CN107366371A - Assembled architecture wall and its wall connecting component - Google Patents
Assembled architecture wall and its wall connecting component Download PDFInfo
- Publication number
- CN107366371A CN107366371A CN201710829308.0A CN201710829308A CN107366371A CN 107366371 A CN107366371 A CN 107366371A CN 201710829308 A CN201710829308 A CN 201710829308A CN 107366371 A CN107366371 A CN 107366371A
- Authority
- CN
- China
- Prior art keywords
- wall
- sleeve barrel
- screw
- connecting component
- embedded sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010008 shearing Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 5
- 239000000945 filler Substances 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000011900 installation process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 210000002421 cell wall Anatomy 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000009987 spinning Methods 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
- 210000003371 toe Anatomy 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/388—Separate connecting elements
Abstract
The present invention relates to a kind of assembled architecture wall and its wall connecting component, assembled architecture wall includes the first wall, second wall and realize the first wall, first wall connecting component of the second wall connecting, first wall connecting component includes the embedded sleeve barrel being arranged in the second wall, screw rod perforation is provided with first wall, first wall connecting component also includes the connecting screw being arranged in the screw rod perforation, the connection screw thread for being connected with the connecting screw screw thread is provided with embedded sleeve barrel, the threaded one end away from the embedded sleeve barrel is connected with the locking nut for being pressed to first wall on connecting screw, moment of torsion input structure is provided with connecting screw.The invention provides the wall connecting component of assembly connection and the assembled architecture wall using the wall connecting component between a kind of achievable two walls.
Description
Technical field
The present invention relates to the assembled architecture wall in building field and its wall connecting component.
Background technology
In order to avoid construction pollution, while in order to improve efficiency of construction, assembled architecture wall is increasingly by people's
Welcome.Publication No. CN206233403U, apply for entitled " the wall transverse direction dry type attachment structure based on assembled architecture wall "
Chinese patent disclose a kind of assembled architecture wall, including the first wall and the second wall, first, second wall pass through wall
Body connection component is fixed together, and wall connecting component includes the embedded sleeve barrel being embedded in advance in the second wall, and embedded sleeve barrel has
Connection screw thread, wall connecting component also include connecting screw and connecting plate, and connecting screw includes screw rod and is wholely set with screw rod
Bolt head, the threaded connection of connecting screw and embedded sleeve barrel realized together with two wall connectings.Existing this wall connects
Problems be present in connected components:Bolt head is wholely set with screw rod, and the overall radial dimension that this results in connecting screw is larger, even
It can only be installed when connecing screw rod installation in a manner of towards embedded sleeve barrel, cause the use range for limiting wall connecting component.
The content of the invention
It is an object of the invention to provide a kind of wall connecting component of assembly connection between achievable two walls;The present invention
Purpose also reside in provide a kind of assembled architecture wall using the wall connecting component.
In order to solve the above technical problems, the technical scheme of assembled architecture wall is as follows in the present invention:
Assembled architecture wall, including the first wall, the second wall and the first wall for realizing the first wall, the second wall connecting
Body connection component, the first wall connecting component include the embedded sleeve barrel being arranged in the second wall, spiral shell are provided with the first wall
Bar is perforated, and the first wall connecting component also includes the connecting screw being arranged in the screw rod perforation, is provided with embedded sleeve barrel
For the connection screw thread being connected with the connecting screw screw thread, the threaded one end away from the embedded sleeve barrel connects on connecting screw
There is the locking nut for being pressed to first wall, moment of torsion input structure is provided with connecting screw.
First wall, the second wall body vertical are arranged, are provided with the metope of the first wall and are accommodated the locking nut and torsion
The operating groove of square input structure.
The moment of torsion input structure is the outer square head structure for being arranged at connecting screw end.
The embedded sleeve barrel end face adjacent with the first wall or the metope less than the second wall.
Threaded one end of the embedded sleeve barrel away from first wall is connected with embedded bar, embedded sleeve barrel, embedded bar with
The integral structure of concreting of second wall.
