CN206052560U - A kind of protection hanging canopy for bridge span construction of the highway - Google Patents

A kind of protection hanging canopy for bridge span construction of the highway Download PDF

Info

Publication number
CN206052560U
CN206052560U CN201620968389.3U CN201620968389U CN206052560U CN 206052560 U CN206052560 U CN 206052560U CN 201620968389 U CN201620968389 U CN 201620968389U CN 206052560 U CN206052560 U CN 206052560U
Authority
CN
China
Prior art keywords
suspension rod
bridge
longitudinal
highway
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620968389.3U
Other languages
Chinese (zh)
Inventor
王南海
巩汉峰
刘志远
张汉武
张建
徐利
易敏
任富芝
巩汉波
刘倩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201620968389.3U priority Critical patent/CN206052560U/en
Application granted granted Critical
Publication of CN206052560U publication Critical patent/CN206052560U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses longitudinal suspension rod group in a kind of protection hanging canopy for bridge span construction of the highway, including two bridge side longitudinal direction suspension rod groups and multiple bridges;Connect the operating platform structure of a horizontal plane inner sealing in two longitudinal suspension rod groups and multiple bridges under longitudinal suspension rod group, the guardrail structure being each formed with above two longitudinal suspension rod groups on bridge floor, is abound with Dense mesh screen on guardrail structure and two bridge sides longitudinal direction suspension rod group.The operating platform structure closed in the horizontal plane is hung using suspension rod and is located at bridge bottom formation protection hanging canopy by this utility model, can effectively prevent the debris that drop in construction Zhong Xiang highways, it is ensured that construction of the highway safety;It is not take up highway driving road, it can be ensured that highway driving safety;Easy construction, construction speed are fast, short construction period;Without setting up support, material requested is few, low cost.In sum, economic benefit of the present utility model and social benefit are notable.

