CN207277600U - A kind of assembled architecture wall and its wall connecting component - Google Patents
A kind of assembled architecture wall and its wall connecting component Download PDFInfo
- Publication number
- CN207277600U CN207277600U CN201721179337.9U CN201721179337U CN207277600U CN 207277600 U CN207277600 U CN 207277600U CN 201721179337 U CN201721179337 U CN 201721179337U CN 207277600 U CN207277600 U CN 207277600U
- Authority
- CN
- China
- Prior art keywords
- wall
- sleeve barrel
- screw
- connecting component
- embedded sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
It the utility model is related to a kind of assembled architecture wall and its wall connecting component, assembled architecture wall includes the first wall, second wall and realize the first wall, first wall connecting component of the second wall connecting, first wall connecting component includes the embedded sleeve barrel being arranged in the second wall, screw rod perforation is provided with first wall, first wall connecting component further includes the connecting screw being arranged in the screw rod perforation, the connection screw thread for being connected with the connecting screw screw thread is provided with embedded sleeve barrel, the threaded one end away from the embedded sleeve barrel is connected with the locking nut for pressing to first wall on connecting screw, moment of torsion input structure is provided with connecting screw.The utility model provide it is a kind of can be achieved two walls between assembly connection wall connecting component and using the wall connecting component assembled architecture wall.
Description
Technical field
It the utility model is related to the assembled architecture wall and its wall connecting component in building field.
Background technology
In order to avoid construction pollution, while in order to improve construction efficiency, assembled architecture wall is increasingly subject to people's
Welcome.Publication No. CN206233403U, apply for entitled " the wall transverse direction dry type connection structure based on assembled architecture wall "
Chinese patent disclose a kind of assembled architecture wall, including the first wall and the second wall, first, second wall pass through wall
Body connection component is fixed together, and wall connecting component includes the embedded sleeve barrel being embedded in advance in the second wall, and embedded sleeve barrel has
Connection screw thread, wall connecting component further include connecting screw and connecting plate, and connecting screw includes screw rod and is wholely set with screw rod
Bolt head, connecting screw and embedded sleeve barrel, which are threadedly coupled, to be realized together with two wall connectings.Existing this wall connects
There are problems with for connected components:Bolt head is wholely set with screw rod, and the overall radial dimension that this results in connecting screw is larger, even
It can only be installed when connecing screw rod installation in a manner of towards embedded sleeve barrel, cause the use scope for limiting wall connecting component.
Utility model content
The purpose of this utility model is to provide a kind of wall connecting component of assembly connection between achievable two walls;This
The purpose of utility model, which also resides in, provides a kind of assembled architecture wall using the wall connecting component.
In order to solve the above technical problems, the technical solution of assembled architecture wall is as follows in the utility model:
Assembled architecture wall, including the first wall, the second wall and realize the first wall, the of the second wall connecting
One wall connecting component, the first wall connecting component include the embedded sleeve barrel being arranged in the second wall, are set on the first wall
There is screw rod perforation, the first wall connecting component further includes the connecting screw being arranged in the screw rod perforation, set on embedded sleeve barrel
It is equipped with the connection screw thread for being connected with the connecting screw screw thread, the threaded one end away from the embedded sleeve barrel on connecting screw
The locking nut for pressing to first wall is connected with, moment of torsion input structure is provided with connecting screw.
First wall, the second wall body vertical are arranged, are provided with the metope of the first wall and are accommodated the locking nut and torsion
The operating groove of square input structure.
The moment of torsion input structure is the outer square head structure for being arranged at connecting screw end.
The embedded sleeve barrel end face adjacent with the first wall or the metope less than the second wall.
Threaded one end of the embedded sleeve barrel away from first wall is connected with embedded bar, embedded sleeve barrel, embedded bar with
The integral structure of concreting of second wall.
Assembled architecture wall further include with the second wall body vertical arrangement the 3rd wall, the first wall, the second wall and
The 3rd T-shaped structure of wall body structure, the second wall are connected with the 3rd wall by the second wall connecting component, first, second wall
The embedded sleeve barrel coaxial line arrangement of connection component, and linked together by pre embedded bolt.
