CN205400024U - Instrument formula external scaffolding bolt that can dismantle used repeatedly links wall spare - Google Patents
Instrument formula external scaffolding bolt that can dismantle used repeatedly links wall spare Download PDFInfo
- Publication number
- CN205400024U CN205400024U CN201620135332.5U CN201620135332U CN205400024U CN 205400024 U CN205400024 U CN 205400024U CN 201620135332 U CN201620135332 U CN 201620135332U CN 205400024 U CN205400024 U CN 205400024U
- Authority
- CN
- China
- Prior art keywords
- built
- fitting
- hole
- embedded
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 29
- 239000010959 steel Substances 0.000 claims abstract description 29
- 229920003023 plastic Polymers 0.000 claims description 4
- 239000004033 plastic Substances 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 12
- 238000000034 method Methods 0.000 description 9
- 238000009415 formwork Methods 0.000 description 8
- 239000000463 material Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000009435 building construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Ladders (AREA)
Abstract
本实用新型涉及一种可以拆卸重复使用的工具式外脚手架螺栓连墙件,包括预埋件、预埋件封盖、连接螺栓和插销螺丝组件,预埋件一端设有内螺纹,另一端用于卡入侧模上的预埋孔内;预埋件封盖一端设有外螺纹,用于与预埋件连接,另一端用于卡紧在预埋孔上;连接螺栓一端设有外螺纹,用于与预埋件连接,另一端为扁头端并设有插销孔;脚手架钢管上设有连接孔;插销螺丝组件通过插销孔和连接孔将脚手架钢管和连接螺栓连接起来。本实用新型可重复使用,成本节约,强度及轴力承载均远大于规范要求,施工效率高,现场施工时组装连墙件简单方便,拉结强度安全可靠,有效保证了外脚手架与建筑物连接的整体性。
The utility model relates to a tool-type external scaffold bolt wall part which can be disassembled and reused. It is snapped into the pre-embedded hole on the side form; one end of the cover of the embedded part is provided with an external thread for connecting with the pre-embedded part, and the other end is used for clamping on the pre-embedded hole; one end of the connecting bolt is provided with an external thread , used to connect with the embedded parts, the other end is a flat end with a bolt hole; the scaffold steel pipe is provided with a connecting hole; the bolt screw assembly connects the scaffold steel pipe and the connecting bolt through the bolt hole and the connecting hole. The utility model is reusable, cost-saving, the strength and axial load are far greater than the specification requirements, the construction efficiency is high, the assembly of the wall parts is simple and convenient during on-site construction, the tie strength is safe and reliable, and the connection between the external scaffold and the building is effectively guaranteed. integrity.
Description
技术领域technical field
本实用新型涉及建筑施工技术领域,具体涉及一种可以拆卸重复使用的工具式外脚手架螺栓连墙件,适用于各类现浇混凝土多层、高层建筑外脚手架连墙件施工。The utility model relates to the technical field of building construction, in particular to a tool-type external scaffold bolt-connected wall part that can be disassembled and reused, which is suitable for the construction of various cast-in-situ concrete multi-layer and high-rise building external scaffold wall parts.
背景技术Background technique
连墙件是指连接脚手架与建筑物的构件,能够传递拉力和压力,是脚手架的重要组成部分。国内外发生的脚手架倒塌事故,基本都是由于连墙件设置不足或连墙件被拆除后未及时补设引起。脚手架的失稳通常分为整体失稳和局部失稳。其中整体失稳是脚手架失稳的主要破坏形式,破坏始于无连墙件、横向刚度差或初始弯曲较大的横向框架。而设置合理、承载力高、构造符合要求的连墙件,对计算单元的计算跨度的改善和横向刚度的提高,均起直接作用,因而对脚手架的整体稳定性起重要作用。The wall parts refer to the components connecting the scaffold and the building, which can transmit tension and pressure, and are an important part of the scaffold. Scaffolding collapse accidents at home and abroad are basically caused by insufficient setting of connecting wall parts or failure to repair the connecting wall parts in time after being removed. The instability of scaffolding is usually divided into overall instability and local instability. Among them, the overall instability is the main failure form of the scaffold instability, and the failure starts from the transverse frame without wall parts, poor transverse stiffness or large initial bending. The wall parts with reasonable setting, high bearing capacity and satisfactory structure can directly affect the improvement of the calculation span of the calculation unit and the improvement of the transverse stiffness, and thus play an important role in the overall stability of the scaffold.
