CN205976505U - To drawing device - Google Patents

To drawing device Download PDF

Info

Publication number
CN205976505U
CN205976505U CN201620480145.0U CN201620480145U CN205976505U CN 205976505 U CN205976505 U CN 205976505U CN 201620480145 U CN201620480145 U CN 201620480145U CN 205976505 U CN205976505 U CN 205976505U
Authority
CN
China
Prior art keywords
screw rod
sleeve
nut
drawing device
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620480145.0U
Other languages
Chinese (zh)
Inventor
何坎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuyou Zhizao Technology Investment Co., Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201620480145.0U priority Critical patent/CN205976505U/en
Application granted granted Critical
Publication of CN205976505U publication Critical patent/CN205976505U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model belongs to the technical field of building tool, specifically disclose a to drawing device, including sleeve, sleeve pipe and screw rod, the screw rod cross -under the sleeve pipe, the one end and the sleeve of screw rod pass through threaded connection, be equipped with the nut on the screw rod. The utility model discloses the in -process of installing and use, the sleeve is pre -buried in prefabricated component, telescopic open end communicates outward towards prefabricated component, when the formwork, cup jointed sheathed tube screw rod precession pre -embedded sleeve with the screw rod in, use the nut fixed die plate behind the form setting, during the form removal, reverse rotation screw rod, its tip back of screwing out from the sleeve, it can to take the screw rod from the sleeve pipe out. The utility model discloses simple structure, cost saving, convenient to use.

