A kind of sleet canopy of packaged type for above foundation pit Download PDFInfo
- Publication number
- CN207260616U CN207260616U CN201720779418.6U CN201720779418U CN207260616U CN 207260616 U CN207260616 U CN 207260616U CN 201720779418 U CN201720779418 U CN 201720779418U CN 207260616 U CN207260616 U CN 207260616U
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- door cabinet
- cabinet frame
- canopy
- sleet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 description 17
- 230000000694 effects Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
Landscapes
- Gates (AREA)
Abstract
The utility model discloses a kind of sleet canopy of the packaged type for above foundation pit, including the slideway being fixed in foundation pit Guan Liang and the scalable canopy body being arranged on the slideway, the scalable canopy body includes multiple door cabinet frames being set up in parallel, connected between two adjacent door cabinet frame sidepieces by an expansion bracket, the expansion bracket is equipped with two telescopic rods in " X " type arrangement, two telescopic rods are connected in intersection using hinge axis I, the upper end of the telescopic rod and the door cabinet frame sidepiece are affixed, the lower end of the telescopic rod is connected by hinge axis II with sliding sleeve, the sliding sleeve is sleeved on the door cabinet frame sidepiece, at the top of all door cabinet frames covered with paulin, the roller being arranged in the slideway is mounted in the bottom of each door cabinet frame.The utility model can ensure that the speed of application of outdoor foundation pit influences from the influence of sleety weather, concrete curing quality from sleety weather.
Description
Technical field
A kind of sleet canopy is the utility model is related to, the sleet canopy of particularly a kind of packaged type for above foundation pit.
Background technology
China's economy developed rapidly in recent years, and urban rail transit construction is unfolded in big and medium-sized cities in succession.Metro station excavation is mostly
Outdoor foundation pit, after excavation of foundation pit, the construction of agent structure steel bar template and concrete pouring construction are influenced be subject to weather in foundation pit.
When summer rains or winter snows, the construction in foundation pit will be terminated, and largely have impact on project progress.Also exist
During maintenance after concreting, if running into sleet, the quality of concrete curing will also decrease.So how to reduce sleet
Weather is to a problem that the adverse effect of the outdoor foundation pit construction progress of subway and construction quality is in metro station construction.
The content of the invention
The utility model provides a kind of for removable above foundation pit for technical problem present in solution known technology
The sleet canopy of dynamic formula, the sleet canopy can avoid unfavorable shadow of the sleety weather to the outdoor foundation pit construction progress of subway and construction quality
Ring.
The utility model is adopted the technical scheme that to solve technical problem present in known technology:One kind is used for base
Cheat top packaged type sleet canopy, including the slideway being fixed in foundation pit Guan Liang and be arranged on it is scalable on the slideway
Canopy body, the scalable canopy body include multiple door cabinet frames being set up in parallel, pass through one between adjacent two door cabinet frame sidepieces
Expansion bracket connects, and the expansion bracket is equipped with two telescopic rods in " X " type arrangement, and two telescopic rods are used in intersection and cut with scissors
Chain rivet I connects, and the upper end of the telescopic rod and the door cabinet frame sidepiece are affixed, and the lower end of the telescopic rod passes through II He of hinge axis
Sliding sleeve connects, and the sliding sleeve is sleeved on the door cabinet frame sidepiece, at the top of all door cabinet frames covered with paulin,
The roller being arranged in the slideway is mounted in the bottom of each door cabinet frame.
The scalable canopy body is equipped with postive stop baffle, and the postive stop baffle is fixed in the slideway.
The door cabinet frame is using made of zinc-plated square tube.
The telescopic rod is using made of zinc-plated square tube.
The utility model has the advantages and positive effects of:It is capable of the removable of rain and snow by installing one on slideway
Scalable canopy body is moved, when running into sleety weather, canopy body can be conveniently moved to the construction section expansion of foundation pit, ensured outdoor
The speed of application of foundation pit from sleety weather influence, concrete curing quality from sleety weather influence, improve construction effect
Rate, ensure that construction quality.