《建筑施工扣件式钢管脚手架安全技术规范》(JGJ130-2011)第6.4节对连墙件作了具体规定,对24m以上的单、双排脚手架必须采用刚性连墙件。刚性连墙件指的是采用钢管、扣件或预埋件组成的连墙件。但规范中并未具体规定刚性连墙件的做法,导致目前各地刚性连墙件的做法不一,主要有预埋钢管法、后锚固法、箍柱法和预埋铁板法等,部分做法存在安全隐患。Section 6.4 of the "Safety Technical Specifications for Fastener Type Steel Pipe Scaffolding in Building Construction" (JGJ130-2011) has specific regulations on the wall parts. For single and double-row scaffolds over 24m, rigid wall parts must be used. Rigid wall parts refer to wall parts made of steel pipes, fasteners or embedded parts. However, the specification does not specifically stipulate the method of rigid wall parts, resulting in different methods of rigid wall parts in different places, mainly including pre-embedded steel pipe method, post-anchor method, hoop column method and pre-embedded iron plate method, etc., some methods There are security risks.
常规预埋钢管连墙件埋设在梁顶面,影响砌体、抹灰、涂料等外墙施工,钢管预埋件形成的架眼需要修补,二次改设连墙件。传统的钢管预埋连墙件存在以下不足:修补洞口造成渗水的质量通病,由于修补洞口而拆除传统钢管连墙件存在的安全隐患,以及预埋的钢管浪费较大。Conventional pre-embedded steel pipe connecting wall parts are buried on the top of the beam, which affects the construction of external walls such as masonry, plastering, and paint. The traditional steel pipe pre-embedded wall parts have the following disadvantages: the common quality problem of water seepage caused by repairing the hole, the safety hazards of removing the traditional steel pipe wall parts due to the repair of the hole, and the waste of pre-embedded steel pipes.
实用新型内容Utility model content
本实用新型要解决的技术问题是,针对现有技术存在的不足,提供一种组装简单方便、施工效率高、安全可靠、可拆卸重复使用的工具式外脚手架螺栓连墙件。The technical problem to be solved by the utility model is to provide a tool-type external scaffold bolt-connected wall part which is simple and convenient to assemble, high in construction efficiency, safe and reliable, detachable and reusable in view of the deficiencies in the prior art.