Description

A kind of to drawing device
Technical field
This utility model belongs to building implement technical field, more particularly, to a kind of to drawing device.
Background technology
At present, in the cast-in-place concrete construction of building, Screw arbor with nut at both-ends device can typically all be adopted.Traditional to drawing spiral shell Bar is integral type structure, and after concrete cast-in-situ finishes, not only screw rod cannot take out, and stretches out the screw rod impact mould of wall outer side The dismounting of plate, needs to slice off the part of exposing surface, wastes great deal of steel, and can not reuse, wastes manpower wealth Power.
For solving above-mentioned technical problem, in prior art, disclose dismountable Screw arbor with nut at both-ends, such as patent CN104481145A discloses a kind of template and admittedly uses sleeve bolt to tension, includes a length and is equal to thickness of wall body and bilayer The sleeve of wall form thickness sum, one end of sleeve is provided with a closed head, and this closed head and sleeve adopt engineering plastics Injection moulding integrated molding, is provided with sealing ring between closed head and wall form, the other end of described sleeve is provided with female thread, institute State female thread to coordinate with fastening bolt, be provided with rubber seal ring between described fastening bolt and wall form, this rubber seal The endoporus of ring is coordinated with the outer wall extruding of fastening bolt.Above-mentioned Screw arbor with nut at both-ends can be dismantled and repeatable utilization, has saved people Power financial resources.But, the error being made due to prefabricated components, can make the width in cast-in-place region and design ratio that error occurs, be difficult to protect Card length sleeve is equal to thickness of wall body and two-layer wall template thickness sum, and above-mentioned excessively multiple to the structure drawing sleeve bolt Miscellaneous, in addition, entirely treating that casting area all leads to the waste of material using sleeve.
In sum, need badly and develop that a kind of structure is simple, cost savings, easy to use to drawing device.
Utility model content
The purpose of this utility model be provide that a kind of structure is simple, cost savings, easy to use to drawing device.
Above-mentioned purpose is to be achieved through the following technical solutions:A kind of to drawing device, including sleeve, sleeve pipe and screw rod, described Screw rod is worn and is connect described sleeve pipe, and one end of described screw rod and sleeve are threaded connection, and described screw rod is provided with nut.In this practicality New install and use during, sleeve is embedded in prefabricated components, and the opening of sleeve connects, in formwork towards outside prefabricated components When, screw rod is socketed with the screw rod precession embedded sleeve barrel of sleeve pipe, after model sheetinstallat, uses nut fixed form.The length of described sleeve pipe Degree can according to actual needs, and that is, the width according to actual in-situ layer is arranged;During form removal, contra rotating screw, its end is from sleeve After middle back-out, screw rod is extracted out from sleeve pipe.It is arranged such, on the one hand can shorten the length of sleeve, material-saving, simultaneously Be conducive to the dismounting of screw rod.Certainly, the diameter of described sleeve pipe should be moderate, can neither be too little, leads to after such casting concrete Screw rod is not easily taken out, nor too big, leads to leave larger cavity in in-situ layer.
Further, described screw rod is provided with trapezoidal thread, and described nut is used cooperatively with described trapezoidal thread.Trapezoidal thread Pitch larger so that nut can quickly spinning in and out, greatly accelerate die-filling form removal speed;In addition, acme thread is fitted Answering property is good, the trapezoidal tooth of big pitch and make cleaning mud thereon become convenient.
Further, described nut is to lengthen nut.On the one hand the setting lengthening nut easily opens up and screw rod upper trapezoid screw thread The steep-pitch thread using cooperatively, on the other hand big with the contact area of screw rod, it is difficult in the vibration processes of casting concrete By the pine that shakes.
Further, described screw rod is provided with pad.Certainly, for reaching more preferable effect, pad can be increased as far as possible Surface area.
Further, described pad is arranged between described sleeve pipe and nut.
Further, described sleeve is provided with anchoring piece.It is arranged such, anchor force in building element for the sleeve will be increased, During preventing to pulling process, sleeve is extracted in building element.
Further, described nut is wing nut.It is arranged such, manually the both wings of rotation butterfly nut can be to right Drawing device is fastened, and simplifies operation.
Further, described screw rod is connected by regular screw threads with described sleeve.So, by one end of screw rod and sleeve connection Be arranged to regular screw threads end, because precession socket end adopts regular screw threads, pitch little so that pull bar is difficult when cast-in-place because Want vibrated concrete and the pine that shakes.
Further, described screw rod is arranged to square toes or homalocephalus away from one end of sleeve.It is arranged such, square toes or homalocephalus are spiral shell Bar precession sleeve and tearing open provides impetus when thanking to back-out sleeve, you can be stuck on square toes or homalocephalus using spanner so that fill bar, Tear open and exert a force conveniently during bar, dismounting is rapid.The size of square toes or homalocephalus should be less than the size of screw rod so that nut can be from square toes End spinning in and out, easy to use.
Further, described screw rod is socketed with rubber seal plug between sleeve pipe and pad.It is arranged such, the setting of rubber seal plug Concrete slurry can effectively be prevented along the jack hole leakage of template.
Brief description
The accompanying drawing constituting a part of the present utility model is used for providing further understanding to of the present utility model, and this practicality is new The schematic description and description of type is used for explaining this utility model, does not constitute to improper restriction of the present utility model.
Fig. 1 is the structural representation to drawing device involved by a kind of embodiment of this utility model;
Fig. 2 is the use state schematic diagram to drawing device involved by a kind of embodiment of this utility model.
In figure:
1 sleeve, 2 sleeve pipe, 3 screw rod 4 nut
5 prefabricated components, 6 template, 7 back cord 8 in-situ layer
9 trapezoidal thread, 10 pad, 11 regular screw threads 12 anchoring piece
13 square toes
Specific embodiment
Below in conjunction with the accompanying drawings this utility model is described in detail, the description of this part is only exemplary and explanatory, Should not there is any restriction effect to protection domain of the present utility model.Additionally, those skilled in the art's retouching according to presents State, respective combination can be carried out to the feature in embodiment in presents and in different embodiment.
This utility model embodiment is as follows, sees figures.1.and.2, a kind of to drawing device, including sleeve 1, sleeve pipe 2 and screw rod 3, described screw rod 3 is worn and is connect described sleeve pipe 2, and one end of described screw rod 3 and sleeve 1 are threaded connection, and described screw rod 3 is provided with spiral shell Female 4.During this utility model is installed and used, sleeve 1 is embedded in prefabricated components 5, and the opening of sleeve 1 is towards prefabricated structure Part 5 is outer to be connected, and in formwork, screw rod 3 is socketed with the screw rod 3 precession embedded sleeve barrel 1 of sleeve pipe 2, template 6 uses nut after installing 4 fixed forms 6.The length of described sleeve pipe 2 can according to actual needs, and that is, the width according to actual in-situ layer 8 is arranged;During form removal, Contra rotating screw 3, after its end screws out from sleeve 1, screw rod 3 is extracted out from sleeve pipe 2.It is arranged such, on the one hand The length of sleeve 1, material-saving can be shortened, be conducive to the dismounting of screw rod 3 simultaneously.Certainly, the diameter of described sleeve pipe 2 should be fitted In, can neither be too little, lead to screw rod 3 to be not easily taken out after such casting concrete, nor too big, lead to stay in in-situ layer 8 Larger cavity.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 1 and Fig. 2, described screw rod 3 is provided with ladder Shape screw thread 9, described nut 4 is used cooperatively with described trapezoidal thread 9.The pitch of trapezoidal thread 9 is larger so that nut 4 can be fast The spinning in and out of speed, greatly accelerate die-filling form removal speed;In addition, acme thread adaptability is good, the trapezoidal tooth of big pitch and make Cleaning mud thereon becomes convenient.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 1, described nut 4 is to lengthen nut 4.Plus On the one hand the setting of long nut 4 easily opens up the steep-pitch thread using cooperatively with screw rod 3 upper trapezoid screw thread 9, another aspect and spiral shell The contact area of bar 3 is big, is difficult in the vibration processes of casting concrete by the pine that shakes.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 1, described screw rod 3 is provided with pad 10. Certainly, the surface area of pad 10 can for reaching more preferable effect, be increased as far as possible.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 1, described pad 10 is arranged on described set Between pipe 2 and nut 4.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 1 and Fig. 2, described sleeve 1 is provided with anchor Firmware 12.It is arranged such, anchor force in building element for the sleeve 1 will be increased, during preventing to pulling process, by sleeve 1 Extract in building element.
On the basis of above-described embodiment, in another embodiment of the present invention, described nut 4 is wing nut 4.So set Put, manually the both wings of rotation butterfly nut can fasten to drawing device, simplifies operation.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 1 and Fig. 2, described screw rod 3 and described set Cylinder 1 is connected by regular screw threads 11.So, one end screw rod 3 being connected with sleeve 1 is arranged to regular screw threads 11 end, due to rotation Enter sleeve 1 end adopt regular screw threads 11, pitch little so that pull bar is difficult with the pine that shakes because wanting vibrated concrete when cast-in-place.
On the basis of above-described embodiment, in another embodiment of the present invention, such as Fig. 1, described screw rod 3 is away from the one of sleeve 1 End is arranged to square toes 13 or homalocephalus.It is arranged such, square toes 13 or homalocephalus are that screw rod 3 precession sleeve 1 carries with when tearing open and thanking to back-out sleeve 1 For impetus, you can be stuck on square toes 13 or homalocephalus using spanner so that filling bar, conveniently, dismounting is rapid to tear force during bar open.Side 13 or the size of homalocephalus should be less than the size of screw rod 3 so that nut 4 can be easy to use from square toes 13 end spinning in and out.
On the basis of above-described embodiment, in another embodiment of the present invention, described screw rod 3 is between sleeve pipe 2 and pad 10 It is socketed with rubber seal plug.It is arranged such, the setting of rubber seal plug can effectively prevent concrete slurry along outside the jack hole of template 6 Leakage.
The above is only preferred implementation of the present utility model it is noted that common skill for the art For art personnel, on the premise of without departing from this utility model principle, some improvements and modifications can also be made, these improve and Retouching also should be regarded as protection domain of the present utility model.