Brief description of the drawings
Fig. 1 is the expansion plan of the utility model;
Fig. 2 is the contraction plan of the utility model;
Fig. 3 is the side elevational view of the utility model;
Fig. 4 is the preceding elevation of the utility model;
Fig. 5 is the door cabinet frame and expansion bracket connecting node drawing of the utility model.
In figure:1st, door cabinet frame;2nd, telescopic rod;3rd, paulin;4th, roller;5th, slideway;6th, foundation pit Guan Liang;7th, hinge axis I;
8th, postive stop baffle;9th, hinge axis II;10th, sliding sleeve.
Embodiment
For that can further appreciate that the invention, features and effects of the utility model, the following examples are hereby given, and coordinates
Attached drawing describes in detail as follows:
~Fig. 5, a kind of sleet canopy of packaged type for above foundation pit are please referred to Fig.1, including is fixed on foundation pit Guan Liang 6
On slideway 5 and the scalable canopy body that is arranged on the slideway 5, the scalable canopy body include multiple door words being set up in parallel
Frame 1, is connected by an expansion bracket between adjacent two door cabinet frame sidepieces, and the expansion bracket is equipped with two and is arranged in " X " type
Telescopic rod 2, two telescopic rods 2 are connected in intersection using hinge axis I 7, the upper end of the telescopic rod 2 and the door word
Frame sidepiece is affixed, and the lower end of the telescopic rod 2 is connected by hinge axis II 9 and sliding sleeve 10, and the sliding sleeve 10 is sleeved on the door
On cabinet frame sidepiece, at the top of all door cabinet frames 1 covered with paulin 3, pacify in the bottom of each door cabinet frame 1
Equipped with the roller 4 being arranged in the slideway 5.
In the present embodiment, the scalable canopy body is equipped with postive stop baffle 8, and the postive stop baffle 8 is fixed on the slideway 5
It is interior.The door cabinet frame 1 is using made of zinc-plated square tube.The telescopic rod 2 is using made of zinc-plated square tube.
In foundation pit during main structure construction, usually first pack up scalable canopy body and move foundation pit side to.If during construction
Sleety weather is run into, scalable canopy body is unfolded, and is moved to the construction section of hot work in progress, sleet can be blocked, is ensured in foundation pit
Steel bar template engineering and concreting normal construction.If catching up with sleety weather during concrete curing, it is deployable can
Flexible canopy body, and the construction section of concrete curing is moved to, ensure concrete curing quality.
Although the preferred embodiment of the utility model is described above in conjunction with attached drawing, the utility model is not
Above-mentioned embodiment is confined to, above-mentioned embodiment is only schematical, is not restricted, ability
The those of ordinary skill in domain is not departing from the utility model aims and claimed under the enlightenment of the utility model
In the case of scope, many forms can also be made, these are belonged within the scope of protection of the utility model.
Claims (4)
1. the sleet canopy of a kind of packaged type for above foundation pit, it is characterised in that including the cunning being fixed in foundation pit Guan Liang
Road and the scalable canopy body being arranged on the slideway, the scalable canopy body includes multiple door cabinet frames being set up in parallel, adjacent
Two door cabinet frame sidepieces between connected by expansion bracket, the expansion bracket is equipped with two telescopic rods in " X " type arrangement,
Two telescopic rods are connected in intersection using hinge axis I, and the upper end of the telescopic rod and the door cabinet frame sidepiece are affixed, institute
The lower end for stating telescopic rod is connected by hinge axis II with sliding sleeve, and the sliding sleeve is sleeved on the door cabinet frame sidepiece, in all institutes
The top of a cabinet frame is stated covered with paulin, is mounted on being arranged in the slideway in the bottom of each door cabinet frame
Roller.
2. the sleet canopy of the packaged type according to claim 1 for above foundation pit, it is characterised in that described scalable
Canopy body is equipped with postive stop baffle, and the postive stop baffle is fixed in the slideway.
3. the sleet canopy of the packaged type according to claim 1 for above foundation pit, it is characterised in that the door cabinet frame
It is using made of zinc-plated square tube.