Description

A kind of protection hanging canopy for bridge span construction of the highway
Technical field
This utility model is related to a kind of preventer for engineering construction, particularly a kind of to be used for bridge span construction of the highway Protection hanging canopy.
Background technology
With flourishing for highway in China building cause, the construction of bridge is more and more, and engineering-environment becomes increasingly complex, The bridge that crossing highway is arranged is more and more.Generally the superstructure of this bridge adopts prefabricated PC concrete box girder, When wet joint, wet seam and anticollision barrier are constructed between the beam of box beam crossing highway part, have the debris such as welding slag and drop, and Highway can not be broken off a friendship, and vehicle flowrate is big, and speed is fast, therefore, above-mentioned bridge construction operation can bring great safety to highway driving Hidden danger.
The traffic safety for how ensureing highway in construction is the big of wet joint between beam, wet seam and anticollision barrier construction Key issue.Conventional measure is protection canopy at present.But due to protection canopy long construction period, highway driving road is taken, and Set up on highway for a long time protection canopy and take highway there is potential safety hazard in itself, along with protection canopy material requested it is many, Cost is high, therefore the economic benefit and social benefit of protection canopy are unsatisfactory.
The content of the invention
This utility model provides a kind of for bridge span construction of the highway to solve technical problem present in known technology Protection hanging canopy, the protection hanging canopy is not take up highway driving road, and easy construction, short construction period, low cost.
This utility model is adopted the technical scheme that by solving technical problem present in known technology:It is a kind of to be used for bridge Longitudinal suspension rod group in the protection hanging canopy of girder span construction of the highway, including two bridge side longitudinal direction suspension rod groups and multiple bridges;Two described vertical Bridge both sides are separately positioned on to suspension rod group, each described longitudinal suspension rod group is made up of many suspension rods I, the suspension rod I Upper end is locked on the outer end of square steel using nut I, and the inner of the square steel is affixed with the outer flange plate of bridge side box beam;Described The guardrail upright pole affixed with which is provided with above the outer end of square steel, the rail horizontal rod affixed with which is provided with the guardrail upright pole, Dense mesh screen has been abound with the rail horizontal rod, the guardrail upright pole and the suspension rod I;Longitudinally hang in the bridge of both sides Bar group is made up of many suspension rods II, and the suspension rod II is through the corrugated tube I being embedded on the outer flange plate of bridge side box beam, described The upper end of suspension rod II is locked on the outer flange plate and the square steel thereon of bridge side box beam using nut II;Positioned at the institute at middle part In stating bridge, longitudinal suspension rod group is made up of many suspension rods III, and the suspension rod III is through the corrugated tube being embedded on box beam flange plate II and it is fixed on box beam flange plate;Annulus is equipped with the bottom of the suspension rod I, the suspension rod II and the suspension rod III, institute The centrage for stating annulus is longitudinally disposed;Horizontally disposed longitudinal steel pipe is fitted with the annulus, in longitudinal steel pipe On be laid with spaced many horizontal steel pipes, be laid with wooden springboard on the horizontal steel pipe, it is full on the wooden springboard It is furnished with galvanized iron sheet.
Perpendicular hook is provided with the upper end of the suspension rod III, the corrugated tube II is flat bellows.
Diagonal brace I is provided between the square steel and the horizontal steel pipe, is provided between the horizontal steel pipe and box beam tiltedly Support II.
This utility model has the advantages and positive effects that:The operating platform closed in the horizontal plane is tied using suspension rod Structure hangs and is located at bridge bottom formation protection hanging canopy, can effectively prevent the debris that drop in construction Zhong Xiang highways, it is ensured that construction of the highway Safety;It is not take up highway driving road, it can be ensured that highway driving safety;Easy construction, construction speed are fast, short construction period; Without setting up support, material requested is few, low cost.In sum, economic benefit of the present utility model and social benefit are notable.
Description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is I structural representation of suspension rod of the present utility model;
Fig. 3 is III structural representation of suspension rod of the present utility model II and suspension rod.
In figure:1st, suspension rod I;2nd, guardrail upright pole;3rd, rail horizontal rod;4th, square steel;5th, suspension rod II;6th, suspension rod III;7th, longitudinal steel Pipe;8th, horizontal steel pipe;9th, wooden springboard;10th, diagonal brace I;11st, diagonal brace II;12nd, link up with.
Specific embodiment
For the content of the invention of the present utility model, feature and effect can be further appreciated that, following examples are hereby enumerated, and is coordinated Accompanying drawing describes in detail as follows:
Refer to Fig. 1~Fig. 3, a kind of protection hanging canopy for bridge span construction of the highway, including two bridge sides longitudinal direction suspension rod Longitudinal suspension rod group in group and multiple bridges.
Two longitudinal suspension rod groups are separately positioned on bridge both sides, and each described longitudinal suspension rod group is by many suspension rods I 1 Composition, the upper end of the suspension rod I 1 is locked on the outer end of square steel 4 using nut I, the inner and the bridge side box beam of the square steel 4 Outer flange plate it is affixed, the guardrail upright pole 2 affixed with which is provided with above the outer end of the square steel 4, on the guardrail upright pole 2 The rail horizontal rod 3 affixed with which is provided with, and close mesh has been abound with the rail horizontal rod 3, the guardrail upright pole 2 and the suspension rod I 1 Net.
In the bridge of both sides, longitudinal suspension rod group is made up of many suspension rods II 5, and the suspension rod II 5 passes through pre-buried Corrugated tube I on the outer flange plate of bridge side box beam, the upper end of the suspension rod II 5 is locked at the outer wing of bridge side box beam using nut II On listrium and the square steel 4 thereon.
In the bridge at middle part, longitudinal suspension rod group is made up of many suspension rods III 6, and the suspension rod III 6 passes through pre-buried Corrugated tube II on box beam flange plate is simultaneously fixed on box beam flange plate.
Annulus, the center of the annulus are equipped with the bottom of the suspension rod I 1, the suspension rod II 5 and the suspension rod III 6 Line is longitudinally disposed;Horizontally disposed longitudinal steel pipe 7 is fitted with the annulus, between being laid with longitudinal steel pipe 7 Every many horizontal steel pipes 8 for arranging, wooden springboard 9 is laid with the horizontal steel pipe 8, has been abound with plating on the wooden springboard 9 Zinc-iron skin.
In the present embodiment, perpendicular hook 12 is provided with the upper end of the suspension rod III 6, the corrugated tube II is flat Shape corrugated tube, is easy to the dismounting of the suspension rod III 6.In order to strengthen the stability in the large of protection hanging canopy, in the square steel 4 and described Laterally diagonal brace I 10 is provided between steel pipe 8, between the horizontal steel pipe 8 and box beam be provided with diagonal brace II 11.
Before setting a roof beam in place, the suspension rod II 5 and the suspension rod III 6 just can all in box beam, and in annulus Longitudinal steel pipe 7 is penetrated, site operation progress is fast.
Although being described to preferred embodiment of the present utility model above in conjunction with accompanying drawing, this utility model is not Above-mentioned specific embodiment is confined to, above-mentioned specific embodiment is only schematic, is not restricted, ability The those of ordinary skill in domain under enlightenment of the present utility model, without departing from this utility model objective and claimed In the case of scope, many forms can also be made, these are belonged within protection domain of the present utility model.