The technical solution of wall connecting component is in the utility model:
Wall connecting component, including for defaulting in the embedded sleeve barrel in corresponding second wall, wall connecting component also wraps
The connecting screw during the screw rod for being arranged in corresponding first wall is perforated is included, is provided with and is used for and the connection on embedded sleeve barrel
The connection screw thread that screw flight is connected, the threaded one end away from the embedded sleeve barrel is connected with for described the on connecting screw
The locking nut of one wall pressure, is provided with moment of torsion input structure on connecting screw.
The moment of torsion input structure is the outer square head structure for being arranged at connecting screw end.
The one end of connecting screw away from locking nut is provided with taper or spherical seeker.
Threaded one end of the embedded sleeve barrel away from first wall is connected with embedded bar, embedded sleeve barrel, embedded bar with
The integral structure of concreting of second wall.
The beneficial effects of the utility model are:In the utility model, the first wall, the second wall are realized by locking nut
Body is locked, and locking nut is removable with connecting screw, therefore when in use, first can pull down locking nut, connects spiral shell
The side that bar can be closed on the second wall by screw rod perforation is penetrated in screw rod perforation, after connecting screw is connected with embedded sleeve barrel,
Locking nut is screwed on again, accordingly even when the first wall connecting side operating space is limited, can also realize the first wall, the second wall
Between connection, expand the use scope of wall connecting component.
Brief description of the drawings
Fig. 1 is the structure diagram of the embodiment 1 of assembled architecture wall in the utility model;
Fig. 2 is the installation process schematic diagram of the first wall connecting component and the first wall in the utility model;
Fig. 3 is the right view of the first wall in Fig. 2;
Fig. 4 is the installation process schematic diagram of embedded sleeve barrel in the utility model, embedded bar and the second wall;
Fig. 5 is the left view of the secondth wall in Fig. 4;
Fig. 6 is the first wall and the second wall connecting process schematic in the utility model;
Fig. 7 is shearing-resistance blocks and the first wall, the cooperation schematic diagram of the second wall in the utility model;
Fig. 8 is that shearing-resistance blocks are installed on the first wall, the process schematic on the second wall in the utility model;
Fig. 9 is the cooperation schematic diagram of connecting screw and locking nut in Fig. 1;
Figure 10 is the cooperation schematic diagram of embedded sleeve barrel and embedded bar in Fig. 1;
Figure 11 is the structure diagram of the embodiment 2 of assembled architecture wall in the utility model;
Figure 12 is the structure diagram of the embodiment 3 of assembled architecture wall in the utility model.
Embodiment
The embodiment 1 of assembled architecture wall is as shown in Fig. 1 ~ 10:Assembled architecture wall includes vertically arranged first
1 and second wall 3 of wall, the end face of the first wall are withstood on the metope of the second wall.First wall, the second wall pass through multiple
Wall connecting component spaced apart along the vertical direction links together, and two neighboring wall connecting component is wrong in the up-down direction
Arrangement is opened, the thickness direction of the first wall is anteroposterior direction, i.e., two neighboring wall connecting component time interval arrangement, so may be used
To improve the torsional strength of assembled architecture wall.Wall connecting component includes the embedded sleeve barrel 2 being arranged in the second wall, in advance
Bury and connection screw thread is provided with the inner wall of sleeve, the left end of embedded sleeve barrel 2 flushes setting, embedded sleeve barrel with the metope of the second wall
2 right end is threaded with embedded bar 4, and embedded bar is elbow structure.Wall connecting component, which further includes, to be used for and pre-buried set
The connecting screw 5 that cylinder is threadedly coupled, being installed from right to left for connecting screw 5 of extending in left-right direction is offered on the first wall
Screw rod perforation 10, screw rod perforation be circumferentially closed structure, offers operating groove 9 on the metope of the first wall, and connection spiral shell
The left end of bar 5 is threaded with locking nut 7, and gasket 6 is provided between 7 and first wall 1 of locking nut.Connecting screw 5
Left part also has the outer square head structure 8 for being used for moment of torsion input, and outer square head structure and locking nut form operating side, outer square toes knot
Structure and locking nut are respectively positioned in operating groove, connecting screw and locking nut can be operated by operating groove, the right side of connecting screw
End set has tapered guide first 12.First wall, the second wall connecting corner at be provided with across the first wall, the second wall
The shearing resistance groove 15 of body, shearing resistance groove 15 have the shearing resistance block entrance 17 loaded for shearing-resistance blocks 16, and the length of shearing resistance groove is longer than shearing-resistance blocks
16, the anticreep filler 18 for preventing that shearing-resistance blocks from being deviate from by shearing resistance groove, this implementation are provided between the cell wall and shearing-resistance blocks of shearing resistance groove
Anticreep filler is concrete in example.When the first wall, the vibration of the second wall, shearing force can be produced to each connecting screw, passed through
Shearing-resistance blocks undertake the shearing force to ensure the service life of connecting screw.