Assembled architecture wall also include with the second wall body vertical arrangement the 3rd wall, the first wall, the second wall and
The 3rd T-shaped structure of wall body structure, the second wall are connected with the 3rd wall by the second wall connecting component, first, second wall
The embedded sleeve barrel coaxial line arrangement of connection component, and linked together by pre embedded bolt.
The technical scheme of wall connecting component is in the present invention:
Wall connecting component, including for defaulting in the embedded sleeve barrel in corresponding second wall, wall connecting component also includes using
Connecting screw in the screw rod for being arranged in corresponding first wall is perforated, be provided with embedded sleeve barrel for and the connecting screw
The connected connection screw thread of screw thread, the threaded one end away from the embedded sleeve barrel is connected with for first wall on connecting screw
The locking nut of body pressure, is provided with moment of torsion input structure on connecting screw.
The moment of torsion input structure is the outer square head structure for being arranged at connecting screw end.
The one end of connecting screw away from locking nut is provided with taper or spherical seeker.
Threaded one end of the embedded sleeve barrel away from first wall is connected with embedded bar, embedded sleeve barrel, embedded bar with
The integral structure of concreting of second wall.
Beneficial effects of the present invention are:In the present invention, the locking of the first wall, the second wall is realized by locking nut
Fixed, locking nut is removable with connecting screw, therefore when in use, first can pull down locking nut, and connecting screw can be by
The side that screw rod perforation closes on the second wall is penetrated in screw rod perforation, after connecting screw is connected with embedded sleeve barrel, then screws on lock
Tight nut, accordingly even when the first wall connecting side operating space is limited, the company between the first wall, the second wall can also be realized
Connect, expand the use range of wall connecting component.
Brief description of the drawings
Fig. 1 is the structural representation of the embodiment 1 of assembled architecture wall in the present invention;
Fig. 2 is the installation process schematic diagram of the first wall connecting component and the first wall in the present invention;
Fig. 3 is the right view of the first wall in Fig. 2;
Fig. 4 is the installation process schematic diagram of embedded sleeve barrel in the present invention, embedded bar and the second wall;
Fig. 5 is the left view of the secondth wall in Fig. 4;
Fig. 6 is the first wall and the second wall connecting process schematic in the present invention;
Fig. 7 is shearing-resistance blocks and the first wall, the cooperation schematic diagram of the second wall in the present invention;
Fig. 8 is that shearing-resistance blocks are installed on the first wall, the process schematic on the second wall in the present invention;
Fig. 9 is the cooperation schematic diagram of connecting screw and locking nut in Fig. 1;
Figure 10 is the cooperation schematic diagram of embedded sleeve barrel and embedded bar in Fig. 1;
Figure 11 is the structural representation of the embodiment 2 of assembled architecture wall in the present invention;
Figure 12 is the structural representation of the embodiment 3 of assembled architecture wall in the present invention.
