description.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show
The description of example " or " some examples " etc. means specific features, structure, material or the spy for combining the embodiment or example description
Point is contained at least one embodiment of the present invention or example.In the present specification, schematic expression of the above terms is not
It must be directed to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be in office
Combined in an appropriate manner in one or more embodiments or example.In addition, without conflicting with each other, the skill of this area
Art personnel can be tied the different embodiments or example described in this specification and different embodiments or exemplary feature
Close and combine.
Finally it should be noted that:Various embodiments above is only to illustrate the technical solution of the utility model, rather than it is limited
System;Although the utility model is described in detail with reference to foregoing embodiments, those of ordinary skill in the art should
Understand:It can still modify the technical solution described in foregoing embodiments, either to which part or whole
Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly
The scope of each embodiment technical solution of type, it should all cover among claims hereof and the scope of specification.
Claims (2)
1. waterproof special form brick, it is characterised in that including:Vertical portion and horizontal part, the vertical portion and the vertical phase of the horizontal part
Hand over, and the two is integrally formed;
The back side setting of the horizontal part is fluted, and the both ends of the groove end in the side of the horizontal part respectively;
The horizontal part is used to the position of other floor tiles splicing be provided with splicing notch;
The section of the splicing notch is vertical broken line;
The splicing notch is used for being provided with groove in the plane of other floor tiles splicing.
2. waterproof special form brick, it is characterised in that including:Horizontal part, the first vertical portion and the second vertical portion;The horizontal part, institute
State in the first vertical portion and the second vertical portion three it is any both are perpendicular to one another intersecting, and be integrally formed;
The back side setting of the horizontal part is fluted, and the both ends of the groove end in the side of the horizontal part respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720753591.9U CN207296221U (en) | 2017-06-26 | 2017-06-26 | Waterproof special form brick |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720753591.9U CN207296221U (en) | 2017-06-26 | 2017-06-26 | Waterproof special form brick |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207296221U true CN207296221U (en) | 2018-05-01 |
Family
ID=62450315
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720753591.9U Expired - Fee Related CN207296221U (en) | 2017-06-26 | 2017-06-26 | Waterproof special form brick |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207296221U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115045464A (en) * | 2022-06-27 | 2022-09-13 | 舍奢(武汉)家居有限公司 | Splicing and paving method and structure for floor and stone or ceramic tile |
-
2017
- 2017-06-26 CN CN201720753591.9U patent/CN207296221U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115045464A (en) * | 2022-06-27 | 2022-09-13 | 舍奢(武汉)家居有限公司 | Splicing and paving method and structure for floor and stone or ceramic tile |
CN115045464B (en) * | 2022-06-27 | 2024-05-14 | 舍奢(武汉)家居有限公司 | Splicing and paving method and structure for floor and stone or ceramic tile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109184036B (en) | Construction method of ALC (autoclaved lightweight concrete) board for external wall panel | |
CN104612261A (en) | Method for external insulation construction of polystyrene board thin plastered surface in cold and windy area | |
CN103321442A (en) | Self-compensating repair structure and process for internal stress cracking of inner wall heat insulating wall surface | |
CN101418641A (en) | Obligate pore construction method for construction floor | |
CN102852290A (en) | Roof parapet flashing position structure and construction method thereof | |
CN110206074A (en) | A kind of underground waterproof engineering construction technology | |
CN105464243A (en) | Thin-layer mortar masonry method for autoclaved aerated accurate blocks | |
CN207296221U (en) | Waterproof special form brick | |
CN111706031A (en) | Socket type joint finished product flue installation device and method for preventing smoke leakage | |
CN110409633A (en) | A kind of construction method of environment-friendly waterproof exterior walls of buildings | |
CN104652623B (en) | A kind of composite thermal insulation mortar construction method | |
CN107574936A (en) | A kind of heat preserving exterior wall construction technology | |
CN107090923B (en) | Filled wall building construction technique at cold bridge | |
CN110735493B (en) | Anti-leakage composite waterproof method for flat roof | |
CN112663890A (en) | Bonding type construction method for indoor large-size ceramic wall brick | |
CN111535368A (en) | Basement waterproof construction process | |
CN207620156U (en) | Hygienic partition wall structure | |
CN110821181A (en) | Ground leveling method | |
CN208815932U (en) | A kind of water leakage through exterior wall repairerment system | |
CN208293792U (en) | A kind of quick service waterproof construction for toilet warterproof rupture | |
CN114876075A (en) | Water seepage prevention construction method for garage top plate | |
CN114892736A (en) | Underground building bottom plate crack injection grouting method | |
KR102191532B1 (en) | Liquid waterproof agent and constructing method for waterproof by using the same | |
CN208363683U (en) | A kind of building waterproofing reinforced structure | |
CN208202232U (en) | A kind of moistureproof and mildewproof fluting metope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180501 Termination date: 20190626 |
|
CF01 | Termination of patent right due to non-payment of annual fee |