Claims (7)

1. a kind of to drawing device it is characterised in that including sleeve, sleeve pipe and screw rod, described screw rod is worn and is connect described sleeve pipe, described spiral shell One end of bar and sleeve are threaded connection, and described screw rod is provided with nut;Described screw rod is provided with pad, described pad setting Between described sleeve pipe and nut, described screw rod is socketed with rubber seal plug between sleeve pipe and pad.
2. according to claim 1 to drawing device it is characterised in that described screw rod is provided with trapezoidal thread, described nut Use cooperatively with described trapezoidal thread.
3. according to claim 2 to drawing device it is characterised in that described nut be lengthen nut.
4. according to claims 1 to 3 any one to drawing device it is characterised in that described sleeve is provided with anchoring piece.
5. according to claims 1 to 3 any one to drawing device it is characterised in that described nut be wing nut.
6. according to claim 4 to drawing device it is characterised in that described screw rod and described sleeve pass through regular screw threads company Connect.
7. according to claim 6 to drawing device it is characterised in that described screw rod is arranged to square toes away from one end of sleeve Or homalocephalus.
CN201620480145.0U 2016-05-24 2016-05-24 To drawing device Active CN205976505U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620480145.0U CN205976505U (en) 2016-05-24 2016-05-24 To drawing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620480145.0U CN205976505U (en) 2016-05-24 2016-05-24 To drawing device

Publications (1)

Publication Number Publication Date
CN205976505U true CN205976505U (en) 2017-02-22

Family

ID=58019875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620480145.0U Active CN205976505U (en) 2016-05-24 2016-05-24 To drawing device

Country Status (1)