本实用新型解决上述技术问题所采取的技术方案如下:The technical scheme that the utility model solves the problems of the technologies described above is as follows:
一种可以拆卸重复使用的工具式外脚手架螺栓连墙件,包括预埋件、预埋件封盖、连接螺栓和插销螺丝组件,所述的预埋件的一端为中空的管状结构并设有内螺纹,预埋件的另一端用于卡入侧模上的预埋孔内;预埋件封盖的一端设有与预埋件的内螺纹相适应的外螺纹,用于与预埋件连接,预埋件封盖的另一端用于卡紧在预埋孔上;所述的预埋件封盖与预埋件连接后,预埋件封盖露出预埋件外的长度比侧模模板的厚度大,使得预埋件设有内螺纹一端的端面内凹于浇筑后的砼面;所述的连接螺栓的一端设有与预埋件的内螺纹相适应的外螺纹,用于与预埋件连接,连接螺栓的另一端为扁头端,扁头端上设有插销孔并穿入脚手架钢管内;脚手架钢管上设有连接孔;所述的插销孔和连接孔均与插销螺丝组件的螺杆外径相适应,插销螺丝组件通过插销孔和连接孔将脚手架钢管和连接螺栓连接起来。A tool-type external scaffold bolt-connected wall piece that can be disassembled and reused, including a built-in piece, a cover of the built-in piece, a connecting bolt and a bolt screw assembly. One end of the built-in piece is a hollow tubular structure with Internal thread, the other end of the embedded part is used to snap into the embedded hole on the side form; one end of the cover of the embedded part is provided with an external thread suitable for the internal thread of the embedded part, which is used to match the embedded part The other end of the cover of the embedded part is used to clamp on the embedded hole; after the cover of the embedded part is connected with the embedded part, the length of the cover of the embedded part exposed outside the embedded part is longer than that of the side mold The thickness of the formwork is large, so that the end surface of the embedded part provided with internal thread is concave in the concrete surface after pouring; one end of the connecting bolt is provided with an external thread compatible with the internal thread of the embedded part, which is used for connecting with the embedded part. Embedded parts connection, the other end of the connecting bolt is a flat end, and the flat end is provided with a pin hole and penetrates into the steel pipe of the scaffold; a connecting hole is provided on the steel pipe of the scaffold; the pin hole and the connecting hole are both connected with the pin screw The outer diameter of the screw rod of the component is compatible, and the plug screw component connects the scaffolding steel pipe and the connecting bolt through the plug hole and the connecting hole.
所述的预埋件封盖上还设有塑料三角塞,用于将预埋件封盖与预埋孔卡紧。The cover of the embedded part is also provided with a plastic triangular plug for fastening the cover of the embedded part with the embedded hole.
本实用新型将带封盖的预埋件预埋在混凝土梁、柱、墙的侧面,在侧模拆模前,先将预埋件封盖旋出,再将连接螺栓的一端旋进预埋件内,另一端通过插销螺丝组件与脚手架钢管连接,最后将脚手架钢管用扣件与外脚手架立杆相连接,即完成了连墙件的系统连接。预埋件所形成小直径孔洞,待大部分外墙施工完成时,逐层拆除连墙件,用玻璃胶等材质填补孔洞,采用外墙工艺修补好即可。预埋件封盖、连接螺栓、插销螺丝组件、脚手架钢管进行适当保养,即可应用到另一工程中,整套连墙件中损耗的仅是预埋件,其余材料均可重复使用。总体而言,本实用新型具备以下有益效果:The utility model pre-embeds the pre-embedded parts with cover on the side of concrete beams, columns and walls. Before the side formwork is removed, the cover of the pre-embedded parts is screwed out first, and then one end of the connecting bolt is screwed into the pre-embedded parts. Inside the piece, the other end is connected to the scaffold steel pipe through the bolt screw assembly, and finally the scaffold steel pipe is connected to the outer scaffold pole with fasteners, which completes the system connection of the wall parts. The small-diameter holes formed by the embedded parts, when most of the exterior wall construction is completed, remove the wall parts layer by layer, fill the holes with glass glue and other materials, and use the exterior wall technology to repair them. The cover of the embedded parts, connecting bolts, plug screw components, and scaffolding steel pipes can be applied to another project after proper maintenance. Only the embedded parts are lost in the whole set of wall parts, and the rest of the materials can be reused. Generally speaking, the utility model has the following beneficial effects:
(1)由可拆卸的配件组成,能够重复使用,降低了传统工法钢管损耗,实现连墙件的循环周转利用,节约成本50%以上。(1) It is composed of detachable accessories, which can be reused, reducing the loss of steel pipes in traditional construction methods, realizing the recycling and utilization of wall parts, and saving more than 50% of the cost.