Embodiment
The embodiment 1 of assembled architecture wall is as shown in Fig. 1 ~ 10:Assembled architecture wall includes vertically arranged first
The wall 3 of wall 1 and second, the end face of the first wall are withstood on the metope of the second wall.First wall, the second wall pass through multiple
Wall connecting component spaced apart along the vertical direction links together, and two neighboring wall connecting component is wrong in the vertical direction
Arrangement is opened, the thickness direction of the first wall is fore-and-aft direction, i.e., two neighboring wall connecting component time interval arrangement, so may be used
To improve the torsional strength of assembled architecture wall.Wall connecting component includes the embedded sleeve barrel 2 being arranged in the second wall, in advance
Bury and connection screw thread is provided with the inwall of sleeve, the left end of embedded sleeve barrel 2 flushes setting, embedded sleeve barrel with the metope of the second wall
2 right-hand member is threaded with embedded bar 4, and embedded bar is elbow structure.Wall connecting component also includes being used for and pre-buried set
The connecting screw 5 of cylinder threaded connection, being installed from right to left for connecting screw 5 of extending in left-right direction is offered on the first wall
Screw rod perforation 10, screw rod perforation be circumferentially closed structure, offers operating groove 9 on the metope of the first wall, and connection spiral shell
The left end of bar 5 is threaded with locking nut 7, and pad 6 is provided between the wall 1 of locking nut 7 and first.Connecting screw 5
Left part also has the outer square head structure 8 for being used for moment of torsion input, and outer square head structure and locking nut form operating side, outer square toes knot
Structure and locking nut are respectively positioned in operating groove, connecting screw and locking nut can be operated by operating groove, the right side of connecting screw
End set has tapered guide first 12.First wall, the second wall connecting corner at be provided with across the first wall, the second wall
The shearing resistance groove 15 of body, shearing resistance groove 15 have the shearing resistance block entrance 17 loaded for shearing-resistance blocks 16, and the length of shearing resistance groove is longer than shearing-resistance blocks
16, the anticreep filler 18 for preventing that shearing-resistance blocks from being deviate from by shearing resistance groove, this implementation are provided between the cell wall and shearing-resistance blocks of shearing resistance groove
Anticreep filler is concrete in example.When the first wall, the vibration of the second wall, shearing force can be produced to each connecting screw, passed through
Shearing-resistance blocks undertake the shearing force to ensure the service life of connecting screw.
Wherein the manufacturing process of the second wall is as shown in Fig. 4 ~ 5, and embedded bar 4 is positioned first, embedded sleeve barrel 2 is revolved
On embedded bar, the spinning depth of embedded sleeve barrel is paid attention to, then the left end of embedded sleeve barrel screws on plug 11 again, finally pours mixed
Solidifying soil, so as to form the second wall, plug can be played and avoided for embedded sleeve barrel, embedded bar and the integral structure of concreting
Debris enters the effect of embedded sleeve barrel, and embedded bar and embedded sleeve barrel be threadedly coupleds rotation direction and connecting screw and embedded sleeve barrel
Connection screw thread is oppositely oriented, on the one hand can so play the work for preventing that embedded sleeve barrel from rotating in connecting screw connection procedure
With still further aspect can also improve the tensile capacity of embedded sleeve barrel.Connecting screw is encased in process such as Fig. 2 institutes of the first wall
Show, by connecting screw being encased in screw rod perforation 10 from right to left, by operating groove 9 by locking nut 7 and the company of being enclosed on of pad 6
The left end of screw rod 5 is connect, allows the right-hand member of connecting screw to be located in screw rod perforation 10 as far as possible, avoids influenceing the lifting of wall.Realizing
When the first wall and the second wall connecting as shown in fig. 6, by by the lifting of the first wall 1 from top to bottom to the second wall 3, then
Move horizontally the first wall and press close to the second wall, connecting screw is exerted a force by handle hole, the first 12 guiding connection spiral shell of tapered guide
Bar is inserted into embedded sleeve barrel 2, and first connecting screw 5 is screwed on embedded sleeve barrel, and then locking nut is exerted a force, and final realize will
First wall is together with the second wall connecting.Bolt protection body 13 then is set in the left end periphery of connecting screw, bolt is prevented
Watch box 13 can be foam and live plastic-spraying etc., and concrete 14 is inserted in the space between bolt protection body and operating groove, is made
Floating to operating groove with concrete, the purpose for setting filler is to avoid concrete from being contacted with connecting screw, so when needs are torn open
During except annexation between the first wall, the second wall, the part concrete in operating groove is pounded, after filler takes out,
Directly unclamp locking nut and the first wall, the demolishing process of the second wall can be achieved in connecting screw.Embedded bar with it is pre-buried
Sleeve can also be welded and fixed;Later stage can not also carry out Concrete Filled processing to operating groove;The guiding of connecting screw right-hand member
Head can also be spherical structure;Outer square head structure can also be replaced by other moment of torsion input structures, such as interior square hole or edge
Force transmission hole that connecting screw is radially arranged etc..