Country Link
CN (1) CN205976505U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060333A (en) * 2017-06-29 2017-08-18 成都建筑工程集团总公司 Split bolt assembly
CN107366371A (en) * 2017-09-14 2017-11-21 辛红 Assembled architecture wall and its wall connecting component
CN108086171A (en) * 2017-12-12 2018-05-29 四川交大工程检测咨询有限公司 For precisely fixing the fastening bolt of construction formwork and its application method
WO2018161732A1 (en) * 2017-03-07 2018-09-13 刁宏伟 Laminated plate-type sandwich insulation shear wall with tie bolts and installation method thereof
CN110043033A (en) * 2019-05-08 2019-07-23 广东众科建筑技术发展有限公司 Aluminum alloy mould plate system accepts template pre-embedded device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018161732A1 (en) * 2017-03-07 2018-09-13 刁宏伟 Laminated plate-type sandwich insulation shear wall with tie bolts and installation method thereof
US11015343B1 (en) 2017-03-07 2021-05-25 Hongwei DIAO Laminated plate-type sandwich insulation shear wall with tie bolts and installation method thereof
CN107060333A (en) * 2017-06-29 2017-08-18 成都建筑工程集团总公司 Split bolt assembly
CN107366371A (en) * 2017-09-14 2017-11-21 辛红 Assembled architecture wall and its wall connecting component
CN108086171A (en) * 2017-12-12 2018-05-29 四川交大工程检测咨询有限公司 For precisely fixing the fastening bolt of construction formwork and its application method
CN110043033A (en) * 2019-05-08 2019-07-23 广东众科建筑技术发展有限公司 Aluminum alloy mould plate system accepts template pre-embedded device

Similar Documents

Publication Publication Date Title
CN205976505U (en) To drawing device
CN203924104U (en) A kind of blower foundation
CN206487148U (en) A kind of wall bolt hole slip casting capping tools
CN203213598U (en) Anti-leakage embedded part of sewer pipe of concrete slab
CN207495778U (en) A kind of bar connecting grout sleeve fixed structure
CN203499017U (en) Wall tie bar pre-embedded positioning device
CN106522545A (en) Self-disassembled adjustable opposite-pull screw device and assembling and disassembling method thereof
CN207072755U (en) One kind is used for underwater bearing pin and removes rocker device
CN205975996U (en) Thick liquid anchor lap joint structure and wall body
CN105952152B (en) A kind of plate device for floor provided pipe road junction
CN208966008U (en) A kind of reusable exterior wall steel pipe scaffold wall-connecting piece device
CN212802552U (en) Water supply and drainage heating and ventilation reserved sleeve device
CN209162834U (en) A kind of sealing floral tube grouting equipment
CN207211699U (en) A kind of scaffold attachment arrangement
CN207526122U (en) A kind of steel form with stripping off device
CN211221312U (en) Plugging device suitable for prefabricated stand grout sleeve
CN209339585U (en) High-intensitive outrigger drawknot mechanism can be recycled in one kind
CN103967279A (en) Auxiliary device for grouting of prefabricated concrete wall
CN205777524U (en) A kind of to drawing device
CN207697047U (en) A kind of positioning pull unit of plastics lined pipe
CN103615109B (en) A kind of Screw arbor with nut at both-ends
CN205466709U (en) Toper crab -bolt and knockout device
CN214784807U (en) Building wall pre-buried hole conical bolt
CN211515026U (en) Prefabricated PC component transportation crack repair curing means
CN219281288U (en) Water-stopping bolt

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co., Ltd.

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: 2018430000023

Denomination of utility model: To drawing device

Granted publication date: 20170222

License type: Common License

Record date: 20190102

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nanning Zhongmin zhuyou Intelligent Manufacturing Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2019430000004

Denomination of utility model: Tying device

Granted publication date: 20170222

License type: Common License

Record date: 20191105

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Xiangxi Zhongmin zhuyou Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2020430000002

Denomination of utility model: Tying device

Granted publication date: 20170222

License type: Common License

Record date: 20200305

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000

Patentee after: Zhuyou Zhizao Technology Investment Co., Ltd

Address before: 410205 comprehensive building in Hunan province Changsha Kaifu District, No. 30 Xingang Road, Changsha Jinxia bonded logistics center room 3005

Patentee before: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT Ltd.

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nantong Zhongmin zhuyou Zhizao Technology Co., Ltd

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2020980007488

Denomination of utility model: A pair pulling device

Granted publication date: 20170222

License type: Common License

Record date: 20201105

EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Yuanfeng Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980000884

Denomination of utility model: A pair pulling device

Granted publication date: 20170222

License type: Common License

Record date: 20210203

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Hailong Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001039

Denomination of utility model: A pair pulling device

Granted publication date: 20170222

License type: Common License

Record date: 20210207

EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan YingYuan Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001160

Denomination of utility model: A pair pulling device

Granted publication date: 20170222

License type: Common License

Record date: 20210218

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan guochi Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001282

Denomination of utility model: A pair pulling device

Granted publication date: 20170222

License type: Common License

Record date: 20210225

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Linzhou Hongen Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001340

Denomination of utility model: A pair pulling device

Granted publication date: 20170222

License type: Common License

Record date: 20210302

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Shangyi Engineering Labor Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980010464

Denomination of utility model: A pulling device

Granted publication date: 20170222

License type: Common License

Record date: 20211011

EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan fengque Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980010621

Denomination of utility model: A pulling device

Granted publication date: 20170222

License type: Common License

Record date: 20211019

EE01 Entry into force of recordation of patent licensing contract