(2)预埋件预埋在梁、柱、墙侧面,不影响砌体、抹灰、涂料施工,能够避免工人为方便施工大面积拆除连墙件导致的脚手架坍塌事故,解决了传统钢管预埋件修补洞口造成渗水的质量通病问题。(2) The pre-embedded parts are pre-buried on the side of beams, columns and walls, without affecting the construction of masonry, plastering and coating, and can avoid the collapse of scaffolding caused by workers removing large-scale wall parts for the convenience of construction. Common quality problems of water seepage caused by embedded parts repairing holes.
(3)通过强度验算、抗拔及破坏试验,证明本实用新型的强度及轴力承载均远大于规范要求,施工效率高,现场施工时组装连墙件简单方便,拉结强度安全可靠,有效保证了外脚手架与建筑物连接的整体性。(3) Through the strength check, pullout and destruction tests, it is proved that the strength and axial load of the utility model are far greater than the specification requirements, the construction efficiency is high, the assembly of the wall parts is simple and convenient during on-site construction, and the tie strength is safe, reliable and effective. The integrity of the connection between the external scaffold and the building is guaranteed.
附图说明Description of drawings
图1是本实用新型所述的可以拆卸重复使用的工具式外脚手架螺栓连墙件的结构示意图。Fig. 1 is a structural schematic diagram of the tool-type outer scaffold bolt wall part that can be disassembled and reused according to the utility model.
图2是本实用新型所述的连接螺栓的结构示意图。Fig. 2 is a structural schematic diagram of the connecting bolt described in the utility model.
图3是本实用新型所述的预埋件及预埋件封盖的结构分解示意图。Fig. 3 is a schematic exploded view of the structure of the embedded part and the cover of the embedded part described in the present invention.
附图标记为:The reference signs are:
1.预埋件,2.连接螺栓,3.插销螺丝组件,4.脚手架钢管,5.预埋件封盖。1. Embedded parts, 2. Connecting bolts, 3. Pin screw assembly, 4. Scaffold steel pipe, 5. Embedded parts cover.
具体实施方式detailed description
下面举例并结合附图对本实用新型的技术方案做进一步说明。The technical solution of the present utility model is further described with examples below in conjunction with the accompanying drawings.
如图1-图3所示,一种可以拆卸重复使用的工具式外脚手架螺栓连墙件,包括预埋件1、预埋件封盖5、连接螺栓2和插销螺丝组件3,所述的预埋件1的一端为中空的管状结构并设有内螺纹,预埋件1的另一端用于卡入侧模上的预埋孔内;预埋件封盖5的一端设有与预埋件1的内螺纹相适应的外螺纹,用于与预埋件1连接,预埋件封盖5的另一端设有塑料三角塞,用于卡紧在预埋孔上;所述的预埋件封盖5与预埋件1连接后,预埋件封盖5露出预埋件1外的长度比侧模模板的厚度大,使得预埋件1设有内螺纹一端的端面内凹于浇筑后的砼面;所述的连接螺栓2的一端设有与预埋件1的内螺纹相适应的外螺纹,用于与预埋件1连接,连接螺栓2的另一端为扁头端,扁头端上设有插销孔并穿入脚手架钢管4内;脚手架钢管4上设有连接孔;所述的插销孔和连接孔均与插销螺丝组件3的螺杆外径相适应,插销螺丝组件3通过插销孔和连接孔将脚手架钢管4和连接螺栓2连接起来。As shown in Figures 1-3, a tool-type external scaffolding bolted wall piece that can be disassembled and reused includes an embedded part 1, an embedded part cover 5, a connecting bolt 2 and a plug screw assembly 3. One end of the embedded part 1 is a hollow tubular structure with an internal thread, and the other end of the embedded part 1 is used to snap into the embedded hole on the side mold; one end of the embedded part cover 5 is provided with a pre-embedded The external thread adapted to the internal thread of part 1 is used to connect with the embedded part 1, and the other end of the embedded part cover 5 is provided with a plastic triangular plug for clamping on the pre-embedded hole; After the part cover 5 is connected with the embedded part 1, the length of the embedded part cover 5 exposed outside the embedded part 1 is larger than the thickness of the side formwork, so that the end surface of the embedded part 1 with internal thread is concave in the pouring After the concrete surface; one end of the connecting bolt 2 is provided with an external thread compatible with the internal thread of the embedded part 1, which is used to connect with the embedded part 1, and the other end of the connecting bolt 2 is a flat head end. The head end is provided with a bolt hole and penetrates into the scaffold steel pipe 4; the scaffold steel pipe 4 is provided with a connection hole; the bolt hole and the connection hole are both adapted to the outer diameter of the screw of the bolt screw assembly 3, and the bolt screw assembly 3 passes through The bolt hole and the connecting hole connect the scaffolding steel pipe 4 and the connecting bolt 2.