Wherein the manufacturing process of the second wall is as shown in Fig. 4 ~ 5, and embedded bar 4 is positioned first, embedded sleeve barrel 2 is revolved
On embedded bar, the spinning depth of embedded sleeve barrel is paid attention to, then the left end of embedded sleeve barrel screws on plug 11 again, finally pours mixed
Solidifying soil, so as to form the second wall, plug can be played and avoided for embedded sleeve barrel, embedded bar and the integral structure of concreting
Debris enters the effect of embedded sleeve barrel, and embedded bar and embedded sleeve barrel are threadedly coupled rotation direction and connecting screw and embedded sleeve barrel
Connection screw thread is oppositely oriented, and on the one hand can so play prevents the rotating work of embedded sleeve barrel in connecting screw connection procedure
With still further aspect can also improve the tensile capacity of embedded sleeve barrel.Connecting screw is encased in process such as Fig. 2 institutes of the first wall
Show, by connecting screw being encased in screw rod perforation 10 from right to left, by operating groove 9 by 6 company of being sleeved on of locking nut 7 and gasket
The left end of screw rod 5 is connect, allows the right end of connecting screw to be located in screw rod perforation 10 as far as possible, avoids influencing the lifting of wall.Realizing
When the first wall and the second wall connecting as shown in fig. 6, by by the lifting of the first wall 1 from top to bottom to the second wall 3, then
The first wall is moved horizontally close to the second wall, is exerted a force by handle hole to connecting screw, first 12 guiding of tapered guide connects spiral shell
Bar is inserted into embedded sleeve barrel 2, and first connecting screw 5 is screwed on embedded sleeve barrel, is then exerted a force to locking nut, and final realize will
First wall is together with the second wall connecting.Bolt protection body 13 then is set in the left end periphery of connecting screw, bolt is prevented
Watch box 13 can be foam and live plastic-spraying etc., and concrete 14 is inserted in the gap between bolt protection body and operating groove, is made
Operating groove is smoothed out with concrete, the purpose for setting filler is to avoid concrete from being contacted with connecting screw, so when needs are torn open
During except connection relation between the first wall, the second wall, the part concrete in operating groove is pounded, after filler takes out,
Directly unclamp locking nut and the first wall, the demolishing process of the second wall can be achieved in connecting screw.Embedded bar with it is pre-buried
Sleeve can also be welded and fixed;Later stage can not also carry out Concrete Filled processing to operating groove;The guiding of connecting screw right end
Head can also be spherical structure;Outer square head structure can also be replaced by other moment of torsion input structures, such as interior square hole or edge
Force transmission hole that connecting screw is radially set etc..
The embodiment 2 of assembled architecture wall is as shown in figure 11:Embodiment 2 as different from Example 1, assembled architecture
Wall further includes the 3rd wall 20 with the second wall body vertical arrangement, and the first wall 1, the second wall 3 and the 3rd wall 20 are in T words
Shape arranges that by wall connecting component, each wall connecting component does not include embedded bar for the second wall and the 3rd wall, first
The pre-buried set of the wall connecting component between wall connecting component, the second wall, the 3rd wall between wall and the second wall
Connected between cylinder by pre embedded bolt 21.