Claims (3)

1. a kind of protection hanging canopy for bridge span construction of the highway, it is characterised in that including two bridge sides longitudinal direction suspension rod groups and many Longitudinal suspension rod group in individual bridge;
Two longitudinal suspension rod groups are separately positioned on bridge both sides, and each described longitudinal suspension rod group is made up of many suspension rods I , the upper end of the suspension rod I is locked on the outer end of square steel using nut I, the inner of the square steel and the outer wing of bridge side box beam Listrium is affixed;The guardrail upright pole affixed with which is provided with above the outer end of the square steel, is provided with and which on the guardrail upright pole Affixed rail horizontal rod, has been abound with Dense mesh screen on the rail horizontal rod, the guardrail upright pole and the suspension rod I;
In the bridge of both sides, longitudinal suspension rod group is made up of many suspension rods II, and the suspension rod II is passed through and is embedded in bridge side Corrugated tube I on the outer flange plate of box beam, the upper end of the suspension rod II using nut II be locked at bridge side box beam outer flange plate and On the square steel thereon;
In the bridge at middle part, longitudinal suspension rod group is made up of many suspension rods III, and the suspension rod III is passed through and is embedded in box beam Corrugated tube II on flange plate is simultaneously fixed on box beam flange plate;
Annulus is equipped with the bottom of the suspension rod I, the suspension rod II and the suspension rod III, the centrage of the annulus is along longitudinal direction Arrange;Horizontally disposed longitudinal steel pipe is fitted with the annulus, is laid with longitudinal steel pipe spaced many The horizontal steel pipe of root, is laid with wooden springboard on the horizontal steel pipe, on the wooden springboard has been abound with galvanized iron sheet.
2. the protection hanging canopy for bridge span construction of the highway according to claim 1, it is characterised in that in the suspension rod III Upper end be provided with perpendicular hook, the corrugated tube II is flat bellows.
3. the protection hanging canopy for bridge span construction of the highway according to claim 1, it is characterised in that in the square steel and Diagonal brace I is provided between the horizontal steel pipe, diagonal brace II is provided between the horizontal steel pipe and box beam.
CN201620968389.3U 2016-08-27 2016-08-27 A kind of protection hanging canopy for bridge span construction of the highway Expired - Fee Related CN206052560U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620968389.3U CN206052560U (en) 2016-08-27 2016-08-27 A kind of protection hanging canopy for bridge span construction of the highway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620968389.3U CN206052560U (en) 2016-08-27 2016-08-27 A kind of protection hanging canopy for bridge span construction of the highway

Publications (1)

Publication Number Publication Date
CN206052560U true CN206052560U (en) 2017-03-29

Family

ID=58382814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620968389.3U Expired - Fee Related CN206052560U (en) 2016-08-27 2016-08-27 A kind of protection hanging canopy for bridge span construction of the highway

Country Status (1)

Country Link
CN (1) CN206052560U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441247A (en) * 2020-03-23 2020-07-24 中建四局第六建设有限公司 Device for preventing sundries from falling during construction of wet joints and transverse partition plates of bridge
CN113202029A (en) * 2021-04-13 2021-08-03 中铁六局集团有限公司 Construction method for protecting wet joint of bridge and bottom of cross diaphragm plate in upward crossing business line

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111441247A (en) * 2020-03-23 2020-07-24 中建四局第六建设有限公司 Device for preventing sundries from falling during construction of wet joints and transverse partition plates of bridge
CN113202029A (en) * 2021-04-13 2021-08-03 中铁六局集团有限公司 Construction method for protecting wet joint of bridge and bottom of cross diaphragm plate in upward crossing business line

Similar Documents

Publication Publication Date Title
CN201221206Y (en) Movable anti-electricity protection shed rack
CN106978777B (en) A kind of make-shift bridge device
CN106193568A (en) Mobile steel truss operating platform
CN206752843U (en) A kind of combination beam for exempting from fireproof coating
CN103866696A (en) Cast-in-situ support of long-cantilever zero segment of short-pylon cable-stayed bridge
CN102220741B (en) Steel-concrete composite girder construction technology striding current lines and being parallel to existing lines
CN206052560U (en) A kind of protection hanging canopy for bridge span construction of the highway
CN108004931B (en) Using the method for mixing drag-line construction steel reinforced concrete combination beam
CN206873495U (en) A kind of Portable piping lane side wall formwork jumbo
CN101122115B (en) Construction method for tower crane shift
CN209456892U (en) Cable-stayed bridge steel overhangs structure of sidewalk
CN205934735U (en) A operation platform for stretch -draw of cantilever bent cap
CN202611714U (en) Tunnel assembly type construction trolley without welding
CN206986640U (en) A kind of travelling bridge device for being used for track slab pavement and removing
CN203257074U (en) Operation platform of elevator shaft
CN205369866U (en) Assembled steel ladder
CN205474862U (en) Wet seam template operation platform of portable case roof beam
CN205329550U (en) Suspension bridge catwalk system
CN209339019U (en) A kind of anti-wind and snow Lang Peng of steel and concrete structure
CN206887644U (en) A kind of medium-and low-speed maglev single line beam job platform and edge protection device
CN204491837U (en) Suspension type high-strength steel bar lifting module
CN208472473U (en) A kind of suspension type monorail and highway bridge build structure jointly
CN106906756B (en) Can Fast Installation remove maintenance operation platform and its construction method
CN107217685A (en) A kind of Portable piping lane side wall formwork jumbo
CN204589817U (en) A kind of reinforcing mat posture fence operation integrated apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170329

Termination date: 20210827