本实用新型的使用方法如下:The using method of the present utility model is as follows:
(1)将预埋件1预埋好(1) Pre-embed the embedded part 1
现将预埋件封盖5旋入预埋件1内,再将预埋件1卡入侧模上钻好的预埋孔内,预埋件封盖5上的塑料三角塞比预埋孔略大,可以有效的将预埋件1卡紧在预埋孔内。假如侧模的模板厚度为18mm,预埋件封盖5露出预埋件1外的长度设为20mm,浇筑后,预埋件1与砼面内凹差则为2mm,方便拆除连墙件后修补预埋孔。Now screw the embedded part cover 5 into the embedded part 1, and then snap the embedded part 1 into the embedded hole drilled on the side mold. The plastic triangular plug on the embedded part cover 5 is larger than the embedded hole. Slightly larger, it can effectively clamp the embedded part 1 in the embedded hole. If the template thickness of the side form is 18mm, and the length of the embedded part cover 5 exposed outside the embedded part 1 is set to 20mm, after pouring, the concave difference between the embedded part 1 and the concrete surface is 2mm, which is convenient for removing the wall parts. Repair embedded holes.
(2)浇筑混凝土(2) Pouring concrete
(3)拆模(3) demoulding
拆模要先拆周围模板,轻击预埋件1处的模板,待松紧后旋出预埋件封盖5,再拆除模板,以防拆除模板时因混凝土强度过低而破坏锚筋与混凝土之间的握裹力,从而确保施工质量。To remove the formwork, first remove the surrounding formwork, lightly tap the formwork at the embedded part 1, unscrew the embedded part cover 5 after it is tight, and then remove the formwork, so as to prevent the anchor bar and concrete from being damaged due to the low concrete strength when the formwork is removed Between the grip force, so as to ensure the quality of construction.
(4)组装连接螺栓2和脚手架钢管4(4) Assemble connecting bolt 2 and scaffolding steel pipe 4
根据外脚手架与预埋件的实际距离,选择适当长度的脚手架钢管4,在脚手架钢管4边缘30mm的地方用钻头钻孔,将连接螺栓2的扁头端穿入脚手架钢管4内,用插销螺丝组件3穿过脚手架钢管4和连接螺栓2的扁头端并拧紧。According to the actual distance between the outer scaffold and the embedded parts, select the scaffold steel pipe 4 of appropriate length, drill a hole with a drill bit at the edge of the scaffold steel pipe 4 at a distance of 30mm, insert the flat end of the connecting bolt 2 into the scaffold steel pipe 4, and use the bolt screw Component 3 passes through scaffolding steel pipe 4 and the flat end of connecting bolt 2 and tightens.
(5)紧固连接螺栓2及连接外脚手架(5) Tighten the connecting bolt 2 and connect the outer scaffold
将连接螺栓2有外螺纹的一端旋进预埋件1内,在将脚手架钢管4用扣件与外脚手架立杆扣紧。这样就完成了连墙件系统的连接。Screw one end of the connecting bolt 2 with the external thread into the embedded part 1, and fasten the scaffold steel pipe 4 with the fastener and the outer scaffold pole. This completes the connection of the wall fitting system.