The embodiment 3 of assembled architecture wall is as shown in figure 12:Embodiment 3 as different from Example 2, assembled architecture
Wall further includes and the first wall 1,20 vertically arranged 4th wall 22 of the 3rd wall, the first wall 1, the second wall the 3, the 3rd
20 and the 4th wall 22 of wall arranges that the wall connecting component of the 4th wall and the second wall between is with implementing in cross
Wall connecting component described in example 1 is identical.
The implementation of wall connecting component is for example shown in Fig. 1 ~ 12:The concrete structure of wall connecting component and above-mentioned each assembled
Wall connecting component described in construction wall embodiment is identical, and this will not be detailed here.
Claims (10)
1. assembled architecture wall, including the first wall, the second wall and realize the first wall, the first of the second wall connecting
Wall connecting component, the first wall connecting component include the embedded sleeve barrel being arranged in the second wall, it is characterised in that:First wall
Screw rod perforation is provided with body, the first wall connecting component further includes the connecting screw being arranged in the screw rod perforation, pre-buried
It is provided with the connection screw thread for being connected with the connecting screw screw thread on sleeve, away from the embedded sleeve barrel on connecting screw
Threaded one end is connected with the locking nut for pressing to first wall, and moment of torsion input structure is provided with connecting screw.
2. assembled architecture wall according to claim 1, it is characterised in that:First wall, the second wall body vertical arrangement,
The operating groove for accommodating the locking nut and moment of torsion input structure is provided with the metope of first wall.
3. assembled architecture wall according to claim 1, it is characterised in that:The moment of torsion input structure is the company of being arranged at
Connect the outer square head structure of screw rod end.
4. assembled architecture wall according to claim 2, it is characterised in that:The embedded sleeve barrel end adjacent with the first wall
Metope of the face flush or below the second wall.
5. the assembled architecture wall according to claim 1 ~ 4 any one, it is characterised in that:Embedded sleeve barrel is away from described
The threaded one end of first wall is connected with embedded bar, and the concreting of embedded sleeve barrel, embedded bar and the second wall is into whole
Body structure.
6. the assembled architecture wall according to claim 1 ~ 4 any one, it is characterised in that:Assembled architecture wall is also
Including the 3rd wall arranged with the second wall body vertical, the first wall, the second wall and the 3rd T-shaped structure of wall body structure, second
Wall is connected with the 3rd wall by the second wall connecting component, the embedded sleeve barrel coaxial line of first, second wall connecting component
Arrangement, and linked together by pre embedded bolt.
7. wall connecting component, including for defaulting in the embedded sleeve barrel in corresponding second wall, it is characterised in that:Wall connecting
The screw rod that component is further included for being arranged in corresponding first wall perforate in connecting screw, be provided with embedded sleeve barrel for
The connection screw thread that the connecting screw screw thread is connected, the threaded one end away from the embedded sleeve barrel, which is connected with, on connecting screw is used for
To the locking nut of first wall pressure, moment of torsion input structure is provided with connecting screw.
8. wall connecting component according to claim 7, it is characterised in that:The moment of torsion input structure is to be arranged at connection
The outer square head structure of screw rod end.
9. wall connecting component according to claim 7, it is characterised in that:The one end of connecting screw away from locking nut is set
It is equipped with taper or spherical seeker.