4. the sleet canopy of the packaged type according to claim 1 for above foundation pit, it is characterised in that the telescopic rod
It is using made of zinc-plated square tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720779418.6U CN207260616U (en) | 2017-06-30 | 2017-06-30 | A kind of sleet canopy of packaged type for above foundation pit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720779418.6U CN207260616U (en) | 2017-06-30 | 2017-06-30 | A kind of sleet canopy of packaged type for above foundation pit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207260616U true CN207260616U (en) | 2018-04-20 |
Family
ID=61926217
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720779418.6U Expired - Fee Related CN207260616U (en) | 2017-06-30 | 2017-06-30 | A kind of sleet canopy of packaged type for above foundation pit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207260616U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109972848A (en) * | 2019-04-11 | 2019-07-05 | 中铁二十二局集团轨道工程有限公司 | It is a kind of for closing the collapsible automatic telescopic awning and its construction method of subway |
CN110359462A (en) * | 2019-07-25 | 2019-10-22 | 中化明达(福建)地质勘测有限公司 | A kind of deep basal pit rain-baffling device |
CN110700685A (en) * | 2019-09-27 | 2020-01-17 | 中国华冶科工集团有限公司 | Foundation pit sun shading device and construction method thereof |
CN114108472A (en) * | 2021-11-02 | 2022-03-01 | 江苏省交通工程集团有限公司 | Rainproof construction method and device for pouring concrete of bridge |
-
2017
- 2017-06-30 CN CN201720779418.6U patent/CN207260616U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109972848A (en) * | 2019-04-11 | 2019-07-05 | 中铁二十二局集团轨道工程有限公司 | It is a kind of for closing the collapsible automatic telescopic awning and its construction method of subway |
CN110359462A (en) * | 2019-07-25 | 2019-10-22 | 中化明达(福建)地质勘测有限公司 | A kind of deep basal pit rain-baffling device |
CN110700685A (en) * | 2019-09-27 | 2020-01-17 | 中国华冶科工集团有限公司 | Foundation pit sun shading device and construction method thereof |
CN114108472A (en) * | 2021-11-02 | 2022-03-01 | 江苏省交通工程集团有限公司 | Rainproof construction method and device for pouring concrete of bridge |
CN114108472B (en) * | 2021-11-02 | 2024-02-27 | 江苏省交通工程集团有限公司 | Bridge concrete pouring rainproof construction method and device thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207260616U (en) | A kind of sleet canopy of packaged type for above foundation pit | |
CN207277982U (en) | A kind of construction protective fence | |
CN206784583U (en) | The foldable balcony of wall and fabricated structure | |
CN102991401B (en) | High Altitude Emergency sets up the special-purpose vehicle of highway crossing wire facility | |
CN208347445U (en) | The protective device of civic building maintenance | |
CN201236319Y (en) | Apparatus for maintaining inclined molding edge joist dual-purpose bridge for road and railway | |
CN206769761U (en) | Axle chain type shutter door | |
CN106836785A (en) | Possesses the scaffold of rotary work ability | |
CN207701162U (en) | A kind of collapsible air door for coal mine down-hole tunnel | |
CN203998606U (en) | Bridge Erector hoisting overhead travelling crane is from turning round levelling gear | |
CN208294041U (en) | One kind being used for side slope construction Integral foldable scaffold | |
CN206581513U (en) | A kind of glass curtain wall awning | |
CN206052560U (en) | A kind of protection hanging canopy for bridge span construction of the highway | |
CN211172392U (en) | Steel construction skirt house device that can stretch out and draw back automatically | |
CN204684492U (en) | Steel wire rope self-locking device | |
CN213709604U (en) | Novel public road bridge roof beam foundation pile is consolidated device | |
CN207934355U (en) | A kind of underground commercial center entrance awning | |
CN209066661U (en) | A kind of curtain wall shock bracket | |
CN206928287U (en) | A kind of horizontal rail drilling piling machine of more piece | |
CN207004172U (en) | A kind of provisional guard rail of construction engineering quality detection | |
CN205565513U (en) | Overhead ground wire galloping | |
CN103938716B (en) | A kind of vestibule | |
CN206969430U (en) | A kind of building waste pond | |
CN205976513U (en) | Building construction protection platform | |
CN205875766U (en) | Regularization roofing protective structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180420 |
|
CF01 | Termination of patent right due to non-payment of annual fee |