The embodiment 2 of assembled architecture wall is as shown in figure 11:Embodiment 2 as different from Example 1, assembled architecture
Wall also includes the 3rd wall 20 with the second wall body vertical arrangement, and the first wall 1, the second wall 3 and the 3rd wall 20 are in T words
Shape arranges that by wall connecting component, each wall connecting component does not include embedded bar for the second wall and the 3rd wall, first
The pre-buried set of the wall connecting component between wall connecting component, the second wall, the 3rd wall between wall and the second wall
Connected between cylinder by pre embedded bolt 21.
The embodiment 3 of assembled architecture wall is as shown in figure 12:Embodiment 3 as different from Example 2, assembled architecture
Wall also includes and the first wall 1,20 vertically arranged 4th wall 22 of the 3rd wall, the first wall 1, the second wall the 3, the 3rd
The wall 22 of wall 20 and the 4th arranges that the wall connecting component of the 4th wall and the second wall between is with implementing in cross
Wall connecting component described in example 1 is identical.
The implementation of wall connecting component is for example shown in Fig. 1 ~ 12:The concrete structure of wall connecting component and above-mentioned each assembled
Wall connecting component described in construction wall embodiment is identical, will not be described in detail herein.
Claims (10)
1. assembled architecture wall, including the first wall, the second wall and realize the first wall, the first of the second wall connecting
Wall connecting component, the first wall connecting component include the embedded sleeve barrel being arranged in the second wall, it is characterised in that:First wall
Screw rod perforation is provided with body, the first wall connecting component also includes the connecting screw being arranged in the screw rod perforation, pre-buried
It is provided with the connection screw thread for being connected with the connecting screw screw thread on sleeve, away from the embedded sleeve barrel on connecting screw
Threaded one end is connected with the locking nut for being pressed to first wall, and moment of torsion input structure is provided with connecting screw.
2. assembled architecture wall according to claim 1, it is characterised in that:First wall, the second wall body vertical arrangement,
The operating groove for accommodating the locking nut and moment of torsion input structure is provided with the metope of first wall.
3. assembled architecture wall according to claim 1, it is characterised in that:The moment of torsion input structure is the company of being arranged at
Connect the outer square head structure of screw rod end.
4. assembled architecture wall according to claim 2, it is characterised in that:The embedded sleeve barrel end adjacent with the first wall
Metope of the face flush or below the second wall.
5. the assembled architecture wall according to claim 1 ~ 4 any one, it is characterised in that:Embedded sleeve barrel is away from described
The threaded one end of first wall is connected with embedded bar, and the concreting of embedded sleeve barrel, embedded bar and the second wall is into whole
Body structure.
6. the assembled architecture wall according to claim 1 ~ 4 any one, it is characterised in that:Assembled architecture wall is also
Including the 3rd wall arranged with the second wall body vertical, the first wall, the second wall and the 3rd T-shaped structure of wall body structure, second
Wall is connected with the 3rd wall by the second wall connecting component, the embedded sleeve barrel coaxial line of first, second wall connecting component
Arrangement, and linked together by pre embedded bolt.
7. wall connecting component, including for defaulting in the embedded sleeve barrel in corresponding second wall, it is characterised in that:Wall connecting
Connecting screw in the screw rod perforation that component also includes being used for being arranged in corresponding first wall, be provided with embedded sleeve barrel for
The connected connection screw thread of the connecting screw screw thread, the threaded one end away from the embedded sleeve barrel, which is connected with, on connecting screw is used for
To the locking nut of first wall pressure, moment of torsion input structure is provided with connecting screw.
8. wall connecting component according to claim 7, it is characterised in that:The moment of torsion input structure is to be arranged at connection
The outer square head structure of screw rod end.
9. wall connecting component according to claim 7, it is characterised in that:The one end of connecting screw away from locking nut is set
It is equipped with taper or spherical seeker.