10. the wall connecting component according to claim 7 ~ 9 any one, it is characterised in that:Embedded sleeve barrel is away from described
The threaded one end of first wall is connected with embedded bar, and the concreting of embedded sleeve barrel, embedded bar and the second wall is into whole
Body structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721179337.9U CN207277600U (en) | 2017-09-14 | 2017-09-14 | A kind of assembled architecture wall and its wall connecting component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721179337.9U CN207277600U (en) | 2017-09-14 | 2017-09-14 | A kind of assembled architecture wall and its wall connecting component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207277600U true CN207277600U (en) | 2018-04-27 |
Family
ID=61989306
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721179337.9U Expired - Fee Related CN207277600U (en) | 2017-09-14 | 2017-09-14 | A kind of assembled architecture wall and its wall connecting component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207277600U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107366371A (en) * | 2017-09-14 | 2017-11-21 | 辛红 | Assembled architecture wall and its wall connecting component |
CN110067321A (en) * | 2019-05-31 | 2019-07-30 | 福建工程学院 | A kind of fabricated shear wall flexible connecting device and its construction method |
WO2021109168A1 (en) * | 2019-12-06 | 2021-06-10 | 长沙远大住宅工业集团股份有限公司 | Building module, modular building and construction method therefor |
CN113216639A (en) * | 2021-06-17 | 2021-08-06 | 南京瑞平环境科技有限公司 | Knot tying system and knot tying method |
CN113931293A (en) * | 2021-09-16 | 2022-01-14 | 中津华海建设工程有限公司 | Assembly type building |
-
2017
- 2017-09-14 CN CN201721179337.9U patent/CN207277600U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107366371A (en) * | 2017-09-14 | 2017-11-21 | 辛红 | Assembled architecture wall and its wall connecting component |
CN110067321A (en) * | 2019-05-31 | 2019-07-30 | 福建工程学院 | A kind of fabricated shear wall flexible connecting device and its construction method |
CN110067321B (en) * | 2019-05-31 | 2023-10-10 | 福建工程学院 | Flexible connecting device for assembled shear wall and construction method thereof |
WO2021109168A1 (en) * | 2019-12-06 | 2021-06-10 | 长沙远大住宅工业集团股份有限公司 | Building module, modular building and construction method therefor |
CN113216639A (en) * | 2021-06-17 | 2021-08-06 | 南京瑞平环境科技有限公司 | Knot tying system and knot tying method |
CN113931293A (en) * | 2021-09-16 | 2022-01-14 | 中津华海建设工程有限公司 | Assembly type building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207277600U (en) | A kind of assembled architecture wall and its wall connecting component | |
CN107366371A (en) | Assembled architecture wall and its wall connecting component | |
CN207211429U (en) | Assembled architecture wall and its single wall | |
CN105971118B (en) | Rectangle steel tubing string and the unilateral bolt connection node of H profile steel beam inner sleeve cartridge type | |
US4708530A (en) | Concrete foundation pile and device for driving the same into the ground | |
CN106639071A (en) | Laminated slab type sandwich heat preservation shear wall with split bolts and installing method | |
CN205400024U (en) | Instrument formula external scaffolding bolt that can dismantle used repeatedly links wall spare | |
CN207878699U (en) | A kind of assembly concrete shear wall structure | |
WO2017096644A1 (en) | Expanded-foot tubular pile having unfolding blade and piling method thereof | |
CN111980169B (en) | Assembly type shear wall lock inserting and connecting device and application and using method thereof | |
CN206646502U (en) | A kind of steel pipe type soil nailing | |
CN206753086U (en) | A kind of small-sized assembled architecture component hanging apparatus | |
JP5762238B2 (en) | Structure and removal method of steel pipe pile | |
CN210368948U (en) | Combined pile for building foundation engineering | |
CN104533970B (en) | A kind of attachment structure of air-expanding shaft and chuck body | |
CN211285966U (en) | Spacing auto-lock, unblock and steel bar connection's precast concrete post butt joint full section connecting box device | |
CN207277599U (en) | A kind of assembled architecture wall of dry type connection | |
CN102979183A (en) | Embedded cylindrical nut anchor bed and use method thereof | |
AU2013351554A1 (en) | Method for manufacturing a pile | |
CN207004551U (en) | A kind of new pressure-relieving achor bar | |
CN206529942U (en) | A kind of overlaid plate type sandwich heat preservation shear wall with split bolt | |
CN207277598U (en) | Assembled architecture wall | |
CN216484030U (en) | Indoor rock mass structural plane direct shear test specimen sampling system and drilling device thereof | |
CN206034513U (en) | Pre -buried type stake end foundation detecting system | |
CN208502220U (en) | A kind of embedded nut method wall-connecting piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180427 Termination date: 20200914 |