(6)连墙件的拆卸(6) Removal of wall parts
要拆除外架时,先松开扣件,逐层再将整个连墙件系统从预埋件1中旋出即可。预埋件封盖5、连接螺栓2、插销螺丝组件3、脚手架钢管4进行适当保养,即可应用到另一工程中,整套连墙件中损耗的仅是预埋件1,其余材料均可重复使用。When the outer frame is to be removed, first loosen the fastener, and then unscrew the entire wall connecting system from the embedded part 1 layer by layer. The embedded part cover 5, the connecting bolt 2, the plug screw assembly 3, and the scaffold steel pipe 4 can be applied to another project after proper maintenance. In the whole set of wall parts, only the embedded part 1 is lost, and other materials can be used. reuse.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620135332.5U CN205400024U (en) | 2016-02-23 | 2016-02-23 | Instrument formula external scaffolding bolt that can dismantle used repeatedly links wall spare |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620135332.5U CN205400024U (en) | 2016-02-23 | 2016-02-23 | Instrument formula external scaffolding bolt that can dismantle used repeatedly links wall spare |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205400024U true CN205400024U (en) | 2016-07-27 |
Family
ID=56446492
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620135332.5U Active CN205400024U (en) | 2016-02-23 | 2016-02-23 | Instrument formula external scaffolding bolt that can dismantle used repeatedly links wall spare |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205400024U (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106065710A (en) * | 2016-08-19 | 2016-11-02 | 中国十七冶集团有限公司 | A kind of wall-connecting piece utilizing formwork fastener to do overhanging type steel pipe exterior wall scaffold |
| CN107191685A (en) * | 2017-07-07 | 2017-09-22 | 上海民防建筑研究设计院有限公司 | A kind of Novel civil air defense engineering tubular construction through walls |
| CN107268977A (en) * | 2017-07-31 | 2017-10-20 | 中国冶集团有限公司 | Circular high pier stud constructor row cat ladder assembled sustaining wall fixing device and construction method |
| CN107268976A (en) * | 2017-07-31 | 2017-10-20 | 中国冶集团有限公司 | Towering structure constructor row safety climbing ladder assembled sustaining wall fixing device and construction method |
| CN109778896A (en) * | 2019-02-14 | 2019-05-21 | 百盛联合集团有限公司 | A kind of steel structure column lower margin bolt integral built-in construction and its construction method |
| CN110359693A (en) * | 2019-06-24 | 2019-10-22 | 中国五冶集团有限公司 | A kind of boat scaffold structure |
| CN111305543A (en) * | 2020-03-04 | 2020-06-19 | 中国十七冶集团有限公司 | Disposable outer wall scaffold erecting and fixing technology |
| CN113585715A (en) * | 2021-08-17 | 2021-11-02 | 中国五冶集团有限公司 | Structure and construction method of bolt type connecting piece |
| CN113605677A (en) * | 2021-09-02 | 2021-11-05 | 重庆万力新材料有限公司 | Wall connecting piece for building construction and use method thereof |
-
2016
- 2016-02-23 CN CN201620135332.5U patent/CN205400024U/en active Active
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106065710A (en) * | 2016-08-19 | 2016-11-02 | 中国十七冶集团有限公司 | A kind of wall-connecting piece utilizing formwork fastener to do overhanging type steel pipe exterior wall scaffold |
| CN107191685A (en) * | 2017-07-07 | 2017-09-22 | 上海民防建筑研究设计院有限公司 | A kind of Novel civil air defense engineering tubular construction through walls |
| CN107268976B (en) * | 2017-07-31 | 2019-08-23 | 中国一冶集团有限公司 | The fixed device of towering structure constructor's row safety climbing ladder assembled sustaining wall and construction method |
| CN107268976A (en) * | 2017-07-31 | 2017-10-20 | 中国冶集团有限公司 | Towering structure constructor row safety climbing ladder assembled sustaining wall fixing device and construction method |