10. the wall connecting component according to claim 7 ~ 9 any one, it is characterised in that:Embedded sleeve barrel is away from described
The threaded one end of first wall is connected with embedded bar, and the concreting of embedded sleeve barrel, embedded bar and the second wall is into whole
Body structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710829308.0A CN107366371A (en) | 2017-09-14 | 2017-09-14 | Assembled architecture wall and its wall connecting component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710829308.0A CN107366371A (en) | 2017-09-14 | 2017-09-14 | Assembled architecture wall and its wall connecting component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107366371A true CN107366371A (en) | 2017-11-21 |
Family
ID=60302708
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710829308.0A Pending CN107366371A (en) | 2017-09-14 | 2017-09-14 | Assembled architecture wall and its wall connecting component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107366371A (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724542A (en) * | 2017-11-27 | 2018-02-23 | 三筑工科技有限公司 | Walling system |
CN107882185A (en) * | 2017-11-27 | 2018-04-06 | 王玉辉 | Assembled Timberwork wall attachment structure and installation method |
CN107938856A (en) * | 2017-12-29 | 2018-04-20 | 三筑工科技有限公司 | Walling system |
CN108301517A (en) * | 2018-03-19 | 2018-07-20 | 湖北乾奥建设工程有限公司 | A kind of earthquake-resistant structure wall |
CN108547381A (en) * | 2018-07-09 | 2018-09-18 | 沈阳三建筑设计研究有限公司 | Prefabricated components connector, prefabricated components and prefabricated components connecting node |
CN111456274A (en) * | 2020-04-16 | 2020-07-28 | 湖南贵庭住宅工业集团有限公司 | Assembled wall connection structure |
CN114575466A (en) * | 2022-03-28 | 2022-06-03 | 昌建建设集团有限公司 | Energy-conserving ready-package modularization house |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1046706A (en) * | 1996-08-01 | 1998-02-17 | Naoyuki Nishimura | Panel anchoring structure and anchoring method therefor regarding building structure made of concrete wall panel |
CN101715501A (en) * | 2007-03-19 | 2010-05-26 | 斯文伯格控股公司 | Joining device |
US20120279161A1 (en) * | 2011-05-06 | 2012-11-08 | Välinge Flooring Technology AB | Mechanical locking system for building panels |
CN103541427A (en) * | 2013-11-04 | 2014-01-29 | 长沙远大住宅工业有限公司 | Box-shaped structural building system and method |
CN203546909U (en) * | 2013-11-04 | 2014-04-16 | 长沙远大住宅工业有限公司 | Special joints for box structure building system |
CN204418380U (en) * | 2014-12-31 | 2015-06-24 | 深圳市华阳国际工程设计有限公司 | A kind of prefabricated component connector |
CN205637108U (en) * | 2016-05-18 | 2016-10-12 | 罗海军 | Can dismantle precast concrete wall body building structure on terrazzo layer surface |
CN205976505U (en) * | 2016-05-24 | 2017-02-22 | 中民筑友科技投资有限公司 | To drawing device |
CN206233403U (en) * | 2016-12-08 | 2017-06-09 | 四川华构住宅工业有限公司 | Wall transverse direction dry type attachment structure based on assembled architecture wall |
CN207277600U (en) * | 2017-09-14 | 2018-04-27 | 辛红 | A kind of assembled architecture wall and its wall connecting component |
-
2017
- 2017-09-14 CN CN201710829308.0A patent/CN107366371A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1046706A (en) * | 1996-08-01 | 1998-02-17 | Naoyuki Nishimura | Panel anchoring structure and anchoring method therefor regarding building structure made of concrete wall panel |
CN101715501A (en) * | 2007-03-19 | 2010-05-26 | 斯文伯格控股公司 | Joining device |
US20120279161A1 (en) * | 2011-05-06 | 2012-11-08 | Välinge Flooring Technology AB | Mechanical locking system for building panels |
CN103541427A (en) * | 2013-11-04 | 2014-01-29 | 长沙远大住宅工业有限公司 | Box-shaped structural building system and method |
CN203546909U (en) * | 2013-11-04 | 2014-04-16 | 长沙远大住宅工业有限公司 | Special joints for box structure building system |
CN204418380U (en) * | 2014-12-31 | 2015-06-24 | 深圳市华阳国际工程设计有限公司 | A kind of prefabricated component connector |
CN205637108U (en) * | 2016-05-18 | 2016-10-12 | 罗海军 | Can dismantle precast concrete wall body building structure on terrazzo layer surface |
CN205976505U (en) * | 2016-05-24 | 2017-02-22 | 中民筑友科技投资有限公司 | To drawing device |
CN206233403U (en) * | 2016-12-08 | 2017-06-09 | 四川华构住宅工业有限公司 | Wall transverse direction dry type attachment structure based on assembled architecture wall |
CN207277600U (en) * | 2017-09-14 | 2018-04-27 | 辛红 | A kind of assembled architecture wall and its wall connecting component |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107724542A (en) * | 2017-11-27 | 2018-02-23 | 三筑工科技有限公司 | Walling system |
CN107882185A (en) * | 2017-11-27 | 2018-04-06 | 王玉辉 | Assembled Timberwork wall attachment structure and installation method |
CN107938856A (en) * | 2017-12-29 | 2018-04-20 | 三筑工科技有限公司 | Walling system |
CN107938856B (en) * | 2017-12-29 | 2023-10-27 | 三一筑工科技股份有限公司 | wall system |
CN108301517A (en) * | 2018-03-19 | 2018-07-20 | 湖北乾奥建设工程有限公司 | A kind of earthquake-resistant structure wall |
CN108547381A (en) * | 2018-07-09 | 2018-09-18 | 沈阳三建筑设计研究有限公司 | Prefabricated components connector, prefabricated components and prefabricated components connecting node |
CN111456274A (en) * | 2020-04-16 | 2020-07-28 | 湖南贵庭住宅工业集团有限公司 | Assembled wall connection structure |
CN114575466A (en) * | 2022-03-28 | 2022-06-03 | 昌建建设集团有限公司 | Energy-conserving ready-package modularization house |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107366371A (en) | Assembled architecture wall and its wall connecting component | |
CN207277600U (en) | A kind of assembled architecture wall and its wall connecting component | |
CN207211429U (en) | Assembled architecture wall and its single wall | |
CN107023121B (en) | A steel bar grout sleeve for assembled concrete structure ductility is connected | |
US10612241B2 (en) | Apparatus for prestressing concrete floor of inclined shaft wall | |
EP3085843B1 (en) | Device and method for heat decoupling of concreted parts of buildings | |
EP3112542B1 (en) | Device and method for heat decoupling of concreted parts of buildings | |
CN106639071A (en) | Laminated slab type sandwich heat preservation shear wall with split bolts and installing method | |
CN210368948U (en) | Combined pile for building foundation engineering | |
JP2021017738A (en) | Reinforcement structure and reinforcement method of masonry construction structure | |
CN207277599U (en) | A kind of assembled architecture wall of dry type connection | |
CN107044193A (en) | A kind of pair of sleeve steel concrete supporting device | |
DE102007037436A1 (en) | Fire wall or complex separation wall e.g. for building made from pre-fabricated concrete elements, has several similar panels which are made from concrete precast and have horizontal part | |
US2235442A (en) | Support for concrete forms | |
CN206529942U (en) | A kind of overlaid plate type sandwich heat preservation shear wall with split bolt | |
CN212561499U (en) | Assembled screw pile | |
DE102005015494A1 (en) | Robust bayonet coupling used in rotary-impact drilling for underground injected bore anchors, holds bayonet studs with clearance from bayonet groove | |
EP1847666A1 (en) | Anchor device for tying of shuttering plates | |
EP0697489A1 (en) | Footfall sound damming supporting element | |
DE69912267T2 (en) | DEVICE FOR A ROCK WALL | |
CN207277598U (en) | Assembled architecture wall | |
WO2015197441A1 (en) | Anchor dowel | |
CN113202102B (en) | Unconstrained frame stud device for rock-fill dam panel construction and mounting method | |
US6494644B1 (en) | Pile connector and method of installation | |
CN215760464U (en) | Connecting structure of external hanging plate and cast-in-place structure body forming template in fabricated building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171121 |
|
RJ01 | Rejection of invention patent application after publication |