| CN107268977B (en) * | 2017-07-31 | 2019-04-23 | 中国一冶集团有限公司 | Round high pier stud constructor row ladder assembled sustaining wall fixes device and construction method |
| CN107268977A (en) * | 2017-07-31 | 2017-10-20 | 中国冶集团有限公司 | Circular high pier stud constructor row cat ladder assembled sustaining wall fixing device and construction method |
| CN109778896A (en) * | 2019-02-14 | 2019-05-21 | 百盛联合集团有限公司 | A kind of steel structure column lower margin bolt integral built-in construction and its construction method |
| CN109778896B (en) * | 2019-02-14 | 2024-01-30 | 百盛联合集团有限公司 | Construction method for integral pre-buried structure of foundation bolt of steel structure column |
| CN110359693A (en) * | 2019-06-24 | 2019-10-22 | 中国五冶集团有限公司 | A kind of boat scaffold structure |
| CN110359693B (en) * | 2019-06-24 | 2024-04-09 | 中国五冶集团有限公司 | Suspension type scaffold structure |
| CN111305543A (en) * | 2020-03-04 | 2020-06-19 | 中国十七冶集团有限公司 | Disposable outer wall scaffold erecting and fixing technology |
| CN113585715A (en) * | 2021-08-17 | 2021-11-02 | 中国五冶集团有限公司 | Structure and construction method of bolt type connecting piece |
| CN113605677A (en) * | 2021-09-02 | 2021-11-05 | 重庆万力新材料有限公司 | Wall connecting piece for building construction and use method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205400024U (en) | Instrument formula external scaffolding bolt that can dismantle used repeatedly links wall spare | |
| CN202125073U (en) | Turnover bottom clip bolt for combined beam column template | |
| CN110735841A (en) | A T-shaped unilateral bolt fastener and using method | |
| CN210140986U (en) | A kind of embedded part of scaffold steel attached wall and its matching connecting part | |
| CN203795825U (en) | Scaffold and wall connector and scaffold and wall connecting structure | |
| CN211647260U (en) | Can dismantle fastening type even wall spare | |
| CN211114842U (en) | Repeatedly usable's split bolt | |
| CN209799022U (en) | semicircular bolt clamping ring component | |
| CN208966008U (en) | A kind of reusable exterior wall steel pipe scaffold wall-connecting piece device | |
| CN112681717A (en) | Novel embedded type building external scaffold wall connecting device and construction method thereof | |
| CN204139570U (en) | Detachable cantilever steel beam pre-embedded fixing device with horizontal fixing components | |
| CN216892870U (en) | Reinforced concrete structure composite anchoring device | |
| CN204059967U (en) | Fixed building template taper split bolt assembly | |
| CN203499017U (en) | Wall tie bar pre-embedded positioning device | |
| CN214575601U (en) | Outer scaffold is wall spare even | |
| CN206607880U (en) | A kind of unidirectional detachable split bolt | |
| CN110017022A (en) | A kind of template accurate limiting device and mold method | |
| CN201103240Y (en) | Expansion type drawknot screw | |
| CN214575462U (en) | A device for tie-down of double-row protective frame outside the basement of a construction project | |
| CN205669308U (en) | A kind of wall-connecting piece without cutting | |
| CN204960322U (en) | Water -stopping screw rod | |
| CN209179465U (en) | To pull-up screw rod wall-connecting piece | |
| CN102720353A (en) | Post-construction one-side shear wall formwork for settlement joint of tower and construction method | |
| CN220828027U (en) | Wall-penetrating wall connecting piece | |
| CN201152014Y (en) | Scaffolding connector |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A detachable and reusable tool type external scaffolding bolt wall connecting component Granted publication date: 20160727 Pledgee: Guangxi Beibu Gulf Bank Co.,Ltd. Yulin Branch Pledgor: GUANGXI DAYE CONSTRUCTION GROUP Co.,Ltd. Registration number: Y2024980051245 |